Holborn Viaduct–Herne Hill line

The Holborn Viaduct–Herne Hill line is a railway line between Holborn Viaduct in the City of London and Herne Hill in the London Borough of Lambeth. After the closure of Holborn Viaduct station the line ends at the south portal of Snow Hill tunnel merging into Snow Hill lines. From there the Widened Lines to St Pancras and Kentish Town are reached. Today the section north of Blackfriars is part of the Thameslink core. Originally being a branch line of the London, Chatham and Dover Railway (LCDR) towards the City of London, the line is sometimes called LCDR City Branch.

Holborn Viaduct–Herne Hill line
Overview
StatusOperational
OwnerNetwork Rail
ELRHHH
LocaleGreater London
Termini
Service
ServicesThameslink
Southeastern (peak only)
Operator(s)Govia Thameslink Railway
Southeastern
History
Opened6 October 1863
Last extension1874
Technical
Number of tracks2
4 (Blackfriars–Loughborough Junction)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Electrification750 V DC third rail
Holborn Viaduct–Herne Hill North Jn
m ch
Farringdon
0 15
Smithfield Sidings
Holborn Viaduct low level
0 28
former portal of Snow Hill tunnel
tunnel extension beneath former line
0 44
0 23
change of line
Ludgate Hill
0 35
Blackfriars
Blackfriars Bridge
0 63
Blackfriars Jn
Borough Road
1 47
Elephant & Castle
Walworth Road
Camberwell
3 36
Loughborough Jn
3 48
Loughborough Junction
Herne Hill sorting sidings
4 30
Herne Hill north Jn
Herne Hill
Herne Hill south Jn

History edit

In the late 1850s, the East Kent Railway had ambitions to run passenger trains between Kent and London, but it did not own any railway lines in inner London. It reached an agreement with the London, Brighton and South Coast Railway (LB&SCR) in 1858 to use the Crystal Palace line originally built by the West End of London and Crystal Palace Railway from Beckenham Junction to Clapham Junction to access Battersea and (from 1860) Victoria. This arrangement incurred costly access fees, but it was necessary until the company obtained Parliamentary authority to build in London.[1][2]

Construction edit

On 6 August 1860, the Metropolitan Extensions Act granted the London, Chatham and Dover Railway (LCDR; the successor to the East Kent company) the powers to extend the Chatham Main Line from Beckenham Junction to Battersea and to build a branch line from the Herne Hill to the City of London.[3][4]

 
A 1914 Railway Clearing House map of lines around Herne Hill

After the main extension was built, the City Branch opened on 6 October 1863 from Herne Hill as far as Elephant & Castle, via Camberwell and Walworth Road. On 1 June 1864, the line had been extended to Blackfriars Bridge railway station (on the south bank of the River Thames) via Borough Road.[5] Blackfriars Railway Bridge was then built across the Thames and a terminus for trains from the south opened at Ludgate Hill on 1 June 1865[6] (closed 3 March 1929).

Extensions edit

 
A 1914 Railway Clearing House map of lines around Holborn Viaduct
 
Original junction between the Holborn Viaduct–Herne Hill line (continuing on the right) and Snow Hill line (left) in 1953. The new transition between the lines lies 100 m south at the new portal of Snow Hill tunnel.

Snow Hill tunnel opened on 1 January 1866, enabling trains from Ludgate Hill to reach the Widened Lines at Farringdon. LCDR and Great Northern Railways (GNR) joint services from Blackfriars Bridge began operating via Snow Hill tunnel under Smithfield market to Farringdon and northwards on to the GNR.[7]

Later that year, the LCDR completed work to widen the railway viaduct between Herne Hill and Blackfriars Bridge, which included doubling the number of lines north of Loughborough Junction from two to four.[8]

Herne Hill–Tulse Hill

In 1868, the London, Brighton and South Coast Railway opened a suburban line from London Bridge to Sutton via Tulse Hill. A 1 mi (1.6 km) connecting line from Tulse Hill to Herne Hill opened on 1 January 1869.[9]

The platforms at Loughborough Junction between Camberwell and Herne Hill opened in 1872.[5]

In 1874 the line was extended to Holborn Viaduct where a new terminus was built. In 1886 a second parallel bridge across River Thames opened. At the northern end of the bridge St. Paul's station (later renamed Blackfriars) was opened by the London, Chatham and Dover Railway. Blackfriars Bridge station on the south bank closed at this time.

