fbpx
Wikipedia

Lansdowne station (MBTA)

Lansdowne station (formerly Yawkey station) is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.

Lansdowne
Fenway Center construction over Lansdowne station in July 2019
General information
Location85 Brookline Avenue
Boston, Massachusetts
Coordinates42°20′51″N 71°06′02″W / 42.3476°N 71.1006°W / 42.3476; -71.1006
Line(s)Worcester Main Line
Platforms2 side platforms
Tracks2
Connections MBTA bus: 8, 19, 60, 65
At Kenmore: Green Line, 57
Construction
AccessibleYes
Other information
Fare zone1A
History
OpenedApril 29, 1988 (1988-04-29)[1]
RebuiltMarch 10, 2014 (2014-03-10)[2]
Previous namesYawkey
Passengers
20181,195 (weekday average boardings)[3]
Services
Preceding station MBTA Following station
Boston Landing
toward Worcester
Framingham/​Worcester Line Back Bay
Location

The station, originally named after former Boston Red Sox owner Tom Yawkey, opened as an infill station in 1988, for limited service to baseball games at Fenway Park. Regular commuter service began in 2001 for riders headed to Boston University, Kenmore Square, and the Longwood Medical and Academic Area. Inbound and outbound trains formerly shared a single two-car platform on the inbound track, requiring passengers to embark or debark from the front two cars of outbound trains or the rear two cars of inbound trains.

In 2012, work began on a new, fully accessible station, including two longer high-level platforms and an overhead pedestrian bridge. Passengers boarded from the east end of the new station from June 2013 until March 10, 2014; after delays, it opened fully that day. The new station is served by all Worcester Line trains, which was expected to increase ridership from 585 total daily boardings and alightings to 937. By a 2018 count, there were 2,491 daily (1,195 boardings and 1,296 alightings).[3] The Fenway Center air rights development, which is partially over the station, added a pedestrian deck connecting the station to Beacon Street.

The station was renamed Lansdowne (after nearby Lansdowne Street) effective April 8, 2019, following the May 2018 renaming of Yawkey Way back to Jersey Street.

Station design edit

 
The Fenway Center pedestrian deck and the station footbridge

The station is fully accessible, with two full-length high-level platforms. The station has an unusual platform layout, where the outbound side platform is between the tracks rather than to the side. This is because the station is located on a tight curve; doors located on the end of passenger cars would have gaps next to a convex platform.[4][5][6]

A footbridge with elevators and stairs connects the platforms to Overland Street. The Fenway Center pedestrian deck covers the west portion of the platforms, connecting Beacon Street and the station footbridge.[7][8] Staircases to Beacon Street are also available from the west ends of the platforms.

Four MBTA bus routes – 8, 19, 60, and 65 – stop on Brookline Avenue at Jersey Street. Kenmore station, located 0.25 miles (0.40 km) to the northeast along Brookline Avenue, provides connections to the B, C, and D branches of the MBTA Green Line, as well as bus route 57.

History edit

Former stations edit

The Boston and Worcester Railroad (B&W) opened to West Newton on April 16, 1834, and was extended westwards soon after.[9] An early station was located at the west end of the Boston & Roxbury Mill Dam, near what is now Kenmore Square. It was established in 1844 or 1845 as a stop for Newton–Boston commuter trains.[10] The station was variously known as Beacon Street, Mill Dam, Brookline, and Brookline Junction — the latter name reflecting the Brookline branch (later the Highland branch), which opened in 1848.[9][11][12][13]: 154  By 1857, passenger service there was replaced with Cottage Farm station (later University station), a flag stop at Commonwealth Avenue in the Cottage Farm neighborhood.[11][14] Mill Dam station remained in use by Brookline branch trains for some time.[14] The Boston and Albany Railroad (successor to the B&W) maintained a freight yard at Brookline Junction into the 20th century.[15][16]

Service on the Highland branch ran until May 31, 1958, when it was abandoned for conversion to the Riverside Line; a stub remained at Brookline Junction until the 1970s for freight service.[9][11] The B&A attempted to drop all service to University, Brighton, and Faneuil in February 1958; however, minimal service was maintained until the railroad discontinued all commuter stops east of Newtonville in April 1959.[17][18][19] Remaining commuter service on the line was subsidized by the Massachusetts Bay Transportation Authority (MBTA) beginning in 1973, eventually coming under full public control as the Framingham Line.[1]: 340 [9]

Game-day service edit

 
The 1990s-built "mini-high" platform at Yawkey (removed in 2013)

Originally named in honor of long-time Boston Red Sox owner Tom Yawkey, the station was opened on April 29, 1988, and initially was only used for special service to Fenway Park for baseball games.[1][20] It was used by Framingham Line trains as well as special weekend-only "Fenway Flyer" baseball trains from the Attleboro (now Providence/Stoughton), Fairmount, and Franklin lines. Service from the Attleboro and Fairmount lines began on July 12, 1988, followed by the Franklin Line on July 27.[21] The "Fenway Flyer" trains had an annual ridership of 58,000 in 1990.[22] The station became popular enough that the MBTA added regular commuter service. This largely obviated the need for "Fenway Flyer" specials, though certain weekend Providence trains ran to Yawkey as late as 2007.[23] Similar special trains continue to serve Foxboro station during football and soccer games and special events at Gillette Stadium.[24]

The station was built with a low-level asphalt platform and was not initially accessible.[25] With the pending passage of the Americans with Disabilities Act of 1990 (ADA), the MBTA began a project to build a mini-high platform on March 14, 1990.[21] However, the mini-high platform only served one of the line's two tracks, limiting the number of trains that could stop at the station.

