Kyiv Hydroelectric Power Plant

Kyiv Hydroelectric Station (Ukrainian: Київська ГЕС, romanizedKyivska HES) is a run-of-river power plant on the Dnieper River in Vyshhorod, Kyiv Oblast, Central Ukraine. The 288 m (945 ft) long dam creates the Kyiv Reservoir with the purpose of hydroelectric power generation and navigability with the dam's associated lock. The first of 20 generators in the power station was commissioned in 1964, and the last in 1968. Together with the Kyiv Pumped Storage Power Station, it creates a hydroelectricity generating complex. It is operated by the Ukrhydroenergo. Turbines for the plant were produced by the Kharkiv Factory Turboatom, and generators by the Kharkiv Factory "Elektrovazhmash".

Kyiv Hydroelectric Station
View on station from Vyshhorod
Location of Kyiv Hydroelectric Station in Ukraine
LocationVyshhorod, Ukraine
Coordinates50°35′18.02″N 30°30′44.36″E / 50.5883389°N 30.5123222°E / 50.5883389; 30.5123222
PurposePower, navigation
StatusOperational
Opening date1964; 60 years ago (1964)
Dam and spillways
Type of damEarth-fill embankment with gravity sections
ImpoundsDnieper River
Length288 m (945 ft)
Spillway capacity12,500 m3/s (441,433 cu ft/s)
Reservoir
CreatesKyiv Reservoir
Total capacity3,780×10^6 m3 (3,064,496 acre⋅ft)
Surface area922 km2 (356 sq mi)
Power Station
Operator(s)Ukrhydroenergo
Commission date1964-1968
Hydraulic head12 m (39 ft)
Turbines20; 4 x 22.7 MW, 16 x 20.5 MW bulb turbine[1]
Installed capacity418.8 MW
Annual generation683 GWh
Kyiv Power generating complex near Vyshhorod

History of construction edit

The Kyiv Hydroelectric Power Plant project was developed by the leading project research institute "UkrHydroProekt". Construction of the Kyiv Hydroelectric Power Plant began in October 1960. Construction was carried out by Kremenchugs'bud Trust collective. During the construction, many new organizational and constructive solutions were introduced. In particular, the reduction of the cost of construction, and reducing its term when improving the quality of construction structures, was achieved thanks to the use of prefabricated reinforced concrete. The Kyiv HPP also introduced new technologies for high-frequency installation[clarification needed] of large concrete constructions for the first time.

Timeline edit

1960

October–December: organization of the construction site, weaving the trenches of the pit.

1961

June: first concrete plant was built.

July: start of the pumping of the gateway

August: first cubic meter of concrete is enclosed in a navigable gateway

October: beginning of excavation works on the left bank dam

1962

January: transition through Dnepr to the transmission line is 35 kV

March: start of work in the hydroelectric excavation

May: first cubic meter of concrete is enclosed in the foundation of the hydroelectric power station

1963

April: concreting slopes of the left bank dam began

1964

September: shipyards were put into operation

November: flooding of the pit and the Dnipro overpass

December: commissioning of the first unit of the hydroelectric power station

1965

Start of units No. 2–4

1966

Start of units No. 5–10

1967

Start of units No. 11–16

1968

Start of units No. 17–20

During the construction of the Kyiv Hydroelectric Power Plant, groundworks were carried out in an amount of 79 400 thousand cubic meters; 825 thousand cubic meters of monolithic concrete was made.

Specifications edit

For the first time in the former USSR, in Kyiv HPP low-pressure horizontal capsule hydro units were used.

The Kyiv hydroelectric plant is unique in that for the first time in the practice of domestic hydro-building the hydroelectric power plant was combined with a concrete spillway dam with 20 waterways.

Hydroelectric power station - 51 m wide and 285 m long connected type, structurally divided by temperature-sediment seams into five blocks with 4 horizontal capsule units in each.

The water reservoir of Kyiv hydroelectric power station - channel, river type, with limited seasonal regulation. The total length of the protective structures is 70 km; the highest elevation of the channel dam is 22 m.

