fbpx
Wikipedia

Lake Street Transfer station

The Lake Street Transfer station was a rapid transit station on the Chicago "L", serving as a transfer station between its Lake Street Elevated Railroad and the Logan Square branch of its Metropolitan West Side Elevated Railroad. Located where the Logan Square branch crossed over the Lake Street Elevated, it was in service from 1913 to 1951, when it was rendered obsolete by the construction of the Dearborn Street subway.

LAKE ST. TRANSFER
 
1700W
200N
Former Chicago "L" rapid transit station
The Lake Street Transfer. The Metropolitan is on top, the Lake Street Elevated on bottom.
General information
Location1719 West Lake Street
Chicago, Illinois, US[1]
Coordinates41°53′07″N 87°40′12″W / 41.8852°N 87.6701°W / 41.8852; -87.6701Coordinates: 41°53′07″N 87°40′12″W / 41.8852°N 87.6701°W / 41.8852; -87.6701
Owned by
Line(s)
Platforms4 side platforms
Tracks4
Construction
Structure typeElevated
Platform levels2
History
Opened
  • November 6, 1893 (1893-11-06) (Wood)
  • May 6, 1895 (1895-05-06) (Lake)
  • November 3, 1913 (1913-11-03) (Transfer)
ClosedFebruary 25, 1951; 72 years ago (1951-02-25)
Electrified
  • May 9, 1896 (Lake Street Elevated)
  • May 6, 1895 (Logan Square branch)
Previous names
  • Wood (Lake Street Elevated)
  • Lake (Logan Square branch)
Passengers
1948361,934  69.48%
Rank122 out of 223
Former services
Location

The transfer station was an amalgamation of two predecessor stations: Wood, on the Lake Street Elevated, was on Wood Street, one block west of the site of the future transfer, and had been constructed in 1893; the Metropolitan's Lake station, on the other hand, was on the site of the future transfer and had been built in 1895. These stations, and their lines, had been constructed by two different companies; when they and two more companies building what would become the "L" merged operations in the early 1910s, a condition for the merger was the construction of a transfer station between the Metropolitan and Lake Street Elevateds at their crossing, which in practice meant the replacement of Wood station with a new Lake Street one under the Metropolitan. Having already merged operations, the "L" companies formally united under the Chicago Rapid Transit Company (CRT) in 1924; the "L" became publicly owned when the Chicago Transit Authority (CTA) assumed operations in 1947.

Plans for a subway to provide a more direct route from Logan Square to downtown dated to the late 1930s, but the subway was originally intended to supplement the Logan Square branch of the area, on which the Metropolitan's station lay, rather than replace it. The newly formed CTA, however, found little reason to continue operation of the old Logan Square elevated. The subway was completed in 1951, leading to the station's closing, but remnants survived into the 1960s. The site of the station is near the junction of the Paulina Connector – the descendant of the old Logan Square trackage – and the Lake Street Elevated, which was used for temporary and non-revenue service until the Pink Line opened in 2006 and returned it to revenue status.

Lake Street Transfer was double-decked, the Metropolitan's tracks and station located immediately above the Lake Street's tracks and station. Access to the eastbound Lake Street platform was by a station house at the street level; passengers would then use the platform to access the Metropolitan's platforms and Lake Street's westbound platform by additional stairways.

History

Wood station (Lake Street Elevated; 1893–1913)

 
One of Ashland's station houses in 2005. Wood was of a similar design, but would have had staircases on both sides of the station house.

The Lake Street Elevated Railway Company was incorporated on February 7, 1888.[4] Reincorporated as the Lake Street Elevated Railroad Company on August 24, 1892, to avoid legal issues,[5] its line, the Lake Street Elevated, commenced revenue operations at 5 a.m. on November 6, 1893, between California station and the Market Street Terminal.[6] The new line had 13 stations,[c] one of which was located on Wood Street.[8] The Elevated was powered by steam locomotives until May 9, 1896, when its tracks were electrified.[9] The Lake Street Elevated Railroad, having been dogged by financial issues since its inception, was reorganized as the Chicago and Oak Park Elevated Railroad (C&OP) on March 31, 1904.[10]

Lake station (Metropolitan Elevated; 1895–1913)

 
The station house at California in 2011; the original Metropolitan station house was of a similar design.

The Metropolitan West Side Elevated Railroad Company, another founding company of the Chicago "L", was granted a 50-year franchise by the Chicago City Council on April 7, 1892.[11] Unlike the Lake Street Elevated, which operated a single line, the Metropolitan had a main line that proceeded west from downtown to Marshfield Junction, where it split into three branches: one northwestern branch to Logan Square (which in turn had a branch to Humboldt Park[d]), one branch due west to Garfield Park, and one southwestern branch to Douglas Park.[15] While the competing South Side and Lake Street Elevateds used steam traction, the Metropolitan never did; although it had originally intended to, and indeed had built much of its structure under the assumption that locomotives would be used,[16] it decided in May 1894 to have electrified tracks instead,[17] making it upon its opening the first revenue electric elevated railroad in the United States.[18]

The Metropolitan's tracks on the Logan Square branch[d] were finished up to Robey by the middle of October 1894, and were powered on in April 1895 for test and inspection runs.[12] The Metropolitan began service at 6 a.m. on Monday, May 6, 1895, between Robey on the Logan Square branch and Canal on the main line.[19] Eleven stations opened that day, one of which was on Lake Street.[19] Since the Lake station crossed the Lake Street Elevated, its tracks and platforms were much higher than elsewhere on the "L".[1]

Transfer station (1913–1951)

 
The Lake Street Transfer station in context. The station itself is marked by a blue marker.
  The Lake Street Elevated
  The Metropolitan's trackage prior to 1951
  The Loop[13]
  The Milwaukee-Dearborn subway and Congress Line[20]

In 1911, the four companies operating the "L" – the C&OP and Metropolitan, as well as the South Side and Northwestern Elevated Railroads – merged operations under the aegis of Chicago Elevated Railways (CER) while keeping their separate identities.[21] CER instituted full integration of crosstown service on the "L" and free transfers between the lines in 1913, having been mandated to do so by the City Council.[22] As part of the same ordinance, the Metropolitan and C&OP were required to construct a transfer station where their tracks intersected; since the Metropolitan already had its Lake station on the site, this meant in practice that the C&OP had to build a station to connect with it.[23] In the process of constructing the new transfer, the C&OP closed its nearby Wood station.[23] Free transfers commenced on November 3, 1913, but the C&OP's new station was not finished at that point. As an interim measure, "walking" transfers between Wood station and the Metropolitan's Lake station were issued.[23] After a few weeks, the C&OP's station was complete, and the Wood station was closed.[23] Throughout the transfer station's existence, it was used as a point of transfer for passengers of one of the lines to switch to the other when construction or maintenance work rendered a line unable to go downtown.[e]