Regular service edit

In early 2000, the MBTA released a study which analyzed the possibility of full-time commuter service to then-Yawkey station to serve workers at nearby Boston University, Kenmore Square, and the Longwood Medical and Academic Area. An addendum released in August 2000 analyzed increased service (on all modes) to Fenway Park on game days. Possibilities studied included running game day service from the Plymouth/Kingston Line with an unused trainset, a South Station-Yawkey shuttle, increased Green Line service, and bus shuttles to the Red Line in Cambridge and to Ruggles station. Consideration was given to building a dedicated terminal spur and station on the remains of the former Highland branch.[26]

Regular weekday commuter service to the station began on January 2, 2001, with four daily round trips. Weekend service was still initially limited to game days.[1][27] Regular weekend service was added on April 30, 2001.[1] From 2001 to 2014, not all trains stopped at the station; most peak-direction trains stopped, but many off-peak trains did not. Before the rebuilding began in 2012, some trains stopped at the station only on game days during the Red Sox season.[28]

New station edit

 
New platforms under construction in December 2012

In August 2007, the MBTA published a feasibility study exploring the possibility of rebuilding the station as a full-service station. The recommended alternative had a footbridge in the center of the platform, with elevators to the Beacon Street bridge.[4] The study concluded that full service to the rebuilt station would increase ridership by 60%, from 585 daily boardings and alightings to 937.[29] On November 15, 2010, Governor Deval Patrick and other officials broke ground on a major rebuilding of the station, originally expected to be completed in the spring of 2012.[30] The new station has two full-length high-level platforms that provide level, accessible boarding for all passengers; the old platform had only a wooden ramp for accessibility. The two 700-foot-long platforms (a side platform between the tracks plus a side platform on the south side of the tracks) are connected with an overpass, and passengers no longer have to cross the tracks to access certain outbound trains.[7][8]

The rebuilt station was intended to be the first component of a larger, mostly private development called Fenway Center. The new station, which cost about $13.5 million, was planned to be powered entirely by solar panels after the development opened.[30] Although the developer wished to close the station during rebuilding, the MBTA elected to keep it open.[31][32] Fenway Center, which was to be built on the air rights over the adjacent Massachusetts Turnpike (I-90), would eventually cover much of the station.[7] As part of the development, walkways would be built above the station, allowing passengers to walk directly to the pedestrian bridge and platforms from Beacon Street and Brookline Avenue rather than passing through private parking lots. After lengthy negotiations, an air-rights deal between the city and the developer regarding Fenway Center was reached in May 2013.[33]

 
A train passes the under-construction station in May 2013

The Framingham/Worcester line schedule was changed slightly in April 2012 to allow for temporary single-tracking through the station for construction.[34] Actual station construction activity started in June 2012, and in August one track was cut, reducing the line to one track through the station. The platforms were installed in late November 2012; construction of the elevator shafts began in February 2013. A temporary ramp opened in June 2013 for passengers to use the east end of the future outbound platform; the old platform was demolished soon afterwards to make room for the west ends of the new platforms. The pedestrian bridge was lifted into place in August 2013, followed by the various roof and canopy elements. The second track was rebuilt in late September, followed by the remaining platform segments.

The new station fully opened on March 10, 2014, coinciding with planned service increases on the Framingham/Worcester Line. Before the reconstruction, 17 trains stopped at the station each weekday; after, all 48 daily trains (24 round trips) stopped.[2][30] The opening was first planned for January 13, then January 27, but was delayed due to problems with the station's elevators and adjustments to the schedule based on public comment.[35][36][37] The walkway between the new station and Fenway Park includes large lit statues of the uniform numbers retired by the Red Sox.[38]

In July 2017, the developer and the state reached an agreement under which the buildings south of the station would be built first. The developer paid the state $21 million for the right to delay building the deck.[39] The lease agreement was finalized that December.[40] The first phase of the project added a pedestrian deck over the west part of the platforms, connecting to Beacon Street and the station footbridge. The Beacon Street staircases were closed on December 1, 2018, due to the construction of Fenway Center.[41] They were originally expected to reopen in March 2020, though this was delayed into 2021.[42] After special events, such as concerts at Fenway Park, the MBTA sometimes runs special commuter rail shuttles from Lansdowne to South Station.[43]

