The East Link Extension, also known as the 2 Line, is a future light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It will be part of Sound Transit's Link light rail system, running 18 miles (29 km) from west to east and serving 12 stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. The first section of the 2 Line, between South Bellevue and Redmond Technology stations, is scheduled to open in 2024. It is planned to be followed in 2025 by an extension east to Downtown Redmond and west to Seattle, where it will continue into the Downtown Seattle Transit Tunnel and share stations with the 1 Line through to Lynnwood City Center station.

2 Line
Construction in the median of Interstate 90 on the East Channel Bridge, seen in July 2019
Overview
Other name(s)
  • East Link Extension
  • Blue Line
StatusUnder construction
OwnerSound Transit
LocaleSeattle, Washington, U.S.
Termini
Stations
  • 8 (2024)
  • 25 (2025)
Websitesoundtransit.org/eastlink
Service
TypeLight rail
SystemLink light rail
History
Planned opening
  • 2024 (South Bellevue to Redmond Technology)
  • 2025 (Lynnwood to Downtown Redmond)
Technical
Line lengthNew segments: 18 miles (29 km)[1]
Number of tracks2
CharacterAt grade, elevated, and underground
Track gauge4 ft 8+12 in (1,435 mm)
ElectrificationOverhead line1,500 V DC
Operating speed55 mph (89 km/h)
Route map

The East Link project was approved by voters in the 2008 Sound Transit 2 ballot measure, with construction costs projected at $3.7 billion. The line will use the Homer M. Hadley Memorial Bridge, one of the Interstate 90 floating bridges, which was constructed in 1989 with the intent to convert its reversible express lanes to light rail. Early transit plans from the 1960s proposed an Eastside rail system, but preliminary planning on the system did not begin until Sound Transit's formation in the early 1990s.

The proposed alignment of the East Link project was debated by the Bellevue city council in the early 2010s, with members split on two different routes south of Downtown Bellevue; city funding for the downtown segment's tunnel was also debated and ultimately included in the final agreement. The alignment was finalized in 2013, after more than two years of debate, and delayed the beginning of construction to 2016 and the completion of the project from 2021 to 2023. The line will be the world's first railway constructed on a floating bridge and is expected to carry 50,000 daily riders by 2030.

History edit

Background and early proposals edit

The Eastside suburbs underwent rapid development into bedroom communities after the 1940 opening of the first Lake Washington floating bridge, which replaced a cross-lake ferry system as the main connection to Seattle.[2][3] While private bus operators ran routes over the Lake Washington Floating Bridge from Seattle to Eastside towns, the municipal Seattle Transit System opted not to extend its routes.[4] The 1963 opening of the Evergreen Point Floating Bridge fueled further growth, leading to traffic congestion on both bridges during peak periods.[5][6] By 1965, more than 150,000 people lived on the Eastside; the King County government predicted in 1965 that up to 550,000 people would live in Eastside cities by 1990.[7]

In the 1960s, the construction of a rapid transit system for the Seattle metropolitan area was explored by municipal and regional governments. The initial system, serving the city of Seattle, would be extended east to Bellevue via Mercer Island and an additional floating bridge in a later phase, to be built by 1990.[8] The state government amended its plans for a parallel floating bridge to Mercer Island to include exclusive right of way for rapid transit.[9] The Eastside section of the rapid transit system was expanded to include branches to Eastgate and the Bel-Red area, with provisions to extend the system to Redmond. Intermediate stations would be located at Rainier Avenue in Seattle, on Mercer Island, and in Downtown Bellevue.[10][11] The proposal, funded with federal grants, was put to a public vote as part of the Forward Thrust referendums in 1968 and 1970, requiring a 60 percent majority in order to use increased property taxes. During both referendums, voters were unable to meet the required majority to approve the rapid transit plan; the first earned a simple majority, while the second failed due to local economic conditions.[12][13]

Metro Transit was created by a 1972 referendum to operate a countywide bus system and resumed planning work for a Seattle–Eastside transit system to be built using the new Interstate 90 floating bridge.[14] A transit element for the new floating bridge was requested by the Puget Sound Council of Governments and a group of municipal leaders from Seattle and the Eastside, seeking to avoid additional traffic.[15] A memorandum of agreement signed by the Washington State Highway Commission, Metro Transit, and local governments in late 1976 designated the center two lanes of the eight-lane bridge for use by transit and Mercer Island residents,[16] with possible conversion to a fixed-guideway system in the future.[13][17] The Puget Sound Council of Governments (PSCOG), a regional planning organization, determined in a 1981 study that light rail would be a feasible way to relieve traffic on the Interstate 90 corridor and recommended that Metro include it in their long-term plan.[18] A joint study by Metro and the PSCOG in 1986 explored several alternative routes for an Eastside light rail system, recommending a route across the Interstate 90 bridge and branching from Downtown Bellevue to Kirkland and Bothell, via the Eastside railway, and Downtown Redmond, via State Route 520.[19][20] While the light rail plan was left unfunded, provisions were made to accommodate a future Eastside light rail connection in the Downtown Seattle bus tunnel that opened in 1990.[13]

In 1990, the state legislature called for the creation of a regional transit authority to fund the construction of a light rail system serving the Seattle metropolitan area.[21] A work group, known as the Joint Regional Policy Committee, drafted a transit plan in March 1993 that conceived of a 105-mile (169 km) rapid rail system with a line between Seattle, Bellevue, and Redmond served by through-trains from Snohomish County.[22][23] The plan recommended a hybrid rail and bus system, with rail serving as the primary form of high-capacity transit on the Interstate 90 corridor.[24]: 1–9  Later that year, the Central Puget Sound Regional Transit Authority, later renamed Sound Transit, was established and began planning a package of transit projects for a public referendum.[25] The committee's plan was downsized to 69 miles (111 km) of light rail, including a line from Seattle to Bellevue and Overlake, and submitted to voters on March 14, 1995.[26][27] The $6.7 billion transit package was rejected by voters, in part due to an opposition campaign funded by Bellevue developer Kemper Freeman.[28][29] A smaller, $3.9 billion system was proposed the following year, with a light rail line serving Seattle and Seattle–Tacoma International Airport instead of a system spanning the entire metropolitan area; express buses from Seattle to the Eastside would be funded by the package in place of light rail service.[30] The removal of the Eastside light rail line was opposed by politicians and business groups in the area, with prominent developers funding an opposition campaign.[30][31] The package was approved by the Puget Sound region's voters on November 5, 1996, earning a majority of votes in Eastside cities.[32][33] Express buses between Seattle and the Eastside, funded by Sound Transit, began operating in 1999.[34]