CER acted as a de facto holding company for the "L" – unifying its operations and instituting the same management across the companies – but kept the underlying companies intact.[26] This continued until the companies were formally merged into the single Chicago Rapid Transit Company (CRT) in 1924, which assumed operations on January 9; the former C&OP and Metropolitan were designated as the respective Lake Street and Metropolitan Divisions of the CRT for administrative purposes.[27] Although municipal ownership of transit had been a hotly-contested issue for half a century, the publicly-owned Chicago Transit Authority (CTA) would not be created until 1945,[28] and would not assume operation of the "L" until October 1, 1947.[29]

The new CTA began experiments to streamline service on the "L"; among them was skip-stop, which began as an experiment on the Lake Street Elevated on April 5, 1948.[2] Stations in between Pulaski and the Loop, exclusive, became either "A" or "B" stations and were serviced by respective "A" or "B" trains during weekdays.[2] Despite being located in this area, Lake Street Transfer was exempt from this system and continued to be serviced by all Lake Street Elevated trains.[2] As part of the same plan to streamline Lake Street service, the Ashland station one block east of the transfer was closed but remained standing.[2] The Logan Square branch would not begin skip-stop until the opening of the Dearborn Street subway and the closing of the transfer in 1951.[20]

Dearborn Street subway, closure, and demolition

Plans for Chicago to have a subway system to relieve the severe congestion of, if not replace, its elevated trackage dated back to the early 20th century, but the city lagged in building subways.[30] Chicago petitioned the Public Works Administration (PWA) for construction funds for a subway on State Street in 1937.[31] The petition originally included a proposal for two downtown east-west streetcar tunnels.[32] Harold L. Ickes, the administrator of the PWA and a longtime Chicagoan, vetoed the streetcar tunnel plan and insisted instead on a second subway that would go under Dearborn Street and Milwaukee Avenue, which would provide a more direct route from Logan Square to downtown.[32] Although this idea engendered considerable local opposition, especially from mayor Edward Joseph Kelly, Ickes's influence in the federal government led to the Dearborn plan being adopted in 1938.[32] A 1939 plan also introduced the idea of replacing the Metropolitan's main line and Garfield Park branch with a section of rapid transit operating through a proposed superhighway on Congress Street (the eventual Interstate 290).[33] These sections of transit would be connected, allowing for the area's rapid transit to be routed through downtown rather than adhere to a trunk-and-branch model.[34]

The subway's approval did not immediately imply the end of the old Logan Square branch; plans in 1939 included another proposed subway to connect the branch with the Ravenswood branch to the north and through-routing it with the Douglas Park branch to the south into a subway on Ashland Avenue to form a crosstown route.[35] Damen Tower serving the Humboldt Park branch divergence was rebuilt with the expectation that it also would switch trains between the subway and the elevated, much like the State Street subway connects with the earlier elevated North Side main line that remained standing after its construction,[36] and as late as 1949 commuters were promised such a setup that would have preserved the old Logan Square trackage.[37] However, the CTA had no interest in operating either the old Logan Square elevated or the Humboldt Park branch; the new Damen Tower would never be installed with switching equipment, and the Logan Square branch south of Damen would be closed after the Dearborn subway opened.[36]

 
Washington Junction, near the site of the Lake Street Transfer station, in 2023.

World War II interrupted the construction of the Dearborn Street subway; although the federal government allowed the continued construction of the State Street subway, it did not do so for the Dearborn Street subway even though it was 82 percent completed by 1942.[20] After the war ended, work resumed on the Dearborn Street subway and it opened at the midnight beginning Sunday, February 25, 1951; at the same time, the Humboldt Park branch was restricted to a shuttle service to and from Damen on the Logan Square branch.[20] Having been rendered obsolete by the subway, the Lake Street Transfer station was closed and the Lake Street's Ashland station reopened.[3] The subway was predicted to reduce the travel time between Logan Square and downtown from 28 minutes to 15.[20] Since construction had not started on the Congress Line, trains in the Dearborn subway stopped at its southern terminus at LaSalle and turned back.[20] Despite its incomplete state, and complaints from riders no longer given a direct trip to the Near West Side,[38][39] the new subway had over 60 percent higher ridership than the old Logan Square branch by the end of the year.[40] The old Logan Square branch trackage south of its entrance to the subway became known as the Paulina Connector, connecting the branch with the rest of the "L" system.[41]

Construction on the Congress Line began in 1954, leaving the Douglas branch with the issue of how to connect with the Loop in the meantime.[42] The Paulina Connector south of Washington Boulevard (a block south of Lake Street) was reopened for the purpose,[42] but the Metropolitan's old tracks north of Washington were replaced in revenue service by a direct connection to the Lake Street's trackage known as Washington Junction, located adjacent to the abandoned station.[41] This junction contained an automatic interlocking mechanism, where Douglas Park trains carried an electric coil to switch them to the Connector that Lake Street trains lacked.[43] This connection was used until the Congress Line was completed in 1958, after which the Douglas branch connected directly with it to use the Dearborn Street subway to go downtown, creating the "West-Northwest Route" that was renamed the Blue Line in 1992.[44][45]

The Paulina Connector – both the original Metropolitan tracks and the newer Washington Junction – remained in non-revenue service. The old northbound track north of Washington Junction was removed in 1957, the southbound track continuing non-revenue operations.[41] Wooden material from closed stations on the Connector, including Lake Street Transfer, was removed in the late 1950s to mitigate fire hazards, as were the lowest flights of stairs to deter trespassing, but the rest of the station would remain until the mid-to-late 1960s.[1] The old Metropolitan trackage north of Washington Junction was sparsely used and most of it was demolished in 1964 with the right of way sold off;[46] the remainder of the Connector reentered revenue service when the Pink Line was formed from it and the Douglas Park branch – by then renamed the Cermak branch – in 2006; the junction of the Pink Line with the modern-day Green Line (the modern service on the Lake Street Elevated) is at Washington Junction by the site of the station.[47]

Station details

Before 1913, the Wood and Lake stations had two wooden side platforms each. The Wood station had two station houses, one on each platform, designed in a "gingerbread" Queen Anne style, similar to the other stations on the route and the surviving station houses at Ashland.[48] The station houses were heated by potbelly stoves, and while earlier plans had called for their ticket agent's booths to be placed on the sides of the station houses facing the street, they ended up being placed in alcoves adjacent to the platforms.[48] The construction of the Lake Street Elevated's stations was contracted to Frank L. Underwood of Kansas City and Willard R. Green of New York.[49] The Metropolitan's Lake station, which continued as its portion of the Lake Street Transfer, also had two wooden side platforms, but a station house located at street level on the north side of Lake Street. The station house, made of red pressed brick and white limestone trim, was designed similarly to other stations on the Logan Square branch, surviving examples of which are at California and Damen, with a corniced and dentiled front bay containing dual doors specifically marked "Entrance" and "Exit" and prolific use of terra cotta. Its wooden platforms had hipped roof tin canopies in the center and decorative cast-iron railings with diamond designs.[1][50] Unlike elsewhere on the "L", station houses on the Metropolitan had central heating and a basement.[51]