Lansdowne is a proposed intermediate station for East-West Rail, which would provide intercity passenger service between Boston and Pittsfield.[44]

Cancelled plans edit

The station was a proposed stop on the Urban Ring – a circumferential bus rapid transit (BRT) line designed to connect the existing radial MBTA rail lines to reduce overcrowding in the downtown stations.[45] Under draft plans released in 2008, the Urban Ring would have accessed the station via Mountfort Street to the north and a new tunnel paralleling the Green Line D branch to the southwest, with a turnoff and surface station at Overland Street.[46] The project was cancelled in 2010[47]

In 2014, it was revealed by the state that the stop would be part of the proposed Indigo Line system with frequent DMU service, but that plan was canceled in 2015.[48][49]

Renaming edit

In December 2015, The Boston Globe columnist Adrian Walker proposed renaming Yawkey Way and Yawkey station after alleging their namesake, Tom Yawkey, was a racist who made the Red Sox the last major league team to hire black players.[50] In August 2017, amid heightened media coverage of the removal of Confederate monuments and memorials in the United States, the Red Sox organization began advocating for the city to change the street's name. A bill to change the station's name was filed in the state legislature.[51] Changing the street name was approved in April 2018 and implemented in May 2018.[52] The MBTA announced that the station would also be renamed, though a new name was not immediately determined.[53] On March 28, 2019, the MBTA announced that the station would be renamed Lansdowne (after nearby Lansdowne Street) effective April 8.[54]

