fbpx
Wikipedia

Kayu Agung–Palembang–Betung Toll Road

Kayu Agung–Palembang–Betung Toll Road or Kapal Betung/Kapalbetung Toll Road is a 111.7-kilometre-long (69.4 mi) tolled expressway, which is part of Trans-Sumatra Toll Road. The toll road is managed by PT Waskita Sriwijaya Tol[1] stretching from the township of Kayu Agung, passing through the major city of Palembang, and terminating at the township of Betung. The toll road connects Lampung–Palembang corridor with the Palembang–Jambi corridor of Trans-Sumatra Toll Road network.[2]

Kayu Agung–Palembang–Betung Toll Road
Kapalbetung Toll Road kilometer 337 in Ogan Komering Ilir Regency, South Sumatra
Route information
Part of AH25
Maintained by PT Sriwijaya Waskita Tol
Length111.7 km (69.4 mi)
Major junctions
South endKayu Agung
Major intersections
North endBetung
Location
CountryIndonesia
ProvincesSouth Sumatra
Major cities
Highway system
Trans-Sumatra Toll Road

History edit

The first section of the toll road was inaugurated by President Joko Widodo on 26 January 2021. The President stated that the inauguration of the toll road has cut travel time from Bakauheni to Palembang from 12 hours road trip to only around 3.5 hours of road trip.[3] The second section of the toll road is scheduled to be inaugurated in August 2023.[4]

Sections edit

This toll road is divided into three sections:

Sections Destinations Length
Section I Kayu Agung-Jakabaring 33.5 km
Section II Jakabaring-Musilandas 33.9 km
Section III Musilandas-Betung 44.29 km

Section I opened on April 1, 2020, with a temporary exit to Jakabaring.[5]

Exits edit

There are 5 planned exits in this toll road:

  • Kayu Agung (km 329)
  • Jejawi (km 347)
  • Kramasan (km 371)
  • Pangkalan Balai (km 415)
  • Betung (km 433)

Currently a temporary exit to Jakabaring is constructed in Section I as other Sections are awaiting completion.


ProvinceLocationkmmiExitNameDestinationsNotes
South SumatraKayu Agung, Ogan Komering Ilir Regency329.0204.4  Pematang Panggang–Kayuagung Toll Road
329.8204.9329Kayuagung Toll GateSouthern terminus
330.0205.1Kayuagung Utama Toll Gate
Jejawi, Ogan Komering Ilir Regency347.4215.9347Jejawi Toll Gate
  • Lingkis
  • Muara Batun
  • Karang Agung
Pemulutan, Ogan Ilir Regency360.4223.9360Jakabaring RampTemporary exit, south-bound only
367.5228.4367Kramasan Toll Gate
Banyuasin RegencySungai Rengas Toll Gate
Pulau Rimau Toll Gate
Pangkalan Balai Toll Gate
  Betung–Tempino–Jambi Toll Road (Planned)
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References edit

  1. ^ "Gugatan Ingkar Janji, PT Sriwijaya Markmore Persada Harus Bayar Rp33 Miliar". Harian Pelita (in Indonesian). 2019-11-18. Retrieved 2020-04-27.
  2. ^ "BPJT - Badan Pengatur Jalan Tol". bpjt.pu.go.id. Retrieved 2020-04-27.
  3. ^ "Diresmikan Presiden Jokowi, Jalan Tol Kayu Agung-Palembang Tingkatkan Efisiensi Distribusi Logistik di Sumsel" [Inaugurated by President Jokowi, Kayu Agung-Palembang Toll Road Improves Logistics Distribution Efficiency in South Sumatra]. bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 27 January 2021. Retrieved 31 October 2022.
  4. ^ "DUKUNGAN KONEKTIVITAS DI SUMATERA SELATAN, PEMBANGUNAN JALAN TOL KAPALBETUNG TAHAP 2 KRAMASAN - BETUNG RAMPUNG AKHIR TAHUN 2023 MENDATANG". bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 30 June 2022. Retrieved 31 October 2022.
  5. ^ Rosana, Dolly (1 April 2020). Dewanto, Kelik (ed.). "Pemprov Sumsel minta pembangunan Tol Palembang-Betung dipercepat". Antara News (in Indonesian). Palembang. Retrieved 27 April 2020.

