This list attempts to include all plants which generate coal power in Turkey including autoproducers. All coal-fired power stations which sent power to the grid in 2020 are listed below.[1] In 2018 there were 300 MW of unlicensed thermal power stations (a licence is not required if no power is sent to the grid) but it is not known whether any of them were coal-fired.[2][3][4]

Coal-fired power stations Edit

class=notpageimage|
Location of operational coal-fired power stations larger than 50 megawatts in Turkey
Station Operational Capacity (MWe) Generation to grid in 2019 (GWh)[note 1][note 2] Capacity factor in 2019 (%)[note 3] Province and District Construction or operational start year [note 4] Owner Type[8] Coal type Retirement Notes Ref

[note 5]

[note 6]

[12]

18 Mart Çan a.k.a. Çan 320 2134 76 Çanakkale

Çan

2003 EÜAŞ Subcritical Lignite Unknown [a][13]
Adapazarı Sugar Factory a.k.a. Ada Şeker a.k.a. Sakarya 10 13 Unknown as some electricity might have been used by the factory Sakarya

Adapazarı

2014 Adapazarı Sugar Unknown Lignite Unknown Captive power plant: no output to grid first half 2020 [b][14]
Afşin Elbistan A 1355 1899 16 Kahramanmaraş

Afşin

1984–1987 EÜAŞ Subcritical Lignite Unknown [c][15]
Afşin Elbistan B 1440 2773 22 Kahramanmaraş

Afşin

2004–2005 EÜAŞ Subcritical[16] Lignite Unknown [d][13]
Afyon Sugar Factory Cogeneration a.k.a. Afyon Şeker 15 0 Unknown as some electricity might have been used by the factory Afyonkarahisar

Afyonkarahisar

2018 Doğüş Food and Drink Unknown Unknown Unknown Captive power plant: no output to grid 2019 or first half 2020 [e]
Albayrak Balıkesir Cogeneration a.k.a. Albayrak TES 80
[17]
57 8 Balıkesir

Balıkesir

2019
[18]
Varaka Paper Unknown Imported[17] Unknown Averages 150 tons steam from 27 tons coal per hour[18] [f][17]
Atlas 1200 8502 81 Hatay

İskenderun

2014 Diler Holding via Atlas Enerji Supercritical Imported Unknown Diler is on the Global Coal Exit List.[19] [g]
Aynes Cogeneration a.k.a. Aynes Gıda 6 9 18 Denizli

Acıpayam

2014 Aynes Food Unknown Lignite Unknown [h]
Eti Maden Bandirma power station a.k.a. Bandırma Boron Factory a.k.a. Bandırma Boraks 36
[20]
53 17 Bandırma

Acıpayam

2014 ETİ Maden Unknown Lignite Unknown [i]
Bekirli-1 a.k.a. Biga a.k.a. İçdaş Çelik Enerji 405 3164 89 Çanakkale

Biga

2005 (unit 1), 2009 (units 2–3) İÇDAŞ Subcritical Imported Unknown [j]
Bekirli-2 a.k.a. Bekirli 1200 8658 82 Çanakkale

Biga

2011 (unit 1), 2015 (unit 2) İÇDAŞ Supercritical Imported Unknown [k]
Beypazarı ETİ Soda Cogeneration a.k.a. ETİ Soda 20
[17]
94 54 Ankara

Beypazarı

Unknown Ciner Group via ETİ Soda[17] Unknown Lignite[17] Unknown [l]
Bolluk a.k.a.

Alkim Konya

1
[21]
2 19 Konya

Cihanbeyli[21]

2014 Alkim Alkali Chemicals[21] Unknown Lignite[21] Unknown [m][21]
Bolu Göynük a.k.a. Aksa Göynuk TES 270 1964 83 Bolu

Göynük

2015 Kazancı Holding Subcritical fluidized bed Lignite Unknown Dusts air and ground.[22] Uses 1.8 million tons of lignite with a thermal value of 2,450 kcal/kg per year [n][23][24]
Cenal 1320 9167 79 Çanakkale

Biga

2017 Alarko Holding and Cengiz Holding via Cenal Elektrik Ultra-Supercritical Imported Bituminous Unknown Cenal is on the Global Coal Exit List.[25] [o]
Çan-2 330 1524 53 Çanakkale

Çan

2018 ODAŞ Group Lignite Unknown [p][21]
Çankırı Salt Factory Cogeneration

a.k.a.

Med-mar Sağlık

2 9 64 Çankırı

Çankırı

2014 Med-mar Unknown Lignite Unknown [q]
Çatalağzı

a.k.a. Yeni Çatalağzı

314 1494 54 Zonguldak

Kilimli

1979 (opening:1989) Aydem Enerji Subcritical Anthracite[26] Unknown [r][27]
Çayırhan 620 4312 79 Ankara

Nallıhan

1987–2000 Ciner Group Subcritical Lignite Unknown [s][13]
Çayırhan Sodium Sulphate Cogeneration a.k.a. Alkim Çayırhan 3 9 39 Ankara

Nallıhan

2014 Alkim Alkali Chemicals Unknown Unknown Unknown [t]
Çoban Yıldızı power stations a.k.a. Çumra Termik Santrali a.k.a. Çobanyıldızı (Cumra)[28] 37 35 11 Konya

Çumra

2015 Anadolu Birlik Holding via Konya Sugar (in Turkish) Unknown Lignite Unknown At Çumra Campus [u]
Çoban Yıldızı power stations a.k.a. Çumra[28] 24 35 Unknown as some electricity might have been used by the factory Konya

Çumra

2014 Anadolu Birlik Holding via Konya Sugar (in Turkish) Unknown Lignite Unknown Supplies both sugar factory and grid.[29] Claimed to be most environment friendly factory in Turkey.[30] [v]
Çolakoğlu a.k.a. Çolakoğlu-2 190 1191 72 Kocaeli

Gebze

2003 Çolakoğlu Metalurji Subcritical Bituminous Unknown [w]
Dazkırı Cogeneration

a.k.a.