References edit

  1. ^ a b c d e Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. pp. 345, 349. Page numbers are accurate to the .
  2. ^ a b Rocheleau, Matt (February 26, 2014). . Boston Globe. Archived from the original on March 4, 2016. Retrieved March 6, 2014.
  3. ^ a b Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  4. ^ a b Edwards & Kelcey, Inc.; et al. (August 2007). MBTA Yawkey Station Feasibility Study. Massachusetts Bay Transportation Authority. OCLC 192139849.
  5. ^ (PDF). Massachusetts Bay Transportation Authority. October 28, 1992. p. 1019. Archived from the original (PDF) on March 4, 2016.
  6. ^ Devadoss, Rajkumar; Ahmad, Shan Sanjar; Raman, Dhamodharan (2012). "Platform–train interface for rail passengers – a technology review" (PDF). CRC for Rail Innovation. p. 6.
  7. ^ a b c Richards Barry Joyce and Partners. (PDF). Meredith Corporation. Archived from the original (PDF) on March 11, 2014.
  8. ^ a b Rocheleau, Matt (July 24, 2013). . Boston Globe. Archived from the original on March 5, 2016. Retrieved July 24, 2013.
  9. ^ a b c d Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 21–25. ISBN 9780685412947.
  10. ^ Report of the Directors of the Boston and Worcester Railroad. Boston and Worcester Railroad. June 2, 1845. p. 10.
  11. ^ a b c Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. pp. 338–346. ISBN 9780942147124.
  12. ^ "Our New England Letter". The Station Agent. Vol. 1, no. 6. August 1889. p. 188 – via Google Books.
  13. ^ Kennedy, Charles J. (Summer 1962). "Commuter Services in the Boston Area, 1835-1860". The Business History Review. 36 (2): 153–170. doi:10.2307/3111453. JSTOR 3111453. S2CID 154294514.
  14. ^ a b Barrett, Richard C. (1996). Boston's Depots and Terminals. Railroad Research Publications. p. 207. ISBN 1884650031.
  15. ^ Bromley, George W.; Bromley, Walter S. (1915). Atlas of the City of Boston. G.W. Bromley & Co. Plate 11.
  16. ^ Post Office Department Annual Reports for the year ended June 30, 1913. United States Post Office Department. 1914. p. 211 – via Google Books.
  17. ^ "DPU Permits B.&M. 5% Intrastate Fare Boost". Daily Boston Globe. April 15, 1959. p. 11 – via Newspapers.com. 
  18. ^ "B. & A. Drops Two Trains, Some Stops". Boston Globe. February 5, 1958. p. 6 – via Newspapers.com.  
  19. ^ "Protests Save One Stop a Day At University". Boston Globe. February 22, 1958. p. 14 – via Newspapers.com.  
  20. ^ "Train to Glory". Boston Globe. April 30, 1988. p. 24 – via Newspapers.com.
  21. ^ a b Sanborn, George M. (1992). . Massachusetts Bay Transportation Authority. Archived from the original on April 16, 2019 – via Massachusetts Institute of Technology.
  22. ^ Middleton, William D. (November 1, 1991). . Railway Age. p. 33. Archived from the original on June 11, 2014 – via Highbeam Research.
  23. ^ (PDF). Massachusetts Bay Transportation Authority. April 30, 2007. Archived from the original (PDF) on January 5, 2010.
  24. ^ "Gillette Stadium". Massachusetts Bay Transportation Authority. Retrieved June 12, 2018.
  25. ^ Operations Directorate Planning Division (November 1990). "Ridership and Service Statistics" (3 ed.). Massachusetts Bay Transportation Authority. pp. 1–5 – via Internet Archive.
  26. ^ KKO and Associates (August 2000). "Fenway Park Game Day Service Improvement Study". Feasibility of Full-Time Commuter Rail Service to the Fenway/Kenmore Area. Massachusetts Bay Transportation Authority.
  27. ^ (PDF). TRANSreport. Boston Metropolitan Regional Planning Organization. February 2001. Archived from the original (PDF) on December 9, 2010.
  28. ^ "Massachusetts Bay Transportation Authority Commuter Rail Executive Summary" (PDF). Massachusetts Bay Transportation Authority. 2010.
  29. ^ Tetra Tech (August 10, 2012). "Boston University Charles River Campus Transportation Master Plan" (PDF). Boston University. p. 51.
  30. ^ a b c "Patrick Murray Administration, City of Boston Break Ground on Yawkey Station Project" (Press release). Massachusetts Bay Transportation Authority. November 15, 2010.
  31. ^ Grillo, Thomas (July 2, 2010). "Developer tells T: Fast-track Yawkey plan". Boston Herald. Retrieved July 19, 2011.
  32. ^ . MASCO. Archived from the original on March 11, 2014. Retrieved March 18, 2012.
  33. ^ Ross, Casey (May 13, 2013). . Boston Globe. Archived from the original on March 4, 2016. Retrieved September 11, 2013.
  34. ^ "Reconstruction of Yawkey Station Results In Schedule Adjustments For Worcester Line" (Press release). Massachusetts Bay Transportation Authority. March 23, 2012.
  35. ^ (PDF). Massachusetts Bay Transportation Authority. January 13, 2014. Archived from the original (PDF) on January 8, 2014.
  36. ^ Bard, Megan (January 14, 2014). "MBTA expands Worcester – Boston commuter rail service starting Jan. 27". MassLive. Retrieved August 10, 2015.
  37. ^ Kush, Bronislaus B. (January 8, 2014). "MBTA adding trains on Worcester commuter line". Worcester Telegram. Retrieved January 8, 2014.
  38. ^ Silva, Steve (April 2, 2014). "Refurbished third base deck, new menu offerings highlight Fenway Park changes for 2014 season". Boston Globe. Retrieved June 12, 2018.
  39. ^ Vaccaro, Adam; Logan, Tim (July 17, 2017). "Long-delayed Fenway Center project moves ahead". Boston Globe. Retrieved July 22, 2017.
  40. ^ "Boston: MassDOT Closes Lease Agreement for Fenway Center Development Project" (Press release). Massachusetts Department of Transportation. December 8, 2017.
  41. ^ . Massachusetts Bay Transportation Authority. November 27, 2018. Archived from the original on December 2, 2018. On 12/1, the Beacon Street entrance to Yawkey Station will close for approximately one year due to the Fenway Center construction project. Access will be via Maitland Street and David Ortiz Way.
  42. ^ . Massachusetts Bay Transportation Authority. January 9, 2020. Archived from the original on February 6, 2020.
  43. ^ Massachusetts Bay Transportation Authority (August 4, 2015). . Archived from the original on August 6, 2015.
  44. ^ "Chapter 4 – Alternatives Development and Analysis". East-West Passenger Rail Study Final Report. Massachusetts Department of Transportation. January 2021.
  45. ^ (PDF). January 2009. Archived from the original (PDF) on July 8, 2011.
  46. ^ (PDF). Massachusetts Executive Office of Transportation. November 2008. Archived from the original (PDF) on February 27, 2017.
  47. ^ Mullan, Jeffery B. (January 22, 2010). "Re: Urban Ring Phase 2, EOEEA #12565" (PDF). Massachusetts Executive Office of Energy and Environmental Affairs.
  48. ^ Annear, Steve (January 9, 2014). "Take A Ride On The MBTA's 'New Indigo Line' In 2024". Boston Magazine. Retrieved June 12, 2018.
  49. ^ Stout, Matt (June 20, 2015). . Boston Herald. Archived from the original on July 27, 2015.
  50. ^ Walker, Adrian (December 7, 2015). "It's time to banish the racist legacy of Tom Yawkey". The Boston Globe. Retrieved December 8, 2015.
  51. ^ Silverman, Michael (August 18, 2017). "'Haunted' by past owner's history, Red Sox seek name change for Yawkey Way". Boston Herald. Retrieved August 19, 2017.
  52. ^ "So long Yawkey Way! Boston officially changes name of street outside Fenway Park". WCVB-TV. May 3, 2018.
  53. ^ Vaccaro, Adam (April 26, 2018). "So, what to call Yawkey MBTA station?". Boston Globe.
  54. ^ "MBTA Announces Yawkey Station on Framingham/Worcester Line Will Be Renamed Lansdowne" (Press release). Massachusetts Bay Transportation Authority. March 28, 2019.

