fbpx
Wikipedia

Kualanamu Airport Rail Link

Kualanamu Airport Railink Services (ARS) (Indonesian: KA Bandara Kualanamu) is an airport rail link service in Medan in North Sumatra, Indonesia. The rail link is built to cut travel time from Medan railway station to Kualanamu International Airport, as roads connecting the airport and Medan city center are frequently affected by traffic congestion.[citation needed]

Kualanamu Airport Raillink Services (ARS)
A
Kualanamu ARS DEMU towards the airport near Araskabu station
Overview
Native nameKA Bandara Kualanamu
Statusin service
OwnerPT Kereta Api Indonesia & PT Angkasa Pura II
LocaleNorth Sumatera, Indonesia
Termini
Stations3 (operational)
Websitewww.railink.co.id
Service
TypeExpress rail
SystemAirport rail link
ServicesKualanamu - Bandar Khalipah - Medan
Operator(s)PT Railink
Rolling stockWoojin DEMU
Four 4-carriage trainsets
History
Opened25 July 2013; 10 years ago (2013-07-25)
Technical
Line length40 km (25 mi)
CharacterGround, and elevated
Track gauge1,067 mm (3 ft 6 in)
ElectrificationNone
Operating speed60 km/h (37 mph)
Route map

KNM
Kualanamu Int'l Airport
to Rantau Prapat
Araskabu
Serdang
Batang Kuis
BAP
Bandar Khalipah
Belmera Toll Road
lower line for intercity trains
Kebun Pisang
Medan Pasar
former branch to Batu
MDN
Medan  S 
freight line to Belawan
 S  to Binjai

The Kualanamu ARS is the first airport rail link in Indonesia connecting passenger between the city centre and airport.[citation needed]

Background edit

 
Interior of Woojin DEMU for Kualanamu ARS

Train services is provided by PT Railink, a joint venture between PT Angkasa Pura II and PT Kereta Api Indonesia. It is the first integrated airport rail link in Indonesia, city check-in and electronic tickets are also available for convenience.[1] The trains were manufactured by Woojin Industrial Systems in South Korea.[2]

In May 2014, double-tracking was completed, cutting travel by at least 10 minutes.[3] The first stage of double tracking, Kualanamu-Bandar Khalipah is predicted to be finished in end 2015, while the second stage as fly over Bandar Khalipah-Medan city is predicted to be finished in mid-year 2016.[4][needs update]

The elevated tracks running from Medan Station up till Araskabu Station started operating on 1 December 2019. Beginning 28 September 2022, train services began making brief stops at Bandar Khalipah Station.

Stations edit

Station Transfer/Notes Location
Medan Terminal station

  Intercity trains

 S  Sri Lelawangsa

Medan
Bandar Khalipah   Intercity trains Deli Serdang Regency
Kualanamu International Airport Terminal station

  Kualanamu International Airport

See also edit

References edit

  1. ^ "Jalur KA Kualanamu segera beroperasi (Indonesian)". June 2, 2012.
  2. ^ "Medan's new Kualanamu International Airport set to operate July 25". July 8, 2013.
  3. ^ Apriadi Gunawan (May 23, 2014). "N. Sumatra double-track railway work begins".
  4. ^ Akbar Dongoran. "Jalur KA Double Track Medan-Kualanamu Rampung 2016". Retrieved October 8, 2015.

kualanamu, airport, rail, link, kualanamu, airport, railink, services, indonesian, bandara, kualanamu, airport, rail, link, service, medan, north, sumatra, indonesia, rail, link, built, travel, time, from, medan, railway, station, kualanamu, international, air. Kualanamu Airport Railink Services ARS Indonesian KA Bandara Kualanamu is an airport rail link service in Medan in North Sumatra Indonesia The rail link is built to cut travel time from Medan railway station to Kualanamu International Airport as roads connecting the airport and Medan city center are frequently affected by traffic congestion citation needed Kualanamu Airport Raillink Services ARS AKualanamu ARS DEMU towards the airport near Araskabu stationOverviewNative nameKA Bandara KualanamuStatusin serviceOwnerPT Kereta Api Indonesia amp PT Angkasa Pura IILocaleNorth Sumatera IndonesiaTerminiKualanamuMedanStations3 operational Websitewww wbr railink wbr co wbr idServiceTypeExpress railSystemAirport rail linkServicesKualanamu Bandar Khalipah MedanOperator s PT RailinkRolling stockWoojin DEMU Four 4 carriage trainsetsHistoryOpened25 July 2013 10 years ago 2013 07 25 TechnicalLine length40 km 25 mi CharacterGround and elevatedTrack gauge1 067 mm 3 ft 6 in ElectrificationNoneOperating speed60 km h 37 mph Route mapLegendKNM Kualanamu Int l Airportto Rantau PrapatAraskabuSerdangBatang KuisBAP Bandar KhalipahBelmera Toll Roadlower line for intercity trainsKebun PisangMedan Pasarformer branch to BatuMDN Medan S freight line to Belawan S to BinjaiThis diagram viewtalkeditThe Kualanamu ARS is the first airport rail link in Indonesia connecting passenger between the city centre and airport citation needed Contents 1 Background 2 Stations 3 See also 4 ReferencesBackground edit nbsp Interior of Woojin DEMU for Kualanamu ARSTrain services is provided by PT Railink a joint venture between PT Angkasa Pura II and PT Kereta Api Indonesia It is the first integrated airport rail link in Indonesia city check in and electronic tickets are also available for convenience 1 The trains were manufactured by Woojin Industrial Systems in South Korea 2 In May 2014 double tracking was completed cutting travel by at least 10 minutes 3 The first stage of double tracking Kualanamu Bandar Khalipah is predicted to be finished in end 2015 while the second stage as fly over Bandar Khalipah Medan city is predicted to be finished in mid year 2016 4 needs update The elevated tracks running from Medan Station up till Araskabu Station started operating on 1 December 2019 Beginning 28 September 2022 train services began making brief stops at Bandar Khalipah Station Stations editStation Transfer Notes LocationMedan Terminal station nbsp Intercity trains S Sri Lelawangsa MedanBandar Khalipah nbsp Intercity trains Deli Serdang RegencyKualanamu International Airport Terminal station nbsp Kualanamu International AirportSee also edit nbsp Indonesia portal nbsp Trains portalSoekarno Hatta Airport Rail Link Minangkabau Airport Rail Link Adisumarmo Airport Rail LinkReferences edit Jalur KA Kualanamu segera beroperasi Indonesian June 2 2012 Medan s new Kualanamu International Airport set to operate July 25 July 8 2013 Apriadi Gunawan May 23 2014 N Sumatra double track railway work begins Akbar Dongoran Jalur KA Double Track Medan Kualanamu Rampung 2016 Retrieved October 8 2015 Retrieved from https en wikipedia org w index php title Kualanamu Airport Rail Link amp oldid 1137533794, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.