fbpx
Wikipedia

I-275 Metro Trail

The I-275 Metro Trail is a bicycle trail in Wayne and Oakland counties in the US state of Michigan.

I-275 Metro Trail
I-275 Metro Trail in Canton, December 2008
Length31.6 mi (50.9 km)
LocationWayne, and Oakland counties
Trailheads2[1]
UseHiking, biking

History edit

The Michigan Department of Transportation (MDOT) built a bike trail parallel to I-275 in the mid-1970s. This I-275 Bikeway was constructed as a reply to the 1970s energy crisis,[2] along a 31.6-mile (50.9 km) stretch in Monroe, Wayne and Oakland counties.[3] This path is 8 feet (2.4 m) wide and runs at least 30 feet (9 m) from the freeway, fenced off from adjacent landowners. It was not well-maintained originally, but it was being improved in the first decade of the 21st century.[4] There are 24 access points to the trail located at major cross roads along the route.[2] The trail is one of a network approved in June 1974,[5] and the state originally planned it to follow almost all 60 miles (97 km) of I-275 at the time, including the unbuilt segment north of Novi.[6]

Since 2006, the Michigan Trails & Greenway Alliance and MDOT have been working to improve the bike trail.[2] At the time of the alliance's initial studies, the trail was overgrown with vegetation in locations. The study focused on areas of needed improvement after meeting with members of the public in the communities surrounding the bike path.[4] In August 2009, MDOT held an open house to discuss construction work planned to improve the trail.[7] Further impacts by MDOT to the bikeway included closures in 2010 during reconstruction projects underway on the I-275 freeway.[8] Since a grand re-opening in 2011, the bike path has been called the I-275 Metro Trail.[9] In the middle of 2015, MDOT completed reconstruction of the bike trail,[3] resulting in a paved trail from a junction with the Downriver Linked Greenways East–West Trail near South Huron Road northward to 12 Mile Road in Novi.[1]

See also edit

References edit

  1. ^ a b Rockford Advertising (2016). "I-275 Metro Trail North" (PDF) (Map). Michigan Trails Magazine. Retrieved July 5, 2016.
    Rockford Advertising (2016). "I-275 Metro Trail South" (PDF) (Map). Michigan Trails Magazine. Retrieved July 5, 2016.
  2. ^ a b c Michigan Trails & Greenways Alliance. . Michigan Trails & Greenways Alliance. Archived from the original on November 10, 2010. Retrieved March 3, 2010.
  3. ^ a b Rockford Advertising. . Michigan Trails Magazine. Rockford Advertising. Archived from the original on July 2, 2016. Retrieved July 5, 2016.
  4. ^ a b Michigan Trails & Greenway Alliance (September 7, 2006). (PDF) (Report). Michigan Trails & Greenway Alliance. Archived from the original (PDF) on July 18, 2011. Retrieved March 3, 2010.
  5. ^ "Legislature Backs Bicycle Path Bill". The News-Palladium. Benton Harbor, MI. Associated Press. June 28, 1974. p. 21. OCLC 10117334. Retrieved July 13, 2018 – via Newspapers.com.  
  6. ^ "Bicycle Paths Are Okayed". Holland Evening Sentinel. United Press International. May 9, 1974. p. 13. OCLC 13440201. Retrieved October 15, 2014 – via Newspapers.com.  
  7. ^ Morosi, Rob (August 5, 2009). (Press release). Michigan Department of Transportation. Archived from the original on December 19, 2009. Retrieved March 3, 2010.
  8. ^ Taylor Transportation Service Center (February 11, 2010). . Michigan Department of Transportation. Archived from the original on June 3, 2010. Retrieved March 3, 2010.
  9. ^ Admin (September 15, 2011). . Friends of the I-275 Metro Trail. Archived from the original on October 19, 2014. Retrieved June 21, 2014.{{cite web}}: CS1 maint: unfit URL (link)