Planning and ballot measures edit

In the late 1990s, Sound Transit and the Washington State Department of Transportation (WSDOT) co-led a study into congestion-relief measures on the State Route 520 corridor, including the use of light rail on either of the floating bridges.[35][36] The final Trans-Lake Washington Study, published in 2002, recommended further development of a high-capacity fixed transit system on Interstate 90 to supplement a new floating bridge carrying State Route 520.[13][37] While the Trans-Lake Washington Study was underway, Sound Transit formed a steering committee in 1998 to assess configuration options for Interstate 90 and its existing reversible express lane.[13][38] The committee recommended the addition of high-occupancy vehicle lanes (HOV lanes) to both directions of Interstate 90 by narrowing the existing lanes, leaving the reversible lanes ready for future transit use.[13][39] The lane conversion, coupled with additional HOV ramps on Mercer Island, was approved by Sound Transit, WSDOT, and the Federal Highway Administration (FHWA) in 2004. An amendment to the 1976 memorandum signed by Metro and municipal governments to build the Interstate 90 bridge was drafted and signed, authorizing the conversion of the reversible lanes for high-capacity transit.[13]

Sound Transit added the Eastside high-capacity transit project to its preliminary long-range plan in 2004, exploring several conceptual corridors and modes that branched out from a main line on Interstate 90.[40] The Bellevue–Overlake corridor was chosen as the preferred routing of the Eastside line, which would be either light rail trains or a bus rapid transit system that could be converted to rail, in July 2005.[13][41] Light rail was chosen as the preferred mode by Sound Transit in July 2006,[42] after receiving endorsements from the city councils of Bellevue, Kirkland, and Redmond.[43] The $3.9 billion light rail project, named "East Link", would be part of the next regional transit ballot measure and run from Seattle to Bellevue, the Microsoft campus, and downtown Redmond.[44] A 15-mile (24 km) segment of East Link was included as part of 50 miles (80 km) of light rail in the $47 billion Roads and Transit package, which combined Sound Transit projects with highway expansion. Under the plan, light rail service from Seattle to the Overlake Hospital Medical Center east of Downtown Bellevue would begin in 2021, followed by an extension to the Microsoft campus in Overlake by 2027; the segment between Overlake and downtown Redmond would be prioritized for future extension using additional funding, with engineering and property acquisition work covered by the Roads and Transit package.[45][46] The package attracted opposition from environmentalists, developer Kemper Freeman, and Eastside elected officials,[45] and failed to pass in the November 2007 election.[47]

Sound Transit continued to hold public hearings and open houses on the design of East Link after the rejection of the Roads and Transit package as part of the environmental review process.[48] A smaller, transit-only package named "Sound Transit 2" with 34 miles (55 km) of light rail was passed by voters in November 2008, including funds for East Link.[49] The $18 billion plan projected that light rail trains would reach Bellevue in 2020 and Overlake Transit Center in 2021, and also included preliminary engineering for an eventual extension to downtown Redmond.[50][51]

Floating bridge engineering and litigation edit

 
Looking east on the Homer M. Hadley Memorial Bridge in 2016

In 2005, WSDOT conducted a live load test on the Interstate 90 floating bridge using 65-foot (20 m) flatbed trucks carrying concrete weights to simulate the weight of light rail trains and test its performance. Using the results, which matched those from an earlier computer simulation, WSDOT concluded that the bridge could carry the weight of light rail trains after minor changes to sections of the transition spans were made during construction.[52] Sound Transit later determined in an engineering study that rail joints could be designed to accommodate the multi-directional movement of the floating bridge, with special design considerations and speed restrictions.[53][54] In 2008, the state legislature's Joint Transportation Committee commissioned an independent review of potential issues that would arise with light rail operations on the floating bridge. The panel identified 23 issues, including stray currents from the electrical system that could cause corrosion, the weight of the tracks and catenary on top of the deck, the design of the expansion joints, and a needed seismic upgrade for the bridge.[55] The panel recommended several mitigation measures for the identified issues, which were accepted for consideration by Sound Transit, and gave the preliminary go-ahead on the project.[56][57]

Sound Transit authorized a $53 million budget for preliminary engineering work on the floating bridge segment in 2011, contracting out to a team led by Parsons Brinckerhoff and Balfour Beatty.[58][59] Preliminary design on the track bridge system to be used over the bridge's expansion joints was completed in early 2012, following the development of computer models and prototypes tested at the University of Washington.[60] A 5,000-foot-long (1,500 m) replica of the bridge's light rail tracks, complete with an electrified overhead line, was built for field testing at the Transportation Technology Center in Pueblo, Colorado, using two light rail vehicles from Central Link.[58][59] The track bridge system was designed to accommodate the bridge's six ranges of motion, changes in lake level, and allow for trains to operate at the full speed of 55 miles per hour (89 km/h).[59][60] The 43-foot-long (13 m) track bridges consist of curved steel platforms placed under the tracks, connected to the railroad ties by pivoting bearings that move independently of the tracks, allowing them to remain parallel; the pivoting bearings would also stabilize the railroad ties during an earthquake, moving slightly apart to accommodate the seismic waves.[60] Under the steel platforms, a series of flexible bearings would allow for the tracks to rise and fall by up to 3.6 inches (9.1 cm) while following the motion of the bridge deck.[60] Trains would be halted from the bridge in the event of a major windstorm, with gusts of 40 miles per hour (64 km/h) from the north or 50 miles per hour (80 km/h) from the south.[60] The design of the system, which would make East Link the first railway over a floating bridge ever constructed,[60] was recognized by Popular Science magazine in their 2017 "Best of What's New" awards.[61] The design of the seismic system and steel frames to be installed inside the floating pontoons added $225 million in construction costs, increasing the construction budget by 46 percent, and was paid for using contingency funds.[62]

