fbpx
Wikipedia

Lane Cove Tunnel

The Lane Cove Tunnel is a 3.6-kilometre (2.2 mi) twin-tunnel tollway in Sydney, New South Wales that is part of the Sydney Orbital Network. Owned by toll road operator Transurban, It connects the M2 Motorway at North Ryde with the Gore Hill Freeway at Artarmon and forms part of Sydney's M2 route, with the M2 Hills Motorway constituting the rest of the M2 route.

Lane Cove Tunnel
Overview
LocationLane Cove, New South Wales
StatusOpen
Route M2 (2013–present)
Start Hills Motorway, North Ryde, Sydney
End Gore Hill Freeway, Artarmon, Sydney
Operation
Work begunJune 2004
Opened25 March 2007[1]
OperatorTransurban
Traffic40% Traffic
Tollsee Tolls
Technical
Length3.6 km (2.2 mi)
No. of lanes4
Operating speed80 km/h (variable)
Tunnel clearance4.4 meters
Width15 meters
Inside the Lane Cove Tunnel
Westbound entrance and eastbound exit in Artarmon
Travelling eastbound through the tunnel and its approach from Epping Road

History edit

On 1 October 2003, the Lane Cove Tunnel Company was awarded a $1.1 billion contract to design and construct the tunnel to a joint venture between Thiess and the John Holland Group.[2][3] The company, later known as Connector Motorways, would operate the tunnel as well as the associated Falcon Street Gateway (now Military Road E-ramp).

It was intended to replace the few kilometres motorists had to drive along Epping Road, through the suburb of Lane Cove, between two sections of freeway.

During construction, in the early hours of 2 November 2005, the roof of a ventilation tunnel for the project collapsed. The collapse caused a 10 by 10 metre crater to appear near the southbound exit ramp of the Pacific Highway.[4] It also damaged a three-storey building at 11–13 Longueville Road, forcing the evacuation of 47 people.[5] Emergency crews pumped 1000 cubic metres of concrete into the hole to try to stop the housing block from collapsing into it.[6] An investigation by Workcover NSW found that the collapse was caused by geological conditions at the site, the large span width of the tunnel, and inadequacy of roof support. The proximity of the excavations to the surface resulted in the property damage.[4]

The tunnel was opened on 25 March 2007, two months ahead of schedule, by four workers who represented the 9,000 who had worked on the Lane Cove Tunnel, the Military Road E-Ramp and the widened Gore Hill Freeway Project. Following the opening there was a one-month toll-free period (as occurred with the Westlink M7).

Connector Motorways was supposed to operate the tunnel concession until 2037. However, the project was a disaster for the company, which went into receivership in January 2010 after a string of losses.[7] Toll road operator Transurban bought the tunnel in May 2010 for $630 million and became the new operator.[8]

Alternative routes edit

Before the opening of the tunnel, motorists had to drive along Epping Road through the suburb of Lane Cove, for the few kilometres between two freeway sections. Studies by the tunnel operator indicated that the Lane Cove Tunnel would cut road travel times by up to 17 minutes and save motorists over $4 a trip.[9]

After the completion of the consequential surface road changes in March 2008, the existing Epping Road was slated to have 24-hour bus lanes to reduce travel times for east and west bound bus services, a new bus interchange, a shared cyclist and pedestrian path, and other measures were implemented to improve public transport and local traffic in the corridor.[10] Changes to the road network in the area had the primary aim of encourage traffic to use the new tolled tunnel instead of the untolled surface road.

Interchanges edit

LGALocationkmmiDestinationsNotes
RydeNorth Ryde00.0  M2 Hills Motorway / Epping Road – Epping, WindsorWestern end
WilloughbyArtarmon3.62.2    Gore Hill Freeway (M1) / Pacific Highway (A1) – Sydney, Sydney AirportEastern end
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Tolls edit

Toll prices as of 1 January 2024[11]
Toll road Class A toll prices[a] Class B toll prices[a] Toll increase[13] Toll concessionaire Expiry of toll concession[14]


Lane Cove Tunnel $3.97 $13.43 Quarterly on 1 January, 1 April, 1 July, and 1 October, by the greater of quarterly CPI or 1% Transurban June 2048