After the transfer was completed in 1913, the C&OP built new platforms; these platforms projected westward from the Metropolitan, with their eastern halves covered by arched canopies with lattice framing and their western halves open. Auxiliary exits onto Hermitage Avenue were located on the middle of the Lake Street platforms at the western ends of their canopies. On the Metropolitan's end, its platforms and canopies were extended southward to meet the southern Lake Street platform, and a new station house on the south side of Lake Street was constructed sometime before 1917, after which the original station house was used for storage. The final station was double-decked, with the Metropolitan's original two side platforms being augmented by the Lake Street Elevated's lower two side platforms. Access to the station was through stairwells from the station house to the Lake Street platforms, which had additional stairways to connect to the Metropolitan platforms; each Lake Street platform was connected to each Metropolitan platform, leading to four inter-platform stairwells in total. It is presumed that the station house had direct access only to the southern eastbound Lake Street platform, with patrons wishing to access the Lake Street's northern westbound platform having to walk up to the Metropolitan platforms and walk down again.[1]

Throughout the stations' existence, the Lake Street[f] and Metropolitan Elevateds[15] had two tracks each in the vicinity, meaning that the transfer station had four tracks overall. Having had trouble constructing its trackage with two different companies and assembling much of its own infrastructure, the Lake Street Elevated contracted with Underwood and Green to construct its stations and the tracks west of Ashland.[53] The Metropolitan's tracks were constructed by the West Side Construction Company, a company with the same officers as the Metropolitan itself and the chief engineer of E. W. Elliot, with steel and iron from the Carnegie Steel Company.[15] Like the rest of the station, the tracks were double-decked in relation with one another.[1]

Operations and connections

As originally opened, the Metropolitan's trains ran every six minutes between 6 a.m. and 6:30 p.m., and every ten minutes during the night; the average speed was 16 mph (26 km/h).[19] Unlike the Lake Street Elevated, all of the Metropolitan's motor cars allowed smoking.[19] The Lake Street Elevated originally operated smoking cars at some times and not at others,[19] but the C&OP banned all smoking on its trains in 1909.[54] Smoking was banned by the city across the "L" and in streetcars in response to a 1918 influenza outbreak, a prohibition that has remained in force ever since.[54]

The fare across the "L" was legally mandated to be a nickel (5 cents, $1.37 in 2021) in the late 19th and early 20th centuries. This fare continued until temporarily increased by a cent to $0.06 ($1.27 in 2021) in 1917 before stabilizing to a dime (10 cents, $1.35 in 2021) in 1920.[55] Starting in 1922, fares were usually marketed in packs of three rides for 25 cents, or 8+13 cents per ride ($1.35 per ride in 2021), but individual fares remained 10 cents each.[56] At the same time, a weekly pass was introduced, the first in a major American city, for $1.25 ($20.24 in 2021) for rides outside of Evanston and Wilmette.[56] Fare control was originally by station agents posted at the station 24 hours a day; on the Lake Street, conductors were instead used for off-peak and night hours between 1921 and 1922 and consistently from 1925,[57] while the Metropolitan used conductors between 1931 and 1937.[58]

The Lake Street transfer station was served by a streetcar service on Lake Street; this service was consolidated with a streetcar service on State Street down to 63rd Street on September 14, 1924, as part of so-called "Through Route 16", or TR 16.[59] Unlike many streetcar lines in Chicago, TR 16 had no owl service, and its last northbound car left 63rd Street at 12:35 a.m..[60] During the day, streetcar lines in Chicago typically had intervals of between eight and fifteen minutes per car.[61] After the transfer station was abandoned, streetcar service on Lake Street was cut back from downtown on November 15, 1953, and replaced by buses on May 30, 1954.[62]

Ridership

Prior to the construction of the transfer, the Metropolitan's Lake station had a ridership that hovered around 250,000 a year, peaking at 296,116 in 1905.[63] The Lake Street's Wood station had a similar ridership, but one which peaked at 441,045 in 1905.[64] Once the transfer was in place, the two lines' contributions to station ridership were roughly equal, with the Lake Street edging out the Metropolitan each year.[65]

Lake, Wood, and Lake Street Transfer station riderships from 1900 through 1948[66]

In 1936, the last year Lake Street records are available, the transfer station had 94,688 Lake Street riders and 87,533 Metropolitan riders for a combined ridership of 182,221.[67] The following year's Metropolitan ridership was 181,909, suggesting that subsequent years' riderships were all recorded as being under the Metropolitan.[58] The Metropolitan continued to record transfer ridership until 1948; that year, the Lake Street Transfer had 361,934 riders, a substantial 69.48 percent increase from the 213,561 of 1947. Throughout the 1940s, the transfer's ridership ranking within the Northwest branch's six stations varied significantly; in 1940, it was the second-least patronized station after Grand immediately to the north, while in 1948 it had the third-highest ridership after Damen and Chicago.[68] For the "L" overall, in 1948 it was the 122nd-most ridden of 223 stations at the beginning of the year where ridership was recorded; in 1947, it had been the 174th-most ridden of 222 such stations.[g][70]

Notes

  1. ^ California after 1948[2]
  2. ^ Loomis after 1948;[2] Ashland reopened on February 25, 1951, upon the Lake Street Transfer's closure.[3]
  3. ^ Including one at Homan, west of California, which had been a part of a non-revenue grand opening on November 4 but would not open for revenue service until November 24.[7]
  4. ^ a b Technically, the Logan Square branch started after Robey and was, like the Humboldt Park branch, a divergence from what was formally known as the "Northwest branch".[12] However, as early as 1898, even the Metropolitan itself was referring to the Northwest branch as part of the "Logan Square branch",[13] although ridership statistics continued to separate them.[14]
  5. ^ Examples of this occurring include incidents in February 1916[24] and on December 8, 1935.[25]
  6. ^ The Lake Street Elevated had a third track built west of Rockwell Street, approximately 1 mile (1.6 km) west of the transfer, to store cars not in revenue service.[52]
  7. ^ Several stations on the Niles Center and Westchester branches were permanently unmanned and thus did not collect ridership statistics.[69] Several stations closed on the "L" during 1948.[2] Exchange station on the Stock Yards branch discontinued statistics after 1946, but adjacent Racine station began collecting them in 1948.[68]

