fbpx
Wikipedia

L0 Series

The L0 Series (Japanese: Lエル0ゼロけい, Hepburn: Eru-zero-kei, "L zero series")[3] is a high-speed maglev train that the Central Japan Railway Company (JR Central) is developing and testing. JR Central plans to use the L0 series on the Chūō Shinkansen railway line between Tokyo and Osaka, which is under construction.

L0 Series
A test run of the Improved L0 Series, August 2020
ManufacturerMitsubishi Heavy Industries, Nippon Sharyo, Hitachi Rail
Constructed2011–
Entered service2011
2020 (improved)
2027 (passenger service)
Number built14 vehicles
Number in service12 vehicles (1 set)
FormationTest: 5–12 cars
Operation: 16 cars
CapacityEnd cars: 24
Intermediate cars: 68
OperatorsJR Central
Lines servedCurrent: Yamanashi test track
Future: Chūō Shinkansen
Specifications
Train length299 m (981 ft 0 in) (12-car formation)
Car length28 m (91 ft 10 in) (end cars)
24.3 m (79 ft 9 in) (intermediate cars)
Width2.9 m (9 ft 6 in)[1]
Height3.1 m (10 ft 2 in)[1]
Doors2 × 1 per car
Maximum speedDesign: 550 km/h (342 mph)
Record: 603 km/h (375 mph)
Operational: 500 km/h (311 mph)
Power supplyL0 series: gas turbine-electric[2]
Improved L0 series: unknown
Electric system(s)33 kV AC
Current collector(s)L0 series: none
Improved L0 series: induction (wireless power transfer)
Track gaugeSCMaglev guideway

The L0 series uses the Japanese-designed SCMaglev system. Mitsubishi Heavy Industries and Nippon Sharyo, a subsidiary of JR Central, are building fourteen pre-production vehicles.[4]

A seven-car train set a land speed record for rail vehicles of 603 km/h (375 mph) on 21 April 2015.[5] The trains are planned to run at a maximum speed of 500 km/h (311 mph),[6] offering journey times of 40 minutes between Tokyo (Shinagawa Station) and Nagoya, and 1 hour 7 minutes between Tokyo and Osaka.[7]

Specifications edit

The end cars of L0 series trainsets are 28 meters (92 ft) long and carry 24 passengers. The nose extends 15 meters (49 ft) for better aerodynamics and reduced noise in tunnels.[7][8][9] Intermediate cars are 24.3 meters (80 ft) long and carry 68 passengers each, which totals a 299 m (981 ft) long and 728 passengers train. Each row is four seats wide, one fewer than JR Central shinkansen trains. The cars are more box-shaped than earlier models to allow for more interior space.[10] Cars are painted white and blue. During normal operation, the train is expected to operate at a maximum speed of 500 km/h (310 mph).[6]

The train does not require a driver, but does have a camera at the front of both end cars in order to allow for remote operation, in case the automated systems fail. The camera is more apparent on the revised end cars, introduced in 2020. It is moved to a higher position, and increased in size.[2]

The superconducting magnets in the bogies are built by Toshiba and Mitsubishi Electric. The cars are built by Nippon Sharyo, with Mitsubishi Heavy Industries also having built some in the past. Mitsubishi Heavy Industries stopped producing cars in 2017 after car manufacturing cost disagreements with JR central and the Mitsubishi SpaceJet's spiralling development costs.[11] The bogies are arranged in a Jacobs bogie configuration.

Planned operations edit

Chuo Shinkansen edit

Construction on the Chuo Shinkansen line on which the train is intended to run began in December 2014. The first section to Nagoya is expected to be completed in 2027. That section will be approximately 85% tunnels with an estimated cost of ¥5.5 trillion (US$46.5 billion). The relatively high cost is in large part due to the many tunnels.[12][13]

The complete line to Osaka is estimated to cost ¥9 trillion ($74.7 billion), and was expected to be completed by 2045, after an eight-year pause in construction to recuperate costs. However, after receiving a ¥3 trillion ($28 billion) loan from the Japanese government, JR Central moved the project forward. It now expects to be able to open the full line as early as 2037, with construction beginning immediately after completion of the Tokyo–Nagoya section.[14]

United States edit

A route from Washington, D.C. to Baltimore, eventually extending all the way to New York City has received political support in the United States. JR Central chairman Yoshiyuki Kasai spoke with U.S. President Barack Obama about the L0 series during Prime Minister Shinzo Abe's 28 April 2015 visit.

