The Gunning Wind Farm project is a wind farm development in the Cullerin Range, north-east of Gunning, in New South Wales. Wind turbines in the farm are visible from the Hume Highway.

Gunning Wind Farm
CountryAustralia
LocationCullerin Range
Coordinates34°48′48″S 149°24′00″E / 34.8132°S 149.4°E / -34.8132; 149.4
StatusOperational
Construction beganApril 2010
Commission dateMay 2011
Construction costA$147m
Owner(s)Acciona Energy
Wind farm
TypeOnshore
Hub height80 metres (262 ft)
Rotor diameter77 metres (253 ft) and 82 metres (269 ft)
Power generation
Units operational31 × 1.5 MW
Make and modelUnknown (31)
Nameplate capacity46.5 MW
External links
Websitehttps://www.acciona.no/projects/energy/wind-power/gunning-wind-farm/
CommonsRelated media on Commons

The Gunning Wind Farm comprises an electrical substation and operation and maintenance facilities plus 31 turbines which send power to the substation via 17km of underground cabling. A 14km-long 132kV transmission line was constructed to connect the wind farm to the 132kV Yass-Goulburn transmission line. Turbines generate electricity at 12kV which travels via underground cables to the substation where it is stepped up to 132kV to match the grid voltage. Construction began in April 2010 and created about 100 jobs, bringing significant economic activity to the Gunning region. The wind farm was completed in May 2011. A great deal of work was done prior to development of the wind farm. Technical studies identified constraints and the best design, with independent consultants engaged to report on:

  • flora and fauna
  • cultural heritage
  • traffic and transport
  • geology and hydrology
  • landscape and visual amenity
  • sound

The wind farm is capable of producing 46.5MW of clean, renewable energy. Each of the 1.5MW turbines at the Gunning Wind Farm can provide sufficient renewable energy to power approximately 750 homes and save more than 5,250 tonnes of greenhouse gas emissions a year. The 31 turbines can power 35,000 homes annually and save more than 162,750 tonnes of greenhouse gases a year.

See also edit

References edit

External links edit

  • Official website

gunning, wind, farm, project, wind, farm, development, cullerin, range, north, east, gunning, south, wales, wind, turbines, farm, visible, from, hume, highway, countryaustralialocationcullerin, rangecoordinates34, 8132, 8132, 4statusoperationalconstruction, be. The Gunning Wind Farm project is a wind farm development in the Cullerin Range north east of Gunning in New South Wales Wind turbines in the farm are visible from the Hume Highway Gunning Wind FarmCountryAustraliaLocationCullerin RangeCoordinates34 48 48 S 149 24 00 E 34 8132 S 149 4 E 34 8132 149 4StatusOperationalConstruction beganApril 2010Commission dateMay 2011Construction costA 147mOwner s Acciona EnergyWind farmTypeOnshoreHub height80 metres 262 ft Rotor diameter77 metres 253 ft and 82 metres 269 ft Power generationUnits operational31 1 5 MWMake and modelUnknown 31 Nameplate capacity46 5 MWExternal linksWebsitehttps www acciona no projects energy wind power gunning wind farm CommonsRelated media on Commons edit on Wikidata The Gunning Wind Farm comprises an electrical substation and operation and maintenance facilities plus 31 turbines which send power to the substation via 17km of underground cabling A 14km long 132kV transmission line was constructed to connect the wind farm to the 132kV Yass Goulburn transmission line Turbines generate electricity at 12kV which travels via underground cables to the substation where it is stepped up to 132kV to match the grid voltage Construction began in April 2010 and created about 100 jobs bringing significant economic activity to the Gunning region The wind farm was completed in May 2011 A great deal of work was done prior to development of the wind farm Technical studies identified constraints and the best design with independent consultants engaged to report on flora and fauna cultural heritage traffic and transport geology and hydrology landscape and visual amenity soundThe wind farm is capable of producing 46 5MW of clean renewable energy Each of the 1 5MW turbines at the Gunning Wind Farm can provide sufficient renewable energy to power approximately 750 homes and save more than 5 250 tonnes of greenhouse gas emissions a year The 31 turbines can power 35 000 homes annually and save more than 162 750 tonnes of greenhouse gases a year See also editCullerin Range Wind FarmReferences editExternal links edit nbsp New South Wales portal nbsp Weather portal nbsp Renewable energy portal Official website Retrieved from https en wikipedia org w index php title Gunning Wind Farm amp oldid 1017507689, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.