In 1900, it was suggested in The Contemporary Review that the City Branch should be replaced with an electric deep-level railway (i.e. a 'tube' line) between Herne Hill and Farringdon in order to remove Blackfriars Railway Bridge, which the author considered to be a blight on the Thames.[10]

In 1916 passenger services through Snow Hill tunnel were discontinued, and trains from the south terminated at Holborn Viaduct.[11][12] The tunnel remained in use for freight trains.

On 12 July 1925, a 660-volt third-rail system came into operation along the entire length of line. Electric trains ran every 20 minutes during the day [13]

Trains on the City Branch were affected by World War II. Services were reduced from September 1939 to once every 30 minutes during the week and hourly at weekends;[14] and the line was cut twice during the Blitz. On the second occasion, the railway bridge over Hinton Road (immediately south of Loughborough Junction) was destroyed.[15] The route between Holborn Viaduct and Herne Hill was disrupted by 62 incidents during the war.[16]

Snow Hill tunnel closed in the end of the 1960s and tracks were lifted in 1971.

Thameslink Programme edit

 
St Paul's Thameslink station shortly after opening, with the remains of Holborn Viaduct railway station in the background

In 1988, Snow Hill tunnel re-opened and the former LCDR City Branch formed the basis of the new Thameslink route. Holborn Viaduct station was demolished and replaced by St Paul's Thameslink station (later renamed City Thameslink) in the tunnel. The line was dismantled between Lutgate Hill and Holborn Viaduct; instead a new section of Snow Hill tunnel was built.

Network Rail began a major upgrade of the route in 2009. A key objective of the Thameslink Programme was allowing more trains to travel between central London and Brighton, which was prevented by a bottleneck between London Bridge and Blackfriars on a viaduct through the historic Borough Market. Network Rail initially suggested widening the viaduct and demolishing part of the market, but the public backlash against this plan prompted Network Rail to consider permanently routing all Thameslink trains to/from Brighton via Herne Hill, avoiding London Bridge and the market.[17] This would have required the grade separation of the two lines through Herne Hill, which would have been achieved by constructing a new viaduct immediately to the east of the existing viaduct and using a fly-over to connect the southern end of the new viaduct to the line between Tulse Hill and North Dulwich (taking the tracks over the Chatham Main Line and towards Tulse Hill).[18] This proposal was rejected in 2004 because of its environmental impact on Herne Hill and the larger number of interchanges offered on the London Bridge route; the Borough Market viaduct was widened instead.[17] From December 2008 to May 2012, Thameslink trains serving Herne Hill did not run most weekends or after 22:30 every week-night because of construction work on the Thameslink route through central London as part of the Thameslink Programme.[19]

During the initial planning in the late 1980s for High Speed 1, British Rail considered building the line to serve a low-level station at King's Cross via south London.[20] An option for this route was via the City Branch, which would have required quadrupling the tracks between Loughborough Junction and Herne Hill.[21]

Services edit

Early services edit

From July 1863, LCDR trains between London and Kent ran to continental Europe via a connecting steamboat from Dover Harbour to Calais;[22] these boat trains left Victoria and Ludgate Hill simultaneously and were joined at Herne Hill.[23] to give passengers easier access to the City of London and beyond. [24] The LCDR also began operating direct services to King's Cross and Barnet (now High Barnet Underground station) when Snow Hill tunnel opened.[25]

A popular workmen's train (one penny per journey) ran between Ludgate Hill and Victoria via Herne Hill from 1865. Trains left from both termini at 04:55 and returned at 18:15.[26] The LCDR was compelled to operate this service by Parliament to compensate for the large number of working-class homes destroyed in Camberwell during the construction of the line.[27] Regular one-way fares from Herne Hill to Ludgate Hill were eightpence, sixpence and fourpence for first, second and third class respectively (or return for one shilling, ninepence and sevenpence respectively), with journey times of 15 minutes on express trains and 26 minutes when calling at all stops.[28]