In August 2017, development partner Mitsubishi announced that talks had "stalled" because of "a lack of clarity on the Trump administration's stance on high-speed rail".[15][16]

In March 2019, Northeast Maglev project director David Henley stated in an interview that they expect to have a Record of Decision for the D.C.–Baltimore section by August 2020, and to begin construction later that same year, or in early 2021. According to Henley, this would allow operations to begin in 2027–28, allowing for a construction period of 7 years.[17]

History edit

 
The first L0 series undergoing test-running in August 2014

L0 series edit

The first L0 series vehicle was delivered to the Yamanashi Maglev Test Line and unveiled to the press in November 2012.[18] The first five vehicles were linked up and placed on the guideway in June 2013.[10]

The first five-car train began test-running at the 42.8 km (26.6 mi) Yamanashi Maglev Test Line in June 2013, following completion of extension and upgrade work at the facility, earlier than the originally scheduled September date.[19] The maximum speed of test runs was gradually increased, reaching 500 km/h (311 mph) by the end of July 2013.[19]

The five-car train was lengthened to seven cars in September 2013, and test-running as a 12-car formation commenced on 25 June 2014.[20] The train was reverted to a 7-car formation later in 2014,[20] and used for public preview rides starting in November.[21]

A series of endurance and speed tests was carried out on the 42.8 km (26.6 mi) test rail in April 2015 to examine the reliability and durability of the L0 after repeated high speed usage. Several speed and distance records were set in the process.[22]

After April 2015, the train returned to being used for public preview rides.

Improved L0 Series edit

 
Improved L0-series in Fuefuki, 29 August 2020

The L0 series are planned to be replaced with a revised model starting May 2020 (named the "Improved L0 series"). This will be the first L0 series to receive power from the guideway through induction. Currently, on-board power is provided by a small gas turbine generator in each end car. The new end cars also feature a relocated and enlarged camera, and are more aerodynamic thanks to the removal of the exhaust vent necessary for the generator. Only one end car will be replaced by 2020, as well as one intermediate car. This means that the train will consist of a combination of revised and original cars for a period of time, and will be able to generate electricity with its onboard generator while testing the new induction system.[2]

The new cars were completed in March 2020. While presenting the new end car to the press, lead designer Motoaki Terai stated that this model represents the completion of around 80–90% of the design goals for the final train.[23]

Variants edit

L0 Series: 1 × 12-car set owned by JR Central, introduced in 2011 and planned to be converted to the Improved L0 series starting in June 2020.

Improved L0 Series: 1 × 12-car set planned to be gradually upgraded from L0 series starting June 2020. Two replacement cars have been completed as of April 2020.

Records edit

Speed records edit

  • 16 April 2015: Fastest manned train in the world (590 km/h (370 mph))
  • 21 April 2015: Fastest manned train in the world (603 km/h (375 mph))

On 16 April 2015, a manned seven-car L0 series trainset reached a speed of 590 km/h (370 mph), breaking the previous world record of 581 km/h (361 mph) set by a Japanese MLX01 maglev trainset in December 2003. The speed of 590 km/h was sustained for a period of 19 seconds.[24] This speed record was broken again on 21 April 2015, when a manned seven-car set recorded a top speed of 603 km/h (375 mph).[5] The train hit its top speed at 10:48 am, about 4 minutes into the run. With 49 JR Central employees on board, the train sustained the speed for 10.8 seconds, travelling 1.8 kilometers (1.1 mi) during that time.[5][15]

Distance records edit

  • 10 April 2015: Longest distance travelled in one day (3,904 km (2,426 mi)), breaking the previous record (2,876 km (1,787 mi)) set in 2003.
  • 14 April 2015: Longest distance travelled in one day (4,064 km (2,525 mi)).[12][25]

