Line 19 (Sky Blue) (Portuguese: Linha 19–Celeste) is a planned line of the São Paulo Metro.[4][5][6]

São Paulo Metro Line 19 (Sky Blue)
Overview
StatusProposed
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
Guarulhos, Brazil
Termini
Connecting lines
Stations15 (First phase)
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) Companhia do Metropolitano de São Paulo
Depot(s)Vila Medeiros railyard[1]
Rolling stock31 6-car trains[1]
Daily ridership500,000 (projected, first phase)[2]
Ridership621,000/business day (projected, first phase)[1]
History
Planned opening2030 (estimated)[3]
Technical
Line length17.6 km (10.9 mi) (First phase)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
SignallingCBTC
Route map

Campo Belo
Jesuíno Maciel
Alvorada
Hélio Peregrino
 20 
Itaim Bibi
Parque Ibirapuera
Jardim Paulista
 16 
Brigadeiro
Bela Vista
Second phase
First phase
Bixiga train park
Anhangabaú
São Bento
Cerealista
Silva Teles
Catumbi train park
Catumbi
Vila Maria
Santo Eduardo
Cerejeiras
Vila Sabrina
Jardim Julieta
Vila Medeiros rail yard
Itapegica
Dutra
Vila Augusta
Guarulhos Centro
Bosque Maia train park
Bosque Maia

At 17.6 kilometres (10.9 mi) in length at its first phase, the line will be the first subway line to serve the municipality of Guarulhos, with Line 13-Jade of the commuter rail system already serving the city since 2018. Construction is expected to begin in 2023.[2]

Background edit

Guarulhos is the second-largest city in the state of São Paulo, yet was not served by rail transport until the opening of the CPTM commuter rail's Line 13-Jade in 2018. Thus, planning for Line 19 began to link Guarulhos to the São Paulo Metro, along with Vila Medeiros and Vila Maria.[2] It will be underground for its entire length.

Planning edit

São Paulo Metro originally planned to begin tendering for the construction of Line 19 in April 2020, but this was delayed to May.[7]

Stations edit

Code Station Integration City Platform[8] Status
TBA Bosque Maia Guarulhos Side platforms Planning (first phase)
Guarulhos Centro
Vila Augusta
Dutra    
Itapegica
Jardim Julieta São Paulo
Vila Sabrina
Cerejeiras
Santo Eduardo
Vila Maria
Catumbi
Silva Teles
Cerealistas    
São Bento    
Anhangabaú    
Bela Vista     Planning (second phase)
Brigadeiro    
Jardim Paulista    16 
Parque Ibirapuera
Itaim Bibi
Hélio Peregrino    20 
Alvorada
Jesuíno Maciel
Campo Belo      


References edit

  1. ^ a b c Meier, Ricardo (14 April 2021). "Cinco consórcios participam da licitação de projeto básico da Linha 19-Celeste do Metrô". Metrô CPTM (in Portuguese). Retrieved 14 April 2021.
  2. ^ a b c "São Paulo Metro begins studies to build Line 19". 6 August 2019. Retrieved 6 August 2019.
  3. ^ Meier, Ricardo (13 July 2022). "Metrô projeta abrir Linha 19-Celeste em 2030". MetrôCPTM (in Portuguese). Retrieved 14 July 2022.
  4. ^ "PDUI-STM-RedeAltaMediaCapacidade-11-05-2016.pdf" (PDF). Retrieved 16 January 2019.
  5. ^ http://www.domboscoitaquera.org.br/downloads/secretaria_estadual_de_transportes.pdf Seminário sobre infraestrutura e sistema viário para a copa 2014 e o desenvolvimento da zona leste, Jurandir Fernandes, Secretário dos Transportes Metropolitanos, 25/08/2011
  6. ^ "Metrô contrata estudos para três linhas an zona norte de SP".
  7. ^ "Contractual wrangles delay São Paulo metro schemes". Railway Gazette International. 1 April 2020. Retrieved 20 June 2020.
  8. ^ "Licitação do projeto básico da Linha 19-Celeste do Metrô é anulada pelo TCE". Metrô CPTM (in Brazilian Portuguese). 2020-09-10. Retrieved 2020-09-11.