Alkim Afyon

3 16 72 Afyonkarahisar Dazkırı 2014 Alkim Alkali Chemicals Unknown Lignite Unknown [x]
Göknur 2 0 Unknown as some electricity might have been used by the factory Niğde

Niğde

2014 Göknur Food Unknown Unknown Unknown Captive power plant: no output to grid 2019 or first half 2020 [y]
İsken Sugözü

a.k.a. Sugözu İsken

a.k.a. İskenderun

1320 7110 61 Adana

Yumurtalık

2003 OYAK Subcritical Hard coal[31] Anthracite[26] Unknown [z]
İzdemir 350 2484 81 İzmir

Aliağa

2014 İzdemir Enerji Supercritical Imported[32] Unknown [aa]
Kahramanmaraş Paper Factory 16 73 Unknown as some electricity might have been used by the factory Kahramanmaraş

Kahramanmaraş

2014 Kahramanmaraş Paper Unknown Imported Unknown [ab]
Kangal 457[33] 2588 65 Sivas

Kangal

1989 (Unit 1) 1990 (Unit 2) 2000 (Unit 3) Anadolu Birlik Holding via Konya Sugar (in Turkish) Subcritical Lignite Unknown On the Global Coal Exit List[34] [ac][13]
Kardemir a.k.a. Karabük 78 546 80 Kütahya

Karabük

Unknown Kardemir A.Ş. Unknown Hard coal Unknown May need update to meet 2020 standards[35][36] [ad]
Kemerköy 630 4128 75 Muğla

Gökova

1994 (units 1–2), 1995 (unit 3) Yeniköy Kemerköy Elektrik Subcritical Lignite Unknown [ae][13]
Kipaş Paper Factory 8 1 Unknown as some electricity might have been used by the factory Kahramanmaraş

Türkoğlu

2014 Kipaş Paper Unknown Imported Unknown [af]
Küçüker Cogeneration 5 34 Unknown as some electricity might have been used by the factory Denizli

Denizli

2014 Küçüker Textiles Unknown Lignite Unknown [ag]
Kütahya Sugar Factory 7 7 Unknown as some electricity might have been used by the factory Kütahya

Kütahya

2014 Kütahya Sugar factory Unknown Lignite Unknown [ah]
Orhaneli 210 1570 85 Bursa

Orhaneli

1992 Çelikler Holding Subcritical Lignite Unknown [ai][13]
Petlas Tyres 6 0 Unknown as some electricity might have been used by the factory Kırşehir

Kirşehir

2014 Petlas Tyres Unknown Unknown Unknown Captive power plant: no output to grid 2019 or first half 2020 [aj]
Polat a.k.a. Polat-1 51 132 30 Kütahya

Tavşanlı

2013 Polatyol Circulating fluidized bed Lignite Unknown [ak]
Seydişehir a.k.a. ETİ Alüminyum 14 33 27 Konya

Seydişehir

2014 ETİ Aluminium Unknown Lignite Unknown [al]
Seyitömer 600 3968 75 Kütahya Kütahya 1973–1989 Çelikler Holding Subcritical Lignite Unknown [am][13][15]
Soma Kolin 510 2527 57 Manisa

Soma

2019 Kolin Group Circulating fluidized bed Lignite Unknown The environmental impact assessment does not mention greenhouse gas (sera gaz) emissions.[37] [an][17]
Soma

a.k.a. Soma A

44 0 Unknown as some electricity might have been used for other purposes Manisa

Soma

1957[38] EÜAŞ Unknown Lignite Unknown No output to grid 2019 or first half 2020 [ao]
Soma B a.k.a. Soma 660 5059 Unknown as the steam is also used for residential heating Manisa

Soma

1981–1992 Anadolu Birlik Holding via Konya Sugar (in Turkish) Subcritical Lignite Unknown Of the six 165 MW units, 2 units are shut down and 4 units operating under temporary license.[39] Steam from the power station is used for residential heating in the winter.[40] [ap]
Şırnak Silopi a.k.a. Silopi 405 2324 66 Şırnak

Silopi

2013 (unit 1), 2015 (units 2–3) Ciner Group Circulating fluidized bed Asphaltite Unknown May need update to meet 2020 standards[35][36] Although technically not coal the solid fuel is treated similarly by regulators so is included here. [aq][13]
Tufanbeyli 450 3283 83 Adana

Tufanbeyli

2016 Sabancı Holding via Enerjisa Circulating fluidized bed Lignite Unknown [ar]
Tunçbilek 365 Unknown Unknown Kütahya

Tavşanlı

1973 Çelikler Holding Subcritical Lignite Unknown Not listed on "real time generation" query so no generation figure shown [as][41]
Yatağan 630 3764 68 Muğla

Yatağan

1984 (units 1–2), 1986 (unit 3) Aydem Enerji Subcritical Lignite Unknown [at][42][13]
Yeniköy 420 2997 81 Muğla

Milas

1986–1987 Yeniköy Kemerköy Elektrik Subcritical Lignite Unknown [au][13]
ZETES-1 160 1141 81 Zonguldak

Zonguldak

2010 Eren Holding via Eren Enerji Circulating fluidized bed Bituminous Unknown Licensed as "Çatalağzı Termik" together with other ZETES [av]
ZETES-2 1230 8931 83 Zonguldak

Zonguldak

2010 Eren Holding via Eren Enerji Supercritical Bituminous Unknown Licensed as "Çatalağzı Termik" together with other ZETES [aw]
ZETES-3 1400 9212 75 Zonguldak

Zonguldak

2016 Eren Holding via Eren Enerji Supercritical Bituminous Unknown Licensed as "Çatalağzı Termik" together with other ZETES [ax]

