fbpx
Wikipedia

Jane Byrne Interchange

The Jane Byrne Interchange (until 2014, Circle Interchange) is a major freeway interchange near downtown Chicago, Illinois. It is the junction between the Dan Ryan, Kennedy and Eisenhower Expressways (I-90/I-94 and I-290), and Ida B. Wells Drive.[1] In a dedication ceremony held on August 29, 2014, the interchange was renamed in honor of former Chicago mayor Jane M. Byrne (1979–1983).[2]

Jane Byrne Interchange
Circle Interchange
View of the interchange from the BMO Tower in October 2022
Location
Chicago, Illinois
Coordinates41°52′32″N 87°38′44″W / 41.87556°N 87.64556°W / 41.87556; -87.64556
Roads at
junction
I-90

I-94
I-290


IL 110 (CKC)
Construction
Opened1960s; 62 years ago (1960s)
Maintained byIDOT

First developed in the late 1950s and 1960s, over time the interchange in its original configuration became notorious for traffic jams. In 2004, it was rated as the country's third-worst traffic bottleneck, with approximately 400,000 vehicles using it per day.[3][4] In a 2010 study of freight congestion (truck speed and travel time), the U.S. Department of Transportation ranked this section of I-290 as having the worst congestion in the United States.[5] This led to an $800 million reconfiguration begun in 2013 and completed in December 2022.[6]

Design Edit

 
Original configuration

This interchange as originally built was an asymmetrical turbine interchange, with each of the four mainlines having a single entrance and exit serving both directions of the crossing highway. It did not use the quadruple-decker architecture commonly associated with stack interchanges. Instead, it had a flattened layout, using the long, curving ramps to circumnavigate the crossing of the mainlines. This resulted in fewer tall bridges and gave the interchange its distinctive "circle" appearance.[citation needed] Since 2016, it has had a three-level stack in the center due to the realignment of the north-to-west ramp.

Both I-90/I-94 and I-290/Ida B. Wells Drive have four lanes in each direction at this interchange (three lanes prior to December 2022). Most of the ramps leading to and from the freeways are one lane wide, except for the ramps from eastbound I-290 to I-90/94 in both directions and the ramp from I-90/94 westbound/Dan Ryan Expressway to I-290; these ramps are two lanes wide. [7]

This interchange centers on Ida B. Wells Drive (the east–west surface street that is the continuation of the Eisenhower Expressway beyond its terminus several blocks east of the interchange) and extends roughly from Halsted Street on the west to Jefferson Street on the east.[citation needed]

The tracks of the Chicago Transit Authority Blue Line 'L' train pass directly underneath the center of the interchange, running in an east–west direction, as they transition from surface operation in the median of the Eisenhower Expressway, to a subway to the east of the Interchange. This complicates where support columns could be located in any future construction at this interchange.[8]

History Edit

Originally known as the Congress Interchange and changed to Circle Interchange in 1964, it was built in the late 1950s and early 1960s, at the same time as the construction of the Kennedy Expressway.[citation needed]

The University of Illinois at Chicago is to the southwest of the interchange. When the campus opened in 1965, it was called the University of Illinois at Chicago Circle, making it the only university in the world known to be named after a freeway interchange.[9][10][11]

Due to its congestion, the May 2008 issue of Popular Mechanics listed this interchange among their list of the 10 Pieces of U.S. Infrastructure We Must Fix Now.[3]

In a dedication ceremony held on August 29, 2014, this interchange, formerly called the Circle Interchange, was renamed the Jane Byrne Interchange in honor of former Chicago Mayor Jane M. Byrne (1979–1983).[2] The market's radio and television traffic reporting services immediately instituted the interchange's new name, although many went with a dual reference of the "Jane Byrne–Circle Interchange" during a transition period until the services updated their maps and road signage was changed to reflect the new name, to avert confusion.

Reconstruction project Edit

Traffic after the construction
 
The interchange after the reconstruction

In August 2012, the Illinois Department of Transportation (IDOT) began the planning and design phases for the potential rehabilitation of this interchange.[12] It has established a project web site, which is being used to schedule public meetings.[12][13]

On April 3, 2013, the Chicago Tribune featured a front-page article on the estimated $420 million project, which was slated to take four years.[14][15] The project began in late 2013.[16] The interchange, as well as a series of overpasses surrounding it, would receive a complete overhaul, including the addition of a flyover ramp from northbound I-90/I-94 to westbound I-290. It also sought to move the Taylor Street exit (from eastbound I-90/I-94 traffic) north.