The use of the floating bridge for light rail service remained controversial after the passage of Sound Transit 2 in 2008. Bellevue developer Kemper Freeman filed a lawsuit against the state government in 2009, arguing that the 18th amendment of the state constitution prohibited the use of the gas tax-funded bridge for non-road uses.[63] The case was argued before the state supreme court,[64] who ruled in April 2011 that the case should be heard in a lower court first.[65][66] Days later, Freeman re-filed the lawsuit in the Kittitas County Superior Court, naming Governor Christine Gregoire and Secretary of Transportation Paula Hammond as defendants.[67] A judge in the Kittitas court issued a summary judgement in favor of Sound Transit and WSDOT, effectively halting the lawsuit.[68] A third lawsuit was filed by Freeman in the state supreme court, where a 7–2 decision in September 2013 deemed that the conversion of the express lanes for light rail was not unconstitutional.[69]

Route refinement in Bellevue edit

The Sound Transit 2 package did not include a specific route for East Link in Bellevue and Redmond, due to the time needed to evaluate alignment options.[70] The Sound Transit Board divided the line into five segments and identified 19 total potential alignments, including tunnel routes in Downtown Bellevue favored by the city's government, that were studied in the project's draft environmental impact statement in 2008.[71][72] In southern Bellevue (named Segment B), the alternatives considered included an at-grade line along Bellevue Way, an at-grade or elevated alignment on 112th Avenue Southeast, and a route following Interstate 405 on the east side of Mercer Slough Nature Park. In Downtown Bellevue (Segment C), three alternatives called for tunnels, while two were elevated guideways along 110th or 112th avenues, and a sixth alignment consisted of an at-grade line split between 108th and 110th avenues. In the Bel-Red area (Segment D), the alignments traveled above or along new east–west streets proposed by the city, transitioning into an at-grade and retained cut alignment along State Route 520 to Overlake Transit Center. The Overlake to Redmond segment (Segment E), studied by the project but not funded for construction, diverged at West Lake Sammamish Parkway, generally serving stations at the Redmond Town Center mall and on the east side of Marymoor Park.[72]

The Bellevue City Council endorsed the 112th Avenue alignment, along with a tunnel in Downtown Bellevue under 106th Avenue, in February 2009.[73] Microsoft voiced its opposition to the tunnel alignment, which the company believed would jeopardize funding for the segment of the line serving its corporate headquarters in Overlake; the tunnel was estimated to add $600 million in costs to the project's budget.[74] On May 14, 2009, Sound Transit Board chose the two-street surface alignment on 108th and 110th avenues as its preferred alternative, but indicated that it would prefer a tunnel under 108th Avenue if $500 million in additional funding could be found.[75][76] In September, the Bellevue City Council requested further review of the options in Downtown Bellevue, and together with Sound Transit proposed a short tunnel under 110th Avenue with one station that would be cheaper to construct and avoid disruptions to the existing Bellevue Transit Center and the 12th Street corridor.[77][78] The composition of the Bellevue City Council was changed later in the year, with candidates backed by light rail opponent Kemper Freeman winning a majority in the November election.[79][80][81] New councilmember Kevin Wallace proposed the "Vision Line", an elevated alignment that followed Interstate 405 and the Eastside Rail Corridor, with its downtown station connected by skybridges and moving walkways.[82][83]

Bellevue continued to consider four new downtown alignments, as well as options in the South Bellevue area.[84] The city council considered routing trains through the Mercer Slough and on the Eastside Rail Corridor until the National Park Service spoke out against the plan.[85] In March 2010, the city council unanimously endorsed the 110th Avenue tunnel alternative, which would cost an additional $285 million, and drafted a cost savings plan that would levy a local tax to pay for the tunnel.[86] A new alignment in the South Bellevue area using the east sides of Bellevue Way and 112th Avenue, along with the city covering the cost of street reconstruction and utility relocation, was also proposed in order to save $75 million in costs.[87] The Sound Transit Board made the revised tunnel and South Bellevue alignment its new preferred route in April and requested further study into the impacts of rail construction in the Surrey Downs area.[88] Sound Transit also approved the exploration of alternative designs for the Overlake Hospital station, the alignment through the Bel-Red area, and the Overlake Village station in Redmond.[89] An additional downtown option, using a shorter tunnel beginning at Northeast 2nd Street and an at-grade crossing of Main Street, was also proposed by Sound Transit to help reduce costs amid an expected shortfall in revenue.[90][91]

 
Map of the preferred alignments selected by Sound Transit (B2M, colored blue) and the Bellevue City Council majority (B7, colored red)

In July, the Bellevue City Council voted 4–3 to reject Sound Transit's six proposed South Bellevue options, in favor of its preferred alternative ("B7") using the Eastside Rail Corridor.[92] The Sound Transit Board voted to continue studying the 112th Avenue alignment and identified the corridor as its preferred route ("B2M"), drawing criticism from Bellevue mayor Don Davidson, who spoke before the board.[93] The city council responded by approving $670,000 in funds towards study into the B7 alternative to provide an even comparison to Sound Transit's proposed 112th Avenue alignment.[94] The three councilmembers who voted against the study called it a hypocritical move, in the face of financial conservation during the Great Recession, and feared that it would extend the planning period by several years.[95] Sound Transit released its supplemental draft environmental impact statement in November, finding that the B7 alternative would be costlier to construct and require more wetland mitigation and displace more businesses.[96] A public hearing on the document later that month in Bellevue was filled by supporters of the B7 alternative, who outnumbered those arguing in favor of B2M.[97] The delays in deciding the Bellevue route moved the projected opening date for East Link from 2021 to 2022 for an at-grade alignment and 2023 for a tunneled line.[98][99] A group of fourteen business executives representing Boeing, Microsoft, T-Mobile USA, and Symetra, among others, sent a letter to the Bellevue city council in May requesting it to cooperate with Sound Transit and expedite the planning process.[100]