References

  1. ^ a b c d e f Garfield, Graham. "Lake Street Transfer". Chicago-L.org. from the original on June 9, 2021. Retrieved February 12, 2022.
  2. ^ a b c d e f g Chicago Transit Authority (April 5, 1948). "New Lake Street All-Express "L" Service". Chicago Tribune. Vol. 107, no. 82. p. 7. from the original on February 13, 2022. Retrieved February 13, 2022 – via Newspapers.com.
  3. ^ a b CTA 1951, p. 15
  4. ^ Moffat 1995, p. 55
  5. ^ Moffat 1995, p. 59
  6. ^ Moffat 1995, p. 62
  7. ^ Moffat 1995, pp. 62–63
  8. ^ Moffat 1995, p. 63
  9. ^ Moffat 1995, p. 73
  10. ^ Moffat 1995, pp. 104–106
  11. ^ Moffat 1995, p. 123
  12. ^ a b Moffat 1995, p. 130
  13. ^ a b The Metropolitan West Side Elevated Railroad (Map). Metropolitan West Side Elevated Railroad. 1898. Retrieved October 23, 2022 – via Chicago-L.org.
  14. ^ CTA 1979, pp. 10–14
  15. ^ a b c 1895 Review, p. 264
  16. ^ 1895 Review, p. 267
  17. ^ Moffat 1995, p. 124
  18. ^ Borzo 2007, p. 43
  19. ^ a b c d e "New "L" Road Opens". Chicago Tribune. Vol. 54, no. 127. May 7, 1895. p. 12 – via Newspapers.com.
  20. ^ a b c d e f Buck, Thomas (February 18, 1951). "1st Trains Run in New Subway Saturday Night". Chicago Tribune. Vol. 110, no. 7. p. 1–21. Retrieved October 16, 2022 – via Newspapers.com.
  21. ^ Moffat 1995, p. 237
  22. ^ Moffat 1995, p. 241
  23. ^ a b c d Moffat 1995, p. 244
  24. ^ "New Lake Street Bridge". Chicago Tribune. Vol. 75, no. 49. February 26, 1916. p. 11. from the original on September 15, 2022. Retrieved September 15, 2022 – via Newspapers.com.
  25. ^ "Bridge Repairs to Require Lake St. 'L' Changes Today". Chicago Tribune. Vol. 94, no. 49. December 8, 1935. p. 1–27. from the original on September 15, 2022. Retrieved September 15, 2022 – via Newspapers.com.
  26. ^ Moffat 1995, pp. 240–242
  27. ^ Moffat 1995, p. 261
  28. ^ Moffat 1995, p. 260
  29. ^ Chicago Transit Authority (October 1, 1947). "Today – they're all yours!". Chicago Tribune. Vol. 106, no. 235. p. 8. Retrieved October 29, 2022 – via Newspapers.com.
  30. ^ Borzo 2007, p. 91
  31. ^ Borzo 2007, p. 92
  32. ^ a b c "Entries in Loop at Every Block; Begin Work Dec. 15". Chicago Tribune. Vol. 97, no. 245. October 13, 1938. pp. 1–2. Retrieved November 17, 2022 – via Newspapers.com.
  33. ^ CTA 1967, p. 9
  34. ^ CTA 1967, p. 5
  35. ^ CTA 1939, p. 16
  36. ^ a b Garfield, Graham. "Damen Tower". Chicago-L.org. Retrieved November 18, 2022.
  37. ^ "Work Speeds on Building New Subway". Chicago Tribune. Vol. 108, no. 34. August 21, 1949. p. 3–1. Retrieved November 20, 2022 – via Newspapers.com.
  38. ^ Nedella, Carola (March 5, 1951). "Results of Eliminating the Logan Square "L"". Chicago Tribune. Vol. 110, no. 62. p. 1–20. Retrieved November 22, 2022 – via Newspapers.com.
  39. ^ Serpico, Lillian (May 15, 1951). "Inconvenienced Riders". Chicago Tribune. Vol. 110, no. 116. p. 1–14. Retrieved November 19, 2022 – via Newspapers.com.
  40. ^ CTA 1951, p. 1
  41. ^ a b c Garfield, Graham. "Paulina Connector". Chicago-L.org. from the original on January 19, 2022. Retrieved February 12, 2022.
  42. ^ a b CTA 1954, p. 12
  43. ^ CTA 1954, p. 14
  44. ^ "Announces Congress Subway Plan System for Trains". Berwyn Life. Vol. 26, no. 70. Berwyn, Illinois. June 11, 1958. p. 5. Retrieved October 16, 2022 – via Newspapers.com.
  45. ^ "A colorful inspiration at the CTA". Chicago Tribune. Vol. 148, no. 209. September 25, 1992. p. 1–22. Retrieved October 16, 2022 – via Newspapers.com.
  46. ^ "Demolish 70-Year-Old 'L'". Chicago Tribune. Vol. 118, no. 306. November 1, 1964. p. 10–9. Retrieved October 29, 2022 – via Newspapers.com.
  47. ^ Groark, Virginia (June 23, 2006). "Pink Line set for its debut". Chicago Tribune. Vol. 160, no. 174. pp. 2–1 & 2–10. Retrieved October 29, 2022 – via Newspapers.com.
  48. ^ a b Moffat 1995, pp. 64–65
  49. ^ Moffat 1995, p. 60
  50. ^ 1895 Review, p. 268
  51. ^ Moffat 1995, p. 134
  52. ^ Moffat 1995, p. 66
  53. ^ Moffat 1995, pp. 58–60.
  54. ^ a b Moffat 1995, p. 115
  55. ^ Moffat 1995, pp. 254–255
  56. ^ a b Moffat 1995, p. 255
  57. ^ CTA 1979, pp. 28–31
  58. ^ a b CTA 1979, p. 13
  59. ^ Lind 1974, pp. 272 and 276
  60. ^ Lind 1974, p. 203
  61. ^ Lind 1974, p. 201
  62. ^ Lind 1974, p. 276
  63. ^ CTA 1979, p. 10
  64. ^ CTA 1979, p. 26
  65. ^ CTA 1979, pp. 10–14 & 27–29
  66. ^ CTA 1979, pp. 10–14 & 26–29
  67. ^ CTA 1979, pp. 13 & 29
  68. ^ a b CTA 1979, p. 14
  69. ^ CTA 1979, pp. 22 & 38
  70. ^ CTA 1979, pp. 6, 14, 22, 30, & 38

