The Laguna Diversion Dam is a rock-filled diversion dam on the Colorado River. It is located 13 miles northeast of Winterhaven, CAYuma, AZ on Imperial County route S24. Constructed between 1903 and 1905, the dam was the first dam built on the Colorado River and subsequently ended boat travel to the north.

Laguna Diversion Dam
Overhead of dam facing north
Location of Laguna Diversion Dam in California
LocationImperial County, California / Yuma County, Arizona, US
Coordinates32°49′22″N 114°29′39″W / 32.82278°N 114.49417°W / 32.82278; -114.49417Coordinates: 32°49′22″N 114°29′39″W / 32.82278°N 114.49417°W / 32.82278; -114.49417
Construction began1903
Opening date1905
Operator(s)U.S. Bureau of Reclamation
Dam and spillways
Type of damRock-fill weir, concrete surface
ImpoundsColorado River
Height43 feet (13 m)
Length4,780 feet (1,460 m)
Spillway typeControlled service

History

After the passage of the Reclamation Act by the US Congress in 1902, the U.S. Bureau of Reclamation began constructing the dam under the Yuma Project in 1903. This project was the first development of the U.S. Reclamation Service along the Lower Colorado River and featured the Laguna Diversion Dam, a pumping station and a series of canals.[1] On July 6, 1905 the contract to build the dam was awarded to J. G. White and Company who started construction less than two weeks later. Deliveries of cement were a problem as they had to be delivered to Yuma by rail and to the construction site by wagons or steamboat. Poor rock quality at local quarries also posed a problem that consistently delayed construction, 50% of the weak rock was unusable. Even after their contract was supplemented to encompass the rock quality delays, J. G. White and Company still did not meet their deadline and the Bureau of Reclamation took over construction in early 1907.[2]

To solve the cement delivery problems, the Bureau of Reclamation had built a levee on the California side on the dam that was topped by a rail-line by March 1908. Beforehand, they had also gained the cooperation of the Southern Pacific Railroad who agreed to deliver cement directly at the dam site. The rock problem was solved when the Bureau raised the upstream and downstream cofferdams with rock waste and topped them with rail lines that could deliver rock-fill much faster. By December 1908, the water bypass around the dam was complete and workers began to pour the rock-fill. Three large concrete walls supported by 6-inch sheet-wood pilings were built across the river for the dam's foundation. Rock-fill was placed in between and on the outsides of these walls for support. The California sluiceway consisted of three iron gates while the Arizona had one. Mexican-Americans mostly worked on the dam while a few Native American Indians did as well. Skilled white-labor worked in the cooler months.[2]

The Laguna Dam's design and size made it a peculiar structure for the time. The dam, a weir, was merely 43 ft. tall, almost two-thirds of which were built below the riverbed. Subsequently, the dam only raised the river ten feet. Modifications to the dam's downstream talus were done between 1923–1924.[2] After the creation of the Imperial Dam 5-miles upstream, the Laguna Diversion Dam was no longer needed and its California diversion outlets were closed on June 23, 1948. Since then, the dam serves to regulate the outflows of the Imperial Dam and often does not impound a large reservoir.[3]

Swastika design

The Laguna Dam was decorated with numerous swastikas, thus developing the eventual nickname "Swastika Dam." The swastikas present on this structure were not put there for any sort of National Socialist ("Nazi"), or otherwise racist or socio-political reasons. They were placed there prior to Adolf Hitler's effectively having altered the popular meaning of the swastika within Western societies.

Fish species

See also

References

  1. ^ "Yuma Project". U.S. Bureau of Reclamation. Retrieved 13 July 2010.
  2. ^ a b c A. Stene, Eric. "Yuma Project and Yuma Auxiliary Project" (PDF). History of Reclamation Projects. U.S. Bureau of Reclamation. Retrieved 14 July 2010.
  3. ^ "Laguna Diversion Dam". U.S. Bureau of Reclamation. Retrieved 13 July 2010.