See also edit

References edit

  1. ^ a b "L0 design changes" (PDF). jr-central.co.jp. JR Central. Retrieved 14 March 2019.
  2. ^ a b c 山梨リニア実験線に改良型試験車両 2020年春に完成へ. 乗りものニュース (in Japanese). Retrieved 14 March 2019.
  3. ^ [JR Central to resume maglev rides – costing around 2,500 yen]. The Yamanashi Nichinichi Shimbun – Web Edition (in Japanese). Japan: The Yamanashi Nichinichi Shimbun. 20 March 2014. Archived from the original on 25 March 2014. Retrieved 25 March 2014.
  4. ^ [Maglev vehicles to be built by Mitsubishi Heavy Industries and Nippon Sharyo – JR Central President] (in Japanese). Japan: Sankei Shimbun. 21 December 2010. Archived from the original on 23 December 2010. Retrieved 20 July 2013.
  5. ^ a b c "Japan's maglev train breaks world speed record with 600 km/h test run". The Guardian. United Kingdom: Guardian News and Media Limited. 21 April 2015. Retrieved 21 April 2015.
  6. ^ a b [JR Central: Maglev testing at 500 km/h resumes – Expanded commuter area to create major upheavals]. Bloomberg (in Japanese). Japan: Bloomberg LP. 29 August 2013. Archived from the original on 30 August 2013. Retrieved 12 February 2015.
  7. ^ a b . Daily Onigiri. DailyOnigiri.com. 4 November 2010. Archived from the original on 4 August 2017. Retrieved 17 January 2013.
  8. ^ Iida, Masanobu; Kikuchi, Katsuhiro; Fukuda, Takashi (2006). "Analysis and Experiment of Compression Wave Generated by Train Entering Tunnel Entrance Hood". JSME International Journal Series B Fluids and Thermal Engineering. 49 (3): 761–770. doi:10.1299/jsmeb.49.761.
  9. ^ "About the vehicle | SCMAGLEV | Central Japan Railway Company". scmaglev.jr-central-global.com. JR Central. Retrieved 15 June 2021.
  10. ^ a b "Prototype of high-speed maglev train shown to public" 30 July 2013 at the Wayback Machine. Asahi Shimbun, 3 June 2013.
  11. ^ "Mitsubishi Heavy to back out of maglev train project". Nikkei Asian Review.
  12. ^ a b Keith Barrow (17 April 2015). "Japan breaks maglev speed record". International Railway Journal. Retrieved 22 April 2015.
  13. ^ Ichihara, Tomohiro (22 April 2015). "Japanese rail company eyes exports to cover maglev costs". Nikkei. Retrieved 22 April 2015.
  14. ^ "Japan PM's maglev decision reflects political calculus over economics". Reuters. 21 July 2016. Retrieved 14 March 2019.
  15. ^ a b "Japanese rail company eyes exports to cover maglev costs". Nikkei. 22 April 2015. Retrieved 22 April 2015.
  16. ^ "Mitsubishi Heavy to back out of maglev train project". Nikkei Asian Review. 10 August 2017.
  17. ^ American Rail Club (9 March 2019), Fastest Train Being Built in America! – NYC to DC in 60 Minutes, retrieved 14 March 2019
  18. ^ リニア新型車両「L0系」を初公開 JR東海が山梨の実験線に搬入 [New L0 series maglev car unveiled, delivered to Yamanashi Test Track]. Sankei Biz (in Japanese). Japan: Sankei Digital Inc. 22 November 2012. Retrieved 22 November 2012.
  19. ^ a b 7月中にも最高時速500キロに 新型車両「L0系」 [New L0 series trains to reach 500 km/h during July]. Chunichi Web (in Japanese). Japan: The Chunichi Shimbun. 24 July 2013. Archived from the original on 29 July 2013. Retrieved 30 July 2013.
  20. ^ a b [Maglev L0 to start testing today as 12-car formation]. The Yamanashi Nichinichi Shimbun – Web Edition (in Japanese). The Yamanashi Nichinichi Shimbun. 25 June 2014. Archived from the original on 10 August 2014. Retrieved 8 August 2014.
  21. ^ . The Asahi Shimbun Asahi & Japan Watch. Japan: The Asahi Shimbun Company. 13 November 2014. Archived from the original on 16 November 2014. Retrieved 17 April 2015.
  22. ^ . Railway Gazette. 21 April 2015. Archived from the original on 10 March 2020. Retrieved 22 April 2015.
  23. ^ "超電導リニアL0系 スマホ同様に電気を得る「誘導集電」全面対応の改良型試験車が登場". 乗りものニュース (in Japanese). Retrieved 27 March 2020.
  24. ^ リニア「L0系」、世界最高の590キロ記録 [L0 series maglev sets world speed record of 590 km/h]. Yomiuri Online (in Japanese). Japan: The Yomiuri Shimbunl. 16 April 2015. Archived from the original on 16 April 2015. Retrieved 17 April 2015.
  25. ^ 「山梨リニア実験線 長距離走行試験」の結果等について [Results of distance trials at Yamanashi Maglev Test Track] (PDF) (Press release) (in Japanese). Japan: Central Japan Railway Company. 16 April 2015. Retrieved 17 April 2015.