The northwest flyover of the Jane Byrne Interchange opened on December 4, 2016, after which the old ramp was closed and demolished.[17][18] Several more ramps, as well as the expressways themselves, were rebuilt during the course of the project. One ramp that connects from northbound Dan Ryan to eastbound Ida B. Wells was closed from the spring of 2014 to September 7, 2019. On the same day, the second lane of the flyover ramp, as well as the Morgan Street off-ramp, opened.[19]

Delays and increasing costs led to a final completion date of December 16, 2022, at which time all lanes and ramps were opened to motorists. The estimated final cost of the reconstruction was $804.6 million. IDOT stated they expected a 50% reduction in traffic delays as a result of the project's conclusion.[20][21][22]

See also Edit

References Edit

  1. ^ Neil Steinberg (May 23, 2023). "Honor Jane Byrne on her 90th birthday by taking the train". Chicago Sun-Times. from the original on June 19, 2023. Retrieved June 18, 2023.
  2. ^ a b "Circle Interchange to Be Renamed for Jane Byrne Today". Chicago Tribune. from the original on August 29, 2014. Retrieved August 29, 2014.
  3. ^ a b Sofge, Erik (April 7, 2008). "10 Pieces of U.S. Infrastructure We Must Fix Now—Brooklyn Bridge, Chicago, New Orleans—Rebuilding America". Popular Mechanics. from the original on April 14, 2022. Retrieved August 29, 2015.
  4. ^ "Chapter 3". Traffic Congestion and Reliability: Trends and Advanced Strategies for Congestion Mitigation. Federal Highway Administration. from the original on August 13, 2022. Retrieved August 7, 2007.
  5. ^ . Federal Highway Administration. 2011. Archived from the original on June 6, 2013. Retrieved July 26, 2013.
  6. ^ Dudek, Mitch (December 14, 2022). "After nearly 10 years, Jane Byrne Interchange 'substantially complete,' expected to cut congestion in half". Chicago Sun-Times. from the original on December 15, 2022. Retrieved December 15, 2022.
  7. ^ "Benefits - Jane Byrne Interchange". www.janebyrneinterchange.org. from the original on February 1, 2023. Retrieved December 16, 2022.
  8. ^ http://www.circleinterchange.org/pdf/document_library/circle%20cdr_vol%201%20of%203.pdf[dead link]
  9. ^ Young, David M. (2005). "Spaghetti Bowl". Encyclopedia of Chicago. Chicago Historical Society. Retrieved January 26, 2008.
  10. ^ UIC Historian (2006). "Chicago Circle Campus Construction". Board of Trustees of the University of Illinois. from the original on December 24, 2007. Retrieved February 1, 2008.
  11. ^ . UIC School of Architecture. Archived from the original on February 13, 2012. Retrieved February 2, 2008.
  12. ^ a b "Circle Interchange". Illinois Department of Transportation. from the original on September 4, 2012. Retrieved August 27, 2012.
  13. ^ . Illinois Department of Transportation. Archived from the original on April 9, 2013. Retrieved February 22, 2013.
  14. ^ . Chicago Tribune. Archived from the original on April 3, 2013. Retrieved October 30, 2020.
  15. ^ Hilkevitch, Jon. "IDOT finalizing plan to unsnarl Circle Interchange". Chicago Tribune. from the original on December 19, 2020. Retrieved October 30, 2020.
  16. ^ "About | Jane Byrne Interchange". www.janebyrneinterchange.org. from the original on August 28, 2022. Retrieved October 30, 2020.
  17. ^ Ward, Joe (November 30, 2016). . DNAinfo Chicago. Archived from the original on November 14, 2017. Retrieved June 11, 2022.
  18. ^ "Circle Interchange–Completed Projects". www.janebyrneinterchange.org. from the original on August 11, 2019. Retrieved August 11, 2019.
  19. ^ Jindra, Sarah; Dwyer, Meghan (September 6, 2019). "Relief on the way for drivers at the Jane Byrne Interchange". WGN-TV. Retrieved April 7, 2022.
  20. ^ Varon, Roz (February 8, 2022). "Chicago construction on Jane Byrne Interchange to wrap up this year, IDOT says". ABC7 Chicago. from the original on April 7, 2022. Retrieved April 7, 2022.
  21. ^ "Byrne interchange construction will continue through 2022 | Gazette Chicago". gazettechicago.com. from the original on December 2, 2020. Retrieved October 30, 2020.
  22. ^ "Jane Byrne Interchange officially opens; overnight closures still expected". www.cbsnews.com. December 16, 2022. from the original on December 17, 2022. Retrieved December 17, 2022.