The divided opinions of the Bellevue city council, led by B7 supporter Kevin Wallace and B2M supporter Claudia Balducci (also a Sound Transit Boardmember) resulted in heated debates, one of which devolved into a shouting match, and accusations of conflicting interests in decisions related to the light rail project.[101] In April 2011, the city council hired an independent investigator to probe for possible conflicts of interest related to the East Link decision. Balducci, through her involvement on the Sound Transit Board, and councilmember Grant Degginger, whose law firm represented Sound Transit in disputes over other projects, were investigated and cleared of any wrongdoing under state laws.[102] Wallace himself became the subject of a separate investigation by the City Attorney's Office after court documents revealed that his real estate company had negotiated with a freight railroad looking to use the Eastside Rail Corridor; he was later cleared by the independent investigator, having not sought to profit from city council activities.[103] The City of Bellevue adopted an ethics code in 2013 that banned specific conflicts of interest as a result of the investigation.[104] In the November 2011 city council election, Freeman and other anti-light rail developers funded challengers to Balducci and Chelminiak (themselves funded by Spring District developer Wright Runstad), as well as opposition messages and advertisements.[81][105] Balducci and Chelminiak were re-elected and joined by newly elected councilmember John Stokes, replacing Degginger, in continuing the 4–3 makeup of the council.[106][107]

The preliminary Bellevue city council report was released in May 2011, finding that the B7 alternative would be feasible, but cost up to $140 million more than Sound Transit's B2M alternative. The study received a mixed reaction from the council and members of the public, and the final version was cut after the cost of the study increased to $730,000.[108][109] After the release of the study, high-level talks with Sound Transit were initiated by a delegation of Bellevue officials, including city manager Steve Sarkozy and councilmembers Degginger and Wallace.[110] The negotiations moved into public sessions in mid-July, focusing on design modifications to Sound Transit's B2M alternative on 112th Avenue that would lessen impacts on nearby homeowners.[111] A final environmental impact statement was published on July 15,[112] which excluded a modified version of the B7 alternative,[113] and the Sound Transit Board selected a modified version of its 112th Avenue route and the 110th Avenue tunnel as its preferred route on July 28. The new version included an HOV lane on Bellevue Way, grade separation on 112th Avenue, the replacement of a station at Southeast 8th Street with one at Main Street, and a noise wall and landscape buffer next to the tracks.[114] The Bellevue city council approved a preliminary agreement in August in support of the 112th Avenue alignment, and continued its negotiations with Sound Transit ahead of a memorandum of agreement due later in the year.[115][116] Further modifications in September eliminated a retained-cut trench favored by the city council and moved the planned crossover from the east side of 112th Avenue to the west side from Southeast 6th Street to Southeast 15th Street.[117] The deadline for the memorandum was originally set for October, but it was extended into November while awaiting additional public comments solicited by the city council. The city council also asked for a grade-separated overpass for light rail trains crossing 112th Avenue at Southeast 15th Street.[118][119] An umbrella memorandum of understanding between Sound Transit and the City of Bellevue was approved unanimously by the city council on November 15, placing East Link on 112th Avenue and funding the downtown tunnel with a $100 million contribution from the city.[120] After the signing of an agreement with WSDOT to use the Interstate 90 floating bridge, Sound Transit received a Record of Decision for the East Link project issued by the Federal Transit Administration (FTA), formally ending the environmental review process.[121]

Sound Transit initiated design work on East Link in early 2012, commissioning a cost-savings analysis for the Bellevue segments to find elements where project costs could be reduced.[122] The analysis was released for public comment in April, proposing $60 million in savings by moving the downtown station out of the 110th Avenue tunnel, removing trenches from the 112th Avenue section, and moving the historic Frederick W. Winters House out of the planned guideway.[123][124] Bellevue proposed an additional design change for the 112th Avenue corridor, moving the planned elevated flyover for trains into a trench under the raised road, after Surrey Downs residents complained of the potential visual and noise impacts.[125] A shortlist of design modifications was approved for further study by the Sound Transit Board in late June, with an endorsement from the city council.[126] After the publication of the final cost-savings analysis in September, the Sound Transit Board and Bellevue city council voted to endorse the proposed design modifications to the downtown station, 112th Avenue crossing, and Winters House trench.[127][128] The design modifications to Bellevue Way and 112th Avenue were opposed by residents of the Enatai and Surrey Downs neighborhoods, who claimed that the changes would restrict road access and lower property values and quality of life.[129] After threatening to block property acquisition and delay the project further, a group representing Enatai residents agreed to changes in the city code that were approved by the city council in February 2013, giving homeowners a larger setback from the tracks and more time to negotiate property sales to Sound Transit.[130] The city council also approved a streamlined permitting process that would expedite planning within Bellevue.[131] The Enatai group had previously sued Sound Transit over impacts to the Mercer Slough and the Winters House,[132] but the lawsuit was rejected by the U.S. District Court in March 2013.[131]

A supplemental environmental impact statement was released in late March, incorporating the Bellevue design modifications and requesting further design of pedestrian bridges over State Route 520 near Overlake Village station in Redmond.[133] The Bellevue city council unanimously approved a final alignment for East Link on April 22, 2013, including up to $53 million in cost savings identified in the 2012 analysis.[134][135] Days later, Sound Transit approved the same final alignment and design modifications.[135][136] Public open houses on final design and property acquisitions began in May,[137] and an amended transitway agreement was signed by the City of Bellevue in June.[138] In July 2014, Sound Transit selected a former rail yard located west of the Spring District and its station as the site of the project's 25-acre (10 ha) satellite operations and maintenance facility.[139][140] The proposed site initially came as a surprise to the City of Bellevue, who had hoped to use it for transit-oriented development, and also attracted an offer from the Mars Hill Church to share the site, which was later rejected.[141][142] After negotiations with the city, the design of the facility was amended to add 1.6 million square feet (150,000 m2) of commercial and residential development on part of the shrunken yard, and asked Sound Transit to improve nearby pedestrian and bicycle connections.[143]

In 2015, Sound Transit adopted a $3.7 billion budget for the East Link project, funded primarily by tax revenue and bond proceeds from the Sound Transit 2 package.[144] The FTA agreed to contribute a $1.33 billion loan for the project, as well as $88.7 million in grants.[145] The City of Bellevue also contributed $100 million towards the construction of the downtown tunnel after signing an updated memorandum of understanding in 2015.[146][147]