See also Edit

Notes Edit

  1. ^ A graph of a power station's generation over a specified period of time can be seen on the Energy Exchange Istanbul (EXIST) transparency platform "Real-Time Generation" option, with the total above the graph.[5] Recent generation by unit can be seen on the "Final Daily Production Program" option by first entering the company name and then dropping down the list of unit names.[6] Even so some small power stations may not show on the platform if they do not sell to the grid (that is they are just autoproducers).
  2. ^ In 2018 coal-fired power stations gross generation was 113 terawatt hours (TWh), which was 37% of total gross generation.[7] The figures in the table below are net generation.
  3. ^ By routine calculations from the 2 columns to the left as described in Capacity factor#Sample calculations – note that there are 366 days in 2020
  4. ^ Where the construction year is not known, the start of the current EDPK operational license is shown – nevertheless there may have been "pre-licenses" before that.
  5. ^ Public information about a power station (e.g. Cenal) can be displayed from the Turkish Energy Market Regulatory Authority database as follows. Click the bracketed letter link in its cell below (e.g. [n]) and copy the license number (e.g. EÜ/4315-42/02574) into the "Lisans No." box on the query screen.[9] Tick "Ben robot değilim" (I am not a robot) and then press the "Sorgula" (query) button. Ignore the co-ordinates as they are garbage data. A translation of the column headers and drop down selection may be helpful.[10].
  6. ^ As of 2021 there is no web service for this at https://www.epdk.gov.tr/Detay/Icerik/21-35/web-servisleri so to attempt to list operational coal-fired power stations from the licence database enter: "Lisans Durumu"="Yürülükte" (license status=In force),"Tesis Türü"="Termik" (facility type=Thermal) and "Tesis Durumu"="İşletmede" (facility status=In business). Then tick "Ben robot değilim" (I am not a robot) and "Sorgula" (Query) which should list licensed, operational thermal power stations.[9] Click "Raporla" (Report) to download it. Repeat with "Tesis Durumu"="Kısmi İşletmede" (facility status=Partly in business). Using your spreadsheet software merge the 2 downloads, select "Yakıt Türü"="Kömür" (Fuel=Coal) OR "İthal Kömür" (Imported Coal) OR "Yerli Kömür" (Local Coal) OR "Yerli Asfaltit" (Local Asphaltite). Then sort by "Tesis Adı"(Facility Name). A translation of the column headers and drop down selection may be helpful. When copying the operational capacity into Wikipedia or Wikidata be sure to copy MWe which is the last power column.[11].
  1. ^ EÜ/101-44/020
  2. ^ EÜ/4969-177/2877
  3. ^ EÜ/8263-5/04139
  4. ^ EÜ/101-43/019
  5. ^ EÜ/8140-9/04101
  6. ^ EÜ/6660-5/03613
  7. ^ EÜ/1813-3/1274
  8. ^ EÜ/4969-230/2930
  9. ^ EÜ/4969-196/2896
  10. ^ EÜ/1435-26/1041
  11. ^ EÜ/1160-3/833
  12. ^ EÜ/4969-120/2820
  13. ^ EÜ/4969-2/2702
  14. ^ EÜ/3734-19/2290
  15. ^ EÜ/4315-42/02574
  16. ^ EÜ/6083-2/03428
  17. ^ EÜ/4969-240/2940
  18. ^ EÜ/5358-1/03178
  19. ^ EÜ/5088-4/03041
  20. ^ EÜ/4969-16/2716
  21. ^ EÜ/5603-8/03299
  22. ^ EÜ/4969-46/2746
  23. ^ EÜ/4969-33/2733
  24. ^ EÜ/4969-24/2724
  25. ^ EÜ/4969-153/2853
  26. ^ EÜ/8886-12/04341
  27. ^ EÜ/2116-8/1490
  28. ^ EÜ/4969-202/2902
  29. ^ EÜ/4537/02625
  30. ^ EÜ/4969-204/2904
  31. ^ EÜ/5358-2/03180
  32. ^ EÜ/4969-259/2959
  33. ^ EÜ/4969-211/2911
  34. ^ EÜ/4969-212/2912
  35. ^ EÜ/5642-3/03300
  36. ^ EÜ/4969-166/2866
  37. ^ EÜ/1866-11/1342
  38. ^ EÜ/4969-236/2936
  39. ^ EÜ/4447/02616
  40. ^ EÜ/5906-18/03394
  41. ^ EÜ/6604-3/03635
  42. ^ EÜ/5642-1/03298
  43. ^ EÜ/308-3/424
  44. ^ EÜ/298-1/415
  45. ^ EÜ/5642-4/03301
  46. ^ EÜ/5327/03164
  47. ^ EÜ/5358-3/03181
  48. ^ EÜ/369-1/479
  49. ^ EÜ/369-1/479
  50. ^ EÜ/369-1/479