The structure of the main hydroelectric power plants includes: a hydroelectric power plant with right and left bank facilities, an open distribution unit (GRP) of 110 kV, and a combined concrete spillway with 20 waterways. The hydro-unit also includes the right-bank and left-bank dam, the protective dam of the right bank, the dam - the insert between the gateway and the building of the hydroelectric power station, the dam-wave separation, channel rowing and pressureless dam of the left bank and the Kyiv navigable gateway (which today belongs to the State Enterprise "Ukrvodshlyah").

In general, at the hydroelectric power station, 20 horizontally-capsule aggregates with rotary-shovel hydro turbines type PL/GK-600M manufactured by the Kharkiv turbine plant and horizontal synchronous generators of type SGK-538/160-70 were installed at the plant "Electrotyazhmash", installed capacity for today (after carrying out of the reconstruction of hydrounits) is 440 MW.

Over the overlap of the flowing part in the generating premises are located: the main outputs of generators, oil pressure equipment with speed regulators, pumps, and the like.

The upper ceiling of these premises in a complex with a deformed metallic lid forms the threshold of spillage. From the bottom seating along the entire surface of the building.[clarification needed]

See also edit

References edit

  1. ^ "Kiev HPP". Global Energy Observatory. Retrieved 20 February 2014.

External links edit

  Media related to Kyiv Hydroelectric Power Plant at Wikimedia Commons

kyiv, hydroelectric, power, plant, this, article, multiple, issues, please, help, improve, discuss, these, issues, talk, page, learn, when, remove, these, template, messages, this, article, includes, list, general, references, lacks, sufficient, corresponding,. This article has multiple issues Please help improve it or discuss these issues on the talk page Learn how and when to remove these template messages This article includes a list of general references but it lacks sufficient corresponding inline citations Please help to improve this article by introducing more precise citations February 2022 Learn how and when to remove this message This article may require copy editing for grammar style cohesion tone or spelling You can assist by editing it April 2024 Learn how and when to remove this message This article needs to be updated Please help update this article to reflect recent events or newly available information April 2024 You can help expand this article with text translated from the corresponding article in Russian April 2024 Click show for important translation instructions Machine translation like DeepL or Google Translate is a useful starting point for translations but translators must revise errors as necessary and confirm that the translation is accurate rather than simply copy pasting machine translated text into the English Wikipedia Consider adding a topic to this template there are already 1 218 articles in the main category and specifying topic will aid in categorization Do not translate text that appears unreliable or low quality If possible verify the text with references provided in the foreign language article You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation A model attribution edit summary is Content in this edit is translated from the existing Russian Wikipedia article at ru Kievskaya GES see its history for attribution You may also add the template Translated ru Kievskaya GES to the talk page For more guidance see Wikipedia Translation Learn how and when to remove this message Kyiv Hydroelectric Station Ukrainian Kiyivska GES romanized Kyivska HES is a run of river power plant on the Dnieper River in Vyshhorod Kyiv Oblast Central Ukraine The 288 m 945 ft long dam creates the Kyiv Reservoir with the purpose of hydroelectric power generation and navigability with the dam s associated lock The first of 20 generators in the power station was commissioned in 1964 and the last in 1968 Together with the Kyiv Pumped Storage Power Station it creates a hydroelectricity generating complex It is operated by the Ukrhydroenergo Turbines for the plant were produced by the Kharkiv Factory Turboatom and generators by the Kharkiv Factory Elektrovazhmash Kyiv Hydroelectric StationView on station from VyshhorodLocation of Kyiv Hydroelectric Station in UkraineLocationVyshhorod UkraineCoordinates50 35 18 02 N 30 30 44 36 E 50 5883389 N 30 5123222 E 50 5883389 30 5123222PurposePower navigationStatusOperationalOpening date1964 60 years ago 1964 Dam and spillwaysType of damEarth fill embankment with gravity sectionsImpoundsDnieper RiverLength288 m 945 ft Spillway capacity12 500 m3 s 441 433 cu