Works cited

  • "The Metropolitan West Side Elevated Railroad of Chicago". The Street Railway Review. 5: 263–274. January 15, 1895.
  • Borzo, Greg (2007). The Chicago "L". Charleston, South Carolina: Arcadia. ISBN 978-0-7385-5100-5 – via Google Books.
  • Department of Subways and Traction (1939). A Comprehensive Plan for the Extension of the Subway System of the City of Chicago. Chicago: City of Chicago – via Internet Archive.
  • Chicago Transit Authority (1951). Seventh Annual Report of Chicago Transit Board for the Fiscal Year ended December 31, 1951 – via Internet Archive.
  • Chicago Transit Board (1954). Tenth Annual Report for the Fiscal Year ended December 31, 1954 – via Internet Archive.
  • Public Information Department (1967). Congress Rapid Transit. Chicago: Chicago Transit Authority – via Internet Archive.
  • CTA Rail Entrance, Annual Traffic, 1900–1979 (Report). Chicago: Chicago Transit Authority. October 1, 1979.
  • Lind, Alan R. (1974). Chicago Surface Lines: An Illustrated History. Park Forest, Illinois: Transport History Press.
  • Moffat, Bruce G. (1995). The "L": The Development of Chicago's Rapid Transit System, 1888–1932. Chicago: Central Electric Railfans' Association. ISBN 0-915348-30-6.