Construction and delays edit

 
Groundbreaking ceremony for East Link in Bellevue on April 22, 2016

Sound Transit broke ground on the project's Downtown Bellevue tunnel on April 22, 2016, beginning its construction with the demolition of homes in the Surrey Downs area.[146][148] The tunnel was excavated using sequential mining, as opposed to tunnel boring machines used for Sound Transit's other light rail projects.[149] To prepare for East Link construction on the express lanes of the Interstate 90 floating bridge, which began in June 2017,[150] WSDOT added HOV lanes to the outer lanes of the freeway between Rainier Avenue in Seattle and Bellevue Way. The $283 million project was completed in stages from 2008 to 2012, reducing lane and shoulder widths on the floating bridge to accommodate the new lanes.[151][152] The bridge's express lanes were closed to traffic on June 5, 2017, and will be rebuilt for light rail trains.[153] Construction was scheduled to move from the pontoons to the bridge deck in 2019.[154]

Demolition work in the South Bellevue, Bel-Red, and Overlake segments of the line also began in early 2017, including the closure of the South Bellevue Park and Ride, which was replaced with several temporary parking lots around the Eastside.[155][156] By the end of the year, site grading and preparation was underway in Mercer Island and along State Route 520 in Overlake.[157] The first segment of elevated guideway was erected at the future Bellevue Downtown station in December 2017 and in Bel-Red in March 2018.[158][159] Work on the line's crossing over Interstate 405 in Bellevue began in early 2018, with a falsework constructed under the arches for the bridge.[160] During installation of girders near Overlake Village in late May, a construction worker was killed after falling from a column near State Route 520 and 148th Avenue.[161] Excavation of the Bellevue tunnel was completed in July 2018, approximately five months ahead of schedule,[162] and substantial finishing work on the structure was declared complete in August 2020.[163] Construction on the entire project reached the halfway milestone in April 2019, including 2.86 miles (4.60 km) of elevated guideway and 1 mile (1.6 km) of tracks.[164]

 
Mercer Island track partially installed in the I-90 median, December 2018

Construction of the line's operations and maintenance facility in the Spring District began in April 2018 and is scheduled to be completed in 2020. It will include space for 96 light rail vehicles and integrate housing and office space.[165] The Rainier Freeway Station was closed in September 2018 and work on the Judkins Park station began shortly thereafter with the demolition of a freeway overpass.[166] By mid-November, installation of rails and ties began on Mercer Island had begun and work on the elevated guideway near South Bellevue had transitioned towards girder installation using a traveling form system.[167][168] Construction was originally scheduled to conclude across all segments in 2020,[169] but was delayed by a work stop during the COVID-19 pandemic.[170]

Train testing on the section between Downtown Bellevue and Redmond Technology station began in November 2021.[171] Live wire tests at full speed with trainsets began between Bellevue Downtown and Spring District stations in February 2022.[172] Light rail service was anticipated to begin in June 2023, but was delayed after a series of concrete structures, mainly over 5,455 plinths under the tracks on the 4-mile (6.4 km) Interstate 90 segment, were found in early 2022 to be in need of replacement or reinforcement.[173][174] Demolition of the faulty plinths began in September 2022 after repairs were deemed infeasible and was followed by rebuilding over several work zones. Service on the floating bridge section is anticipated to begin in 2025.[175]

Starter Line concept edit

Balducci, several Eastside mayors, and other leaders endorsed a plan in 2022 to open a truncated Bellevue–Redmond version of the 2 Line in 2023 to serve local trips while awaiting the completion of the Seattle–Bellevue section with its extended timeline.[176] Sound Transit presented two operational scenarios in December 2022: a truncated 2 Line between South Bellevue and Redmond Technology stations that begins service in early 2024 and is followed by extensions in 2025; or a full opening of the initial line and Downtown Redmond extension in early 2025.[177] The 6.3-mile (10.1 km) "starter line" would run with 10-minute frequencies and would require service on the Lynnwood Link Extension to be halved until early 2025.[178][179]

On August 24, 2023, the Sound Transit Board approved a new operating plan for the 2 Line that included the starter line, which is projected to open in March 2024.[180] The line would debut with two-car trainsets that run at 10-minute frequencies for 16 hours per day between South Bellevue and Redmond Technology stations. The remaining sections to Seattle and Downtown Redmond are planned to open in 2025, along with the full length of the 2 Line to Lynnwood.[180][181] Pre-revenue service testing on the starter line began on November 1 with plans to run simulated service at a later date.[182]

Downtown Redmond Extension edit

The 3.7-mile (6.0 km) Overlake to downtown Redmond segment of East Link was granted engineering and design funding in Sound Transit 2, passed by voters in 2008, leaving a future ballot measure to fund construction.[50] During a funding shortfall in 2010, Sound Transit suspended engineering work on the downtown Redmond segment, which was later restored in 2016.[183] The Sound Transit Board studied several alternative alignments in the downtown Redmond area and selected a route through Marymoor Park and on a disused railroad, terminating at the Redmond Town Center mall.[114] The project was included in the Sound Transit 3 ballot measure, passed by voters in 2016,[184] and preliminary design work began the following year.[185] The project began construction in 2019 and is expected open in 2025, several months later than the original late 2024 schedule.[173][186] Sound Transit filed a lawsuit against Microsoft in March 2020 for access to land in the future right of way on State Route 520, after a dispute over payment for the property and easement.[187]

Route edit

 
Map of East Link and its stations

East Link diverges from the 1 Line at International District/Chinatown station, located near the end of the Downtown Seattle Transit Tunnel. The tracks ascend on an existing ramp, used by buses leaving the tunnel, and turn east to follow Interstate 90 over Interstate 5.[188] The line will use the freeway's former express lanes, which weave under the westbound lanes and onto the roadway's median as I-90 passes around the north side of Beacon Hill. East Link then stops at Judkins Park station near the freeway's interchange with Rainier Avenue before entering the Mount Baker Tunnel.[24]: 2–8  The tracks travel onto the Homer M. Hadley Memorial Bridge, a floating bridge that will be renovated to accommodate light rail, towards Mercer Island. On the island, East Link travels under Aubrey Davis Park and stops at a station at the center of the city's central business district. After traversing the East Channel Bridge, the light rail tracks leave I-90 and cross over to the east side of Bellevue Way, traveling north on an elevated guideway through South Bellevue station. The tracks descend into a trench running along the west edge of Mercer Slough Nature Park, with lids near the historic Frederick W. Winters House and other intersections.[188][189] East Link then turns northeastward to follow 112th Avenue Southeast, crossing under the street to its west side near Surrey Downs Park, and stops at East Main station before turning sharply westward into a tunnel.[188] The 1,985-foot-long (605 m) tunnel travels under 110th Avenue Northeast in Downtown Bellevue and makes a sharp turn to the east at Bellevue Downtown station, adjacent to Bellevue Transit Center at the eastern edge of Downtown Bellevue.[190][191]