References Edit

  1. ^ "Türkiye'de kaç tane termik santral var? Tüm termik santrallerin isimleri!" [How many thermal power plants are there in Turkey? Names of all thermal power plants!]. Haberler.com (in Turkish). 3 August 2021. Retrieved 27 November 2021.{{cite web}}: CS1 maint: url-status (link)
  2. ^ "12 Mayıs 2019 PAZAR". www.resmigazete.gov.tr. Retrieved 23 June 2020.
  3. ^ Önol, Boden Law Office-Ayşegül; Akalın, Değer Boden; Olğun, Şeyma. "Electricity generation and transmission in Turkey | Lexology". www.lexology.com. Retrieved 23 June 2020.
  4. ^ "Türkiye Elektrik Üretim-İletim İstatistikleri:Yillar İti̇bari̇yle Türki̇ye Kurulu Gücünün Üreti̇ci̇ Kuruluşlara Dağilimi" [Turkey electricity generation and transmission statistics:Distribution of Installed Capacity of Turkey by Year] (Yıllar İtibariyle Türkiye Kurulu Gücünün Üretici Kuruluşlara Dağılımı (2006-2018).xls).
  5. ^ Exist real time generation.
  6. ^ Exist daily generation.
  7. ^ "Coal". Ministry of Energy and Natural Resources (Turkey). Retrieved 19 April 2020.
  8. ^ "Global Coal Plant Tracker". Global Energy Monitor. from the original on 25 October 2019. Retrieved 4 January 2020.
  9. ^ a b "Elektrik Piyasası Üretim Lisansları" [Electricity Market Generation Licences]. lisans.epdk.gov.tr. Energy Market Regulatory Authority. from the original on 23 March 2019. Retrieved 23 March 2019.
  10. ^ "Google Translate". translate.google.com. Retrieved 10 June 2020.
  11. ^ "Google Translate". translate.google.com. Retrieved 10 June 2020.
  12. ^ "Enerji Yatırımları" [Energy Investments]. Enerji İşleri Genel Müdürlüğü. from the original on 5 October 2018. Retrieved 3 October 2019.
  13. ^ a b c d e f g h i j "Close Unfiltered Thermal Plants in Turkey During Coronavirus Outbreak". Bianet. 22 May 2020.
  14. ^ "Şeker Üretimi" [Sugar production]. www.adaseker.com.tr (in Turkish). Retrieved 5 June 2020.
  15. ^ a b "Coal-fired plants reopen: Engineers cast doubt on minister's statement that 'obligations fulfilled'". Bianet. 17 June 2020.
  16. ^ "Afsin Elbistan-B Coal Power Plant Turkey". globalenergyobservatory.org. from the original on 1 September 2019. Retrieved 31 January 2020.
  17. ^ a b c d e f g "2019 yılı enerji yatırımları" [2019 energy investments]. Enerji İşleri Genel Müdürlüğü.
  18. ^ a b "Dumansız fabrika için 14 milyon avro yatırdı" [14 million euros invested in smokeless factory]. Memurlar.Net (in Turkish). from the original on 31 January 2020. Retrieved 31 January 2020.
  19. ^ "Diler". coalexit.org. Retrieved 6 March 2020.
  20. ^ "ETİ Maden – Bandırma" [ETİ Mining – Bandırma] (in Turkish). Lagos Enerji. from the original on 15 February 2020. Retrieved 15 February 2020.
  21. ^ a b c d e f "2018 Yılı Enerji Yatırımları" [2018 Energy Investments]. Ministry of Energy and Natural Resources (Turkey).
  22. ^ Ercan, Özgen; Dinçer, Faruk; Sarı, Deniz; Ceylan, Özcan; Di̇nçer, Fatih Kemal (10 June 2020). "Determination of PM10 and deposited dust dispersion on the settlement areas from Aksa Göynük coal (lignite) fueled thermal power plant". Atmospheric Pollution Research. 11 (12): 2126–2132. doi:10.1016/j.apr.2020.05.025. ISSN 1309-1042. S2CID 225757367.
  23. ^ "Bolu Göynük Thermal Power Plant". www.aksaenerji.com.tr. Retrieved 20 June 2020.
  24. ^ Ercan, Özgen; Dinçer, Faruk; Sarı, Deniz; Ceylan, Özcan; Di̇nçer, Fatih Kemal (10 June 2020). "Determination of PM10 and deposited dust dispersion on the settlement areas from Aksa Göynük coal (lignite) fueled thermal power plant". Atmospheric Pollution Research. 11 (12): 2126–2132. doi:10.1016/j.apr.2020.05.025. ISSN 1309-1042. S2CID 225757367.
  25. ^ "Cenal". coalexit.org. Retrieved 6 March 2020.
  26. ^ a b "Infographic: Turkish coal-fired plant expansion stalls, with 70 GW shelved since 2009". S & P Global. 23 August 2019. from the original on 1 September 2019.
  27. ^ "Çatalağzı Termik Santrali yeniden çalışmaya başlıyor" [Çatalağzı thermal power plant starts working again]. Enerji Günlüğü (in Turkish). Retrieved 5 June 2020.
  28. ^ a b "Konya Şeker Coban Yildizi Thermal Powerplant". Konya Sugar. from the original on 20 August 2019. Retrieved 5 February 2020.
  29. ^ "Hakkımızda | Çoban Yıldızı Elektrik Üretim A.Ş." cobanyildizi.com.tr. from the original on 31 January 2020. Retrieved 31 January 2020.
  30. ^ "Konya Şeker Cumra Sugar Factory". www.konyaseker.com.tr. from the original on 3 August 2019. Retrieved 2 March 2020.
  31. ^ "İsken Sugözü Power Plant". Isken. Retrieved 11 June 2020.
  32. ^ "Teknik Özellikler" [Technical Details] (in Turkish). İzdemir Energy. from the original on 18 August 2019. Retrieved 31 January 2020.
  33. ^ "Kangal Termik Santrali 6 ay sonra yeniden tam kapasite olarak üretime başladı" [After 6 months Kangal once again started generating at full capacity]. Timeturk.com. Retrieved 4 June 2020.
  34. ^ "Kangal". coalexit.org. Retrieved 6 March 2020.
  35. ^ a b "Baskı sonuç verdi: Filtresiz termik santrallere izin çıkmadı" [Pressure brings result: No thermal power plants without filters allowed] (in Turkish). Deutsche Welle. 15 February 2019. from the original on 4 September 2019. Retrieved 4 September 2019.
  36. ^ a b "Filtresiz santraller tek tek mühürleniyor" [Stations without filters sealed one by one] (in Turkish). Sözcü. 1 January 2020. from the original on 1 January 2020. Retrieved 2 January 2020.
  37. ^ "Soma Kolin Termik Santrali ÇED" [Soma Kolin power station EIA]. eced.csb.gov.tr. from the original on 2 September 2019. Retrieved 8 February 2020.
  38. ^ "Soma-A Thermal Power Plant".
  39. ^ "Bakan Kurum: 5 Termik santral tamamen kapatıldı" [Ministry: 5 thermal power plants completely shut down] (in Turkish). Sabah. 1 January 2020. from the original on 2 January 2020. Retrieved 2 January 2020.
  40. ^ Direskeneli, Haluk (3 January 2020). "Enerji piyasalarında 2020 yılı öngörüleri" [Looking ahead to the 2020 energy market]. Enerji Günlüğü (in Turkish). Retrieved 4 January 2020.
  41. ^ "1st Power Plant | ENKA İnşaat ve Sanayi A.Ş." 28 February 1973. Retrieved 20 June 2020.
  42. ^ "Thermal Generation | Aydem Energy". Thermal Generation | Aydem Energy. Retrieved 31 May 2020.