lake, street, transfer, station, confused, with, lake, transfer, station, part, clark, lake, rapid, transit, station, chicago, serving, transfer, station, between, lake, street, elevated, railroad, logan, square, branch, metropolitan, west, side, elevated, rai. Not to be confused with the Lake Transfer station now part of Clark Lake The Lake Street Transfer station was a rapid transit station on the Chicago L serving as a transfer station between its Lake Street Elevated Railroad and the Logan Square branch of its Metropolitan West Side Elevated Railroad Located where the Logan Square branch crossed over the Lake Street Elevated it was in service from 1913 to 1951 when it was rendered obsolete by the construction of the Dearborn Street subway LAKE ST TRANSFER 1700W200NFormer Chicago L rapid transit stationThe Lake Street Transfer The Metropolitan is on top the Lake Street Elevated on bottom General informationLocation1719 West Lake StreetChicago Illinois US 1 Coordinates41 53 07 N 87 40 12 W 41 8852 N 87 6701 W 41 8852 87 6701 Coordinates 41 53 07 N 87 40 12 W 41 8852 N 87 6701 W 41 8852 87 6701Owned byChicago Transit Authority 1947 1951 Chicago Rapid Transit Company 1924 1947 See text before 1924Line s Lake Street Elevated Logan Square BranchPlatforms4 side platformsTracks4ConstructionStructure typeElevatedPlatform levels2HistoryOpenedNovember 6 1893 1893 11 06 Wood May 6 1895 1895 05 06 Lake November 3 1913 1913 11 03 Transfer ClosedFebruary 25 1951 72 years ago 1951 02 25 ElectrifiedMay 9 1896 Lake Street Elevated May 6 1895 Logan Square branch Previous namesWood Lake Street Elevated Lake Logan Square branch Passengers1948361 934 69 48 Rank122 out of 223Former servicesPreceding station Chicago L Following stationDamenClosed 1948 a toward Forest Park Lake Street Elevated AshlandClosed 1948 b toward Loop Randolph Wells or Market TerminalGrandtoward Logan Square Logan Square branch Madisontoward MarshfieldLocationThe transfer station was an amalgamation of two predecessor stations Wood on the Lake Street Elevated was on Wood Street one block west of the site of the future transfer and had been constructed in 1893 the Metropolitan s Lake station on the other hand was on the site of the future transfer and had been built in 1895 These stations and their lines had been constructed by two different companies when they and two more companies building what would become the L merged operations in the early 1910s a condition for the merger was the construction of a transfer station between the Metropolitan and Lake Street Elevateds at their crossing which in practice meant the replacement of Wood station with a new Lake Street one under the Metropolitan Having already merged operations the L companies formally united under the Chicago Rapid Transit Company CRT in 1924 the L became publicly owned when the Chicago Transit Authority CTA assumed operations in 1947 Plans for a subway to provide a more direct route from Logan Square to downtown dated to the late 1930s but the subway was originally intended to supplement the Logan Square branch of the area on which the Metropolitan s station lay rather than replace it The newly formed CTA however found little reason to continue operation of the old Logan Square elevated The subway was completed in 1951 leading to the station s closing but remnants survived into the 1960s The site of the station is near the junction of the Paulina Connector the descendant of the old Logan Square trackage and the Lake Street Elevated which was used for temporary and non revenue service until the Pink Line opened in 2006 and returned it to revenue status Lake Street Transfer was double decked the Metropolitan s tracks and station located immediately above the Lake Street s tracks and station Access to the eastbound Lake Street platform was by a station house at the street level passengers would then use the platform to access the Metropolitan s platforms and Lake Street s westbound platform by additional stairways Contents 1 History 1 1 Wood station Lake Street Elevated 1893 1913 1 2 Lake station Metropolitan Elevated 1895 1913 1 3 Transfer station 1913 1951 1 4 Dearborn Street subway closure and demolition 2 Station details 2 1 Operations and connections 2 2 Ridership 3 Notes 4 References 5 Works citedHistory EditWood station Lake Street Elevated 1893 1913 Edit One of Ashland s station houses in 2005 Wood was of a similar design but would have had staircases on both sides of the station house The Lake Street Elevated Railway Company was incorporated on February 7 1888 4 Reincorporated as the Lake Street Elevated Railroad Company on August 24 1892 to avoid legal issues 5 its line the Lake Street Elevated commenced revenue operations at 5 a m on November 6 1893 between California station and the Market Street Terminal 6 The new line had 13 stations c one of which was located on Wood Street 8 The Elevated was powered by steam locomotives until May 9 1896 when its tracks were electrified 9 The Lake Street Elevated Railroad having been dogged by financial issues since its inception was reorganized as the Chicago and Oak Park Elevated Railroad C amp OP on March 31 1904 10 Lake station Metropolitan Elevated 1895 1913 Edit The station house at California in 2011 the original Metropolitan station house was of a similar design The Metropolitan West Side Elevated Railroad Company another founding company of the Chicago L was granted a 50 year franchise by the Chicago City Council on April 7 1892 11 Unlike the Lake Street Elevated which operated a single line the Metropolitan had a main line that proceeded west from downtown to Marshfield Junction where it split into three branches one northwestern branch to Logan Square which in turn had a branch to Humboldt Park d one branch due west to Garfield Park and one southwestern branch to Douglas Park 15 While the competing South Side and Lake Street Elevateds used steam traction the Metropolitan never did although it had originally intended to and indeed had built much of its structure under the assumption that locomotives would be used 16 it decided in May 1894 to have electrified tracks instead 17 making it upon its opening the first revenue electric elevated railroad in the United States 18 The Metropolitan s tracks on the Logan Square branch d were finished up to Robey by the middle of October 1894 and were powered on in April 1895 for test and inspection runs 12 The Metropolitan began service at 6 a m on Monday May 6 1895 between Robey on the Logan Square branch and Canal on the main line 19 Eleven stations opened that day one of which was on Lake Street 19 Since the Lake station crossed the Lake Street Elevated its tracks and platforms were much higher than elsewhere on the L 1 Transfer station 1913 1951 Edit The Lake Street Transfer station in context The station itself is marked by a blue marker The Lake Street Elevated The Metropolitan s trackage prior to 1951 The Loop 13 The Milwaukee Dearborn subway and Congress Line 20 In 1911 the four companies operating the L the C amp OP and Metropolitan as well as the South Side and Northwestern Elevated Railroads merged operations under the aegis of Chicago Elevated Railways CER while keeping their separate identities 21 CER instituted full integration of crosstown service on the L and free transfers between the lines in 1913 having been mandated to do so by the City Council 22 As part of the same ordinance the Metropolitan and C amp OP were required to construct a transfer station where their tracks intersected since the Metropolitan already had its Lake station on the site this meant in practice that the C amp OP had to build a station to connect with it 23 In the process of constructing the new transfer the C amp OP closed its nearby Wood station 23 Free transfers commenced on November 3 1913 but the C amp OP s new station was not finished at that point As an interim measure walking transfers between Wood station and the Metropolitan s Lake station were issued 23 After a few weeks the C amp OP s station was complete and the Wood station was closed 23 Throughout the transfer station s existence it was used as a point of transfer for passengers of one of the lines to switch to the other when construction or maintenance work rendered a line unable to go downtown e CER acted as a de facto holding company for the L unifying its operations and instituting the same management across the companies but kept the underlying companies intact 26 This continued until the companies were formally merged into the single Chicago Rapid Transit Company CRT in 1924 which assumed operations on January 9 the former C amp OP and Metropolitan were designated as the respective Lake Street and Metropolitan Divisions of the CRT for administrative purposes 27 Although municipal ownership of transit had been a hotly contested issue for half a century the publicly owned Chicago Transit Authority CTA would not be created until 1945 28 and would not assume operation of the L until October 1 1947 29 The new CTA began experiments to streamline service on the L among them was skip stop which began as an experiment on the Lake Street Elevated on April 5 1948 2 Stations in between Pulaski and the Loop exclusive became either A or B stations and were serviced by respective A or B trains during weekdays 2 Despite being located in this area Lake Street Transfer was exempt from this system and continued to be serviced by all Lake Street Elevated trains 2 As part of the same plan to streamline Lake Street