External links edit

  • JR Central press release (Part 1) (26 October 2010) (in Japanese)
  • JR Central press release (Part 2) (26 October 2010) (in Japanese)
  • SCMAGLEV Website

series, japanese, エル, ゼロ, けい, hepburn, zero, zero, series, high, speed, maglev, train, that, central, japan, railway, company, central, developing, testing, central, plans, series, chūō, shinkansen, railway, line, between, tokyo, osaka, which, under, construct. The L0 Series Japanese L エル 0 ゼロ 系 けい Hepburn Eru zero kei L zero series 3 is a high speed maglev train that the Central Japan Railway Company JR Central is developing and testing JR Central plans to use the L0 series on the Chuō Shinkansen railway line between Tokyo and Osaka which is under construction L0 SeriesA test run of the Improved L0 Series August 2020ManufacturerMitsubishi Heavy Industries Nippon Sharyo Hitachi RailConstructed2011 Entered service20112020 improved 2027 passenger service Number built14 vehiclesNumber in service12 vehicles 1 set FormationTest 5 12 carsOperation 16 carsCapacityEnd cars 24Intermediate cars 68OperatorsJR CentralLines servedCurrent Yamanashi test trackFuture Chuō ShinkansenSpecificationsTrain length299 m 981 ft 0 in 12 car formation Car length28 m 91 ft 10 in end cars 24 3 m 79 ft 9 in intermediate cars Width2 9 m 9 ft 6 in 1 Height3 1 m 10 ft 2 in 1 Doors2 1 per carMaximum speedDesign 550 km h 342 mph Record 603 km h 375 mph Operational 500 km h 311 mph Power supplyL0 series gas turbine electric 2 Improved L0 series unknownElectric system s 33 kV ACCurrent collector s L0 series noneImproved L0 series induction wireless power transfer Track gaugeSCMaglev guideway The L0 series uses the Japanese designed SCMaglev system Mitsubishi Heavy Industries and Nippon Sharyo a subsidiary of JR Central are building fourteen pre production vehicles 4 A seven car train set a land speed record for rail vehicles of 603 km h 375 mph on 21 April 2015 5 The trains are planned to run at a maximum speed of 500 km h 311 mph 6 offering journey times of 40 minutes between Tokyo Shinagawa Station and Nagoya and 1 hour 7 minutes between Tokyo and Osaka 7 Contents 1 Specifications 2 Planned operations 2 1 Chuo Shinkansen 2 2 United States 3 History 3 1 L0 series 3 2 Improved L0 Series 4 Variants 5 Records 5 1 Speed records 5 2 Distance records 6 See also 7 References 8 External linksSpecifications editThe end cars of L0 series trainsets are 28 meters 92 ft long and carry 24 passengers The nose extends 15 meters 49 ft for better aerodynamics and reduced noise in tunnels 7 8 9 Intermediate cars are 24 3 meters 80 ft long and carry 68 passengers each which totals a 299 m 981 ft long and 728 passengers train Each row is four seats wide one fewer than JR Central shinkansen trains The cars are more box shaped than earlier models to allow for more interior space 10 Cars are painted white and blue During normal operation the train is expected to operate at a maximum speed of 500 km h 310 mph 6 The train does not require a driver but does have a camera at the front of both end cars in order to allow for remote operation in case the automated systems fail The camera is more apparent on the revised end cars introduced in 2020 It is moved to a higher position and increased in size 2 The superconducting magnets in the bogies are built by Toshiba and Mitsubishi Electric The cars are built by Nippon Sharyo with Mitsubishi Heavy Industries also having built some in the past Mitsubishi Heavy Industries stopped producing cars in 2017 after car manufacturing cost disagreements with JR central and the Mitsubishi SpaceJet s spiralling development costs 11 The bogies are arranged in a Jacobs bogie configuration Planned operations editChuo Shinkansen edit Main article Chuo Shinkansen Construction on the Chuo Shinkansen line on which the train is intended to run began in December 2014 The first section to Nagoya is expected to be completed in 2027 That section will be approximately 85 tunnels with an estimated cost of 5 5 trillion US 46 5 billion The relatively high cost is in large part due to the many tunnels 12 13 The complete line to Osaka is estimated to cost 9 trillion 74 7 billion and was expected to be completed by 2045 after an eight year pause in construction to recuperate costs However after receiving a 3 trillion 28 billion loan from the Japanese government JR Central moved the project forward It now expects to be able to open the full line as early as 2037 with