External links edit

  • MBTA – Lansdowne
  • Google Maps Street View: from I-90, David Ortiz Drive, Beacon Street
  • Fenway Center

lansdowne, station, mbta, other, places, with, same, name, lansdowne, station, lansdowne, station, formerly, yawkey, station, mbta, commuter, rail, station, boston, massachusetts, serves, framingham, worcester, line, lansdowne, located, next, massachusetts, tu. For other places with the same name see Lansdowne station Lansdowne station formerly Yawkey station is an MBTA Commuter Rail station in Boston Massachusetts It serves the Framingham Worcester Line Lansdowne is located next to the Massachusetts Turnpike in the Fenway Kenmore neighborhood near Kenmore Square below grade between Beacon Street and Brookline Avenue LansdowneFenway Center construction over Lansdowne station in July 2019General informationLocation85 Brookline AvenueBoston MassachusettsCoordinates42 20 51 N 71 06 02 W 42 3476 N 71 1006 W 42 3476 71 1006Line s Worcester Main LinePlatforms2 side platformsTracks2ConnectionsMBTA bus 8 19 60 65 At Kenmore Green Line 57ConstructionAccessibleYesOther informationFare zone1AHistoryOpenedApril 29 1988 1988 04 29 1 RebuiltMarch 10 2014 2014 03 10 2 Previous namesYawkeyPassengers20181 195 weekday average boardings 3 ServicesPreceding station MBTA Following stationBoston Landingtoward Worcester Framingham Worcester Line Back Baytoward South StationLocationThe station originally named after former Boston Red Sox owner Tom Yawkey opened as an infill station in 1988 for limited service to baseball games at Fenway Park Regular commuter service began in 2001 for riders headed to Boston University Kenmore Square and the Longwood Medical and Academic Area Inbound and outbound trains formerly shared a single two car platform on the inbound track requiring passengers to embark or debark from the front two cars of outbound trains or the rear two cars of inbound trains In 2012 work began on a new fully accessible station including two longer high level platforms and an overhead pedestrian bridge Passengers boarded from the east end of the new station from June 2013 until March 10 2014 after delays it opened fully that day The new station is served by all Worcester Line trains which was expected to increase ridership from 585 total daily boardings and alightings to 937 By a 2018 count there were 2 491 daily 1 195 boardings and 1 296 alightings 3 The Fenway Center air rights development which is partially over the station added a pedestrian deck connecting the station to Beacon Street The station was renamed Lansdowne after nearby Lansdowne Street effective April 8 2019 following the May 2018 renaming of Yawkey Way back to Jersey Street Contents 1 Station design 2 History 2 1 Former stations 2 2 Game day service 2 3 Regular service 2 4 New station 2 5 Cancelled plans 2 6 Renaming 3 References 4 External linksStation design edit nbsp The Fenway Center pedestrian deck and the station footbridgeThe station is fully accessible with two full length high level platforms The station has an unusual platform layout where the outbound side platform is between the tracks rather than to the side This is because the station is located on a tight curve doors located on the end of passenger cars would have gaps next to a convex platform 4 5 6 A footbridge with elevators and stairs connects the platforms to Overland Street The Fenway Center pedestrian deck covers the west portion of the platforms connecting Beacon Street and the station footbridge 7 8 Staircases to Beacon Street are also available from the west ends of the platforms Four MBTA bus routes 8 19 60 and 65 stop on Brookline Avenue at Jersey Street Kenmore station located 0 25 miles 0 40 km to the northeast along Brookline Avenue provides connections to the B C and D branches of the MBTA Green Line as well as bus route 57 History editFormer stations edit The Boston and Worcester Railroad B amp W opened to West Newton on April 16 1834 and was extended westwards soon after 9 An early station was located at the west end of the Boston amp Roxbury Mill Dam near what is now Kenmore Square It was established in 1844 or 1845 as a stop for Newton Boston commuter trains 10 The station was variously known as Beacon Street Mill Dam Brookline and Brookline Junction the latter name reflecting the Brookline branch later the Highland branch which opened in 1848 9 11 12 13 154 By 1857 passenger service there was replaced with Cottage Farm station later University station a flag stop at Commonwealth Avenue in the Cottage Farm neighborhood 11 14 Mill Dam station remained in use by Brookline branch trains for some time 14 The Boston and Albany Railroad successor to the B amp W maintained a freight yard at Brookline Junction into the 20th century 15 16 Service on the Highland branch ran until May 31 1958 when it was abandoned for conversion to the Riverside Line a stub remained at Brookline Junction until the 1970s for freight service 9 11 The B amp A attempted to drop all service to University Brighton and Faneuil in February 1958 however minimal service was maintained until the railroad discontinued all commuter stops east of Newtonville in April 1959 17 18 19 Remaining commuter service on the line was subsidized by the Massachusetts Bay Transportation Authority MBTA beginning in 1973 eventually coming under full public control as the Framingham Line 1 340 9 