Both the Great Northern Railway (GNR) and the London and South Western Railway (LSWR) helped fund the Metropolitan Extensions (£320,000 and £310,000 respectively; £37,970,000 and £36,780,000 in 2023[29]) in return for the right to use the LCDR's tracks. The LSWR began running trains between Ludgate Hill and Wimbledon via Herne Hill when the Tulse Hill extension was completed.[30] Some of these services went as far as Kingston until the mid-1890s.[31]

A late-night service from Ludgate Hill (departing 01:15) to Beckenham Junction via Herne Hill began in 1910. The intention was to satisfy journalists on Fleet Street who regularly complained in print about the poor quality of service on the line; those working on the morning papers often worked beyond midnight and missed the last train.[32]

By 1959, the pattern of commuter services had taken the shape it held into the 21st century: all-stops trains from the City of London to Wimbledon and Sutton (but, unlike the modern Sutton Loop, via West Croydon).[33]

Current edit

Passenger services are operated by Govia Thameslink Railway. Additional peak-services terminating at Blackfriars are run by Southeastern.

Stations edit

Stations on the line are

  • Herne Hill (opened 1862)
  • Loughborough Junction (opened 1 March 1863 on west chord as Loughborough Road, renamed when City line and east chord platforms opened in 1872, west platforms closed 1916, east platforms closed 1925)
  • Camberwell (opened as Camberwell New Road 6 October 1862, closed 1916)
  • Walworth Road (opened as Camberwell Gate 1 May 1863, closed 1916)
  • Elephant & Castle (opened 6 October 1862)
  • Borough Road (opened 1 June 1864, closed 1907)
  • Blackfriars Bridge (opened 1 June 1864, goods only from 1885, closed 1964) Now part of its site is the southbank entrance for Blackfriars station.
  • Blackfriars (opened 1886 as St Paul's, renamed Blackfriars 1937)
  • Ludgate Hill (opened 1865, closed 1929)
  • Holborn Viaduct (opened 1874, closed 1990)

References edit

  1. ^ Dendy Marshall & Kidner 1968, p. 327.
  2. ^ Turner, John Howard (1978). The London Brighton and South Coast Railway 2 Establishment and Growth. London: B.T Batsford. p. 121. ISBN 978-0-7134-1198-0.
  3. ^ White 1961, p. 36.
  4. ^ Adams, W.J (1866). Bradshaw's Railway Manual, Shareholders' Guide, and Official Directory. p. 172.
  5. ^ a b White 1961, p. 37.
  6. ^ Spinks, Neil (June 1988). Slater, John (ed.). "Thameslink Services a Century Ago". Railway Magazine. Vol. 134, no. 1046. Cheam: Prospect Magazines. p. 364. ISSN 0033-8923.
  7. ^ "Fowler's Ghost" 1962, p. 304.
  8. ^ The Railway News: 233. 1 September 1866. {{cite journal}}: Missing or empty |title= (help)
  9. ^ Kidner, R.W. (1952). The London, Chatham and Dover Railway. South Godstone, Surrey: Oakwood Press. p. 10. OCLC 12264028.
  10. ^ Strahan, A. (1900). The Contemporary Review. 78: 109. {{cite journal}}: Missing or empty |title= (help)
  11. ^ Jackson 1969, p. 201.
  12. ^ White 1971, p. 39.
  13. ^ Moody 1957, p. 28.
  14. ^ Moody 1957, p. 107.
  15. ^ Moody 1957, p. 114.
  16. ^ Moody 1957, p. 115.
  17. ^ a b Network Rail, June 2004, p. 8.
  18. ^ Network Rail, June 2004, p. 10.
  19. ^ Question 48 18 February 2012 at the Wayback Machine, Thameslink Programme. Retrieved 20 April 2012
  20. ^ Timpson, Trevor (14 November 2007). "How St Pancras was chosen". BBC News Online. London. Retrieved 19 November 2007.
  21. ^ Cowton, Rodney (15 July 1988). "British Rail sets out timetable for train services to the Channel tunnel". The Times. London. (subscription required)
  22. ^ Reynolds, Siân (2007). Paris-Edinburgh: Cultural Connections in the Belle Epoque. Farnham: Ashgate Publishing. p. 14.
  23. ^ Ward and Lock's Pictorial Guide to London. Ward, Lock and Co, Ltd. 1879. p. 36.
  24. ^ White 1961, p. 39.
  25. ^ Jackson 1969, p. 194.
  26. ^ White 1971, p. 36.
  27. ^ Dendy Marshall & Kidner 1968, p. 333.
  28. ^ The ABC; or, Alphabetical railway guide: showing at a glance how and when to go from London to the different stations in Great Britain, and return, etc. London: W. Tweedie. 1870. pp. 10, 55.
  29. ^ UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 7 May 2024.
  30. ^ Jackson 1969, p. 193.
  31. ^ Mitchell & Smith 1992, fig. 53.
  32. ^ Jackson 1969, p. 199.
  33. ^ Jackson 1969, p. 205.