Sources Edit

  • "Real-Time Generation". Exist Transparency Platform. Retrieved 10 June 2020.
  • "Final Daily Production Program". Exist Transparency Platform. Retrieved 10 June 2020.
  • Boom and Bust 2021: Tracking The Global Coal Plant Pipeline (Report). Global Energy Monitor. 5 April 2021.

See also Edit

External links Edit

list, active, coal, fired, power, stations, turkey, annual, capacity, payments, emissions, list, power, stations, turkey, also, climate, change, litigation, turkey, this, list, attempts, include, plants, which, generate, coal, power, turkey, including, autopro. For annual capacity payments and CO2 emissions see list of power stations in Turkey See also Climate change litigation Turkey This list attempts to include all plants which generate coal power in Turkey including autoproducers All coal fired power stations which sent power to the grid in 2020 are listed below 1 In 2018 there were 300 MW of unlicensed thermal power stations a licence is not required if no power is sent to the grid but it is not known whether any of them were coal fired 2 3 4 Contents 1 Coal fired power stations 2 See also 3 Notes 4 References 4 1 Sources 5 See also 6 External linksCoal fired power stations Edit 18 Mart Can Afsin Elbistan A Afsin Elbistan B Atlas Enerji Iskenderun Bolu Goynuk Cenal Can 2 Catalagzi Cayirhan Coban Yildizi Cumra Emba Hunutlu Gebze Colakoglu ICDAS Bekirli1 ICDAS Bekirli2 Isken Sugozu Izdemir Kangal Kemerkoy Orhaneli Polat Seyitomer Soma Soma Kolin Sirnak Silopi Tufanbeyli Tuncbilek Yatagan Yenikoy Yunus Emre ZETESclass notpageimage Location of operational coal fired power stations larger than 50 megawatts in Turkey Station Operational Capacity MWe Generation to grid in 2019 GWh note 1 note 2 Capacity factor in 2019 note 3 Province and District Construction or operational start year note 4 Owner Type 8 Coal type Retirement Notes Ref note 5 note 6 12 18 Mart Can a k a Can 320 2134 76 Canakkale Can 2003 EUAS Subcritical Lignite Unknown a 13 Adapazari Sugar Factory a k a Ada Seker a k a Sakarya 10 13 Unknown as some electricity might have been used by the factory Sakarya Adapazari 2014 Adapazari Sugar Unknown Lignite Unknown Captive power plant no output to grid first half 2020 b 14 Afsin Elbistan A 1355 1899 16 Kahramanmaras Afsin 1984 1987 EUAS Subcritical Lignite Unknown c 15 Afsin Elbistan B 1440 2773 22 Kahramanmaras Afsin 2004 2005 EUAS Subcritical 16 Lignite Unknown d 13 Afyon Sugar Factory Cogeneration a k a Afyon Seker 15 0 Unknown as some electricity might have been used by the factory Afyonkarahisar Afyonkarahisar 2018 Dogus Food and Drink Unknown Unknown Unknown Captive power plant no output to grid 2019 or first half 2020 e Albayrak Balikesir Cogeneration a k a Albayrak TES 80 17 57 8 Balikesir Balikesir 2019 18 Varaka Paper Unknown Imported 17 Unknown Averages 150 tons steam from 27 tons coal per hour 18 f 17 Atlas 1200 8502 81 Hatay Iskenderun 2014 Diler Holding via Atlas Enerji Supercritical Imported Unknown Diler is on the Global Coal Exit List 19 g Aynes Cogeneration a k a Aynes Gida 6 9 18 Denizli Acipayam 2014 Aynes Food Unknown Lignite Unknown h Eti Maden Bandirma power station a k a Bandirma Boron Factory a k a Bandirma Boraks 36 20 53 17 Bandirma Acipayam 2014 ETI Maden Unknown Lignite Unknown i Bekirli 1 a k a Biga a k a Icdas Celik Enerji 405 3164 89 Canakkale Biga 2005 unit 1 2009 units 2 3 ICDAS Subcritical Imported Unknown j Bekirli 2 a k a Bekirli 1200 8658 82 Canakkale Biga 2011 unit 1 2015 unit 2 ICDAS Supercritical Imported Unknown k Beypazari ETI Soda Cogeneration a k a ETI Soda 20 17 94 54 Ankara Beypazari Unknown Ciner Group via ETI Soda 17 Unknown Lignite 17 Unknown l Bolluk a k a Alkim Konya 1 21 2 19 Konya Cihanbeyli 21 2014 Alkim Alkali Chemicals 21 Unknown Lignite 21 Unknown m 21 Bolu Goynuk a k a Aksa Goynuk TES 270 1964 83 Bolu Goynuk 2015 Kazanci Holding Subcritical fluidized bed Lignite Unknown Dusts air and ground 22 Uses 1 8 million tons of lignite with a thermal value of 2 450 kcal kg per year n 23 24 Cenal 1320 9167 79 Canakkale Biga 2017 Alarko Holding and Cengiz Holding via Cenal Elektrik Ultra Supercritical Imported Bituminous Unknown Cenal is on the Global Coal Exit List 25 o Can 2 330 1524 53 Canakkale Can 2018 ODAS Group Lignite Unknown p 21 Cankiri Salt Factory Cogeneration a k a Med mar Saglik 2 9 64 Cankiri Cankiri 2014 Med mar Unknown Lignite Unknown q Catalagzi a k a Yeni Catalagzi 314 1494 54 Zonguldak Kilimli 1979 opening 1989 Aydem Enerji Subcritical Anthracite 26 Unknown r 27 Cayirhan 620 4312 79 Ankara Nallihan 1987 2000 Ciner Group Subcritical Lignite Unknown s 13 Cayirhan Sodium Sulphate Cogeneration a k a Alkim Cayirhan 3 9 39 Ankara Nallihan 2014 Alkim Alkali Chemicals Unknown Unknown Unknown t Coban Yildizi power stations a k a Cumra Termik Santrali a k a Cobanyildizi Cumra 28 37 35 11 Konya