service the Ashland station one block east of the transfer was closed but remained standing 2 The Logan Square branch would not begin skip stop until the opening of the Dearborn Street subway and the closing of the transfer in 1951 20 Dearborn Street subway closure and demolition Edit Plans for Chicago to have a subway system to relieve the severe congestion of if not replace its elevated trackage dated back to the early 20th century but the city lagged in building subways 30 Chicago petitioned the Public Works Administration PWA for construction funds for a subway on State Street in 1937 31 The petition originally included a proposal for two downtown east west streetcar tunnels 32 Harold L Ickes the administrator of the PWA and a longtime Chicagoan vetoed the streetcar tunnel plan and insisted instead on a second subway that would go under Dearborn Street and Milwaukee Avenue which would provide a more direct route from Logan Square to downtown 32 Although this idea engendered considerable local opposition especially from mayor Edward Joseph Kelly Ickes s influence in the federal government led to the Dearborn plan being adopted in 1938 32 A 1939 plan also introduced the idea of replacing the Metropolitan s main line and Garfield Park branch with a section of rapid transit operating through a proposed superhighway on Congress Street the eventual Interstate 290 33 These sections of transit would be connected allowing for the area s rapid transit to be routed through downtown rather than adhere to a trunk and branch model 34 The subway s approval did not immediately imply the end of the old Logan Square branch plans in 1939 included another proposed subway to connect the branch with the Ravenswood branch to the north and through routing it with the Douglas Park branch to the south into a subway on Ashland Avenue to form a crosstown route 35 Damen Tower serving the Humboldt Park branch divergence was rebuilt with the expectation that it also would switch trains between the subway and the elevated much like the State Street subway connects with the earlier elevated North Side main line that remained standing after its construction 36 and as late as 1949 commuters were promised such a setup that would have preserved the old Logan Square trackage 37 However the CTA had no interest in operating either the old Logan Square elevated or the Humboldt Park branch the new Damen Tower would never be installed with switching equipment and the Logan Square branch south of Damen would be closed after the Dearborn subway opened 36 Washington Junction near the site of the Lake Street Transfer station in 2023 World War II interrupted the construction of the Dearborn Street subway although the federal government allowed the continued construction of the State Street subway it did not do so for the Dearborn Street subway even though it was 82 percent completed by 1942 20 After the war ended work resumed on the Dearborn Street subway and it opened at the midnight beginning Sunday February 25 1951 at the same time the Humboldt Park branch was restricted to a shuttle service to and from Damen on the Logan Square branch 20 Having been rendered obsolete by the subway the Lake Street Transfer station was closed and the Lake Street s Ashland station reopened 3 The subway was predicted to reduce the travel time between Logan Square and downtown from 28 minutes to 15 20 Since construction had not started on the Congress Line trains in the Dearborn subway stopped at its southern terminus at LaSalle and turned back 20 Despite its incomplete state and complaints from riders no longer given a direct trip to the Near West Side 38 39 the new subway had over 60 percent higher ridership than the old Logan Square branch by the end of the year 40 The old Logan Square branch trackage south of its entrance to the subway became known as the Paulina Connector connecting the branch with the rest of the L system 41 Construction on the Congress Line began in 1954 leaving the Douglas branch with the issue of how to connect with the Loop in the meantime 42 The Paulina Connector south of Washington Boulevard a block south of Lake Street was reopened for the purpose 42 but the Metropolitan s old tracks north of Washington were replaced in revenue service by a direct connection to the Lake Street s trackage known as Washington Junction located adjacent to the abandoned station 41 This junction contained an automatic interlocking mechanism where Douglas Park trains carried an electric coil to switch them to the Connector that Lake Street trains lacked 43 This connection was used until the Congress Line was completed in 1958 after which the Douglas branch connected directly with it to use the Dearborn Street subway to go downtown creating the West Northwest Route that was renamed the Blue Line in 1992 44 45 The Paulina Connector both the original Metropolitan tracks and the newer Washington Junction remained in non revenue service The old northbound track north of Washington Junction was removed in 1957 the southbound track continuing non revenue operations 41 Wooden material from closed stations on the Connector including Lake Street Transfer was removed in the late 1950s to mitigate fire hazards as were the lowest flights of stairs to deter trespassing but the rest of the station would remain until the mid to late 1960s 1 The old Metropolitan trackage north of Washington Junction was sparsely used and most of it was demolished in 1964 with the right of way sold off 46 the remainder of the Connector reentered revenue service when the Pink Line was formed from it and the Douglas Park branch by then renamed the Cermak branch in 2006 the junction of the Pink Line with the modern day Green Line the modern service on the Lake Street Elevated is at Washington Junction by the site of the station 47 Station details EditBefore 1913 the Wood and Lake stations had two wooden side platforms each The Wood station had two station houses one on each platform designed in a gingerbread Queen Anne style similar to the other stations on the route and the surviving station houses at Ashland 48 The station houses were heated by potbelly stoves and while earlier plans had called for their ticket agent s booths to be placed on the sides of the station houses facing the street they ended up being placed in alcoves adjacent to the platforms 48 The construction of the Lake Street Elevated s stations was contracted to Frank L Underwood of Kansas City and Willard R Green of New York 49 The Metropolitan s Lake station which continued as its portion of the Lake Street Transfer also had two wooden side platforms but a station house located at street level on the north side of Lake Street The station house made of red pressed brick and white limestone trim was designed similarly to other stations on the Logan Square branch surviving examples of which are at California and Damen with a corniced and dentiled front bay containing dual doors specifically marked Entrance and Exit and prolific use of terra cotta Its wooden platforms had hipped roof tin canopies in the center and decorative cast iron railings with diamond designs 1 50 Unlike elsewhere on the L station houses on the Metropolitan had central heating and a basement 51 After the transfer was completed in 1913 the C amp OP built new platforms these platforms projected westward from the Metropolitan with their eastern halves covered by arched canopies with lattice framing and their western halves open Auxiliary exits onto Hermitage Avenue were located on the middle of the Lake Street platforms at the western ends of their canopies On the Metropolitan s end its platforms and canopies were extended southward to meet the southern Lake Street platform and a new station house on the south side of Lake Street was constructed sometime before 1917 after which the original station house was used for storage The final station was double decked with the Metropolitan s original two side platforms being augmented by the Lake Street Elevated s lower two side platforms Access to the station was through stairwells from the station house to the Lake Street platforms which had additional stairways to connect to the Metropolitan platforms each Lake Street platform was connected to each Metropolitan platform leading to four inter platform stairwells in total It is presumed that the station house had direct access only to the southern eastbound Lake Street platform with patrons wishing to access the Lake Street s northern westbound platform having to walk up to the Metropolitan platforms and walk down again 1 Throughout the stations existence the Lake Street f and Metropolitan Elevateds 15 had two tracks each in the vicinity meaning that the transfer station had four tracks overall Having had trouble constructing its trackage with two different companies and assembling much of its own infrastructure the Lake Street Elevated contracted with Underwood and Green to construct its stations and the tracks west of Ashland 53 The Metropolitan s tracks were constructed by the West Side Construction Company a company with the same officers as the Metropolitan itself and the chief engineer of E W Elliot with steel and iron from the Carnegie Steel Company 15 Like the rest of the station the tracks were double decked in relation with one another 1 Operations and connections Edit As originally opened the Metropolitan s trains ran every six minutes between 6 a m and 6 30 p m and every ten minutes during the night the average speed