Bibliography edit

  • Dendy Marshall, C.F.; Kidner, R.W. (1968). A history of the Southern Railway (Combined Volume). London: Ian Allan. ISBN 978-0-7110-0059-9.
  • "Fowler's Ghost" (May 1962). Cooke, B.W.C. (ed.). "Railway connections at King's Cross (part one)". The Railway Magazine. 108 (733). Tothill Press.
  • Greater London Authority (February 2012). The Mayor's Rail Vision (PDF). Retrieved 20 April 2012.
  • Herne Hill Society (2003). Herne Hill Heritage Trail. London: Herne Hill Society. ISBN 978-1-873520-46-8.
  • Jackson, Alan Arthur (1969). London's Termini. Newton Abbot: David & Charles. ISBN 978-0-7153-4474-3.
  • Mitchell, Vic; Smith, Keith (1992). Victoria to Bromley South (Southern Main Line). Midhurst, W. Sussex: Middleton Press. ISBN 978-0-906520-98-7.
  • Moody, G.T. (1957). Southern Electric. London: Ian Allan.
  • Network Rail (June 2004). Thameslink 2000: Environmental Statement – Alternatives Report (PDF). Retrieved 20 April 2012.
  • Network Rail (March 2008). (PDF). Archived from the original (PDF) on 19 January 2012. Retrieved 20 April 2012.
  • Network Rail (July 2011). London and South East Route utilisation strategy (PDF). Retrieved 20 April 2012.
  • Sheppard, F. H. W. (1956). Survey of London: volume 26: Lambeth: Southern area. British History Online.
  • Southeastern (2015). . Archived from the original on 3 March 2015. Retrieved 10 January 2015.
  • White, H.P. (1961). A Regional History of the Railways of Great Britain: Greater London. London: Phoenix House.
  • White, H.P. (1971). A Regional History of the Railways of Great Britain: Greater London (New ed.). Newton Abbot: David & Charles. ISBN 978-0-7153-6145-0.