External links

  • USBR Laguna Diversion Dam Website
  • Historic American Engineering Record (HAER) No. AZ-87, "Laguna Diversion Dam, Laguna Dam Road, Yuma, Yuma County, AZ", 4 data pages
  • Swastika Dam article by Walter Smoter Frank
  • USBR History of Laguna Dam
  • Arizona Lake Levels

laguna, diversion, rock, filled, diversion, colorado, river, located, miles, northeast, winterhaven, yuma, imperial, county, route, constructed, between, 1903, 1905, first, built, colorado, river, subsequently, ended, boat, travel, north, overhead, facing, nor. The Laguna Diversion Dam is a rock filled diversion dam on the Colorado River It is located 13 miles northeast of Winterhaven CA Yuma AZ on Imperial County route S24 Constructed between 1903 and 1905 the dam was the first dam built on the Colorado River and subsequently ended boat travel to the north Laguna Diversion DamOverhead of dam facing northLocation of Laguna Diversion Dam in CaliforniaLocationImperial County California Yuma County Arizona USCoordinates32 49 22 N 114 29 39 W 32 82278 N 114 49417 W 32 82278 114 49417 Coordinates 32 49 22 N 114 29 39 W 32 82278 N 114 49417 W 32 82278 114 49417Construction began1903Opening date1905Operator s U S Bureau of ReclamationDam and spillwaysType of damRock fill weir concrete surfaceImpoundsColorado RiverHeight43 feet 13 m Length4 780 feet 1 460 m Spillway typeControlled service Contents 1 History 2 Swastika design 3 Fish species 4 See also 5 References 6 External linksHistory EditAfter the passage of the Reclamation Act by the US Congress in 1902 the U S Bureau of Reclamation began constructing the dam under the Yuma Project in 1903 This project was the first development of the U S Reclamation Service along the Lower Colorado River and featured the Laguna Diversion Dam a pumping station and a series of canals 1 On July 6 1905 the contract to build the dam was awarded to J G White and Company who started construction less than two weeks later Deliveries of cement were a problem as they had to be delivered to Yuma by rail and to the construction site by wagons or steamboat Poor rock quality at local quarries also posed a problem that consistently delayed construction 50 of the weak rock was unusable Even after their contract was supplemented to encompass the rock quality delays J G White and Company still did not meet their deadline and the Bureau of Reclamation took over construction in early 1907 2 To solve the cement delivery problems the Bureau of Reclamation had built a levee on the California side on the dam that was topped by a rail line by March 1908 Beforehand they had also gained the cooperation of the Southern Pacific Railroad who agreed to deliver cement directly at the dam site The rock problem was solved when the Bureau raised the upstream and downstream cofferdams with rock waste and topped them with rail lines that could deliver rock fill much faster By December 1908 the water bypass around the dam was complete and workers began to pour the rock fill Three large concrete walls supported by 6 inch sheet wood pilings were built across the river for the dam s foundation Rock fill was placed in between and on the outsides of these walls for support The California sluiceway consisted of three iron gates while the Arizona had one Mexican Americans mostly worked on the dam while a few Native American Indians did as well Skilled white labor worked in the cooler months 2 The Laguna Dam s design and size made it a peculiar structure for the time The dam a weir was merely 43 ft tall almost two thirds of which were built below the riverbed Subsequently the dam only raised the river ten feet Modifications to the dam s downstream talus were done between 1923 1924 2 After the creation of the Imperial Dam 5 miles upstream the Laguna Diversion Dam was no longer needed and its California diversion outlets were closed on June 23 1948 Since then the dam serves to regulate the outflows of the Imperial Dam and often does not impound a large reservoir 3 Swastika design EditThe Laguna Dam was decorated with numerous swastikas thus developing the eventual nickname Swastika Dam The swastikas present on this structure were not put there for any sort of National Socialist Nazi or otherwise racist or socio political reasons They were placed there prior to Adolf Hitler s effectively having altered the popular meaning of the swastika within Western societies Fish species EditLargemouth Bass Striped Bass Crappie Bullhead catfish Catfish Channel Catfish Flathead Tilapia Redear Sunfish Green Sunfish Front of dam Bluegill Sunfish Mullet Carp BullfrogsSee also EditMittry Lake Created by the dam County Route S24References Edit Yuma Project U S Bureau of Reclamation Retrieved 13 July 2010 a b c A Stene Eric Yuma Project and Yuma Auxiliary Project PDF History of Reclamation Projects U S Bureau of Reclamation Retrieved 14 July 2010 Laguna Diversion Dam U S Bureau of Reclamation Retrieved 13 July 2010 Information and Education Division 2007 Arizona Fishin Holes Phoenix AZ Arizona Game and Fish Department a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help Map of Laguna Diversion DamExternal links Edit Wikimedia Commons has media related to Laguna Diversion Dam USBR Laguna Diversion Dam Website Historic American Engineering Record HAER No AZ 87 Laguna Diversion Dam Laguna Dam Road Yuma Yuma County AZ 4 data pages Swastika Dam article by Walter Smoter Frank USBR History of Laguna Dam Arizona Lake Levels Retrieved from https en wikipedia org w index php title Laguna Diversion Dam amp oldid 1110846953, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.