The tracks continue onto an elevated viaduct that travels over Interstate 405 and turn north over the Eastside Rail Corridor. Trains reach Wilburton station, on the north side of Northeast 8th Street, and follow the Eastside Rail Corridor while descending to ground level near Lake Bellevue.[188] At Northeast 12th Street, the tracks turn east, while the Eastside Rail Corridor continues north along another set of tracks leading to Link's East operations and maintenance facility. Trains continue into a trench with a station at 120th Avenue, in the center of the Spring District development.[188] The tracks cross over Kelsey Creek and return to street level at BelRed station, traveling northeast in the median of Northeast Spring Boulevard and 136th Place Northeast. After crossing Northeast 20th Street, trains ascend onto an elevated guideway that follows the south side of State Route 520, crossing over the 148th Avenue Northeast interchange and stopping at Overlake Village station. East Link descends to ground level and turns north along the freeway and approaches its initial terminus at Redmond Technology station, located at Northeast 40th Street on the Microsoft Redmond campus.[188][191] The Downtown Redmond Extension will continue along State Route 520 towards downtown Redmond, stopping at a station northeast of Marymoor Park. The extension then turns west, crossing under the freeway, and terminates at Downtown Redmond station near the intersection of Cleveland Street and 166th Avenue Northeast.[185][192]

Stations edit

Station City Location Planned
opening[181]
Type Connections and notes
Continues into Downtown Seattle Transit Tunnel towards Lynnwood
International District/Chinatown Seattle 5th Avenue S and S Jackson Street 2025 Underground Transfer to Sounder commuter rail, Amtrak, First Hill Streetcar
Judkins Park Interstate 90 and Rainier Avenue S 2025 Surface
Mercer Island Mercer Island Interstate 90 and 80th Avenue SE 2025 Surface Park and ride: 447 stalls
South Bellevue Bellevue 2700 Bellevue Way SE 2024 Elevated Park and ride: 1,500 stalls
East Main 112th Avenue SE and Main Street 2024 Surface
Bellevue Downtown NE 6th Street and 110th Avenue NE 2024 Retained cut Transfer to RapidRide B Line
Wilburton 116th Avenue NE and NE 8th Street 2024 Elevated Transfer to RapidRide B Line
Spring District NE 15th Street and 120th Avenue NE 2024 Retained cut
BelRed NE Spring Boulevard and 130th Avenue NE 2024 Surface Park and ride: 300 stalls
Overlake Village Redmond 152nd Avenue NE and NE Shen Street 2024 Surface Transfer to RapidRide B Line
Redmond Technology 156th Avenue NE and NE 40th Street 2024 Surface Transfer to RapidRide B Line
Park and ride: 300 stalls
Marymoor Village State Route 520 and NE 70th Street 2025 Surface Park and ride: 1,400 stalls
Downtown Redmond Cleveland Street and 166th Avenue NE 2025 Elevated Transfer to RapidRide B Line

Service plans edit

When fully opened in 2025, the 2 Line (formerly known during planning as the Blue Line) is planned to operate between Lynnwood and Redmond, serving all stations on the East Link Extension and sharing tracks with the 1 Line from Lynnwood to Downtown Seattle.[180][193] The initial starter line opening in 2024 would have ten-minute frequencies and serve eight stations between South Bellevue and Redmond Technology.[180] The Seattle–Redmond section, to open fully in 2025,[180] would have trains every eight minutes at peak and ten minutes mid-day and on weekends, with a combined frequency of four minutes at peak and five minutes off-peak on the Lynnwood–Seattle shared with the 1 Line.[194] The 2011 final environmental impact statement had initially assumed three-car operations with a headway of eight minutes during peak, twelve minutes during the day on weekdays and weekends, and fifteen minutes during early morning and late evening service.[195]

East Link trains are anticipated to carry 50,000 daily passengers by 2030, and take 20 minutes to travel from International District/Chinatown station to Downtown Bellevue, and 10 minutes from Downtown Bellevue to Redmond Technology station.[196] Sound Transit's current bus service on the west half of the corridor, Sound Transit Express Route 550, carries over 10,000 daily passengers and takes 35 minutes to travel from Seattle to Bellevue.[197][198] King County Metro's RapidRide B Line operates on the east half of the corridor, traveling between Bellevue and Overlake at a frequency of 10 to 15 minutes.[199][200]

The 2 Line is planned to be extended to the Mariner area of Everett by 2037, while 3 Line trains (replacing the 1 Line) would continue on to Downtown Everett.[201][202] Sound Transit plans to expand light rail service to Kirkland and Issaquah by 2044, as part of the Sound Transit 3 program. The preliminary design for the 4 Line includes tracks shared with East Link through Downtown Bellevue, between East Main and Wilburton stations.[201][203]