External links edit

Blackfriars: A complicated station on YouTube

holborn, viaduct, herne, hill, line, railway, line, between, holborn, viaduct, city, london, herne, hill, london, borough, lambeth, after, closure, holborn, viaduct, station, line, ends, south, portal, snow, hill, tunnel, merging, into, snow, hill, lines, from. The Holborn Viaduct Herne Hill line is a railway line between Holborn Viaduct in the City of London and Herne Hill in the London Borough of Lambeth After the closure of Holborn Viaduct station the line ends at the south portal of Snow Hill tunnel merging into Snow Hill lines From there the Widened Lines to St Pancras and Kentish Town are reached Today the section north of Blackfriars is part of the Thameslink core Originally being a branch line of the London Chatham and Dover Railway LCDR towards the City of London the line is sometimes called LCDR City Branch Holborn Viaduct Herne Hill lineA Class 700 unit at BlackfriarsOverviewStatusOperationalOwnerNetwork RailELRHHHLocaleGreater LondonTerminiHolborn Viaduct closed Herne HillServiceServicesThameslinkSoutheastern peak only Operator s Govia Thameslink RailwaySoutheasternHistoryOpened6 October 1863Last extension1874TechnicalNumber of tracks24 Blackfriars Loughborough Junction Track gauge4 ft 8 1 2 in 1 435 mm standard gaugeElectrification750 V DC third rail vteHolborn Viaduct Herne Hill North Jn Legend m ch Widened Linesto Kentish Town Jn Hammersmith amp City Metropolitan and Circle lines Farringdon Hammersmith amp City Metropolitan and Circle lines Widened Linesto Moorgate 0 15 Smithfield Sidings Holborn Viaduct low level 0 28 City Thameslink Holborn Viaduct superimposed former portal of Snow Hill tunnel tunnel extension beneath former line 0 440 23 change of line Ludgate Hill 0 35 Blackfriars River Thames Blackfriars Railway Bridge Blackfriars Bridge 0 63 Blackfriars Jn South Eastern Main LineCharing Cross Dover Priory Borough Road 1 47 Elephant amp Castle Walworth Road Camberwell 3 36 Loughborough Jn 3 48 Loughborough Junction Catford loop lineBrixton Jn Shortlands Jn South London lineBattersea Park Peckham Rye Jn Herne Hill sorting sidings Chatham Main Lineto Victoria 4 30 Herne Hill north Jn Herne Hill Herne Hill south Jn Chatham Main Lineto Ramsgate curve to Tulse Hillfor Portsmouth line to Horsham Contents 1 History 1 1 Construction 1 2 Extensions 1 3 Thameslink Programme 2 Services 2 1 Early services 2 2 Current 3 Stations 4 References 5 Bibliography 6 External linksHistory editIn the late 1850s the East Kent Railway had ambitions to run passenger trains between Kent and London but it did not own any railway lines in inner London It reached an agreement with the London Brighton and South Coast Railway LB amp SCR in 1858 to use the Crystal Palace line originally built by the West End of London and Crystal Palace Railway from Beckenham Junction to Clapham Junction to access Battersea and from 1860 Victoria This arrangement incurred costly access fees but it was necessary until the company obtained Parliamentary authority to build in London 1 2 Construction edit vteLC amp DR s Metropolitan Extensionsand neighbouring railway lines Legend To St Pancras nbsp Farringdon nbsp nbsp nbsp nbsp nbsp 18662009 Barbican nbsp nbsp nbsp nbsp Moorgate 18662009 18741990 Holborn Viaduct nbsp nbsp nbsp nbsp Holborn Viaduct low 18741916 Victoria nbsp nbsp nbsp nbsp nbsp nbsp City Thameslink nbsp 18671911 Grosvenor Road nbsp nbsp nbsp nbsp Ludgate Hill 18651929 Charing Cross nbsp nbsp nbsp nbsp nbsp Blackfriars nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp River Thames 18671916 Battersea Park Road nbsp nbsp nbsp nbsp Blackfriars Bridge 18641964 Waterloo East nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp To London Bridge Vauxhall nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Waterloo nbsp nbsp nbsp nbsp nbsp nbsp To Clapham Jct nbsp nbsp nbsp Borough Road 18641907 Wandsworth Road nbsp nbsp nbsp nbsp Elephant amp Castle nbsp nbsp nbsp Clapham High Street nbsp nbsp nbsp nbsp nbsp Walworth Road 18621916 nbsp nbsp nbsp Camberwell 18621916 nbsp nbsp nbsp nbsp Loughborough Junction nbsp Brixton nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Denmark Hill Catford loop nbsp 18661976 East Brixton nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp South London Line nbsp nbsp nbsp nbsp nbsp Herne Hill sidings 18851966 nbsp nbsp nbsp North Junction nbsp Herne