Félou Hydroelectric Plant

The Félou Hydroelectric Plant (French: Centrale hydroélectrique de Félou) is a hydroelectric installation at the Félou Falls on the Sénégal River in Mali. It has three water turbines capable of generating 62.3 MW. The current power station replaced an older one built in the 1920s. Construction of the new power station began in October 2009 and was financed by the World Bank.[1] It is the third Senegal River Basin Development Authority project on the river and was completed in 2014. The existing weir was refurbished with the previous 2 metres (6.6 ft) height maintained. In 1927, the previous hydroelectric power station was commissioned. It was refurbished in 1992 and had an installed capacity of 600 kW.[2]

Félou Weir
Plant in 2014
Location of Félou Weir in Mali
Official nameFélou Hydroelectric Plant
CountryMali
LocationKayes Region
Coordinates14°21′13″N 11°20′43″W / 14.35361°N 11.34528°W / 14.35361; -11.34528
PurposePower
StatusOperational
Construction began2009
Opening date1927; 97 years ago (1927)
Construction cost242 million US dollars (est.)
Dam and spillways
Type of damWeir
ImpoundsSénégal River
Height2 m (6 ft 7 in)
Length945 m (3,100 ft)
Power Station
Operator(s)Operator: ESKOM
Owner: Société de Gestion de l'Energie de Manantali (SOGEM)
Commission date2014
TypeRun-of-the-river
Hydraulic head13.8 m (45 ft)
Turbines3 x 21 MW bulb-type
Installed capacity62.3 MW (83,500 hp) (max. planned)
Annual generation320–350 GWh (1,200–1,300 TJ)

At maximum output the three 21 MW turbines pass a total of 500 cubic metres per second (18,000 cu ft/s) of water. Between August and November the water flowing in the river generally exceeds this value allowing the plant to operate at full capacity and the excess water to pass over the weir. During the dry season (December to July) the electricity generated is reduced to about a third of the maximum output as the flow of water is limited to the 150–200 cubic metres per second (5,300–7,100 cu ft/s) released from the Manantali Dam.[3]

The total estimated cost is 241 million US dollars.[4] The construction of the plant was completed in 2014.[5]

See also edit

References edit

  1. ^ . Xinhua. 17 December 2013. Archived from the original on February 3, 2015. Retrieved 2 January 2015.
  2. ^ "Etude des Impacts Environnementaux du Projet D'aménagement de Félou" (PDF) (in French). Organisation Pour la Mise en Valeur du Fleuve Senegal (O.M.V.S.). February 2006. Retrieved 2 January 2015.
  3. ^ Africa - Additional Financing for the Felou Hydroelectric West African Power Pool (WAPP) Second Adaptable Program Loan (APL2) Project (Report). World Bank. 2009. p. 35..
  4. ^ Africa - Additional Financing for the Felou Hydroelectric West African Power Pool (WAPP) Second Adaptable Program Loan (APL2) Project (Report). World Bank. 2009. p. 2..
  5. ^ Africa - WAPP APL 2 - OMVS Felou Hydroelectric Project : P094916 - Implementation Status Results Report : Sequence 15 (English) (Report). World Bank. 24 December 2014.

félou, hydroelectric, plant, french, centrale, hydroélectrique, félou, hydroelectric, installation, félou, falls, sénégal, river, mali, three, water, turbines, capable, generating, current, power, station, replaced, older, built, 1920s, construction, power, st. The Felou Hydroelectric Plant French Centrale hydroelectrique de Felou is a hydroelectric installation at the Felou Falls on the Senegal River in Mali It has three water turbines capable of generating 62 3 MW The current power station replaced an older one built in the 1920s Construction of the new power station began in October 2009 and was financed by the World Bank 1 It is the third Senegal River Basin Development Authority project on the river and was completed in 2014 The existing weir was refurbished with the previous 2 metres 6 6 ft height maintained In 1927 the previous hydroelectric power station was commissioned It was refurbished in 1992 and had an installed capacity of 600 kW 2 Felou WeirPlant in 2014Location of Felou Weir in MaliOfficial nameFelou Hydroelectric PlantCountryMaliLocationKayes RegionCoordinates14 21 13 N 11 20 43 W 14 35361 N 11 34528 W 14 35361 11 34528PurposePowerStatusOperationalConstruction began2009Opening date1927 97 years ago 1927 Construction cost242 million US dollars est Dam and spillwaysType of damWeirImpoundsSenegal RiverHeight2 m 6 ft 7 in Length945 m 3 100 ft Power StationOperator s Operator ESKOMOwner Societe de Gestion de l Energie de Manantali SOGEM Commission date2014TypeRun of the riverHydraulic head13 8 m 45 ft Turbines3 x 21 MW bulb typeInstalled capacity62 3 MW 83 500 hp max planned Annual generation320 350 GWh 1 200 1 300 TJ At maximum output the three 21 MW turbines pass a total of 500 cubic metres per second 18 000 cu ft s of water Between August and November the water flowing in the river generally exceeds this value allowing the plant to operate at full capacity and the excess water to pass over the weir During the dry season December to July the electricity generated is reduced to about a third of the maximum output as the flow of water is limited to the 150 200 cubic metres per second 5 300 7 100 cu ft s released from the Manantali Dam 3 The total estimated cost is 241 million US dollars 4 The construction of the plant was completed in 2014 5 See also edit nbsp Mali portal nbsp Water portal nbsp Renewable energy portal Manantali Dam upstream Gouina Hydroelectric Plant upstream Diama Dam downstreamReferences edit Mali s Felou hydroelectric dam to be inaugurated by 4 presidents Xinhua 17 December 2013 Archived from the original on February 3 2015 Retrieved 2 January 2015 Etude des Impacts Environnementaux du Projet D amenagement de Felou PDF in French Organisation Pour la Mise en Valeur du Fleuve Senegal O M V S February 2006 Retrieved 2 January 2015 Africa Additional Financing for the Felou Hydroelectric West African Power Pool WAPP Second Adaptable Program Loan APL2 Project Report World Bank 2009 p 35 Africa Additional Financing for the Felou Hydroelectric West African Power Pool WAPP Second Adaptable Program Loan APL2 Project Report World Bank 2009 p 2 Africa WAPP APL 2 OMVS Felou Hydroelectric Project P094916 Implementation Status Results Report Sequence 15 English Report World Bank 24 December 2014 Retrieved from https en wikipedia org w index php title Felou Hydroelectric Plant amp oldid 1155980068, wikipedia, wiki, book, books, library,