Cumra 2015 Anadolu Birlik Holding via Konya Sugar in Turkish Unknown Lignite Unknown At Cumra Campus u Coban Yildizi power stations a k a Cumra 28 24 35 Unknown as some electricity might have been used by the factory Konya Cumra 2014 Anadolu Birlik Holding via Konya Sugar in Turkish Unknown Lignite Unknown Supplies both sugar factory and grid 29 Claimed to be most environment friendly factory in Turkey 30 v Colakoglu a k a Colakoglu 2 190 1191 72 Kocaeli Gebze 2003 Colakoglu Metalurji Subcritical Bituminous Unknown w Dazkiri Cogeneration a k a Alkim Afyon 3 16 72 Afyonkarahisar Dazkiri 2014 Alkim Alkali Chemicals Unknown Lignite Unknown x Goknur 2 0 Unknown as some electricity might have been used by the factory Nigde Nigde 2014 Goknur Food Unknown Unknown Unknown Captive power plant no output to grid 2019 or first half 2020 y Isken Sugozu a k a Sugozu Iskena k a Iskenderun 1320 7110 61 Adana Yumurtalik 2003 OYAK Subcritical Hard coal 31 Anthracite 26 Unknown z Izdemir 350 2484 81 Izmir Aliaga 2014 Izdemir Enerji Supercritical Imported 32 Unknown aa Kahramanmaras Paper Factory 16 73 Unknown as some electricity might have been used by the factory Kahramanmaras Kahramanmaras 2014 Kahramanmaras Paper Unknown Imported Unknown ab Kangal 457 33 2588 65 Sivas Kangal 1989 Unit 1 1990 Unit 2 2000 Unit 3 Anadolu Birlik Holding via Konya Sugar in Turkish Subcritical Lignite Unknown On the Global Coal Exit List 34 ac 13 Kardemir a k a Karabuk 78 546 80 Kutahya Karabuk Unknown Kardemir A S Unknown Hard coal Unknown May need update to meet 2020 standards 35 36 ad Kemerkoy 630 4128 75 Mugla Gokova 1994 units 1 2 1995 unit 3 Yenikoy Kemerkoy Elektrik Subcritical Lignite Unknown ae 13 Kipas Paper Factory 8 1 Unknown as some electricity might have been used by the factory Kahramanmaras Turkoglu 2014 Kipas Paper Unknown Imported Unknown af Kucuker Cogeneration 5 34 Unknown as some electricity might have been used by the factory Denizli Denizli 2014 Kucuker Textiles Unknown Lignite Unknown ag Kutahya Sugar Factory 7 7 Unknown as some electricity might have been used by the factory Kutahya Kutahya 2014 Kutahya Sugar factory Unknown Lignite Unknown ah Orhaneli 210 1570 85 Bursa Orhaneli 1992 Celikler Holding Subcritical Lignite Unknown ai 13 Petlas Tyres 6 0 Unknown as some electricity might have been used by the factory Kirsehir Kirsehir 2014 Petlas Tyres Unknown Unknown Unknown Captive power plant no output to grid 2019 or first half 2020 aj Polat a k a Polat 1 51 132 30 Kutahya Tavsanli 2013 Polatyol Circulating fluidized bed Lignite Unknown ak Seydisehir a k a ETI Aluminyum 14 33 27 Konya Seydisehir 2014 ETI Aluminium Unknown Lignite Unknown al Seyitomer 600 3968 75 Kutahya Kutahya 1973 1989 Celikler Holding Subcritical Lignite Unknown am 13 15 Soma Kolin 510 2527 57 Manisa Soma 2019 Kolin Group Circulating fluidized bed Lignite Unknown The environmental impact assessment does not mention greenhouse gas sera gaz emissions 37 an 17 Soma a k a Soma A 44 0 Unknown as some electricity might have been used for other purposes Manisa Soma 1957 38 EUAS Unknown Lignite Unknown No output to grid 2019 or first half 2020 ao Soma B a k a Soma 660 5059 Unknown as the steam is also used for residential heating Manisa Soma 1981 1992 Anadolu Birlik Holding via Konya Sugar in Turkish Subcritical Lignite Unknown Of the six 165 MW units 2 units are shut down and 4 units operating under temporary license 39 Steam from the power station is used for residential heating in the winter 40 ap Sirnak Silopi a k a Silopi 405 2324 66 Sirnak Silopi 2013 unit 1 2015 units 2 3 Ciner Group Circulating fluidized bed Asphaltite Unknown May need update to meet 2020 standards 35 36 Although technically not coal the solid fuel is treated similarly by regulators so is included here aq 13 Tufanbeyli 450 3283 83 Adana Tufanbeyli 2016 Sabanci Holding via Enerjisa Circulating fluidized bed Lignite Unknown ar Tuncbilek 365 Unknown Unknown Kutahya Tavsanli 1973 Celikler Holding Subcritical Lignite Unknown Not listed on real time generation query so no generation figure shown as 41 Yatagan 630 3764 68 Mugla Yatagan 1984 units 1 2 1986 unit 3 Aydem Enerji Subcritical Lignite Unknown at 42 13 Yenikoy 420 2997 81 Mugla Milas 1986 1987 Yenikoy Kemerkoy Elektrik Subcritical Lignite Unknown au 13 ZETES 1 160 1141 81 Zonguldak Zonguldak 2010 Eren Holding via Eren Enerji Circulating fluidized bed Bituminous Unknown Licensed as Catalagzi Termik together with other ZETES av ZETES 2 1230 8931 83 Zonguldak Zonguldak 2010 Eren Holding via Eren Enerji Supercritical Bituminous Unknown Licensed as Catalagzi Termik together with other ZETES aw ZETES 3 1400 9212 75 Zonguldak Zonguldak 2016 Eren Holding via Eren Enerji Supercritical Bituminous Unknown Licensed as Catalagzi Termik together with other ZETES ax See also Edit Turkey portal Energy portal Global warming