  1. ^ a b Class A vehicles are typically cars and motorcycles; Class B vehicles are all other vehicles including trucks and heavy vehicles.[12]

Controversy edit

Air quality edit

A report by CSIRO Deputy Chief of Air Science, Dr Peter Manins, concluded the ambient air quality modelling undertaken for Lane Cove Tunnel was 'best practice'.[15] The air quality modelling indicated that the Lane Cove Tunnel would comfortably meet the air quality requirements set by the Planning Minister's Conditions of Approval. Dr Manins also said most of the air quality modelling results were in fact likely to "over estimate emission and pollution levels".[16]

Ambient air quality is monitored at four monitoring stations nearby the tunnel's ventilation stacks. The monitoring results are published in real time on the operator's website.

The air quality readings published for particulate matter (PM10) are 24-hour averages, as required by the Planning Minister's Conditions of Approval for the tunnel. Some commentators are concerned that averaging the readings over 24 hours disguises the fact that the 50uG goal may be exceeded during peak periods, with low readings, which typically occur after midnight, effectively counteracting short-term breaches which occur during peak periods.

2007 State election edit

The Labor government was accused of interfering in the tunnel project to increase its re-election chances in the March 2007 election. The tunnel's expected late-2006 opening was pushed back to "January or February", closer to the poll date.[17] In fact, that deadline was missed and the opening was announced to be 25 March, the day after the election.

In December 2006, it was announced that surface road changes would be delayed by five months, meaning that they would not be completed until after state and federal elections. The delay, which was likely to cut into tunnel revenues, was agreed to by the operators at a cost to taxpayers of $25 million.[18][19]

The Sydney Morning Herald described the payment as a "bribe" and a "political rort". According to a Herald editorial, "The use of public funds to compensate Connector Motorways for delays to road changes around the tunnel is ... as cynical a piece of political jobbery as Sydney has seen in many a long year."[20]

Changes to Epping Road edit

Changes made to Epping Road and associated roads included:[21]

  • A bus interchange, completed in March 2008, on the corner of Longueville Road and Parklands Avenue at Lane Cove.
  • A new pedestrian bridge across Longueville Road[22] providing access to the bus interchange and a link to Lane Cove village.
  • A new cycleway and pedestrian path[23] between Mowbray Road and Pacific Highway, to join the completed cycleway between Mowbray and Wicks Road, North Ryde, and along the Gore Hill Freeway between Pacific Highway and Naremburn.
  • Because over 30 per cent of all travel on Epping Road is by public transport, bus-only lanes were provided.[24]

Some parts of Epping Road[21] and Longueville Road required widening to provide the dedicated bus lanes and cycle path.

Epping Road eastbound,[25] between Mowbray Road west and Longueville Road,[25] Lane Cove, has one general traffic lane and one bus lane eastbound.

Epping Road westbound, between Longueville Road and Centennial Avenue, and between Sam Johnson Way and Mowbray Road West,[26] has two general traffic lanes and one bus lane. Between Centennial Avenue and Sam Johnson Way it has one general traffic lane and one bus lane.

Right turn lanes were reinstated for westbound traffic at the intersection of Parklands Avenue and Centennial Avenue, Lane Cove. Street lighting was upgraded. As the final construction activity, Epping Road between Mowbray Road and Pacific Highway was resurfaced with new asphalt and new line marking.

These changes were considered in the 2001 Environmental Impact Statement (EIS) and are part of the Planning Minister's 2003 approval.[27] They have been supported by a more recent Parliamentary Inquiry.[28]

The measures were designed to try to overcome the disconnection of the local community resulting from the extensive road work – reinstating right hand lanes, adding pedestrian crossings and making improvements to public transport infrastructure. Extensive community consultation[28] was undertaken.