Hill nbsp nbsp nbsp nbsp South Junction To Sutton Tulse Hill nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp North Dulwich To L Bridge nbsp West Dulwich nbsp Chatham Main Line to Kent On 6 August 1860 the Metropolitan Extensions Act granted the London Chatham and Dover Railway LCDR the successor to the East Kent company the powers to extend the Chatham Main Line from Beckenham Junction to Battersea and to build a branch line from the Herne Hill to the City of London 3 4 nbsp A 1914 Railway Clearing House map of lines around Herne Hill After the main extension was built the City Branch opened on 6 October 1863 from Herne Hill as far as Elephant amp Castle via Camberwell and Walworth Road On 1 June 1864 the line had been extended to Blackfriars Bridge railway station on the south bank of the River Thames via Borough Road 5 Blackfriars Railway Bridge was then built across the Thames and a terminus for trains from the south opened at Ludgate Hill on 1 June 1865 6 closed 3 March 1929 Extensions edit nbsp A 1914 Railway Clearing House map of lines around Holborn Viaduct nbsp Original junction between the Holborn Viaduct Herne Hill line continuing on the right and Snow Hill line left in 1953 The new transition between the lines lies 100 m south at the new portal of Snow Hill tunnel Snow Hill tunnel opened on 1 January 1866 enabling trains from Ludgate Hill to reach the Widened Lines at Farringdon LCDR and Great Northern Railways GNR joint services from Blackfriars Bridge began operating via Snow Hill tunnel under Smithfield market to Farringdon and northwards on to the GNR 7 Later that year the LCDR completed work to widen the railway viaduct between Herne Hill and Blackfriars Bridge which included doubling the number of lines north of Loughborough Junction from two to four 8 vteHerne Hill Tulse Hill Legend Holborn Viaduct Herne Hill line nbsp to Holborn Viaduct nbsp Chatham Main Lineto Victoria nbsp nbsp nbsp Herne Hill nbsp nbsp nbsp nbsp Portsmouth lineto South Bermondsey Jn nbsp nbsp nbsp nbsp Chatham Main Lineto Ramsgate nbsp nbsp nbsp nbsp nbsp Tulse Hill Crystal Palace lineto Balham Jn nbsp nbsp nbsp Crystal Palace lineto Beckenham Junction nbsp Portsmouth lineto Horsham In 1868 the London Brighton and South Coast Railway opened a suburban line from London Bridge to Sutton via Tulse Hill A 1 mi 1 6 km connecting line from Tulse Hill to Herne Hill opened on 1 January 1869 9 The platforms at Loughborough Junction between Camberwell and Herne Hill opened in 1872 5 In 1874 the line was extended to Holborn Viaduct where a new terminus was built In 1886 a second parallel bridge across River Thames opened At the northern end of the bridge St Paul s station later renamed Blackfriars was opened by the London Chatham and Dover Railway Blackfriars Bridge station on the south bank closed at this time In 1900 it was suggested in The Contemporary Review that the City Branch should be replaced with an electric deep level railway i e a tube line between Herne Hill and Farringdon in order to remove Blackfriars Railway Bridge which the author considered to be a blight on the Thames 10 In 1916 passenger services through Snow Hill tunnel were discontinued and trains from the south terminated at Holborn Viaduct 11 12 The tunnel remained in use for freight trains On 12 July 1925 a 660 volt third rail system came into operation along the entire length of line Electric trains ran every 20 minutes during the day 13 Trains on the City Branch were affected by World War II Services were reduced from September 1939 to once every 30 minutes during the week and hourly at weekends 14 and the line was cut twice during the Blitz On the second occasion the railway bridge over Hinton Road immediately south of Loughborough Junction was destroyed 15 The route between Holborn Viaduct and Herne Hill was disrupted by 62 incidents during the war 16 Snow Hill tunnel closed in the end of the 1960s and tracks were lifted in 1971 Thameslink Programme edit nbsp St Paul s Thameslink station shortly after opening with the remains of Holborn Viaduct railway station in the background In 1988 Snow Hill tunnel re opened and the former LCDR City Branch formed the basis of the new Thameslink route Holborn Viaduct station was demolished and replaced by St Paul s Thameslink station later renamed City Thameslink in the tunnel The line was dismantled between Lutgate Hill and Holborn Viaduct