kayu, agung, palembang, betung, toll, road, kapal, betung, kapalbetung, toll, road, kilometre, long, tolled, expressway, which, part, trans, sumatra, toll, road, toll, road, managed, waskita, sriwijaya, stretching, from, township, kayu, agung, passing, through. Kayu Agung Palembang Betung Toll Road or Kapal Betung Kapalbetung Toll Road is a 111 7 kilometre long 69 4 mi tolled expressway which is part of Trans Sumatra Toll Road The toll road is managed by PT Waskita Sriwijaya Tol 1 stretching from the township of Kayu Agung passing through the major city of Palembang and terminating at the township of Betung The toll road connects Lampung Palembang corridor with the Palembang Jambi corridor of Trans Sumatra Toll Road network 2 Kayu Agung Palembang Betung Toll RoadKapalbetung Toll Road kilometer 337 in Ogan Komering Ilir Regency South SumatraRoute informationPart of AH25Maintained by PT Sriwijaya Waskita TolLength111 7 km 69 4 mi Major junctionsSouth endKayu AgungMajor intersectionsPematang Panggang Kayuagung Toll RoadPalembang Indralaya Toll RoadBetung Jambi Toll RoadNorth endBetungLocationCountryIndonesiaProvincesSouth SumatraMajor citiesOgan Komering Ilir RegencyOgan Ilir RegencyPalembangBanyuasin RegencyHighway systemTransport in IndonesiaTrans Sumatra Toll Road Contents 1 History 2 Sections 3 Exits 4 ReferencesHistory editThe first section of the toll road was inaugurated by President Joko Widodo on 26 January 2021 The President stated that the inauguration of the toll road has cut travel time from Bakauheni to Palembang from 12 hours road trip to only around 3 5 hours of road trip 3 The second section of the toll road is scheduled to be inaugurated in August 2023 4 Sections editThis toll road is divided into three sections Sections Destinations Length Section I Kayu Agung Jakabaring 33 5 km Section II Jakabaring Musilandas 33 9 km Section III Musilandas Betung 44 29 km Section I opened on April 1 2020 with a temporary exit to Jakabaring 5 Exits editThere are 5 planned exits in this toll road Kayu Agung km 329 Jejawi km 347 Kramasan km 371 Pangkalan Balai km 415 Betung km 433 Currently a temporary exit to Jakabaring is constructed in Section I as other Sections are awaiting completion ProvinceLocationkmmiExitNameDestinationsNotes South SumatraKayu Agung Ogan Komering Ilir Regency329 0204 4 nbsp Pematang Panggang Kayuagung Toll Road 329 8204 9329Kayuagung Toll GateKayu AgungIndralayaSouthern terminus 330 0205 1Kayuagung Utama Toll Gate Jejawi Ogan Komering Ilir Regency347 4215 9347Jejawi Toll GateLingkisMuara BatunKarang Agung Pemulutan Ogan Ilir Regency360 4223 9360Jakabaring RampJakabaring Sports CityTemporary exit south bound only 367 5228 4367Kramasan Toll GatePemulutanPalembangKertapati Banyuasin RegencySungai Rengas Toll Gate Pulau Rimau Toll Gate Pangkalan Balai Toll Gate nbsp Betung Tempino Jambi Toll Road Planned 1 000 mi 1 609 km 1 000 km 0 621 mi Electronic toll collection Incomplete access Route transitionReferences edit Gugatan Ingkar Janji PT Sriwijaya Markmore Persada Harus Bayar Rp33 Miliar Harian Pelita in Indonesian 2019 11 18 Retrieved 2020 04 27 BPJT Badan Pengatur Jalan Tol bpjt pu go id Retrieved 2020 04 27 Diresmikan Presiden Jokowi Jalan Tol Kayu Agung Palembang Tingkatkan Efisiensi Distribusi Logistik di Sumsel Inaugurated by President Jokowi Kayu Agung Palembang Toll Road Improves Logistics Distribution Efficiency in South Sumatra bpjt pu go id in Indonesian Badan Pengatur Jalan Tol 27 January 2021 Retrieved 31 October 2022 DUKUNGAN KONEKTIVITAS DI SUMATERA SELATAN PEMBANGUNAN JALAN TOL KAPALBETUNG TAHAP 2 KRAMASAN BETUNG RAMPUNG AKHIR TAHUN 2023 MENDATANG bpjt pu go id in Indonesian Badan Pengatur Jalan Tol 30 June 2022 Retrieved 31 October 2022 Rosana Dolly 1 April 2020 Dewanto Kelik ed Pemprov Sumsel minta pembangunan Tol Palembang Betung dipercepat Antara News in Indonesian Palembang Retrieved 27 April 2020 Previous Segments Terbanggi Besar Pematang Panggang Kayu Agung Toll Road Trans Sumatra Toll Road Next Segments Palembang Indralaya Toll RoadBetung Jambi Toll Road planned Retrieved from https en wikipedia org w index php title Kayu Agung Palembang Betung Toll Road amp oldid 1171461929, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.