Gujarat Solar Park-1 (also called Charanka Solar Park) is a solar power plant near Charanka village in Patan district of Gujarat, India. It is spread over an area of 2,000 hectares(4,900 acres). It has installed generation capacity of about 600 MW, as 2018. More 190 MW are under installation.[1]

Gujarat Solar Park-1
CountryIndia
LocationPatan district
Coordinates23°54′N 71°12′E / 23.900°N 71.200°E / 23.900; 71.200
StatusOperational
Construction began2010
Commission date2012
Solar farm
TypeFlat-panel PV
Site area2,000 ha (4,900 acres) Site plan
Power generation
Units operational615 MW
Nameplate capacity
  • 615 MW

Timeline

Inaugurated in 2012 by the then Chief Minister of Gujarat Narendra Modi, it was home to about 250 MW capacity initially. On 19 April 2012, a total of 214 megawatts (287,000 hp) had been commissioned.[2] It also became the world's third largest photo voltaic power station.

345 MW had been installed by March 2016.[3]

The Gujarat Power Corporation Limited (GPCL), the project's primary developer, said in April, 2018 that further capacity addition of 150 MW taking the total to 790 MW may be opted for soon given the availability of land in the Park.[4]

So far, the park has witnessed investments of Rs 5,365 crore and generated 3,441 million units till date.

Installed generation capacity is at about 615 MW at present, having been commissioned by 31 developers in the Solar Park. GACL (Gujarat Alkalies and Chemicals Limited) is setting up 30 MW Solar PV plant, and GNFC (Gujarat Narmada Valley Fertilizers and Chemicals) is in the process of setting up 10 MW project.

Projects of 95MW are under construction and 30MW under planning as of December, 2018.[5]

Power purchase agreement

Rs 15 (about US$0.29) per kWh for the first 12 years and Rs 5 (about US$0.10) per kWh from the 13th to 25th year.[6] The national solar policy has fixed tariffs of Rs17 for photovoltaic and Rs15 for solar thermal for 25 years.[7]

About 600 MW were completed prior to the deadline of 28 January 2012 to receive the above tariff. Systems completed after that date are subject to a lower tariff.[8]

Criticism

The solar park has been set up on the traditional migration routes of a semi-nomadic shepherd people. The government had not consulted them.[9]

References

  1. ^ Correspondent, dna (2018-04-21). "Solar power capacity at Charanka Solar Park to touch 790 MW". DNA India. Retrieved 2020-12-24.
  2. ^ "Gujarat's 214MW solar park named as Asia's largest single PV plant". PV Tech. 23 April 2012. Retrieved Jan 25, 2019.
  3. ^ Realtime Generation of Solar Plants in Gujarat
  4. ^ "Solar power capacity at Charanka Solar Park to touch 790 MW". DNA. 21 April 2018. Retrieved Jan 25, 2019.
  5. ^ "Gujarat riding on the suns chariot". Times of India. 2 December 2018. Retrieved Jan 25, 2019.
  6. ^ Solar power plant in Ahmedabad Asia's biggest
  7. ^ Gujarat solar park likely to produce 300MW by the end of December
  8. ^ Proposed Gujarat Solar Policy Tariffs for period 29 Jan 2012 to 31 March 2015
  9. ^ "How solar farms fuel land conflicts". mint. 2020-09-20. Retrieved 2020-12-24.