instead a new section of Snow Hill tunnel was built Network Rail began a major upgrade of the route in 2009 A key objective of the Thameslink Programme was allowing more trains to travel between central London and Brighton which was prevented by a bottleneck between London Bridge and Blackfriars on a viaduct through the historic Borough Market Network Rail initially suggested widening the viaduct and demolishing part of the market but the public backlash against this plan prompted Network Rail to consider permanently routing all Thameslink trains to from Brighton via Herne Hill avoiding London Bridge and the market 17 This would have required the grade separation of the two lines through Herne Hill which would have been achieved by constructing a new viaduct immediately to the east of the existing viaduct and using a fly over to connect the southern end of the new viaduct to the line between Tulse Hill and North Dulwich taking the tracks over the Chatham Main Line and towards Tulse Hill 18 This proposal was rejected in 2004 because of its environmental impact on Herne Hill and the larger number of interchanges offered on the London Bridge route the Borough Market viaduct was widened instead 17 From December 2008 to May 2012 Thameslink trains serving Herne Hill did not run most weekends or after 22 30 every week night because of construction work on the Thameslink route through central London as part of the Thameslink Programme 19 During the initial planning in the late 1980s for High Speed 1 British Rail considered building the line to serve a low level station at King s Cross via south London 20 An option for this route was via the City Branch which would have required quadrupling the tracks between Loughborough Junction and Herne Hill 21 Services editEarly services edit From July 1863 LCDR trains between London and Kent ran to continental Europe via a connecting steamboat from Dover Harbour to Calais 22 these boat trains left Victoria and Ludgate Hill simultaneously and were joined at Herne Hill 23 to give passengers easier access to the City of London and beyond 24 The LCDR also began operating direct services to King s Cross and Barnet now High Barnet Underground station when Snow Hill tunnel opened 25 A popular workmen s train one penny per journey ran between Ludgate Hill and Victoria via Herne Hill from 1865 Trains left from both termini at 04 55 and returned at 18 15 26 The LCDR was compelled to operate this service by Parliament to compensate for the large number of working class homes destroyed in Camberwell during the construction of the line 27 Regular one way fares from Herne Hill to Ludgate Hill were eightpence sixpence and fourpence for first second and third class respectively or return for one shilling ninepence and sevenpence respectively with journey times of 15 minutes on express trains and 26 minutes when calling at all stops 28 Both the Great Northern Railway GNR and the London and South Western Railway LSWR helped fund the Metropolitan Extensions 320 000 and 310 000 respectively 37 970 000 and 36 780 000 in 2023 29 in return for the right to use the LCDR s tracks The LSWR began running trains between Ludgate Hill and Wimbledon via Herne Hill when the Tulse Hill extension was completed 30 Some of these services went as far as Kingston until the mid 1890s 31 A late night service from Ludgate Hill departing 01 15 to Beckenham Junction via Herne Hill began in 1910 The intention was to satisfy journalists on Fleet Street who regularly complained in print about the poor quality of service on the line those working on the morning papers often worked beyond midnight and missed the last train 32 By 1959 the pattern of commuter services had taken the shape it held into the 21st century all stops trains from the City of London to Wimbledon and Sutton but unlike the modern Sutton Loop via West Croydon 33 Current edit See also Thameslink Thameslink service pattern Passenger services are operated by Govia Thameslink Railway Additional peak services terminating at Blackfriars are run by Southeastern Stations editStations on the line are Herne Hill opened 1862 Loughborough Junction opened 1 March 1863 on west chord as Loughborough Road renamed when City line and east chord platforms opened in 1872 west platforms closed 1916 east platforms closed 1925 Camberwell opened as Camberwell New Road 6 October 1862 closed 1916 Walworth Road