fbpx
Wikipedia

Federal Way Downtown station

Federal Way Downtown is a future light rail station at the site of the Federal Way Transit Center, a bus station in Federal Way, Washington. The bus station opened in 2006 and has 1,190 parking spaces available in its parking garage and surface lots. It is served by King County Metro, Pierce Transit and Sound Transit Express buses and is the southern terminus of the RapidRide A Line.[1][2] The transit center is located adjacent to The Commons at Federal Way shopping mall and Interstate 5, connected via a direct access ramp to its high-occupancy vehicle lanes.

Federal Way Downtown
Sound Transit Express bus leaving the transit center in 2006
General information
Location31621 23rd Avenue South
Federal Way, Washington
United States
Coordinates47°19′03″N 122°18′17″W / 47.31750°N 122.30472°W / 47.31750; -122.30472
Train operatorsSound Transit (planned)
Bus stands9
Bus operators
Construction
ParkingParking garage
Bicycle facilitiesBicycle lockers and racks
AccessibleYes
History
OpenedFebruary 11, 2006 (February 11, 2006)
Rebuilt2020–2026 (planned)
Previous namesFederal Way Transit Center
Services
Preceding station Sound Transit Following station
Future service
Star Lake
toward Northgate
1 Line
(2026)
Terminus
Proposed service
Star Lake
toward Ballard
1 Line
(2032)
South Federal Way

A similar park-and-ride lot, on the south side of South 320th Street and east of the shopping mall, opened on November 5, 1979, using land donated by a local businessman.[3]

As part of the expansion of Link light rail by Sound Transit, the transit center is planned to be the southern terminus of the Federal Way Link Extension, which would extend light rail south from its current terminus at Angle Lake station to Federal Way. A voter-approved plan passed in 2008 proposed funding to design, but not construct, a light rail station and other bus and parking improvements at the transit center. In 2016, the Sound Transit 3 plan approved a 2024 completion date for light rail to Federal Way Transit Center, as well as a light rail extension from Federal Way to Tacoma to be opened by 2030.[4]

The preliminary design for the light rail station consists of an elevated platform along 23rd Avenue South that is located two blocks south of the current transit center. A second garage with 400 parking stalls would be built, along with transit-oriented development on the site of a former shopping center.[5] Demolition of several vacated retail buildings at the site began in April 2020.[6] A series of 35 murals by local artists were installed on the construction site's fences, but were damaged in an act of vandalism in August 2020.[7] Sound Transit officials called the incident racially-motivated, as the murals were primarily celebrating the area's Pacific Islander, Black, and Asian communities.[8]

Light rail service is expected to begin in 2026.[9]

References edit

  1. ^ Guadette, Karen (February 8, 2006). "New lots will make it easier to park, ride". The Seattle Times. Retrieved May 6, 2016.
  2. ^ "Federal Way Transit Center Boarding Locations". King County Metro. Retrieved May 6, 2016.
  3. ^ "$1 million park-and-ride lot in Federal Way opens". The Seattle Times. November 7, 1979. p. H8.
  4. ^ Demay, Daniel (June 2, 2016). "Sound Transit approves faster timeline for next phases of light rail". Seattle Post-Intelligencer. Retrieved October 26, 2016.
  5. ^ "Federal Way Transit Center station area spotlight". Sound Transit. February 12, 2019. Retrieved March 3, 2019.
  6. ^ Sullivan, Olivia (April 17, 2020). "Demolition of Federal Way buildings will make room for light rail". Federal Way Mirror. Retrieved April 24, 2020.
  7. ^ "Public art murals slashed at Federal Way light rail construction site" (Press release). Sound Transit. September 1, 2020. Retrieved September 1, 2020.
  8. ^ Lindblom, Mike (September 1, 2020). "Sound Transit repairs Federal Way murals the agency says were slashed in acts of racism". The Seattle Times. Retrieved September 1, 2020.
  9. ^ Lindblom, Mike (May 26, 2023). "Wetlands bridge adds delay and $72 million to light-rail project". The Seattle Times. Retrieved July 5, 2023.