portalElectricity sector in Turkey Future Energy policy of Turkey Greenhouse gas emissions by Turkey Environmental issues in Turkey List of active coal fired power stations in the United KingdomNotes Edit A graph of a power station s generation over a specified period of time can be seen on the Energy Exchange Istanbul EXIST transparency platform Real Time Generation option with the total above the graph 5 Recent generation by unit can be seen on the Final Daily Production Program option by first entering the company name and then dropping down the list of unit names 6 Even so some small power stations may not show on the platform if they do not sell to the grid that is they are just autoproducers In 2018 coal fired power stations gross generation was 113 terawatt hours TWh which was 37 of total gross generation 7 The figures in the table below are net generation By routine calculations from the 2 columns to the left as described in Capacity factor Sample calculations note that there are 366 days in 2020 Where the construction year is not known the start of the current EDPK operational license is shown nevertheless there may have been pre licenses before that Public information about a power station e g Cenal can be displayed from the Turkish Energy Market Regulatory Authority database as follows Click the bracketed letter link in its cell below e g n and copy the license number e g EU 4315 42 02574 into the Lisans No box on the query screen 9 Tick Ben robot degilim I am not a robot and then press the Sorgula query button Ignore the co ordinates as they are garbage data A translation of the column headers and drop down selection may be helpful 10 As of 2021 there is no web service for this at https www epdk gov tr Detay Icerik 21 35 web servisleri so to attempt to list operational coal fired power stations from the licence database enter Lisans Durumu Yurulukte license status In force Tesis Turu Termik facility type Thermal and Tesis Durumu Isletmede facility status In business Then tick Ben robot degilim I am not a robot and Sorgula Query which should list licensed operational thermal power stations 9 Click Raporla Report to download it Repeat with Tesis Durumu Kismi Isletmede facility status Partly in business Using your spreadsheet software merge the 2 downloads select Yakit Turu Komur Fuel Coal OR Ithal Komur Imported Coal OR Yerli Komur Local Coal OR Yerli Asfaltit Local Asphaltite Then sort by Tesis Adi Facility Name A translation of the column headers and drop down selection may be helpful When copying the operational capacity into Wikipedia or Wikidata be sure to copy MWe which is the last power column 11 EU 101 44 020 EU 4969 177 2877 EU 8263 5 04139 EU 101 43 019 EU 8140 9 04101 EU 6660 5 03613 EU 1813 3 1274 EU 4969 230 2930 EU 4969 196 2896 EU 1435 26 1041 EU 1160 3 833 EU 4969 120 2820 EU 4969 2 2702 EU 3734 19 2290 EU 4315 42 02574 EU 6083 2 03428 EU 4969 240 2940 EU 5358 1 03178 EU 5088 4 03041 EU 4969 16 2716 EU 5603 8 03299 EU 4969 46 2746 EU 4969 33 2733 EU 4969 24 2724 EU 4969 153 2853 EU 8886 12 04341 EU 2116 8 1490 EU 4969 202 2902 EU 4537 02625 EU 4969 204 2904 EU 5358 2 03180 EU 4969 259 2959 EU 4969 211 2911 EU 4969 212 2912 EU 5642 3 03300 EU 4969 166 2866 EU 1866 11 1342 EU 4969 236 2936 EU 4447 02616 EU 5906 18 03394 EU 6604 3 03635 EU 5642 1 03298 EU 308 3 424 EU 298 1 415 EU 5642 4 03301 EU 5327 03164 EU 5358 3 03181 EU 369 1 479 EU 369 1 479 EU 369 1 479References Edit Turkiye de kac tane termik santral var Tum termik santrallerin isimleri How many thermal power plants are there in Turkey Names of all thermal power plants Haberler com in Turkish 3 August 2021 Retrieved 27 November 2021 a href Template Cite web html title Template Cite web cite web a CS1 maint url status link 12 Mayis 2019 PAZAR www resmigazete gov tr Retrieved 23 June 2020 Onol Boden Law Office Aysegul Akalin Deger Boden Olgun Seyma Electricity generation and transmission in Turkey Lexology www lexology com Retrieved 23 June 2020 Turkiye Elektrik Uretim Iletim Istatistikleri Yillar Iti bari yle Turki ye Kurulu Gucunun Ureti ci Kuruluslara Dagilimi Turkey electricity generation and transmission statistics Distribution of Installed Capacity of Turkey by Year Yillar Itibariyle Turkiye Kurulu Gucunun Uretici Kuruluslara Dagilimi 2006 2018 xls Exist real time generation Exist daily generation Coal Ministry of Energy and Natural Resources Turkey Retrieved 19 April 2020 Global Coal Plant Tracker Global Energy Monitor Archived from the original on 25 October 2019 Retrieved 4 January 2020 a b Elektrik Piyasasi Uretim Lisanslari Electricity Market Generation Licences lisans epdk gov tr Energy Market Regulatory Authority Archived from the original on 23 March 2019 Retrieved 23 March 2019 Google Translate translate google com Retrieved 10 June 2020 Google Translate translate google com Retrieved 10 June 