The Gilgel Gibe I Dam is a rock-filled embankment dam on the Gilgel Gibe River in Ethiopia. It is located about 57 km (35 mi) northeast of Jimma in Oromia Region. The primary purpose of the dam is hydroelectric power production. The Gilgel Gibe I hydroelectric powerplant has an installed capacity of 184 MW, enough to power over 123,200 households.[1] The dam is 1,700 m (5,600 ft) long and 40 m (130 ft) tall. Construction on the dam began in 1988 but work was halted in 1994. In 1995 construction restarted with a new construction firm. The power station was commissioned in 2004.[2]
Water from the dam is diverted through a 9.2 km (5.7 mi) long tunnel to an underground power station downstream. After power generation, the water is discharged back into the Gilgel Gibe River to flow downstream northwards for roughly 2 km, only to enter a 26 km (16 mi) long tunnel through a mountain ridge to an underground power station (Gilgel Gibe II Power Station) at the lower-lying Omo River.
Referencesedit
^"EIB to Kick in for Gilgel Gibe 1?". www.africaintelligence.com. 2007-07-25. Retrieved 2009-08-01.
^"Hydroelectric Power Plants in Ethiopia & Kenya". IndustCards. Retrieved 3 January 2015.
gilgel, gibe, rock, filled, embankment, gilgel, gibe, river, ethiopia, located, about, northeast, jimma, oromia, region, primary, purpose, hydroelectric, power, production, gilgel, gibe, hydroelectric, powerplant, installed, capacity, enough, power, over, hous. The Gilgel Gibe I Dam is a rock filled embankment dam on the Gilgel Gibe River in Ethiopia It is located about 57 km 35 mi northeast of Jimma in Oromia Region The primary purpose of the dam is hydroelectric power production The Gilgel Gibe I hydroelectric powerplant has an installed capacity of 184 MW enough to power over 123 200 households 1 The dam is 1 700 m 5 600 ft long and 40 m 130 ft tall Construction on the dam began in 1988 but work was halted in 1994 In 1995 construction restarted with a new construction firm The power station was commissioned in 2004 2 Gilgel Gibe I DamLocation of Gilgel Gibe I Dam in EthiopiaCountryEthiopiaLocationJimma Oromia RegionCoordinates7 49 53 N 37 19 18 E 7 83139 N 37 32167 E 7 83139 37 32167PurposePowerStatusOperationalConstruction began1988Opening date2004 20 years ago 2004 Owner s Ethiopian Electric PowerDam and spillwaysType of damEmbankment rock fillImpoundsOmo RiverHeight40 m 130 ft Length1 700 m 5 600 ft ReservoirTotal capacity917 000 000 m3 743 000 acre ft Active capacity717 000 000 m3 581 000 acre ft Gilgel Gibe I Power StationCoordinates7 54 31 88 N 37 22 24 33 E 7 9088556 N 37 3734250 E 7 9088556 37 3734250Commission date2004TypeConventional diversionTurbines3 x 61 3 MW Francis typeInstalled capacity184 MW Water from the dam is diverted through a 9 2 km 5 7 mi long tunnel to an underground power station downstream After power generation the water is discharged back into the Gilgel Gibe River to flow downstream northwards for roughly 2 km only to enter a 26 km 16 mi long tunnel through a mountain ridge to an underground power station Gilgel Gibe II Power Station at the lower lying Omo River References edit EIB to Kick in for Gilgel Gibe 1 www africaintelligence com 2007 07 25 Retrieved 2009 08 01 Hydroelectric Power Plants in Ethiopia amp Kenya IndustCards Retrieved 3 January 2015 Map all coordinates using OpenStreetMap Download coordinates as KML GPX all coordinates GPX primary coordinates GPX secondary coordinates nbsp This article about a building or structure in Ethiopia is a stub You can help Wikipedia by expanding it vte nbsp This article about a hydroelectric power plant is a stub You can help Wikipedia by expanding it vte This article about a dam floodgate or canal in Africa is a stub You can help Wikipedia by expanding it vte Retrieved from https en wikipedia org w index php title Gilgel Gibe I Dam amp oldid 1194926171, wikipedia, wiki, book, books, library,