External links Edit

  • Official website
  • The Chicago Sun-Times

jane, byrne, interchange, until, 2014, circle, interchange, major, freeway, interchange, near, downtown, chicago, illinois, junction, between, ryan, kennedy, eisenhower, expressways, wells, drive, dedication, ceremony, held, august, 2014, interchange, renamed,. The Jane Byrne Interchange until 2014 Circle Interchange is a major freeway interchange near downtown Chicago Illinois It is the junction between the Dan Ryan Kennedy and Eisenhower Expressways I 90 I 94 and I 290 and Ida B Wells Drive 1 In a dedication ceremony held on August 29 2014 the interchange was renamed in honor of former Chicago mayor Jane M Byrne 1979 1983 2 Jane Byrne InterchangeCircle InterchangeView of the interchange from the BMO Tower in October 2022LocationChicago IllinoisCoordinates41 52 32 N 87 38 44 W 41 87556 N 87 64556 W 41 87556 87 64556Roads atjunctionI 90I 94 I 290 IL 110 CKC ConstructionOpened1960s 62 years ago 1960s Maintained byIDOTFirst developed in the late 1950s and 1960s over time the interchange in its original configuration became notorious for traffic jams In 2004 it was rated as the country s third worst traffic bottleneck with approximately 400 000 vehicles using it per day 3 4 In a 2010 study of freight congestion truck speed and travel time the U S Department of Transportation ranked this section of I 290 as having the worst congestion in the United States 5 This led to an 800 million reconfiguration begun in 2013 and completed in December 2022 6 Contents 1 Design 2 History 2 1 Reconstruction project 3 See also 4 References 5 External linksDesign Edit nbsp Original configurationThis interchange as originally built was an asymmetrical turbine interchange with each of the four mainlines having a single entrance and exit serving both directions of the crossing highway It did not use the quadruple decker architecture commonly associated with stack interchanges Instead it had a flattened layout using the long curving ramps to circumnavigate the crossing of the mainlines This resulted in fewer tall bridges and gave the interchange its distinctive circle appearance citation needed Since 2016 it has had a three level stack in the center due to the realignment of the north to west ramp Both I 90 I 94 and I 290 Ida B Wells Drive have four lanes in each direction at this interchange three lanes prior to December 2022 Most of the ramps leading to and from the freeways are one lane wide except for the ramps from eastbound I 290 to I 90 94 in both directions and the ramp from I 90 94 westbound Dan Ryan Expressway to I 290 these ramps are two lanes wide 7 This interchange centers on Ida B Wells Drive the east west surface street that is the continuation of the Eisenhower Expressway beyond its terminus several blocks east of the interchange and extends roughly from Halsted Street on the west to Jefferson Street on the east citation needed The tracks of the Chicago Transit Authority Blue Line L train pass directly underneath the center of the interchange running in an east west direction as they transition from surface operation in the median of the Eisenhower Expressway to a subway to the east of the Interchange This complicates where support columns could be located in any future construction at this interchange 8 History EditOriginally known as the Congress Interchange and changed to Circle Interchange in 1964 it was built in the late 1950s and early 1960s at the same time as the construction of the Kennedy Expressway citation needed The University of Illinois at Chicago is to the southwest of the interchange When the campus opened in 1965 it was called the University of Illinois at Chicago Circle making it the only university in the world known to be named after a freeway interchange 9 10 11 Due to its congestion the May 2008 issue of Popular Mechanics listed this interchange among their list of the 10 Pieces of U S Infrastructure We Must Fix Now 3 In a dedication ceremony held on August 29 2014 this interchange formerly called the Circle Interchange was renamed the Jane Byrne Interchange in honor of former Chicago Mayor Jane M Byrne 1979 1983 2 The market s radio and television traffic reporting services immediately instituted the interchange s new name although many went with a dual reference of the Jane Byrne Circle Interchange during a transition period until the services updated their maps and road signage was changed to reflect the new name to avert confusion Reconstruction project Edit source source source source source source source Traffic after the construction nbsp The interchange after the reconstructionIn August 2012 the Illinois Department of Transportation IDOT began the planning and design phases for the potential rehabilitation of this interchange 12 It has established a project web site which is being used to schedule public meetings 12 13 On April 3 2013 the Chicago Tribune featured a front page article on the