Game day service edit nbsp The 1990s built mini high platform at Yawkey removed in 2013 Originally named in honor of long time Boston Red Sox owner Tom Yawkey the station was opened on April 29 1988 and initially was only used for special service to Fenway Park for baseball games 1 20 It was used by Framingham Line trains as well as special weekend only Fenway Flyer baseball trains from the Attleboro now Providence Stoughton Fairmount and Franklin lines Service from the Attleboro and Fairmount lines began on July 12 1988 followed by the Franklin Line on July 27 21 The Fenway Flyer trains had an annual ridership of 58 000 in 1990 22 The station became popular enough that the MBTA added regular commuter service This largely obviated the need for Fenway Flyer specials though certain weekend Providence trains ran to Yawkey as late as 2007 23 Similar special trains continue to serve Foxboro station during football and soccer games and special events at Gillette Stadium 24 The station was built with a low level asphalt platform and was not initially accessible 25 With the pending passage of the Americans with Disabilities Act of 1990 ADA the MBTA began a project to build a mini high platform on March 14 1990 21 However the mini high platform only served one of the line s two tracks limiting the number of trains that could stop at the station Regular service edit In early 2000 the MBTA released a study which analyzed the possibility of full time commuter service to then Yawkey station to serve workers at nearby Boston University Kenmore Square and the Longwood Medical and Academic Area An addendum released in August 2000 analyzed increased service on all modes to Fenway Park on game days Possibilities studied included running game day service from the Plymouth Kingston Line with an unused trainset a South Station Yawkey shuttle increased Green Line service and bus shuttles to the Red Line in Cambridge and to Ruggles station Consideration was given to building a dedicated terminal spur and station on the remains of the former Highland branch 26 Regular weekday commuter service to the station began on January 2 2001 with four daily round trips Weekend service was still initially limited to game days 1 27 Regular weekend service was added on April 30 2001 1 From 2001 to 2014 not all trains stopped at the station most peak direction trains stopped but many off peak trains did not Before the rebuilding began in 2012 some trains stopped at the station only on game days during the Red Sox season 28 New station edit nbsp New platforms under construction in December 2012In August 2007 the MBTA published a feasibility study exploring the possibility of rebuilding the station as a full service station The recommended alternative had a footbridge in the center of the platform with elevators to the Beacon Street bridge 4 The study concluded that full service to the rebuilt station would increase ridership by 60 from 585 daily boardings and alightings to 937 29 On November 15 2010 Governor Deval Patrick and other officials broke ground on a major rebuilding of the station originally expected to be completed in the spring of 2012 30 The new station has two full length high level platforms that provide level accessible boarding for all passengers the old platform had only a wooden ramp for accessibility The two 700 foot long platforms a side platform between the tracks plus a side platform on the south side of the tracks are connected with an overpass and passengers no longer have to cross the tracks to access certain outbound trains 7 8 The rebuilt station was intended to be the first component of a larger mostly private development called Fenway Center The new station which cost about 13 5 million was planned to be powered entirely by solar panels after the development opened 30 Although the developer wished to close the station during rebuilding the MBTA elected to keep it open 31 32 Fenway Center which was to be built on the air rights over the adjacent Massachusetts Turnpike I 90 would eventually cover much of the station 7 As part of the development walkways would be built above the station allowing passengers to walk directly to the pedestrian bridge and platforms from Beacon Street and Brookline Avenue rather than passing through private parking lots After lengthy negotiations an air rights deal between the city and the developer regarding Fenway Center was reached in May 2013 33 nbsp A train passes the under construction station in May 2013The Framingham Worcester line schedule was changed slightly in April 2012 to allow for temporary single tracking through the station for construction 34 Actual station construction activity started in June 2012 and in August one track was cut reducing the line to one track through the station The platforms were installed in late November 2012 construction of the elevator shafts began in February 2013 A temporary ramp opened in June 2013 for passengers to use the east end of the future outbound platform the old platform was demolished soon afterwards to make room for the west ends of the new platforms The pedestrian bridge was lifted into place in August 2013 followed by the various roof and canopy elements The second track was rebuilt in late September followed by the remaining platform segments The new station fully opened on March 10 2014 coinciding with planned service increases on