Lincoln Gap Wind Farm

The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity.[2] Construction began in late 2017 and was initially expected to be commissioned in late 2018.[3] Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing.[4] The site is not far from the Cultana Training Area.

Lincoln Gap Wind Farm
CountryAustralia
Location15 km west of Port Augusta on the Eyre Highway at Lincoln Gap, Eyre Peninsula, South Australia
Coordinates32°37′08″S 137°34′48″E / 32.619°S 137.580°E / -32.619; 137.580Coordinates: 32°37′08″S 137°34′48″E / 32.619°S 137.580°E / -32.619; 137.580
StatusUnder construction
Construction began2017
Commission dateExpected mid-2019
Construction costA$300M (stage 1)[1]
A$170M (stage 2)
Owner(s)Nexif Energy Australia
Wind farm
TypeOnshore
Hub height110 metres (361 ft)
Rotor diameter136 metres (446 ft)
140 metres (459 ft)
Rated wind speed
  • 11 m/s (36 ft/s)
Power generation
Units operational
Make and modelSenvion 3.6M140 EBC
Vestas V136
Units planned42 × 6 MW
Nameplate capacity212 MW
Capacity factor43%
Annual net output800 GW·h
Storage capacity10 MW·h
External links
Websitelincolngapwindfarm.com.au

Following Senvion's European parent company commencing insolvency proceedings, Vestas was engaged to provide maintenance services for the 126 MW first stage, and the 24 3.6 MW turbines for the second stage.[5] The 212 MW wind farm reached full generation capacity in late April 2022.[6]

Construction and commissioning

The wind farm was constructed by Senvion in two stages.[7] The first stage was 35 turbines.[8][9] In December 2018, it was expected to be operational by July 2019. Stage Two for the final 24 turbines received financial approval from Nexif Energy in December 2018. A 10 MW / 10 MW·h battery was expected to be completed in May 2019 by Fluence, with a proposal to later upgrade it to 30 MW.[2] The output is contracted to retailer ERM Power.[10] Some of the towers and turbines were erected using a tower crane similar to what is used to construct high-rise buildings.[11]

The wind farm substation was connected to the national electricity grid on 25 February 2019. The energy storage battery was expected to be installed by the end of May 2019, with wind turbines commissioned from August 2019.[12] The first turbine exported electricity to the grid in the last few days of April 2019.[13]

It was reported in October 2020 that construction of Stage 2 had begun, at a cost of A$170m.[14] It was completed and reached full operation (without the battery) in late April 2022.[6]

References

  1. ^ "SA wind-storage project wins $150m CEFC debt funding". ecogeneration. 13 November 2017. Retrieved 3 January 2018.
  2. ^ a b "About the project". Lincoln Gap Wind Farm. Retrieved 3 January 2017.
  3. ^ Balsamo, Marco (13 November 2017). "Lincoln Gap Wind Farm ready for construction". The Transcontinental. Retrieved 3 January 2018.
  4. ^ Morton, Adam (20 July 2018). "Life after coal: the South Australian city leading the way". The Guardian. Retrieved 20 July 2018.
  5. ^ Mazengarb, Michael (3 March 2020). "Vestas steps in to maintain Lincoln Gap turbines after Senvion troubles". RenewEconomy. Retrieved 31 March 2021.
  6. ^ a b Parkinson, Giles (26 April 2022). "Huge Lincoln Gap wind farm now fully operational, but not the battery". Renew Economy. Retrieved 2 May 2022.
  7. ^ "Australia | Senvion Australia". www.senvion.com. Retrieved 30 January 2020.
  8. ^ "Lincoln Gap (Australia) - Wind farms - Online access - The Wind Power". www.thewindpower.net. Retrieved 1 April 2021.
  9. ^ "Gearbox Exchange - Wind & Renewables - Vestas". MAX Cranes. Retrieved 1 April 2021.
  10. ^ Vorrath, Sophie (10 December 2018). "Nexif hits go on final 86MW of Lincoln Gap Wind Farm, with close of CEFC debt deal". Retrieved 10 December 2018.
  11. ^ "Project Update" (PDF). Nexif Energy. July 2019. Retrieved 10 August 2019.
  12. ^ Parkinson, Giles (25 February 2019). "Life after coal: Lincoln Gap wind farm powers up, battery to be installed soon". Renew Economy. Retrieved 25 February 2019.
  13. ^ Parkinson, Giles (29 April 2019). "Lincoln Gap wind farm delivers first power to grid as it deals with Senvion issues". RenewEconomy. Retrieved 30 April 2019.
  14. ^ Hartmann, Imogen (12 October 2020). "Massive SA renewable energy projects kick off". Energy Magazine. from the original on 23 November 2020. Retrieved 23 November 2020.