construction beginning immediately after completion of the Tokyo Nagoya section 14 United States edit Main article Northeast Maglev A route from Washington D C to Baltimore eventually extending all the way to New York City has received political support in the United States JR Central chairman Yoshiyuki Kasai spoke with U S President Barack Obama about the L0 series during Prime Minister Shinzo Abe s 28 April 2015 visit In August 2017 development partner Mitsubishi announced that talks had stalled because of a lack of clarity on the Trump administration s stance on high speed rail 15 16 In March 2019 Northeast Maglev project director David Henley stated in an interview that they expect to have a Record of Decision for the D C Baltimore section by August 2020 and to begin construction later that same year or in early 2021 According to Henley this would allow operations to begin in 2027 28 allowing for a construction period of 7 years 17 History edit nbsp The first L0 series undergoing test running in August 2014 L0 series edit The first L0 series vehicle was delivered to the Yamanashi Maglev Test Line and unveiled to the press in November 2012 18 The first five vehicles were linked up and placed on the guideway in June 2013 10 The first five car train began test running at the 42 8 km 26 6 mi Yamanashi Maglev Test Line in June 2013 following completion of extension and upgrade work at the facility earlier than the originally scheduled September date 19 The maximum speed of test runs was gradually increased reaching 500 km h 311 mph by the end of July 2013 19 The five car train was lengthened to seven cars in September 2013 and test running as a 12 car formation commenced on 25 June 2014 20 The train was reverted to a 7 car formation later in 2014 20 and used for public preview rides starting in November 21 A series of endurance and speed tests was carried out on the 42 8 km 26 6 mi test rail in April 2015 to examine the reliability and durability of the L0 after repeated high speed usage Several speed and distance records were set in the process 22 After April 2015 the train returned to being used for public preview rides Improved L0 Series edit nbsp Improved L0 series in Fuefuki 29 August 2020 The L0 series are planned to be replaced with a revised model starting May 2020 named the Improved L0 series This will be the first L0 series to receive power from the guideway through induction Currently on board power is provided by a small gas turbine generator in each end car The new end cars also feature a relocated and enlarged camera and are more aerodynamic thanks to the removal of the exhaust vent necessary for the generator Only one end car will be replaced by 2020 as well as one intermediate car This means that the train will consist of a combination of revised and original cars for a period of time and will be able to generate electricity with its onboard generator while testing the new induction system 2 The new cars were completed in March 2020 While presenting the new end car to the press lead designer Motoaki Terai stated that this model represents the completion of around 80 90 of the design goals for the final train 23 Variants editL0 Series 1 12 car set owned by JR Central introduced in 2011 and planned to be converted to the Improved L0 series starting in June 2020 Improved L0 Series 1 12 car set planned to be gradually upgraded from L0 series starting June 2020 Two replacement cars have been completed as of April 2020 Records editSpeed records edit 16 April 2015 Fastest manned train in the world 590 km h 370 mph 21 April 2015 Fastest manned train in the world 603 km h 375 mph On 16 April 2015 a manned seven car L0 series trainset reached a speed of 590 km h 370 mph breaking the previous world record of 581 km h 361 mph set by a Japanese MLX01 maglev trainset in December 2003 The speed of 590 km h was sustained for a period of 19 seconds 24 This speed record was broken again on 21 April 2015 when a manned seven car set recorded a top speed of 603 km h 375 mph 5 The train hit its top speed at 10 48 am about 4 minutes into the run With 49 JR Central employees on board the train sustained the speed for 10 8 seconds travelling 1 8 kilometers 1 1 mi during that time 5 15 Distance records edit 10 April 2015 Longest distance travelled in one day 3 904 km 2 426 mi breaking the previous record 2 876 km 1 787 mi set in 2003 14 April 2015 Longest distance travelled in one day 4 064 km 2 525 mi 12 25 See also