was 16 mph 26 km h 19 Unlike the Lake Street Elevated all of the Metropolitan s motor cars allowed smoking 19 The Lake Street Elevated originally operated smoking cars at some times and not at others 19 but the C amp OP banned all smoking on its trains in 1909 54 Smoking was banned by the city across the L and in streetcars in response to a 1918 influenza outbreak a prohibition that has remained in force ever since 54 The fare across the L was legally mandated to be a nickel 5 cents 1 37 in 2021 in the late 19th and early 20th centuries This fare continued until temporarily increased by a cent to 0 06 1 27 in 2021 in 1917 before stabilizing to a dime 10 cents 1 35 in 2021 in 1920 55 Starting in 1922 fares were usually marketed in packs of three rides for 25 cents or 8 1 3 cents per ride 1 35 per ride in 2021 but individual fares remained 10 cents each 56 At the same time a weekly pass was introduced the first in a major American city for 1 25 20 24 in 2021 for rides outside of Evanston and Wilmette 56 Fare control was originally by station agents posted at the station 24 hours a day on the Lake Street conductors were instead used for off peak and night hours between 1921 and 1922 and consistently from 1925 57 while the Metropolitan used conductors between 1931 and 1937 58 The Lake Street transfer station was served by a streetcar service on Lake Street this service was consolidated with a streetcar service on State Street down to 63rd Street on September 14 1924 as part of so called Through Route 16 or TR 16 59 Unlike many streetcar lines in Chicago TR 16 had no owl service and its last northbound car left 63rd Street at 12 35 a m 60 During the day streetcar lines in Chicago typically had intervals of between eight and fifteen minutes per car 61 After the transfer station was abandoned streetcar service on Lake Street was cut back from downtown on November 15 1953 and replaced by buses on May 30 1954 62 Ridership Edit Prior to the construction of the transfer the Metropolitan s Lake station had a ridership that hovered around 250 000 a year peaking at 296 116 in 1905 63 The Lake Street s Wood station had a similar ridership but one which peaked at 441 045 in 1905 64 Once the transfer was in place the two lines contributions to station ridership were roughly equal with the Lake Street edging out the Metropolitan each year 65 Lake Wood and Lake Street Transfer station riderships from 1900 through 1948 66 In 1936 the last year Lake Street records are available the transfer station had 94 688 Lake Street riders and 87 533 Metropolitan riders for a combined ridership of 182 221 67 The following year s Metropolitan ridership was 181 909 suggesting that subsequent years riderships were all recorded as being under the Metropolitan 58 The Metropolitan continued to record transfer ridership until 1948 that year the Lake Street Transfer had 361 934 riders a substantial 69 48 percent increase from the 213 561 of 1947 Throughout the 1940s the transfer s ridership ranking within the Northwest branch s six stations varied significantly in 1940 it was the second least patronized station after Grand immediately to the north while in 1948 it had the third highest ridership after Damen and Chicago 68 For the L overall in 1948 it was the 122nd most ridden of 223 stations at the beginning of the year where ridership was recorded in 1947 it had been the 174th most ridden of 222 such stations g 70 Notes Edit California after 1948 2 Loomis after 1948 2 Ashland reopened on February 25 1951 upon the Lake Street Transfer s closure 3 Including one at Homan west of California which had been a part of a non revenue grand opening on November 4 but would not open for revenue service until November 24 7 a b Technically the Logan Square branch started after Robey and was like the Humboldt Park branch a divergence from what was formally known as the Northwest branch 12 However as early as 1898 even the Metropolitan itself was referring to the Northwest branch as part of the Logan Square branch 13 although ridership statistics continued to separate them 14 Examples of this occurring include incidents in February 1916 24 and on December 8 1935 25 The Lake Street Elevated had a third track built west of Rockwell Street approximately 1 mile 1 6 km west of the transfer to store cars not in revenue service 52 Several stations on the Niles Center and Westchester branches were permanently unmanned and thus did not collect ridership statistics 69 Several stations closed on the L during 1948 2 Exchange station on the Stock Yards branch discontinued statistics after 1946 but adjacent Racine station began collecting them in 1948 68 References Edit a b c d e f Garfield Graham Lake Street Transfer Chicago L org Archived from the original on June 9 2021 Retrieved February 12 2022 a b c d e f g Chicago Transit Authority April 5 1948 New Lake Street All Express L Service Chicago Tribune Vol 107 no 82 p 7 Archived from the original on February 13 2022 Retrieved February 13 2022 via Newspapers com a b CTA 1951 p 15 Moffat 1995 p 55 Moffat 1995 p 59 Moffat 1995 p 62 Moffat 1995 pp 62 63 Moffat 1995 p 63 Moffat 1995 p 73 Moffat 1995 pp 104 106 Moffat 1995 p 123 a b Moffat 1995 p 130 a b The Metropolitan West Side Elevated Railroad Map Metropolitan West Side Elevated Railroad 1898 Retrieved October 23 2022 via Chicago L org CTA 1979 pp 10 14 a b c 1895 Review p 264 1895 Review p 267 Moffat 1995 p 124 Borzo 2007 p 43 a b c d e New L Road Opens Chicago Tribune Vol 54 no 127 May 7 1895 p 12 via Newspapers com a b c d e f Buck Thomas February 18 1951 1st Trains Run in New Subway Saturday Night Chicago Tribune Vol 110 no 7 p 1 21 Retrieved October 16 2022 via Newspapers com Moffat 1995 p 237 Moffat 1995 p 241 a b c d Moffat 1995 p 244 New Lake Street Bridge Chicago Tribune Vol 75 no 49 February 26 1916 p 11 Archived from the original on September 15 2022 Retrieved September 15 2022 via Newspapers com Bridge Repairs to Require Lake St L Changes Today Chicago Tribune Vol 94 no 49 December 8 1935 p 1 27 Archived from the original on September 15 2022 Retrieved September 15 2022 via Newspapers com Moffat 1995 pp 240 242 Moffat 1995 p 261 Moffat 1995 p 260 Chicago Transit Authority October 1 1947 Today they re all yours Chicago Tribune Vol 106 no 235 p 8 Retrieved October 29 2022 via Newspapers com Borzo 2007 p 91 Borzo 2007 p 92 a b c Entries in Loop at Every Block Begin Work Dec 15 Chicago Tribune Vol 97 no 245 October 13 1938 pp 1 2 Retrieved November 17 2022 via Newspapers com CTA 1967 p 9 CTA 1967 p 5 CTA 1939 p 16 a b Garfield Graham Damen Tower Chicago L org Retrieved November 18 2022 Work Speeds on Building New Subway Chicago Tribune Vol 108 no 34 August 21 1949 p 3 1 Retrieved November 20 2022 via Newspapers com Nedella Carola March 5 1951 Results of Eliminating the Logan Square L Chicago Tribune Vol 110 no 62 p 1 20 Retrieved November 22 2022 via Newspapers com Serpico Lillian May 15 1951 Inconvenienced Riders Chicago Tribune Vol 110 no 116 p 1 14 Retrieved November 19 2022 via Newspapers com CTA 1951 p 1 a b c Garfield Graham Paulina Connector Chicago L org Archived from the original on January 19 2022 Retrieved February 12 2022 a b CTA 1954 p 12 CTA 1954 p 14 Announces Congress Subway Plan System for Trains Berwyn Life Vol 26 no 70 Berwyn Illinois June 11 1958 p 5 Retrieved October 16 2022 via Newspapers com A colorful inspiration at the CTA Chicago Tribune Vol 148 no 209 September 25 1992 p 1 22 Retrieved October 16 2022 via Newspapers com Demolish 70 Year Old L Chicago Tribune Vol 118 no 306 November 1 1964 p 10 9 Retrieved October 29 2022 via Newspapers com Groark Virginia June 23 2006 Pink Line set for its debut Chicago Tribune Vol 160 no 174 pp 2 1 amp 2 10 Retrieved October 29 2022 via Newspapers com a b Moffat 1995 pp 64 65 Moffat 1995 p 60 1895 Review p 268 Moffat 1995 p 134 Moffat 1995 p 66 Moffat 1995 pp 58 60 a b Moffat 1995 p 115 Moffat 1995 pp 254 255 a b Moffat 1995 p 255 CTA 1979 pp 28 31 a b CTA 1979 p 13 Lind 1974 pp 272 and 276 Lind 1974 p 203 Lind 1974 p 201 Lind 1974 p 276 CTA 1979 p 10 CTA 1979 p 26 CTA 1979 pp 10 14 amp 27 29 CTA 1979 pp 10 14 amp 26 29 CTA 1979 pp 13 amp 29 a b CTA 1979 p 14 CTA 1979 pp 22 amp 38 CTA 1979 pp 6 14 22 30 amp 38Works cited Edit The Metropolitan West Side Elevated Railroad of Chicago The Street Railway Review 5 263 274 January 15 1895 Borzo Greg 2007 The Chicago L Charleston South Carolina Arcadia ISBN 978 0 7385 5100 5 via Google Books Department of Subways and Traction 1939 A Comprehensive Plan for the Extension of the Subway System of the City of Chicago Chicago City of Chicago via Internet Archive Chicago Transit Authority 1951 Seventh Annual Report of Chicago Transit Board for the Fiscal Year ended December 31 1951 via Internet Archive Chicago Transit Board 1954 Tenth Annual Report for the Fiscal Year ended December 31 1954 via Internet Archive Public Information Department 1967 Congress Rapid Transit Chicago Chicago Transit Authority via Internet Archive CTA Rail Entrance Annual Traffic 1900 1979 Report Chicago Chicago Transit Authority October 1 1979 Lind Alan R 1974 Chicago Surface Lines An Illustrated History Park Forest Illinois Transport History Press Moffat Bruce G 1995 The L The Development of Chicago s Rapid Transit System 1888 1932 Chicago Central Electric Railfans Association ISBN 0 915348 30 6 Retrieved from https en wikipedia org w index php title Lake Street Transfer station amp oldid 1141472433, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.