External links

  • GPCL Official website

gujarat, solar, park, this, article, needs, updated, please, help, update, this, article, reflect, recent, events, newly, available, information, december, 2020, also, called, charanka, solar, park, solar, power, plant, near, charanka, village, patan, district. This article needs to be updated Please help update this article to reflect recent events or newly available information December 2020 Gujarat Solar Park 1 also called Charanka Solar Park is a solar power plant near Charanka village in Patan district of Gujarat India It is spread over an area of 2 000 hectares 4 900 acres It has installed generation capacity of about 600 MW as 2018 More 190 MW are under installation 1 Gujarat Solar Park 1CountryIndiaLocationPatan districtCoordinates23 54 N 71 12 E 23 900 N 71 200 E 23 900 71 200StatusOperationalConstruction began2010Commission date2012Solar farmTypeFlat panel PVSite area2 000 ha 4 900 acres Site planPower generationUnits operational615 MWNameplate capacity615 MW edit on Wikidata Contents 1 Timeline 1 1 Power purchase agreement 2 Criticism 3 References 4 External linksTimeline EditInaugurated in 2012 by the then Chief Minister of Gujarat Narendra Modi it was home to about 250 MW capacity initially On 19 April 2012 a total of 214 megawatts 287 000 hp had been commissioned 2 It also became the world s third largest photo voltaic power station 345 MW had been installed by March 2016 3 The Gujarat Power Corporation Limited GPCL the project s primary developer said in April 2018 that further capacity addition of 150 MW taking the total to 790 MW may be opted for soon given the availability of land in the Park 4 So far the park has witnessed investments of Rs 5 365 crore and generated 3 441 million units till date Installed generation capacity is at about 615 MW at present having been commissioned by 31 developers in the Solar Park GACL Gujarat Alkalies and Chemicals Limited is setting up 30 MW Solar PV plant and GNFC Gujarat Narmada Valley Fertilizers and Chemicals is in the process of setting up 10 MW project Projects of 95MW are under construction and 30MW under planning as of December 2018 5 Power purchase agreement Edit Rs 15 about US 0 29 per kWh for the first 12 years and Rs 5 about US 0 10 per kWh from the 13th to 25th year 6 The national solar policy has fixed tariffs of Rs17 for photovoltaic and Rs15 for solar thermal for 25 years 7 About 600 MW were completed prior to the deadline of 28 January 2012 to receive the above tariff Systems completed after that date are subject to a lower tariff 8 Developers at Gujarat Solar Park 1 Developer MWpAES Solar Energy Gujarat Pvt Ltd 15Alex Asatral Power Pvt Ltd 25Avatar 5Emami Cement Ltd 10GMR Gujarat Solar Power Pvt Ltd 25GPCL 5GPPC Pipavav Power Company Ltd 5Kiran Energy Solar Power Pvt Ltd Solar Field 20Lanco Solar Pvt Ltd 15NKG Infrastructure Ltd 10Palace Solar Energy Pvt Ltd 15Roha Dyechem Pvt Ltd 25Sun Clean Renewable Power Pvt Ltd 6Sun Edison Energy India Pvt Ltd 25Surana Telecom amp Power Ltd 5Yantra 5ZF Steering Gear India Ltd 5EIT 1Universal Solar 2GSECL 10GPCL NEW 10Kindle Eng and Construction 50Torrent Solargen 51Total 345Criticism EditThe solar park has been set up on the traditional migration routes of a semi nomadic shepherd people The government had not consulted them 9 References Edit Correspondent dna 2018 04 21 Solar power capacity at Charanka Solar Park to touch 790 MW DNA India Retrieved 2020 12 24 Gujarat s 214MW solar park named as Asia s largest single PV plant PV Tech 23 April 2012 Retrieved Jan 25 2019 Realtime Generation of Solar Plants in Gujarat Solar power capacity at Charanka Solar Park to touch 790 MW DNA 21 April 2018 Retrieved Jan 25 2019 Gujarat riding on the suns chariot Times of India 2 December 2018 Retrieved Jan 25 2019 Solar power plant in Ahmedabad Asia s biggest Gujarat solar park likely to produce 300MW by the end of December Proposed Gujarat Solar Policy Tariffs for period 29 Jan 2012 to 31 March 2015 How solar farms fuel land conflicts mint 2020 09 20 Retrieved 2020 12 24 External links EditGPCL Official website Retrieved from https en wikipedia org w index php title Gujarat Solar Park 1 amp oldid 1146084366, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.