opened as Camberwell Gate 1 May 1863 closed 1916 Elephant amp Castle opened 6 October 1862 Borough Road opened 1 June 1864 closed 1907 Blackfriars Bridge opened 1 June 1864 goods only from 1885 closed 1964 Now part of its site is the southbank entrance for Blackfriars station Blackfriars opened 1886 as St Paul s renamed Blackfriars 1937 Ludgate Hill opened 1865 closed 1929 Holborn Viaduct opened 1874 closed 1990 References edit Dendy Marshall amp Kidner 1968 p 327 Turner John Howard 1978 The London Brighton and South Coast Railway 2 Establishment and Growth London B T Batsford p 121 ISBN 978 0 7134 1198 0 White 1961 p 36 Adams W J 1866 Bradshaw s Railway Manual Shareholders Guide and Official Directory p 172 a b White 1961 p 37 Spinks Neil June 1988 Slater John ed Thameslink Services a Century Ago Railway Magazine Vol 134 no 1046 Cheam Prospect Magazines p 364 ISSN 0033 8923 Fowler s Ghost 1962 p 304 The Railway News 233 1 September 1866 a href Template Cite journal html title Template Cite journal cite journal a Missing or empty title help Kidner R W 1952 The London Chatham and Dover Railway South Godstone Surrey Oakwood Press p 10 OCLC 12264028 Strahan A 1900 The Contemporary Review 78 109 a href Template Cite journal html title Template Cite journal cite journal a Missing or empty title help Jackson 1969 p 201 White 1971 p 39 Moody 1957 p 28 Moody 1957 p 107 Moody 1957 p 114 Moody 1957 p 115 a b Network Rail June 2004 p 8 Network Rail June 2004 p 10 Question 48 Archived 18 February 2012 at the Wayback Machine Thameslink Programme Retrieved 20 April 2012 Timpson Trevor 14 November 2007 How St Pancras was chosen BBC News Online London Retrieved 19 November 2007 Cowton Rodney 15 July 1988 British Rail sets out timetable for train services to the Channel tunnel The Times London subscription required Reynolds Sian 2007 Paris Edinburgh Cultural Connections in the Belle Epoque Farnham Ashgate Publishing p 14 Ward and Lock s Pictorial Guide to London Ward Lock and Co Ltd 1879 p 36 White 1961 p 39 Jackson 1969 p 194 White 1971 p 36 Dendy Marshall amp Kidner 1968 p 333 The ABC or Alphabetical railway guide showing at a glance how and when to go from London to the different stations in Great Britain and return etc London W Tweedie 1870 pp 10 55 UK Retail Price Index inflation figures are based on data from Clark Gregory 2017 The Annual RPI and Average Earnings for Britain 1209 to Present New Series MeasuringWorth Retrieved 7 May 2024 Jackson 1969 p 193 Mitchell amp Smith 1992 fig 53 Jackson 1969 p 199 Jackson 1969 p 205 Bibliography editDendy Marshall C F Kidner R W 1968 A history of the Southern Railway Combined Volume London Ian Allan ISBN 978 0 7110 0059 9 Fowler s Ghost May 1962 Cooke B W C ed Railway connections at King s Cross part one The Railway Magazine 108 733 Tothill Press Greater London Authority February 2012 The Mayor s Rail Vision PDF Retrieved 20 April 2012 Herne Hill Society 2003 Herne Hill Heritage Trail London Herne Hill Society ISBN 978 1 873520 46 8 Jackson Alan Arthur 1969 London s Termini Newton Abbot David amp Charles ISBN 978 0 7153 4474 3 Mitchell Vic Smith Keith 1992 Victoria to Bromley South Southern Main Line Midhurst W Sussex Middleton Press ISBN 978 0 906520 98 7 Moody G T 1957 Southern Electric London Ian Allan Network Rail June 2004 Thameslink 2000 Environmental Statement Alternatives Report PDF Retrieved 20 April 2012 Network Rail March 2008 South London Route utilisation strategy PDF Archived from the original PDF on 19 January 2012 Retrieved 20 April 2012 Network Rail July 2011 London and South East Route utilisation strategy PDF Retrieved 20 April 2012 Sheppard F H W 1956 Survey of London volume 26 Lambeth Southern area British History Online Southeastern 2015 Train Times from 11 January 2015 to 16 May 2015 Archived from the original on 3 March 2015 Retrieved 10 January 2015 White H P 1961 A Regional History of the Railways of Great Britain Greater London London Phoenix House White H P 1971 A Regional History of the Railways of Great Britain Greater London New ed Newton Abbot David amp Charles ISBN 978 0 7153 6145 0 External links edit nbsp Wikimedia Commons has media related to Holborn Viaduct Herne Hill line Blackfriars A complicated station on YouTube Retrieved from https en wikipedia org w index php title Holborn Viaduct Herne Hill line amp oldid 1217082150, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.