References edit

  1. ^ "Sound Transit updates East Link preferred route" (Press release). Sound Transit. April 22, 2010. from the original on January 27, 2018. Retrieved January 26, 2018.
  2. ^ Reynolds, Peggy (November 26, 1990). "'The biggest thing afloat'". The Seattle Times. p. A5. from the original on September 1, 2017. Retrieved January 25, 2018.
  3. ^ Whitely, Peyton (April 16, 1998). "Before the Bridge: From 1870 to 1950, most Eastsiders who wanted to cross Lake Washington traveled by ferry". The Seattle Times. p. B3. from the original on September 1, 2017. Retrieved February 19, 2018.
  4. ^ "Four Bus Lines Will Use Floating Bridge". The Seattle Times. June 30, 1940. p. 2.
  5. ^ Barr, Robert A. (July 27, 1970). "Evergreen Bridge Congestion Under Study". The Seattle Times. p. A7.
  6. ^ Whitely, Peyton (November 26, 1972). "Reversible lane tops ideas for Evergreen Point bridge". The Seattle Times. p. A5.
  7. ^ Moody, Dick (November 28, 1965). "East Side May Have 550,000 in 1990". The Seattle Times. p. 1.
  8. ^ Moody, Dick (November 3, 1965). "More Answers Due On Rapid Transit". The Seattle Times. p. 12.
  9. ^ Robinson, Herb (June 27, 1967). "New Bridge Plan Tied To Transit". The Seattle Times. p. 2.
  10. ^ Lane, Bob (April 26, 1970). "Rapid Transit: How It Will Serve". The Seattle Times. p. B1.
  11. ^ Moody, Dick (November 9, 1966). "City Moving Toward System of Subways". The Seattle Times. p. 37.
  12. ^ Cohen, Josh (October 14, 2016). "How Seattle blew its chance at a subway system". Crosscut.com. from the original on September 17, 2017. Retrieved January 25, 2018.
  13. ^ a b c d e f g h Past and Present I-90/East Corridor HCT Alternatives Studies (PDF) (Report). Sound Transit. March 2006. pp. 8–14. (PDF) from the original on September 12, 2017. Retrieved January 25, 2018.
  14. ^ Lane, Bob (June 17, 1975). "Study weighs transit substitutes for I-90 bridge". The Seattle Times. p. A14.
  15. ^ Lane, Bob (January 25, 1976). "A safe guess: New I-90 won't be a miracle". The Seattle Times. p. D4.
  16. ^ Pryne, Eric (November 10, 1976). "Mercer Is. view of I-90: Negotiators slugged it out with the 'giant'". The Seattle Times. p. H1.
  17. ^ "Metro re-emphasizes its 2-transit-lanes support". The Seattle Times. January 16, 1976. p. E4.
  18. ^ Lane, Bob (March 22, 1981). "'Light-rail' system might solve transit problems, says study". The Seattle Times. p. A16.
  19. ^ Corsaletti, Louis T. (January 29, 1986). "Hub plan is answer to transportation woes; but some suburban areas say it overlooks needs". The Seattle Times. p. D3.
  20. ^ "LRT Trunk Route Schematic" (Map). Multi-Corridor Project Summary Report. Municipality of Metropolitan Seattle and Puget Sound Council of Governments. November 1986. p. 44. OCLC 15608855.
  21. ^ Bergsman, Jerry (August 21, 1990). "Everett's OK may speed regional transit". The Seattle Times. p. C2.
  22. ^ Williams, Marla; Schaefer, David (May 30, 1993). "Transit plan paves costly road to future". The Seattle Times. p. B1.
  23. ^ "Alternatives" (PDF). Regional Transit System Plan: Final Environmental Impact Statement (Report). Regional Transit Project. March 1993. p. 35. OCLC 27723634. (PDF) from the original on October 1, 2015. Retrieved January 25, 2018 – via Sound Transit.
  24. ^ a b East Link Project: Final Environmental Impact Statement (Report). Sound Transit. July 2011. OCLC 740478022. from the original on February 27, 2017. Retrieved January 25, 2018.
  25. ^ Schaefer, David (July 7, 1993). "Regional transit unit gets go-ahead". The Seattle Times. p. B3.
  26. ^ Schaefer, David (February 12, 1995). "On the right track? Questions, answers to the $6.7 billion proposal". The Seattle Times. p. A1.
  27. ^ (PDF). Central Puget Sound Regional Transit Authority. February 1995. pp. 5–6. Archived from the original (PDF) on September 30, 2015. Retrieved January 25, 2018.
  28. ^ Schaefer, David; Murakami, Kery (March 15, 1995). "Transit plan derailed: Pierce, Snohomish county voters say no to $6.7 billion proposal". The Seattle Times. p. A1. from the original on January 19, 2018. Retrieved January 25, 2018.
  29. ^ Schaefer, David; Ervin, Keith (March 6, 1995). "A long road to opposition: Kemper Freeman Jr. vs. the RTA". The Seattle Times. p. A1. from the original on October 7, 2008. Retrieved January 25, 2018.
  30. ^ a b Schaefer, David (October 6, 1996). "Looking at the new transit proposal". The Seattle Times. p. A1. from the original on September 18, 2017. Retrieved January 25, 2018.
  31. ^ Ervin, Keith (May 6, 1996). "New transit plan has 'friends' jumping track". The Seattle Times. p. A1.
  32. ^ Schaefer, David (November 7, 1996). "Transit plan can trace surprise success to suburbs". The Seattle Times. p. B1. from the original on January 5, 2017. Retrieved January 25, 2018.
  33. ^ Schaefer, David (November 6, 1996). "Voters back transit plan on fourth try". The Seattle Times. p. A1. from the original on March 3, 2016. Retrieved January 25, 2018.
  34. ^ Whitely, Peyton (September 17, 1999). "Buses ready to roll". The Seattle Times. p. B1. from the original on March 4, 2016. Retrieved January 25, 2018.
  35. ^ Whitely, Peyton (November 22, 1997). "Lake Washington traffic study would involve variety of groups". The Seattle Times. p. A11.
  36. ^ Whitely, Peyton (November 5, 1998). "Cross-lake traffic solutions trimmed". The Seattle Times. p. B3.
  37. ^ Whitely, Peyton (January 31, 2002). "12 options get go-ahead on Highway 520". The Seattle Times. p. B1.
  38. ^ Whitely, Peyton (August 23, 2000). "2 options offered for I-90's future". The Seattle Times. p. B1.