line, são, paulo, metro, line, blue, portuguese, linha, celeste, planned, line, são, paulo, metro, são, paulo, metro, line, blue, overviewstatusproposedownergovernment, state, são, paulolocalesão, paulo, brazilguarulhos, brazilterminianhangabaú, first, phase, . Line 19 Sky Blue Portuguese Linha 19 Celeste is a planned line of the Sao Paulo Metro 4 5 6 Sao Paulo Metro Line 19 Sky Blue OverviewStatusProposedOwnerGovernment of the State of Sao PauloLocaleSao Paulo BrazilGuarulhos BrazilTerminiAnhangabau First phase Bosque MaiaConnecting lines 16 20 Stations15 First phase ServiceTypeRapid transitSystemSao Paulo MetroOperator s Companhia do Metropolitano de Sao PauloDepot s Vila Medeiros railyard 1 Rolling stock31 6 car trains 1 Daily ridership500 000 projected first phase 2 Ridership621 000 business day projected first phase 1 HistoryPlanned opening2030 estimated 3 TechnicalLine length17 6 km 10 9 mi First phase CharacterUndergroundTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeSignallingCBTCRoute mapLegendCampo BeloJesuino MacielAlvoradaHelio Peregrino 20 Itaim BibiParque IbirapueraJardim Paulista 16 BrigadeiroBela VistaSecond phaseFirst phaseBixiga train parkAnhangabauSao BentoCerealistaSilva TelesCatumbi train parkCatumbiVila MariaSanto EduardoCerejeirasVila SabrinaJardim JulietaVila Medeiros rail yardSao PauloGuarulhosItapegicato Vila MadalenaDutraVila AugustaGuarulhos CentroBosque Maia train parkBosque MaiaAt 17 6 kilometres 10 9 mi in length at its first phase the line will be the first subway line to serve the municipality of Guarulhos with Line 13 Jade of the commuter rail system already serving the city since 2018 Construction is expected to begin in 2023 2 Contents 1 Background 2 Planning 3 Stations 4 ReferencesBackground editGuarulhos is the second largest city in the state of Sao Paulo yet was not served by rail transport until the opening of the CPTM commuter rail s Line 13 Jade in 2018 Thus planning for Line 19 began to link Guarulhos to the Sao Paulo Metro along with Vila Medeiros and Vila Maria 2 It will be underground for its entire length Planning editSao Paulo Metro originally planned to begin tendering for the construction of Line 19 in April 2020 but this was delayed to May 7 Stations editCode Station Integration City Platform 8 StatusTBA Bosque Maia Guarulhos Side platforms Planning first phase Guarulhos CentroVila AugustaDutra nbsp nbsp ItapegicaJardim Julieta Sao PauloVila SabrinaCerejeirasSanto EduardoVila MariaCatumbiSilva TelesCerealistas nbsp nbsp Sao Bento nbsp nbsp Anhangabau nbsp nbsp Bela Vista nbsp nbsp Planning second phase Brigadeiro nbsp nbsp Jardim Paulista nbsp 16 Parque IbirapueraItaim BibiHelio Peregrino nbsp 20 AlvoradaJesuino MacielCampo Belo nbsp nbsp nbsp References edit a b c Meier Ricardo 14 April 2021 Cinco consorcios participam da licitacao de projeto basico da Linha 19 Celeste do Metro Metro CPTM in Portuguese Retrieved 14 April 2021 a b c Sao Paulo Metro begins studies to build Line 19 6 August 2019 Retrieved 6 August 2019 Meier Ricardo 13 July 2022 Metro projeta abrir Linha 19 Celeste em 2030 MetroCPTM in Portuguese Retrieved 14 July 2022 PDUI STM RedeAltaMediaCapacidade 11 05 2016 pdf PDF Retrieved 16 January 2019 http www domboscoitaquera org br downloads secretaria estadual de transportes pdf Seminario sobre infraestrutura e sistema viario para a copa 2014 e o desenvolvimento da zona leste Jurandir Fernandes Secretario dos Transportes Metropolitanos 25 08 2011 Metro contrata estudos para tres linhas an zona norte de SP Contractual wrangles delay Sao Paulo metro schemes Railway Gazette International 1 April 2020 Retrieved 20 June 2020 Licitacao do projeto basico da Linha 19 Celeste do Metro e anulada pelo TCE Metro CPTM in Brazilian Portuguese 2020 09 10 Retrieved 2020 09 11 nbsp This article about transport in Brazil is a stub You can help Wikipedia by expanding it vte Retrieved from https en wikipedia org w index php title Line 19 Sao Paulo Metro amp oldid 1164250661, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.