External links edit

  Media related to Federal Way Transit Center at Wikimedia Commons

federal, downtown, station, federal, downtown, future, light, rail, station, site, federal, transit, center, station, federal, washington, station, opened, 2006, parking, spaces, available, parking, garage, surface, lots, served, king, county, metro, pierce, t. Federal Way Downtown is a future light rail station at the site of the Federal Way Transit Center a bus station in Federal Way Washington The bus station opened in 2006 and has 1 190 parking spaces available in its parking garage and surface lots It is served by King County Metro Pierce Transit and Sound Transit Express buses and is the southern terminus of the RapidRide A Line 1 2 The transit center is located adjacent to The Commons at Federal Way shopping mall and Interstate 5 connected via a direct access ramp to its high occupancy vehicle lanes Federal Way DowntownSound Transit Express bus leaving the transit center in 2006General informationLocation31621 23rd Avenue SouthFederal Way WashingtonUnited StatesCoordinates47 19 03 N 122 18 17 W 47 31750 N 122 30472 W 47 31750 122 30472Train operatorsSound Transit planned Bus stands9Bus operatorsKing County MetroPierce TransitSound Transit ExpressConstructionParkingParking garageBicycle facilitiesBicycle lockers and racksAccessibleYesHistoryOpenedFebruary 11 2006 February 11 2006 Rebuilt2020 2026 planned Previous namesFederal Way Transit CenterServicesPreceding station Sound Transit Following station Future service Star Laketoward Northgate 1 LineFederal Way Extension 2026 Terminus Proposed service Star Laketoward Ballard 1 LineTacoma Dome Extension 2032 South Federal Waytoward Tacoma Dome A similar park and ride lot on the south side of South 320th Street and east of the shopping mall opened on November 5 1979 using land donated by a local businessman 3 As part of the expansion of Link light rail by Sound Transit the transit center is planned to be the southern terminus of the Federal Way Link Extension which would extend light rail south from its current terminus at Angle Lake station to Federal Way A voter approved plan passed in 2008 proposed funding to design but not construct a light rail station and other bus and parking improvements at the transit center In 2016 the Sound Transit 3 plan approved a 2024 completion date for light rail to Federal Way Transit Center as well as a light rail extension from Federal Way to Tacoma to be opened by 2030 4 The preliminary design for the light rail station consists of an elevated platform along 23rd Avenue South that is located two blocks south of the current transit center A second garage with 400 parking stalls would be built along with transit oriented development on the site of a former shopping center 5 Demolition of several vacated retail buildings at the site began in April 2020 6 A series of 35 murals by local artists were installed on the construction site s fences but were damaged in an act of vandalism in August 2020 7 Sound Transit officials called the incident racially motivated as the murals were primarily celebrating the area s Pacific Islander Black and Asian communities 8 Light rail service is expected to begin in 2026 9 References edit Guadette Karen February 8 2006 New lots will make it easier to park ride The Seattle Times Retrieved May 6 2016 Federal Way Transit Center Boarding Locations King County Metro Retrieved May 6 2016 1 million park and ride lot in Federal Way opens The Seattle Times November 7 1979 p H8 Demay Daniel June 2 2016 Sound Transit approves faster timeline for next phases of light rail Seattle Post Intelligencer Retrieved October 26 2016 Federal Way Transit Center station area spotlight Sound Transit February 12 2019 Retrieved March 3 2019 Sullivan Olivia April 17 2020 Demolition of Federal Way buildings will make room for light rail Federal Way Mirror Retrieved April 24 2020 Public art murals slashed at Federal Way light rail construction site Press release Sound Transit September 1 2020 Retrieved September 1 2020 Lindblom Mike September 1 2020 Sound Transit repairs Federal Way murals the agency says were slashed in acts of racism The Seattle Times Retrieved September 1 2020 Lindblom Mike May 26 2023 Wetlands bridge adds delay and 72 million to light rail project The Seattle Times Retrieved July 5 2023 External links edit nbsp Media related to Federal Way Transit Center at Wikimedia Commons Retrieved from https en wikipedia org w index php title Federal Way Downtown station amp oldid 1206700847, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.