the Framingham Worcester Line Before the reconstruction 17 trains stopped at the station each weekday after all 48 daily trains 24 round trips stopped 2 30 The opening was first planned for January 13 then January 27 but was delayed due to problems with the station s elevators and adjustments to the schedule based on public comment 35 36 37 The walkway between the new station and Fenway Park includes large lit statues of the uniform numbers retired by the Red Sox 38 In July 2017 the developer and the state reached an agreement under which the buildings south of the station would be built first The developer paid the state 21 million for the right to delay building the deck 39 The lease agreement was finalized that December 40 The first phase of the project added a pedestrian deck over the west part of the platforms connecting to Beacon Street and the station footbridge The Beacon Street staircases were closed on December 1 2018 due to the construction of Fenway Center 41 They were originally expected to reopen in March 2020 though this was delayed into 2021 42 After special events such as concerts at Fenway Park the MBTA sometimes runs special commuter rail shuttles from Lansdowne to South Station 43 Lansdowne is a proposed intermediate station for East West Rail which would provide intercity passenger service between Boston and Pittsfield 44 Cancelled plans edit The station was a proposed stop on the Urban Ring a circumferential bus rapid transit BRT line designed to connect the existing radial MBTA rail lines to reduce overcrowding in the downtown stations 45 Under draft plans released in 2008 the Urban Ring would have accessed the station via Mountfort Street to the north and a new tunnel paralleling the Green Line D branch to the southwest with a turnoff and surface station at Overland Street 46 The project was cancelled in 2010 47 In 2014 it was revealed by the state that the stop would be part of the proposed Indigo Line system with frequent DMU service but that plan was canceled in 2015 48 49 Renaming edit In December 2015 The Boston Globe columnist Adrian Walker proposed renaming Yawkey Way and Yawkey station after alleging their namesake Tom Yawkey was a racist who made the Red Sox the last major league team to hire black players 50 In August 2017 amid heightened media coverage of the removal of Confederate monuments and memorials in the United States the Red Sox organization began advocating for the city to change the street s name A bill to change the station s name was filed in the state legislature 51 Changing the street name was approved in April 2018 and implemented in May 2018 52 The MBTA announced that the station would also be renamed though a new name was not immediately determined 53 On March 28 2019 the MBTA announced that the station would be renamed Lansdowne after nearby Lansdowne Street effective April 8 54 References edit a b c d e Belcher Jonathan Changes to Transit Service in the MBTA district PDF Boston Street Railway Association pp 345 349 Page numbers are accurate to the April 21 2018 version a b Rocheleau Matt February 26 2014 MBTA to open rebuilt Yawkey Station in March boosting service on Framingham Worcester rail line Boston Globe Archived from the original on March 4 2016 Retrieved March 6 2014 a b Central Transportation Planning Staff 2019 2018 Commuter Rail Counts Massachusetts Bay Transportation Authority a b Edwards amp Kelcey Inc et al August 2007 MBTA Yawkey Station Feasibility Study Massachusetts Bay Transportation Authority OCLC 192139849 Commuter Rail Book of Standard Plans Track and Roadway PDF Massachusetts Bay Transportation Authority October 28 1992 p 1019 Archived from the original PDF on March 4 2016 Devadoss Rajkumar Ahmad Shan Sanjar Raman Dhamodharan 2012 Platform train interface for rail passengers a technology review PDF CRC for Rail Innovation p 6 a b c Richards Barry Joyce and Partners Fenway Center PDF Meredith Corporation Archived from the original PDF on March 11 2014 a b Rocheleau Matt July 24 2013 MBTA 14 9m redesign of Yawkey commuter rail station to be finished this fall Boston Globe Archived from the original on March 5 2016 Retrieved July 24 2013 a b c d Humphrey Thomas J Clark Norton D 1985 Boston s Commuter Rail The First 150 Years Boston Street Railway Association pp 21 25 ISBN 9780685412947 Report of the Directors of the Boston and Worcester Railroad Boston and Worcester Railroad June 2 1845 p 10 a b c Karr Ronald Dale 2017 The Rail Lines of Southern New England 2 ed Branch Line Press pp 338 346 ISBN 9780942147124 Our New England Letter The Station Agent Vol 1 no 6 August 1889 p 188 via Google Books Kennedy Charles J Summer 1962 Commuter Services in the Boston Area 1835 1860 The Business History Review 36 2 153 170 doi 10 2307 3111453 JSTOR 3111453 S2CID 154294514 a b Barrett Richard C 1996 Boston s Depots and Terminals Railroad Research Publications p 207 ISBN 1884650031 Bromley George W Bromley Walter S 1915 Atlas of the City of Boston G W Bromley amp Co Plate 11 Post Office Department Annual Reports for the year ended June 30 1913 United States Post Office Department 1914 p 211 via Google Books DPU Permits B amp M 5 Intrastate Fare Boost Daily Boston Globe April 15 1959 p 11 via Newspapers com nbsp B amp A Drops Two Trains Some Stops Boston Globe February 5 1958 p 6 via Newspapers com nbsp Protests Save One Stop a Day At University Boston