fbpx
Wikipedia

Handan–Jinan railway

The Handan–Jinan railway or Hanji railway (simplified Chinese: 邯济铁路; traditional Chinese: 邯濟鐵路; pinyin: Hánjì tiĕlù) is a railway between Handan in Hebei and Jinan in Shandong Province in northern China. The single railway is 231.76 miles (372.98 km) in length and was built from 1996 to 1999 to carry coal from Shanxi Province.[1][2]

When the Hanji Line began operation in 2000,[1] it had a designed annual transport capacity of 20 million tons of goods a year.[2] The line completed 21.56 million tons in 2001 and since 2003 has exceeded 30 million tons transported each year.[1] The line is operated by Hanji Railway Company Limited, a state-owned joint-stock company based in Liaocheng with the Ministry of Railways, Shandong Province and Hebei Province as shareholders.[1] In 2003, the line generated Y600 million profit.[1] In 2008, planning began for a second track and electrification of the line, which would increase annual carrying capacity to 80-100 million tons.[1]

On 10 December 2014 the section between Handan and Liaocheng began being used for long-distance passenger trains. This was the first time passenger services had operated on the line.[3]

Rail connections edit

References edit

  1. ^ a b c d e f (Chinese) "邯郸经济发展纪事"《中原商报》 2012-04-25 at the Wayback Machine 2009-08-20
  2. ^ a b . Archived from the original on 2009-03-07. Retrieved 2009-02-01.
  3. ^ . 邯郸晚报. 2014-12-10. Archived from the original on 2017-02-15. Retrieved 2022-09-10.

handan, jinan, railway, hanji, railway, simplified, chinese, 邯济铁路, traditional, chinese, 邯濟鐵路, pinyin, hánjìtiĕlù, railway, between, handan, hebei, jinan, shandong, province, northern, china, single, railway, miles, length, built, from, 1996, 1999, carry, coal. The Handan Jinan railway or Hanji railway simplified Chinese 邯济铁路 traditional Chinese 邯濟鐵路 pinyin Hanjitiĕlu is a railway between Handan in Hebei and Jinan in Shandong Province in northern China The single railway is 231 76 miles 372 98 km in length and was built from 1996 to 1999 to carry coal from Shanxi Province 1 2 When the Hanji Line began operation in 2000 1 it had a designed annual transport capacity of 20 million tons of goods a year 2 The line completed 21 56 million tons in 2001 and since 2003 has exceeded 30 million tons transported each year 1 The line is operated by Hanji Railway Company Limited a state owned joint stock company based in Liaocheng with the Ministry of Railways Shandong Province and Hebei Province as shareholders 1 In 2003 the line generated Y600 million profit 1 In 2008 planning began for a second track and electrification of the line which would increase annual carrying capacity to 80 100 million tons 1 On 10 December 2014 the section between Handan and Liaocheng began being used for long distance passenger trains This was the first time passenger services had operated on the line 3 Rail connections editHandan Beijing Guangzhou railway Handan Changzhi railway Liaocheng Beijing Kowloon railway Jinan Beijing Shanghai railwayReferences edit nbsp Railways portal a b c d e f Chinese 邯郸经济发展纪事 中原商报 Archived 2012 04 25 at the Wayback Machine 2009 08 20 a b Industry Reviews China Railways Archived from the original on 2009 03 07 Retrieved 2009 02 01 邯济铁路启用客运功能 首开石家庄至烟台和杭州列车 邯郸晚报 2014 12 10 Archived from the original on 2017 02 15 Retrieved 2022 09 10 Retrieved from https en wikipedia org w index php title Handan Jinan railway amp oldid 1137443475, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.