ft s ReservoirCreatesKyiv ReservoirTotal capacity3 780 10 6 m3 3 064 496 acre ft Surface area922 km2 356 sq mi Power StationOperator s UkrhydroenergoCommission date1964 1968Hydraulic head12 m 39 ft Turbines20 4 x 22 7 MW 16 x 20 5 MW bulb turbine 1 Installed capacity418 8 MWAnnual generation683 GWh Kyiv Power generating complex near Vyshhorod Contents 1 History of construction 1 1 Timeline 2 Specifications 3 See also 4 References 5 External linksHistory of construction editThe Kyiv Hydroelectric Power Plant project was developed by the leading project research institute UkrHydroProekt Construction of the Kyiv Hydroelectric Power Plant began in October 1960 Construction was carried out by Kremenchugs bud Trust collective During the construction many new organizational and constructive solutions were introduced In particular the reduction of the cost of construction and reducing its term when improving the quality of construction structures was achieved thanks to the use of prefabricated reinforced concrete The Kyiv HPP also introduced new technologies for high frequency installation clarification needed of large concrete constructions for the first time Timeline edit 1960October December organization of the construction site weaving the trenches of the pit 1961June first concrete plant was built July start of the pumping of the gatewayAugust first cubic meter of concrete is enclosed in a navigable gatewayOctober beginning of excavation works on the left bank dam1962January transition through Dnepr to the transmission line is 35 kVMarch start of work in the hydroelectric excavationMay first cubic meter of concrete is enclosed in the foundation of the hydroelectric power station1963April concreting slopes of the left bank dam began1964September shipyards were put into operationNovember flooding of the pit and the Dnipro overpassDecember commissioning of the first unit of the hydroelectric power station1965Start of units No 2 41966Start of units No 5 101967Start of units No 11 161968Start of units No 17 20During the construction of the Kyiv Hydroelectric Power Plant groundworks were carried out in an amount of 79 400 thousand cubic meters 825 thousand cubic meters of monolithic concrete was made Specifications editFor the first time in the former USSR in Kyiv HPP low pressure horizontal capsule hydro units were used The Kyiv hydroelectric plant is unique in that for the first time in the practice of domestic hydro building the hydroelectric power plant was combined with a concrete spillway dam with 20 waterways Hydroelectric power station 51 m wide and 285 m long connected type structurally divided by temperature sediment seams into five blocks with 4 horizontal capsule units in each The water reservoir of Kyiv hydroelectric power station channel river type with limited seasonal regulation The total length of the protective structures is 70 km the highest elevation of the channel dam is 22 m The structure of the main hydroelectric power plants includes a hydroelectric power plant with right and left bank facilities an open distribution unit GRP of 110 kV and a combined concrete spillway with 20 waterways The hydro unit also includes the right bank and left bank dam the protective dam of the right bank the dam the insert between the gateway and the building of the hydroelectric power station the dam wave separation channel rowing and pressureless dam of the left bank and the Kyiv navigable gateway which today belongs to the State Enterprise Ukrvodshlyah In general at the hydroelectric power station 20 horizontally capsule aggregates with rotary shovel hydro turbines type PL GK 600M manufactured by the Kharkiv turbine plant and horizontal synchronous generators of type SGK 538 160 70 were installed at the plant Electrotyazhmash installed capacity for today after carrying out of the reconstruction of hydrounits is 440 MW Over the overlap of the flowing part in the generating premises are located the main outputs of generators oil pressure equipment with speed regulators pumps and the like The upper ceiling of these premises in a complex with a deformed metallic lid forms the threshold of spillage From the bottom seating along the entire surface of the building clarification needed See also edit nbsp Ukraine portal nbsp Water portal nbsp Renewable energy portal Hydroelectricity in Ukraine List of power stations in UkraineReferences edit Kiev HPP Global Energy Observatory Retrieved 20 February 2014 External links edit nbsp Media related to Kyiv Hydroelectric Power Plant at Wikimedia Commons Retrieved from https en wikipedia org w index php title Kyiv Hydroelectric Power Plant amp oldid 1219747611, wikipedia, wiki, book, books, library,