Defects edit

In July 2022, it was revealed there was cracking found in sections of both the east and westbound tunnel roof, with the owner Transurban taking the builders to court for remediation. It was estimated that the total repair cost would be $300mn and it would take decades to repair as the work can only be undertaken during periods of overnight maintenance shutdowns.[29]

See also edit

References edit

  1. ^ "Sydney's Lane Cove Tunnel opens". The Sydney Morning Herald. 25 March 2007. Retrieved 7 July 2022.
  2. ^ "Workcover blames construction bungles for tunnel collapse". The Sydney Morning Herald. 30 March 2006. Retrieved 4 January 2020.
  3. ^ . Archived from the original on 8 January 2007. Retrieved 23 October 2021.
  4. ^ a b (PDF). workcover.nsw.gov.au. 27 March 2006. Archived from the original (PDF) on 19 October 2007. Retrieved 6 May 2008.
  5. ^ "Lane Cove Tunnel Project". lanecove.nsw.gov.au. Archived from the original on 18 May 2009. Retrieved 6 May 2008.
  6. ^ "Commuter chaos to go on after tunnel collapse – National – smh.com.au". The Sydney Morning Herald. 2 November 2005. Retrieved 6 May 2008.
  7. ^ O'sullivan, Matt (20 January 2010). "Lane Cove Tunnel operator hits the wall". The Sydney Morning Herald.
  8. ^ Lane Cove Tunnel sold for $630 million – ABC News (Australian Broadcasting Corporation). Abc.net.au (10 May 2010). Retrieved 2013-09-07.
  9. ^ Connector Motorways – Connector Motorways Home Page 31 August 2007 at the Wayback Machine
  10. ^ (PDF). Archived from the original (PDF) on 31 August 2007. Retrieved 30 August 2007.
  11. ^ "Toll costs by road". NSW Government. 1 January 2024. Retrieved 9 January 2024.
  12. ^ "What is my vehicle class?". Linkt. Retrieved 5 November 2020.
  13. ^ "When and how do toll prices increase". Linkt. Retrieved 5 November 2020.
  14. ^ "Road tolling in New South Wales" (PDF). New South Wales Parliament. Portfolio Committee No.2 – Health and Community Services. October 2017. Retrieved 30 October 2020.
  15. ^ Connector Motorways – Connector Motorways Home Page[permanent dead link]
  16. ^ Dr Peter Manins: examining our Living Atmosphere (Resume) 8 August 2007 at the Wayback Machine
  17. ^ "Tunnel launch branded as an opportunistic election ploy". Sun-Herald. 17 December 2006. Retrieved 28 January 2007.
  18. ^ "Iemma's $25m election bribe". The Sydney Morning Herald. 8 December 2006. Retrieved 28 January 2007.
  19. ^ "Government pays tunnel operator $25m". News.com.au. 8 December 2006. Retrieved 28 January 2007. [dead link]
  20. ^ "Public money down the tunnel". The Sydney Morning Herald. 11 December 2006. Retrieved 28 January 2007.
  21. ^ a b . Archived from the original on 13 November 2007. Retrieved 1 October 2007.
  22. ^ Longueville Road Pedestrian Bridge. YouTube (18 July 2007). Retrieved 2013-09-07.
  23. ^ Bike North News 29 August 2007 at the Wayback Machine. Bikenorth.org.au. Retrieved 2013-09-07.
  24. ^ [1] 19 July 2008 at the Wayback Machine
  25. ^ a b [2] 13 November 2007 at the Wayback Machine
  26. ^ Home – Road Projects – Roads and Maritime Services 1 October 2007 at the Wayback Machine. Rta.nsw.gov.au. Retrieved 2013-09-07.
  27. ^ Home – Road Projects – Roads and Maritime Services 4 September 2007 at the Wayback Machine. Rta.nsw.gov.au. Retrieved 2013-09-07.
  28. ^ a b (PDF). Archived from the original (PDF) on 24 May 2011. Retrieved 18 December 2007.{{cite web}}: CS1 maint: archived copy as title (link)
  29. ^ "Motorists face years of disruption after cracks found in Sydney's Lane Cove Tunnel". The Sydney Morning Herald. 4 July 2022. Retrieved 7 July 2022.

External links edit

  • Lane Cove Tunnel and Military Road E-Ramp
  • Transfield Services
  • Transurban Limited
  • . Archived from the original on 7 October 2006. Retrieved 28 January 2007.
  • "Roads And Traffic Authority NSW". Retrieved 28 January 2007.
  • Lane Cove Tunnel a success, operators say from news.com.au on 10 April 2007.
  • Tunnel passes morning test from news.com.au 26 March 2007.