2020 Enerji Yatirimlari Energy Investments Enerji Isleri Genel Mudurlugu Archived from the original on 5 October 2018 Retrieved 3 October 2019 a b c d e f g h i j Close Unfiltered Thermal Plants in Turkey During Coronavirus Outbreak Bianet 22 May 2020 Seker Uretimi Sugar production www adaseker com tr in Turkish Retrieved 5 June 2020 a b Coal fired plants reopen Engineers cast doubt on minister s statement that obligations fulfilled Bianet 17 June 2020 Afsin Elbistan B Coal Power Plant Turkey globalenergyobservatory org Archived from the original on 1 September 2019 Retrieved 31 January 2020 a b c d e f g 2019 yili enerji yatirimlari 2019 energy investments Enerji Isleri Genel Mudurlugu a b Dumansiz fabrika icin 14 milyon avro yatirdi 14 million euros invested in smokeless factory Memurlar Net in Turkish Archived from the original on 31 January 2020 Retrieved 31 January 2020 Diler coalexit org Retrieved 6 March 2020 ETI Maden Bandirma ETI Mining Bandirma in Turkish Lagos Enerji Archived from the original on 15 February 2020 Retrieved 15 February 2020 a b c d e f 2018 Yili Enerji Yatirimlari 2018 Energy Investments Ministry of Energy and Natural Resources Turkey Ercan Ozgen Dincer Faruk Sari Deniz Ceylan Ozcan Di ncer Fatih Kemal 10 June 2020 Determination of PM10 and deposited dust dispersion on the settlement areas from Aksa Goynuk coal lignite fueled thermal power plant Atmospheric Pollution Research 11 12 2126 2132 doi 10 1016 j apr 2020 05 025 ISSN 1309 1042 S2CID 225757367 Bolu Goynuk Thermal Power Plant www aksaenerji com tr Retrieved 20 June 2020 Ercan Ozgen Dincer Faruk Sari Deniz Ceylan Ozcan Di ncer Fatih Kemal 10 June 2020 Determination of PM10 and deposited dust dispersion on the settlement areas from Aksa Goynuk coal lignite fueled thermal power plant Atmospheric Pollution Research 11 12 2126 2132 doi 10 1016 j apr 2020 05 025 ISSN 1309 1042 S2CID 225757367 Cenal coalexit org Retrieved 6 March 2020 a b Infographic Turkish coal fired plant expansion stalls with 70 GW shelved since 2009 S amp P Global 23 August 2019 Archived from the original on 1 September 2019 Catalagzi Termik Santrali yeniden calismaya basliyor Catalagzi thermal power plant starts working again Enerji Gunlugu in Turkish Retrieved 5 June 2020 a b Konya Seker Coban Yildizi Thermal Powerplant Konya Sugar Archived from the original on 20 August 2019 Retrieved 5 February 2020 Hakkimizda Coban Yildizi Elektrik Uretim A S cobanyildizi com tr Archived from the original on 31 January 2020 Retrieved 31 January 2020 Konya Seker Cumra Sugar Factory www konyaseker com tr Archived from the original on 3 August 2019 Retrieved 2 March 2020 Isken Sugozu Power Plant Isken Retrieved 11 June 2020 Teknik Ozellikler Technical Details in Turkish Izdemir Energy Archived from the original on 18 August 2019 Retrieved 31 January 2020 Kangal Termik Santrali 6 ay sonra yeniden tam kapasite olarak uretime basladi After 6 months Kangal once again started generating at full capacity Timeturk com Retrieved 4 June 2020 Kangal coalexit org Retrieved 6 March 2020 a b Baski sonuc verdi Filtresiz termik santrallere izin cikmadi Pressure brings result No thermal power plants without filters allowed in Turkish Deutsche Welle 15 February 2019 Archived from the original on 4 September 2019 Retrieved 4 September 2019 a b Filtresiz santraller tek tek muhurleniyor Stations without filters sealed one by one in Turkish Sozcu 1 January 2020 Archived from the original on 1 January 2020 Retrieved 2 January 2020 Soma Kolin Termik Santrali CED Soma Kolin power station EIA eced csb gov tr Archived from the original on 2 September 2019 Retrieved 8 February 2020 Soma A Thermal Power Plant Bakan Kurum 5 Termik santral tamamen kapatildi Ministry 5 thermal power plants completely shut down in Turkish Sabah 1 January 2020 Archived from the original on 2 January 2020 Retrieved 2 January 2020 Direskeneli Haluk 3 January 2020 Enerji piyasalarinda 2020 yili ongoruleri Looking ahead to the 2020 energy market Enerji Gunlugu in Turkish Retrieved 4 January 2020 1st Power Plant ENKA Insaat ve Sanayi A S 28 February 1973 Retrieved 20 June 2020 Thermal Generation Aydem Energy Thermal Generation Aydem Energy Retrieved 31 May 2020 Sources Edit Real Time Generation Exist Transparency Platform Retrieved 10 June 2020 Final Daily Production Program Exist Transparency Platform Retrieved 10 June 2020 Boom and Bust 2021 Tracking The Global Coal Plant Pipeline Report Global Energy Monitor 5 April 2021 See also EditCategory Coal mines in TurkeyExternal links EditMap of coal plants by Global Energy Monitor Map of European coal plants including Turkey by Beyond Coal Graph of owners etc List from Openstreetmap Retrieved from https en wikipedia org w index php title List of active coal fired power stations in Turkey amp oldid 1169862943, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.