fbpx
Wikipedia

Eryaman YHT railway station

Eryaman YHT railway station (Turkish: Eryaman YHT garı), previously known as Ankara West YHT railway station (Turkish: Ankara Batı YHT garı), is a railway station in Ankara, Turkey. Once Başkentray commuter rail service begins in April, the station will become a transfer point between YHT high-speed trains and local commuter trains, replacing Sincan station.[1] Eryaman station also replaced Emirler station, located about 175 m (574 ft) east of the station, which was demolished in July 2016.[2]

Eryaman YHT
TCDD Taşımacılık high-speed rail station
The Başkentray platform, with the YHT platform on the right.
General information
Locationİstasyon Cd. Etiler Mah. 06796
Etimesgut, Ankara
Turkey
Coordinates39°57′20″N 32°37′49″E / 39.9556°N 32.6304°E / 39.9556; 32.6304Coordinates: 39°57′20″N 32°37′49″E / 39.9556°N 32.6304°E / 39.9556; 32.6304
Owned byTurkish State Railways
Operated byTCDD Taşımacılık
Line(s)
Platforms3 (2 island platforms, 1 side platform)
Tracks6
Connections EGO Bus: 507, 507.2, 510-3, 511, 511-3, 512-3, 513-2, 523, 524
Construction
ParkingYes
AccessibleYes
Architectural styleModernism
History
Opened15 March 2018
Services

Eryaman YHT station consists of two island platforms serving four tracks, with two more tracks for bypassing trains. A large station building houses a waiting lounge, cafes and ticket offices. Next to the station is the Etimesgut Yard, opened in February 2016, which is a large maintenance facility and train yard for YHT train-sets.[1]

Station Layout

Street Station house Entrances/Exits
Tracks
Track 1 Başkentray toward Sincan
Island platform (Platform 1), doors will open on the left  
Track 2 Başkentray toward Kayaş
Track 3 Yüksek Hızlı Tren toward Halkalı or Karaman, does not stop here
Track 4 Yüksek Hızlı Tren toward Halkalı or Karaman
Island platform (Platform 2), doors will open on the left  
Track 5 Yüksek Hızlı Tren toward Ankara
Track 6 Yüksek Hızlı Tren toward Ankara, does not stop here

References

  1. ^ a b "Ankara YHT Gar Kompleksi 2016'da tamamlanacak". rayhaber.com (in Turkish). 7 February 2015. Retrieved 31 October 2017.
  2. ^ "Başkentray Yıl Sonu Hizmete Girecek". rayhaber.com (in Turkish). 23 June 2016. Retrieved 31 October 2017.

eryaman, railway, station, turkish, eryaman, garı, previously, known, ankara, west, railway, station, turkish, ankara, batı, garı, railway, station, ankara, turkey, once, başkentray, commuter, rail, service, begins, april, station, will, become, transfer, poin. Eryaman YHT railway station Turkish Eryaman YHT gari previously known as Ankara West YHT railway station Turkish Ankara Bati YHT gari is a railway station in Ankara Turkey Once Baskentray commuter rail service begins in April the station will become a transfer point between YHT high speed trains and local commuter trains replacing Sincan station 1 Eryaman station also replaced Emirler station located about 175 m 574 ft east of the station which was demolished in July 2016 2 Eryaman YHTTCDD Tasimacilik high speed rail stationThe Baskentray platform with the YHT platform on the right General informationLocationIstasyon Cd Etiler Mah 06796Etimesgut AnkaraTurkeyCoordinates39 57 20 N 32 37 49 E 39 9556 N 32 6304 E 39 9556 32 6304 Coordinates 39 57 20 N 32 37 49 E 39 9556 N 32 6304 E 39 9556 32 6304Owned byTurkish State RailwaysOperated byTCDD TasimacilikLine s Yuksek Hizli Tren BaskentrayPlatforms3 2 island platforms 1 side platform Tracks6ConnectionsEGO Bus 507 507 2 510 3 511 511 3 512 3 513 2 523 524ConstructionParkingYesAccessibleYesArchitectural styleModernismHistoryOpened15 March 2018ServicesPreceding station TCDD Tasimacilik Following stationPolatli YHTtowards Istanbul Halkali Yuksek Hizli Tren AnkaraTerminusPolatli YHTtowards KaramanElvankenttowards Sincan Baskentray Ozgunestowards KayasFuture servicePolatli YHTtowards Izmir Yuksek Hizli Tren AnkaraTerminusEryaman YHT station consists of two island platforms serving four tracks with two more tracks for bypassing trains A large station building houses a waiting lounge cafes and ticket offices Next to the station is the Etimesgut Yard opened in February 2016 which is a large maintenance facility and train yard for YHT train sets 1 Station Layout EditStreet Station house Entrances ExitsTracksTrack 1 Baskentray toward SincanIsland platform Platform 1 doors will open on the left Track 2 Baskentray toward Kayas Track 3 Yuksek Hizli Tren toward Halkali or Karaman does not stop hereTrack 4 Yuksek Hizli Tren toward Halkali or KaramanIsland platform Platform 2 doors will open on the left Track 5 Yuksek Hizli Tren toward Ankara Track 6 Yuksek Hizli Tren toward Ankara does not stop here References Edit a b Ankara YHT Gar Kompleksi 2016 da tamamlanacak rayhaber com in Turkish 7 February 2015 Retrieved 31 October 2017 Baskentray Yil Sonu Hizmete Girecek rayhaber com in Turkish 23 June 2016 Retrieved 31 October 2017 Retrieved from https en wikipedia org w index php title Eryaman YHT railway station amp oldid 1094077575, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.