33°48′37″S 151°09′34″E / 33.81039°S 151.15934°E / -33.81039; 151.15934

lane, cove, tunnel, kilometre, twin, tunnel, tollway, sydney, south, wales, that, part, sydney, orbital, network, owned, toll, road, operator, transurban, connects, motorway, north, ryde, with, gore, hill, freeway, artarmon, forms, part, sydney, route, with, h. The Lane Cove Tunnel is a 3 6 kilometre 2 2 mi twin tunnel tollway in Sydney New South Wales that is part of the Sydney Orbital Network Owned by toll road operator Transurban It connects the M2 Motorway at North Ryde with the Gore Hill Freeway at Artarmon and forms part of Sydney s M2 route with the M2 Hills Motorway constituting the rest of the M2 route Lane Cove TunnelOverviewLocationLane Cove New South WalesStatusOpenRouteM2 2013 present StartHills Motorway North Ryde SydneyEndGore Hill Freeway Artarmon SydneyOperationWork begunJune 2004Opened25 March 2007 1 OperatorTransurbanTraffic40 TrafficTollsee TollsTechnicalLength3 6 km 2 2 mi No of lanes4Operating speed80 km h variable Tunnel clearance4 4 metersWidth15 meters Inside the Lane Cove Tunnel Westbound entrance and eastbound exit in Artarmon source source source source Travelling eastbound through the tunnel and its approach from Epping Road Contents 1 History 2 Alternative routes 3 Interchanges 4 Tolls 5 Controversy 5 1 Air quality 5 2 2007 State election 5 3 Changes to Epping Road 5 4 Defects 6 See also 7 References 8 External linksHistory editOn 1 October 2003 the Lane Cove Tunnel Company was awarded a 1 1 billion contract to design and construct the tunnel to a joint venture between Thiess and the John Holland Group 2 3 The company later known as Connector Motorways would operate the tunnel as well as the associated Falcon Street Gateway now Military Road E ramp It was intended to replace the few kilometres motorists had to drive along Epping Road through the suburb of Lane Cove between two sections of freeway During construction in the early hours of 2 November 2005 the roof of a ventilation tunnel for the project collapsed The collapse caused a 10 by 10 metre crater to appear near the southbound exit ramp of the Pacific Highway 4 It also damaged a three storey building at 11 13 Longueville Road forcing the evacuation of 47 people 5 Emergency crews pumped 1000 cubic metres of concrete into the hole to try to stop the housing block from collapsing into it 6 An investigation by Workcover NSW found that the collapse was caused by geological conditions at the site the large span width of the tunnel and inadequacy of roof support The proximity of the excavations to the surface resulted in the property damage 4 The tunnel was opened on 25 March 2007 two months ahead of schedule by four workers who represented the 9 000 who had worked on the Lane Cove Tunnel the Military Road E Ramp and the widened Gore Hill Freeway Project Following the opening there was a one month toll free period as occurred with the Westlink M7 Connector Motorways was supposed to operate the tunnel concession until 2037 However the project was a disaster for the company which went into receivership in January 2010 after a string of losses 7 Toll road operator Transurban bought the tunnel in May 2010 for 630 million and became the new operator 8 Alternative routes editBefore the opening of the tunnel motorists had to drive along Epping Road through the suburb of Lane Cove for the few kilometres between two freeway sections Studies by the tunnel operator indicated that the Lane Cove Tunnel would cut road travel times by up to 17 minutes and save motorists over 4 a trip 9 After the completion of the consequential surface road changes in March 2008 the existing Epping Road was slated to have 24 hour bus lanes to reduce travel times for east and west bound bus services a new bus interchange a shared cyclist and pedestrian path and other measures were implemented to improve public transport and local traffic in the corridor 10 Changes to the road network in the area had the primary aim of encourage traffic to use the new tolled tunnel instead of the untolled surface road Interchanges editLGALocationkmmiDestinationsNotes RydeNorth Ryde00 0 nbsp M2 Hills Motorway Epping Road Epping WindsorWestern end WilloughbyArtarmon3 62 2 nbsp nbsp nbsp Gore Hill Freeway M1 Pacific Highway A1 Sydney Sydney AirportEastern end 1 000 mi 1 609 km 