estimated 420 million project which was slated to take four years 14 15 The project began in late 2013 16 The interchange as well as a series of overpasses surrounding it would receive a complete overhaul including the addition of a flyover ramp from northbound I 90 I 94 to westbound I 290 It also sought to move the Taylor Street exit from eastbound I 90 I 94 traffic north The northwest flyover of the Jane Byrne Interchange opened on December 4 2016 after which the old ramp was closed and demolished 17 18 Several more ramps as well as the expressways themselves were rebuilt during the course of the project One ramp that connects from northbound Dan Ryan to eastbound Ida B Wells was closed from the spring of 2014 to September 7 2019 On the same day the second lane of the flyover ramp as well as the Morgan Street off ramp opened 19 Delays and increasing costs led to a final completion date of December 16 2022 at which time all lanes and ramps were opened to motorists The estimated final cost of the reconstruction was 804 6 million IDOT stated they expected a 50 reduction in traffic delays as a result of the project s conclusion 20 21 22 See also Edit nbsp Chicago portal nbsp U S Roads portalReferences Edit Neil Steinberg May 23 2023 Honor Jane Byrne on her 90th birthday by taking the train Chicago Sun Times Archived from the original on June 19 2023 Retrieved June 18 2023 a b Circle Interchange to Be Renamed for Jane Byrne Today Chicago Tribune Archived from the original on August 29 2014 Retrieved August 29 2014 a b Sofge Erik April 7 2008 10 Pieces of U S Infrastructure We Must Fix Now Brooklyn Bridge Chicago New Orleans Rebuilding America Popular Mechanics Archived from the original on April 14 2022 Retrieved August 29 2015 Chapter 3 Traffic Congestion and Reliability Trends and Advanced Strategies for Congestion Mitigation Federal Highway Administration Archived from the original on August 13 2022 Retrieved August 7 2007 Table 3 9 Top 25 Freight Highway Locations by Freight Congestion Index Rating 2010 Federal Highway Administration 2011 Archived from the original on June 6 2013 Retrieved July 26 2013 Dudek Mitch December 14 2022 After nearly 10 years Jane Byrne Interchange substantially complete expected to cut congestion in half Chicago Sun Times Archived from the original on December 15 2022 Retrieved December 15 2022 Benefits Jane Byrne Interchange www janebyrneinterchange org Archived from the original on February 1 2023 Retrieved December 16 2022 http www circleinterchange org pdf document library circle 20cdr vol 201 20of 203 pdf dead link Young David M 2005 Spaghetti Bowl Encyclopedia of Chicago Chicago Historical Society Retrieved January 26 2008 UIC Historian 2006 Chicago Circle Campus Construction Board of Trustees of the University of Illinois Archived from the original on December 24 2007 Retrieved February 1 2008 Interchanging Identities UIC School of Architecture Archived from the original on February 13 2012 Retrieved February 2 2008 a b Circle Interchange Illinois Department of Transportation Archived from the original on September 4 2012 Retrieved August 27 2012 Public Meetings Hearings Illinois Department of Transportation Archived from the original on April 9 2013 Retrieved February 22 2013 Chicago Tribune Chicago news sports weather entertainment Chicago Tribune Archived from the original on April 3 2013 Retrieved October 30 2020 Hilkevitch Jon IDOT finalizing plan to unsnarl Circle Interchange Chicago Tribune Archived from the original on December 19 2020 Retrieved October 30 2020 About Jane Byrne Interchange www janebyrneinterchange org Archived from the original on August 28 2022 Retrieved October 30 2020 Ward Joe November 30 2016 Long Awaited Outbound Eisenhower Ramp From Inbound Dan Ryan Opens Soon DNAinfo Chicago Archived from the original on November 14 2017 Retrieved June 11 2022 Circle Interchange Completed Projects www janebyrneinterchange org Archived from the original on August 11 2019 Retrieved August 11 2019 Jindra Sarah Dwyer Meghan September 6 2019 Relief on the way for drivers at the Jane Byrne Interchange WGN TV Retrieved April 7 2022 Varon Roz February 8 2022 Chicago construction on Jane Byrne Interchange to wrap up this year IDOT says ABC7 Chicago Archived from the original on April 7 2022 Retrieved April 7 2022 Byrne interchange construction will continue through 2022 Gazette Chicago gazettechicago com Archived from the original on December 2 2020 Retrieved October 30 2020 Jane Byrne Interchange officially opens overnight closures still expected www cbsnews com December 16 2022 Archived from the original on December 17 2022 Retrieved December 17 2022 External links Edit nbsp Wikimedia Commons has media related to Jane Byrne Interchange Official website The Chicago Sun Times Chicagopedia Retrieved from https en wikipedia org w index php title Jane Byrne Interchange amp oldid 1176986809, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.