lincoln, wind, farm, wind, farm, vicinity, lincoln, northeastern, eyre, peninsula, south, australia, australia, consists, wind, turbines, generates, total, electricity, construction, began, late, 2017, initially, expected, commissioned, late, 2018, constructio. The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia Australia It consists of 59 wind turbines and generates a total of 212 MW of electricity 2 Construction began in late 2017 and was initially expected to be commissioned in late 2018 3 Construction was delayed in July 2018 when unexploded ordnance was discovered on the site left from historic military testing 4 The site is not far from the Cultana Training Area Lincoln Gap Wind FarmCountryAustraliaLocation15 km west of Port Augusta on the Eyre Highway at Lincoln Gap Eyre Peninsula South AustraliaCoordinates32 37 08 S 137 34 48 E 32 619 S 137 580 E 32 619 137 580 Coordinates 32 37 08 S 137 34 48 E 32 619 S 137 580 E 32 619 137 580StatusUnder constructionConstruction began2017Commission dateExpected mid 2019Construction costA 300M stage 1 1 A 170M stage 2 Owner s Nexif Energy AustraliaWind farmTypeOnshoreHub height110 metres 361 ft Rotor diameter136 metres 446 ft 140 metres 459 ft Rated wind speed11 m s 36 ft s Power generationUnits operational35 3 6 MW Senvion Stage 1 24 3 6 MW VestasMake and modelSenvion 3 6M140 EBC Vestas V136Units planned42 6 MWNameplate capacity212 MWCapacity factor43 Annual net output800 GW hStorage capacity10 MW hExternal linksWebsitelincolngapwindfarm wbr com wbr au edit on Wikidata Following Senvion s European parent company commencing insolvency proceedings Vestas was engaged to provide maintenance services for the 126 MW first stage and the 24 3 6 MW turbines for the second stage 5 The 212 MW wind farm reached full generation capacity in late April 2022 6 Construction and commissioning EditThe wind farm was constructed by Senvion in two stages 7 The first stage was 35 turbines 8 9 In December 2018 it was expected to be operational by July 2019 Stage Two for the final 24 turbines received financial approval from Nexif Energy in December 2018 A 10 MW 10 MW h battery was expected to be completed in May 2019 by Fluence with a proposal to later upgrade it to 30 MW 2 The output is contracted to retailer ERM Power 10 Some of the towers and turbines were erected using a tower crane similar to what is used to construct high rise buildings 11 The wind farm substation was connected to the national electricity grid on 25 February 2019 The energy storage battery was expected to be installed by the end of May 2019 with wind turbines commissioned from August 2019 12 The first turbine exported electricity to the grid in the last few days of April 2019 13 It was reported in October 2020 that construction of Stage 2 had begun at a cost of A 170m 14 It was completed and reached full operation without the battery in late April 2022 6 References Edit SA wind storage project wins 150m CEFC debt funding ecogeneration 13 November 2017 Retrieved 3 January 2018 a b About the project Lincoln Gap Wind Farm Retrieved 3 January 2017 Balsamo Marco 13 November 2017 Lincoln Gap Wind Farm ready for construction The Transcontinental Retrieved 3 January 2018 Morton Adam 20 July 2018 Life after coal the South Australian city leading the way The Guardian Retrieved 20 July 2018 Mazengarb Michael 3 March 2020 Vestas steps in to maintain Lincoln Gap turbines after Senvion troubles RenewEconomy Retrieved 31 March 2021 a b Parkinson Giles 26 April 2022 Huge Lincoln Gap wind farm now fully operational but not the battery Renew Economy Retrieved 2 May 2022 Australia Senvion Australia www senvion com Retrieved 30 January 2020 Lincoln Gap Australia Wind farms Online access The Wind Power www thewindpower net Retrieved 1 April 2021 Gearbox Exchange Wind amp Renewables Vestas MAX Cranes Retrieved 1 April 2021 Vorrath Sophie 10 December 2018 Nexif hits go on final 86MW of Lincoln Gap Wind Farm with close of CEFC debt deal Retrieved 10 December 2018 Project Update PDF Nexif Energy July 2019 Retrieved 10 August 2019 Parkinson Giles 25 February 2019 Life after coal Lincoln Gap wind farm powers up battery to be installed soon Renew Economy Retrieved 25 February 2019 Parkinson Giles 29 April 2019 Lincoln Gap wind farm delivers first power to grid as it deals with Senvion issues RenewEconomy Retrieved 30 April 2019 Hartmann Imogen 12 October 2020 Massive SA renewable energy projects kick off Energy Magazine Archived from the original on 23 November 2020 Retrieved 23 November 2020 Retrieved from https en wikipedia org w index php title Lincoln Gap Wind Farm amp oldid 1085779705, wikipedia, wiki, book, books, library,