1 000 km 0 621 miTolls editThis table is an excerpt from Toll roads in Australia Toll prices as of 1 January 2024 update 11 Toll road Class A toll prices a Class B toll prices a Toll increase 13 Toll concessionaire Expiry of toll concession 14 Lane Cove Tunnel 3 97 13 43 Quarterly on 1 January 1 April 1 July and 1 October by the greater of quarterly CPI or 1 Transurban June 2048 a b Class A vehicles are typically cars and motorcycles Class B vehicles are all other vehicles including trucks and heavy vehicles 12 Controversy editAir quality edit A report by CSIRO Deputy Chief of Air Science Dr Peter Manins concluded the ambient air quality modelling undertaken for Lane Cove Tunnel was best practice 15 The air quality modelling indicated that the Lane Cove Tunnel would comfortably meet the air quality requirements set by the Planning Minister s Conditions of Approval Dr Manins also said most of the air quality modelling results were in fact likely to over estimate emission and pollution levels 16 Ambient air quality is monitored at four monitoring stations nearby the tunnel s ventilation stacks The monitoring results are published in real time on the operator s website The air quality readings published for particulate matter PM10 are 24 hour averages as required by the Planning Minister s Conditions of Approval for the tunnel Some commentators are concerned that averaging the readings over 24 hours disguises the fact that the 50uG goal may be exceeded during peak periods with low readings which typically occur after midnight effectively counteracting short term breaches which occur during peak periods 2007 State election edit The Labor government was accused of interfering in the tunnel project to increase its re election chances in the March 2007 election The tunnel s expected late 2006 opening was pushed back to January or February closer to the poll date 17 In fact that deadline was missed and the opening was announced to be 25 March the day after the election In December 2006 it was announced that surface road changes would be delayed by five months meaning that they would not be completed until after state and federal elections The delay which was likely to cut into tunnel revenues was agreed to by the operators at a cost to taxpayers of 25 million 18 19 The Sydney Morning Herald described the payment as a bribe and a political rort According to a Herald editorial The use of public funds to compensate Connector Motorways for delays to road changes around the tunnel is as cynical a piece of political jobbery as Sydney has seen in many a long year 20 Changes to Epping Road edit Changes made to Epping Road and associated roads included 21 A bus interchange completed in March 2008 on the corner of Longueville Road and Parklands Avenue at Lane Cove A new pedestrian bridge across Longueville Road 22 providing access to the bus interchange and a link to Lane Cove village A new cycleway and pedestrian path 23 between Mowbray Road and Pacific Highway to join the completed cycleway between Mowbray and Wicks Road North Ryde and along the Gore Hill Freeway between Pacific Highway and Naremburn Because over 30 per cent of all travel on Epping Road is by public transport bus only lanes were provided 24 Some parts of Epping Road 21 and Longueville Road required widening to provide the dedicated bus lanes and cycle path Epping Road eastbound 25 between Mowbray Road west and Longueville Road 25 Lane Cove has one general traffic lane and one bus lane eastbound Epping Road westbound between Longueville Road and Centennial Avenue and between Sam Johnson Way and Mowbray Road West 26 has two general traffic lanes and one bus lane Between Centennial Avenue and Sam Johnson Way it has one general traffic lane and one bus lane Right turn lanes were reinstated for westbound traffic at the intersection of Parklands Avenue and Centennial Avenue Lane Cove Street lighting was upgraded As the final construction activity Epping Road between Mowbray Road and Pacific Highway was resurfaced with new asphalt and new line marking These changes were considered in the 2001 Environmental Impact Statement EIS and are part of the Planning Minister s 2003 approval 27 They have been supported by a more recent Parliamentary Inquiry 28 The measures were designed to try to overcome the disconnection of the local