metro, trail, bicycle, trail, wayne, oakland, counties, state, michigan, canton, december, 2008length31, locationwayne, oakland, countiestrailheads2, usehiking, bikinghistory, editthe, michigan, department, transportation, mdot, built, bike, trail, parallel, 1. The I 275 Metro Trail is a bicycle trail in Wayne and Oakland counties in the US state of Michigan I 275 Metro TrailI 275 Metro Trail in Canton December 2008Length31 6 mi 50 9 km LocationWayne and Oakland countiesTrailheads2 1 UseHiking bikingHistory editThe Michigan Department of Transportation MDOT built a bike trail parallel to I 275 in the mid 1970s This I 275 Bikeway was constructed as a reply to the 1970s energy crisis 2 along a 31 6 mile 50 9 km stretch in Monroe Wayne and Oakland counties 3 This path is 8 feet 2 4 m wide and runs at least 30 feet 9 m from the freeway fenced off from adjacent landowners It was not well maintained originally but it was being improved in the first decade of the 21st century 4 There are 24 access points to the trail located at major cross roads along the route 2 The trail is one of a network approved in June 1974 5 and the state originally planned it to follow almost all 60 miles 97 km of I 275 at the time including the unbuilt segment north of Novi 6 Since 2006 the Michigan Trails amp Greenway Alliance and MDOT have been working to improve the bike trail 2 At the time of the alliance s initial studies the trail was overgrown with vegetation in locations The study focused on areas of needed improvement after meeting with members of the public in the communities surrounding the bike path 4 In August 2009 MDOT held an open house to discuss construction work planned to improve the trail 7 Further impacts by MDOT to the bikeway included closures in 2010 during reconstruction projects underway on the I 275 freeway 8 Since a grand re opening in 2011 the bike path has been called the I 275 Metro Trail 9 In the middle of 2015 MDOT completed reconstruction of the bike trail 3 resulting in a paved trail from a junction with the Downriver Linked Greenways East West Trail near South Huron Road northward to 12 Mile Road in Novi 1 See also edit nbsp Transport portal nbsp Michigan portalReferences edit a b Rockford Advertising 2016 I 275 Metro Trail North PDF Map Michigan Trails Magazine Retrieved July 5 2016 Rockford Advertising 2016 I 275 Metro Trail South PDF Map Michigan Trails Magazine Retrieved July 5 2016 a b c Michigan Trails amp Greenways Alliance I 275 Bikeway Michigan Trails amp Greenways Alliance Archived from the original on November 10 2010 Retrieved March 3 2010 a b Rockford Advertising I 275 Metro Trail North Michigan Trails Magazine Rockford Advertising Archived from the original on July 2 2016 Retrieved July 5 2016 a b Michigan Trails amp Greenway Alliance September 7 2006 Reviving the I 275 Bikeway The Potential for Community Enhancement PDF Report Michigan Trails amp Greenway Alliance Archived from the original PDF on July 18 2011 Retrieved March 3 2010 Legislature Backs Bicycle Path Bill The News Palladium Benton Harbor MI Associated Press June 28 1974 p 21 OCLC 10117334 Retrieved July 13 2018 via Newspapers com nbsp Bicycle Paths Are Okayed Holland Evening Sentinel United Press International May 9 1974 p 13 OCLC 13440201 Retrieved October 15 2014 via Newspapers com nbsp Morosi Rob August 5 2009 MDOT To Hold I 275 Bike Path Construction Open House Press release Michigan Department of Transportation Archived from the original on December 19 2009 Retrieved March 3 2010 Taylor Transportation Service Center February 11 2010 I 275 Corridor Improvements Wayne County Michigan Department of Transportation Archived from the original on June 3 2010 Retrieved March 3 2010 Admin September 15 2011 I 275 Grand Re Opening Friends of the I 275 Metro Trail Archived from the original on October 19 2014 Retrieved June 21 2014 a href Template Cite web html title Template Cite web cite web a CS1 maint unfit URL link Retrieved from https en wikipedia org w index php title I 275 Metro Trail amp oldid 1079286519, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.