Globe February 22 1958 p 14 via Newspapers com nbsp Train to Glory Boston Globe April 30 1988 p 24 via Newspapers com a b Sanborn George M 1992 A Chronicle of the Boston Transit System Massachusetts Bay Transportation Authority Archived from the original on April 16 2019 via Massachusetts Institute of Technology Middleton William D November 1 1991 How MBTA rebuilt ridership Railway Age p 33 Archived from the original on June 11 2014 via Highbeam Research Providence Stoughton Line Schedule PDF Massachusetts Bay Transportation Authority April 30 2007 Archived from the original PDF on January 5 2010 Gillette Stadium Massachusetts Bay Transportation Authority Retrieved June 12 2018 Operations Directorate Planning Division November 1990 Ridership and Service Statistics 3 ed Massachusetts Bay Transportation Authority pp 1 5 via Internet Archive KKO and Associates August 2000 Fenway Park Game Day Service Improvement Study Feasibility of Full Time Commuter Rail Service to the Fenway Kenmore Area Massachusetts Bay Transportation Authority New Buses Weekly Passes Highlight Recent MBTA Improvements PDF TRANSreport Boston Metropolitan Regional Planning Organization February 2001 Archived from the original PDF on December 9 2010 Massachusetts Bay Transportation Authority Commuter Rail Executive Summary PDF Massachusetts Bay Transportation Authority 2010 Tetra Tech August 10 2012 Boston University Charles River Campus Transportation Master Plan PDF Boston University p 51 a b c Patrick Murray Administration City of Boston Break Ground on Yawkey Station Project Press release Massachusetts Bay Transportation Authority November 15 2010 Grillo Thomas July 2 2010 Developer tells T Fast track Yawkey plan Boston Herald Retrieved July 19 2011 Yawkey Station Construction MASCO Archived from the original on March 11 2014 Retrieved March 18 2012 Ross Casey May 13 2013 Patrick administration developer John Rosenthal strike air rights deal for Fenway Center over Mass Pike Boston Globe Archived from the original on March 4 2016 Retrieved September 11 2013 Reconstruction of Yawkey Station Results In Schedule Adjustments For Worcester Line Press release Massachusetts Bay Transportation Authority March 23 2012 Worcester Line Train Times Effective January 13 2014 PDF Massachusetts Bay Transportation Authority January 13 2014 Archived from the original PDF on January 8 2014 Bard Megan January 14 2014 MBTA expands Worcester Boston commuter rail service starting Jan 27 MassLive Retrieved August 10 2015 Kush Bronislaus B January 8 2014 MBTA adding trains on Worcester commuter line Worcester Telegram Retrieved January 8 2014 Silva Steve April 2 2014 Refurbished third base deck new menu offerings highlight Fenway Park changes for 2014 season Boston Globe Retrieved June 12 2018 Vaccaro Adam Logan Tim July 17 2017 Long delayed Fenway Center project moves ahead Boston Globe Retrieved July 22 2017 Boston MassDOT Closes Lease Agreement for Fenway Center Development Project Press release Massachusetts Department of Transportation December 8 2017 Service Alerts and Notices Massachusetts Bay Transportation Authority November 27 2018 Archived from the original on December 2 2018 On 12 1 the Beacon Street entrance to Yawkey Station will close for approximately one year due to the Fenway Center construction project Access will be via Maitland Street and David Ortiz Way Alerts Commuter Rail Massachusetts Bay Transportation Authority January 9 2020 Archived from the original on February 6 2020 Massachusetts Bay Transportation Authority August 4 2015 Commuter Rail Service Alerts Framingham Worcester Line Archived from the original on August 6 2015 Chapter 4 Alternatives Development and Analysis East West Passenger Rail Study Final Report Massachusetts Department of Transportation January 2021 Urban Ring Phase 2 Fact Sheet PDF January 2009 Archived from the original PDF on July 8 2011 The Urban Ring Phase 2 Revised Draft Environmental Impact Report Statement PDF Massachusetts Executive Office of Transportation November 2008 Archived from the original PDF on February 27 2017 Mullan Jeffery B January 22 2010 Re Urban Ring Phase 2 EOEEA 12565 PDF Massachusetts Executive Office of Energy and Environmental Affairs Annear Steve January 9 2014 Take A Ride On The MBTA s New Indigo Line In 2024 Boston Magazine Retrieved June 12 2018 Stout Matt June 20 2015 Charlie Baker derails T trains Boston Herald Archived from the original on July 27 2015 Walker Adrian December 7 2015 It s time to banish the racist legacy of Tom Yawkey The Boston Globe Retrieved December 8 2015 Silverman Michael August 18 2017 Haunted by past owner s history Red Sox seek name change for Yawkey Way Boston Herald Retrieved August 19 2017 So long Yawkey Way Boston officially changes name of street outside Fenway Park WCVB TV May 3 2018 Vaccaro Adam April 26 2018 So what to call Yawkey MBTA station Boston Globe MBTA Announces Yawkey Station on Framingham Worcester Line Will Be Renamed Lansdowne Press release Massachusetts Bay Transportation Authority March 28 2019 External links edit nbsp Wikimedia Commons has media related to Lansdowne station MBTA Lansdowne Google Maps Street View from I 90 David Ortiz Drive Beacon Street Fenway Center Retrieved from https en wikipedia org w index php title Lansdowne station MBTA amp oldid 1218515412 New station, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.