community resulting from the extensive road work reinstating right hand lanes adding pedestrian crossings and making improvements to public transport infrastructure Extensive community consultation 28 was undertaken Defects edit In July 2022 it was revealed there was cracking found in sections of both the east and westbound tunnel roof with the owner Transurban taking the builders to court for remediation It was estimated that the total repair cost would be 300mn and it would take decades to repair as the work can only be undertaken during periods of overnight maintenance shutdowns 29 See also edit nbsp Australian Roads portal Freeways in Australia Freeways in SydneyReferences edit Sydney s Lane Cove Tunnel opens The Sydney Morning Herald 25 March 2007 Retrieved 7 July 2022 Workcover blames construction bungles for tunnel collapse The Sydney Morning Herald 30 March 2006 Retrieved 4 January 2020 Connector Motorways January 2007 Archived from the original on 8 January 2007 Retrieved 23 October 2021 a b Lane Cove Tunnel Construction Site Investigation Report PDF workcover nsw gov au 27 March 2006 Archived from the original PDF on 19 October 2007 Retrieved 6 May 2008 Lane Cove Tunnel Project lanecove nsw gov au Archived from the original on 18 May 2009 Retrieved 6 May 2008 Commuter chaos to go on after tunnel collapse National smh com au The Sydney Morning Herald 2 November 2005 Retrieved 6 May 2008 O sullivan Matt 20 January 2010 Lane Cove Tunnel operator hits the wall The Sydney Morning Herald Lane Cove Tunnel sold for 630 million ABC News Australian Broadcasting Corporation Abc net au 10 May 2010 Retrieved 2013 09 07 Connector Motorways Connector Motorways Home Page Archived 31 August 2007 at the Wayback Machine Epping Road PDF Archived from the original PDF on 31 August 2007 Retrieved 30 August 2007 Toll costs by road NSW Government 1 January 2024 Retrieved 9 January 2024 What is my vehicle class Linkt Retrieved 5 November 2020 When and how do toll prices increase Linkt Retrieved 5 November 2020 Road tolling in New South Wales PDF New South Wales Parliament Portfolio Committee No 2 Health and Community Services October 2017 Retrieved 30 October 2020 Connector Motorways Connector Motorways Home Page permanent dead link Dr Peter Manins examining our Living Atmosphere Resume Archived 8 August 2007 at the Wayback Machine Tunnel launch branded as an opportunistic election ploy Sun Herald 17 December 2006 Retrieved 28 January 2007 Iemma s 25m election bribe The Sydney Morning Herald 8 December 2006 Retrieved 28 January 2007 Government pays tunnel operator 25m News com au 8 December 2006 Retrieved 28 January 2007 dead link Public money down the tunnel The Sydney Morning Herald 11 December 2006 Retrieved 28 January 2007 a b Information Archived from the original on 13 November 2007 Retrieved 1 October 2007 Longueville Road Pedestrian Bridge YouTube 18 July 2007 Retrieved 2013 09 07 Bike North News Archived 29 August 2007 at the Wayback Machine Bikenorth org au Retrieved 2013 09 07 1 Archived 19 July 2008 at the Wayback Machine a b 2 Archived 13 November 2007 at the Wayback Machine Home Road Projects Roads and Maritime Services Archived 1 October 2007 at the Wayback Machine Rta nsw gov au Retrieved 2013 09 07 Home Road Projects Roads and Maritime Services Archived 4 September 2007 at the Wayback Machine Rta nsw gov au Retrieved 2013 09 07 a b Archived copy PDF Archived from the original PDF on 24 May 2011 Retrieved 18 December 2007 a href Template Cite web html title Template Cite web cite web a CS1 maint archived copy as title link Motorists face years of disruption after cracks found in Sydney s Lane Cove Tunnel The Sydney Morning Herald 4 July 2022 Retrieved 7 July 2022 External links editLane Cove Tunnel and Military Road E Ramp Transfield Services Transurban Limited Department of Environment and Conservation NSW Archived from the original on 7 October 2006 Retrieved 28 January 2007 Roads And Traffic Authority NSW Retrieved 28 January 2007 Lane Cove Tunnel a success operators say from news com au on 10 April 2007 Tunnel passes morning test from news com au 26 March 2007 33 48 37 S 151 09 34 E 33 81039 S 151 15934 E 33 81039 151 15934 Retrieved from https en wikipedia org w index php title Lane Cove Tunnel amp oldid 1137071378, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.