editHigh speed rail Land speed record for rail vehicles Shinkansen Transrapid CRRC MaglevReferences edit a b L0 design changes PDF jr central co jp JR Central Retrieved 14 March 2019 a b c 山梨リニア実験線に改良型試験車両 2020年春に完成へ 乗りものニュース in Japanese Retrieved 14 March 2019 リニア試乗11月再開 JR東海 有料2500円程度で JR Central to resume maglev rides costing around 2 500 yen The Yamanashi Nichinichi Shimbun Web Edition in Japanese Japan The Yamanashi Nichinichi Shimbun 20 March 2014 Archived from the original on 25 March 2014 Retrieved 25 March 2014 リニア新車両は三菱重工と日本車輌製造に内定 JR東海社長 Maglev vehicles to be built by Mitsubishi Heavy Industries and Nippon Sharyo JR Central President in Japanese Japan Sankei Shimbun 21 December 2010 Archived from the original on 23 December 2010 Retrieved 20 July 2013 a b c Japan s maglev train breaks world speed record with 600 km h test run The Guardian United Kingdom Guardian News and Media Limited 21 April 2015 Retrieved 21 April 2015 a b JR東海 リニア時速500キロ 試験再開 通勤圏拡大で激変も JR Central Maglev testing at 500 km h resumes Expanded commuter area to create major upheavals Bloomberg in Japanese Japan Bloomberg LP 29 August 2013 Archived from the original on 30 August 2013 Retrieved 12 February 2015 a b JR Tokai unveils a model for the new high speed maglev train L0 Daily Onigiri DailyOnigiri com 4 November 2010 Archived from the original on 4 August 2017 Retrieved 17 January 2013 Iida Masanobu Kikuchi Katsuhiro Fukuda Takashi 2006 Analysis and Experiment of Compression Wave Generated by Train Entering Tunnel Entrance Hood JSME International Journal Series B Fluids and Thermal Engineering 49 3 761 770 doi 10 1299 jsmeb 49 761 About the vehicle SCMAGLEV Central Japan Railway Company scmaglev jr central global com JR Central Retrieved 15 June 2021 a b Prototype of high speed maglev train shown to public Archived 30 July 2013 at the Wayback Machine Asahi Shimbun 3 June 2013 Mitsubishi Heavy to back out of maglev train project Nikkei Asian Review a b Keith Barrow 17 April 2015 Japan breaks maglev speed record International Railway Journal Retrieved 22 April 2015 Ichihara Tomohiro 22 April 2015 Japanese rail company eyes exports to cover maglev costs Nikkei Retrieved 22 April 2015 Japan PM s maglev decision reflects political calculus over economics Reuters 21 July 2016 Retrieved 14 March 2019 a b Japanese rail company eyes exports to cover maglev costs Nikkei 22 April 2015 Retrieved 22 April 2015 Mitsubishi Heavy to back out of maglev train project Nikkei Asian Review 10 August 2017 American Rail Club 9 March 2019 Fastest Train Being Built in America NYC to DC in 60 Minutes retrieved 14 March 2019 リニア新型車両 L0系 を初公開 JR東海が山梨の実験線に搬入 New L0 series maglev car unveiled delivered to Yamanashi Test Track Sankei Biz in Japanese Japan Sankei Digital Inc 22 November 2012 Retrieved 22 November 2012 a b 7月中にも最高時速500キロに 新型車両 L0系 New L0 series trains to reach 500 km h during July Chunichi Web in Japanese Japan The Chunichi Shimbun 24 July 2013 Archived from the original on 29 July 2013 Retrieved 30 July 2013 a b リニア きょうからL0系試験 12両編成で走行 Maglev L0 to start testing today as 12 car formation The Yamanashi Nichinichi Shimbun Web Edition in Japanese The Yamanashi Nichinichi Shimbun 25 June 2014 Archived from the original on 10 August 2014 Retrieved 8 August 2014 Lucky riders whoosh along at 500 km h on maglev test run for the public The Asahi Shimbun Asahi amp Japan Watch Japan The Asahi Shimbun Company 13 November 2014 Archived from the original on 16 November 2014 Retrieved 17 April 2015 Japanese maglev testing tops 600 km h Railway Gazette 21 April 2015 Archived from the original on 10 March 2020 Retrieved 22 April 2015 超電導リニアL0系 スマホ同様に電気を得る 誘導集電 全面対応の改良型試験車が登場 乗りものニュース in Japanese Retrieved 27 March 2020 リニア L0系 世界最高の590キロ記録 L0 series maglev sets world speed record of 590 km h Yomiuri Online in Japanese Japan The Yomiuri Shimbunl 16 April 2015 Archived from the original on 16 April 2015 Retrieved 17 April 2015 山梨リニア実験線 長距離走行試験 の結果等について Results of distance trials at Yamanashi Maglev Test Track PDF Press release in Japanese Japan Central Japan Railway Company 16 April 2015 Retrieved 17 April 2015 External links edit nbsp Wikimedia Commons has media related to L0 series JR Central press release Part 1 26 October 2010 in Japanese JR Central press release Part 2 26 October 2010 in Japanese SCMAGLEV Website Retrieved from https en wikipedia org w index php title L0 Series amp oldid 1222020144, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.