  39. ^ Hadley, Jane (July 16, 2003). "Eastside, Seattle bridge the gap". Seattle Post-Intelligencer. p. B1. from the original on January 27, 2018. Retrieved January 25, 2018.
  40. ^ Pryne, Eric (November 19, 2004). "Eastside transit proposals unveiled". The Seattle Times. p. B1.
  41. ^ (PDF). Final Supplemental Environmental Impact Statement on the Regional Transit Long-Range Plan (Report). Sound Transit. July 2005. p. 1-6. OCLC 60557791. Archived from the original (PDF) on January 27, 2018. Retrieved January 25, 2018.
  42. ^ Chiu, Lisa; Lindblom, Mike (July 14, 2006). "Sound Transit's board endorses light-rail link between Seattle, Eastside". The Seattle Times. p. A1. from the original on January 10, 2018. Retrieved January 25, 2018.
  43. ^ Chiu, Lisa (July 6, 2006). "Eastside sounds off about Sound Transit's new plans". The Seattle Times. p. B3. from the original on January 27, 2018. Retrieved January 25, 2018.
  44. ^ Chiu, Lisa (September 13, 2006). "Light-rail options on the table: Sound Transit to unveil East Link plans". The Seattle Times. p. B1. from the original on January 27, 2018. Retrieved January 25, 2018.
  45. ^ a b Bach, Ashley (October 16, 2007). . The Seattle Times. p. B1. Archived from the original on January 27, 2018. Retrieved January 25, 2018.
  46. ^ "Board adopts Sound Transit 2 Plan proposing 50 miles of light rail expansions" (Press release). Sound Transit. May 23, 2007. from the original on January 27, 2018. Retrieved January 25, 2018.
  47. ^ Garber, Andrew (November 7, 2007). "Huge roads-transit plan gets trounced". The Seattle Times. p. A1. from the original on August 27, 2016. Retrieved January 25, 2018.
  48. ^ "Light-rail input sought at meeting". The Seattle Times. January 5, 2008. p. B3.
  49. ^ Lange, Larry (November 5, 2008). "Sound Transit's package is passing; I-985 falling short". Seattle Post-Intelligencer. p. A14. from the original on April 16, 2012. Retrieved January 25, 2018.
  50. ^ a b (PDF). Sound Transit. July 2008. p. 7. Archived from the original (PDF) on December 2, 2016. Retrieved January 25, 2018.
  51. ^ Lindblom, Mike (July 25, 2008). . The Seattle Times. p. A1. Archived from the original on January 27, 2018. Retrieved January 25, 2018.
  52. ^ Pryne, Eric (December 16, 2005). . The Seattle Times. p. B4. Archived from the original on January 27, 2018. Retrieved January 25, 2018.
  53. ^ Parsons Brinckerhoff Quade & Douglas, Inc. (March 2006). "East Corridor HCT – Summary of I-90 Floating Bridge (Homer Hadley) Studies" (PDF). Sound Transit. (PDF) from the original on January 20, 2018. Retrieved January 25, 2018.
  54. ^ Lindblom, Mike (July 21, 2006). "I-90 floating bridge can be made safe for rail, officials say". The Seattle Times. p. B1. from the original on March 11, 2011. Retrieved January 25, 2018.
  55. ^ Lange, Larry (June 19, 2008). "Panel studies adding trains to I-90 bridge". Seattle Post-Intelligencer. p. B5. from the original on November 7, 2017. Retrieved January 25, 2018.
  56. ^ Slovan, Margie (August 13, 2008). "Light rail on I-90 bridge gets a preliminary OK". Seattle Daily Journal of Commerce. from the original on January 27, 2018. Retrieved January 25, 2018.
  57. ^ (PDF). Sound Transit. February 12, 2009. Archived from the original (PDF) on June 13, 2010. Retrieved January 25, 2018.
  58. ^ a b Harrison, John A.; Cooper, Thomas R.; Lawrence, Lina; Williams, Bryan; Duran Ketchum, Charity; Sleavin, John (2017). (PDF). Transportation Research Record. Transportation Research Board. 2607: 74–81. doi:10.3141/2607-10. ISSN 0361-1981. OCLC 723878893. S2CID 117185460. Archived from the original (PDF) on November 7, 2017. Retrieved January 25, 2018.
  59. ^ a b c Cooper, Thomas; Sleavin, John; Foan, Andy; Thonstad, Travis (March 2014). "Unprecedented Connections" (PDF). Civil Engineering. American Society of Civil Engineers. 84 (3): 56–76. doi:10.1061/ciegag.0000483. ISSN 2381-0688. OCLC 1010682357. Retrieved January 25, 2018.
  60. ^ a b c d e f Lindblom, Mike (May 14, 2017). "World's first light rail on a floating bridge: For I-90, Sound Transit had to invent 'a brilliant solution'". The Seattle Times. p. A1. from the original on September 2, 2017. Retrieved January 25, 2018.
  61. ^ "Sound Transit floating bridge tech for light rail wins award". Metro Magazine. November 1, 2017. from the original on November 1, 2017. Retrieved January 25, 2018.
  62. ^ Lindblom, Mike (March 24, 2017). "I-90 light-rail cost estimate takes a $225 million jump". The Seattle Times. p. A1. from the original on September 28, 2017. Retrieved January 25, 2018.
  63. ^ Long, Katherine (May 2, 2010). . The Seattle Times. p. A1. Archived from the original on February 26, 2018. Retrieved January 25, 2018.
  64. ^ Lindblom, Mike (September 17, 2010). . The Seattle Times. p. B1. Archived from the original on February 26, 2018. Retrieved January 25, 2018.
  65. ^ Lindblom, Mike (April 22, 2011). . The Seattle Times. p. B1. Archived from the original on February 26, 2018. Retrieved January 25, 2018.
  66. ^ Lindblom, Mike (March 10, 2012). "Kemper Freeman loses lawsuit; light-rail can be built on I-90 bridge". The Seattle Times. p. B1. Retrieved January 25, 2018.
  67. ^ "I-90 lawsuit moves east to Ellensburg". Mercer Island Reporter. June 1, 2011. Retrieved January 25, 2018.
  68. ^ "Kittitas County judge rules against Kemper Freeman light rail case". Bellevue Reporter. March 9, 2012. Retrieved January 25, 2018.
  69. ^ Ervin, Keith; Lindblom, Mike (September 13, 2013). "High court rejects Kemper Freeman attempt to stop I-90 light rail". The Seattle Times. p. B1. from the original on September 23, 2015. Retrieved January 25, 2018.
  70. ^ Chiu, Lisa (September 30, 2006). . The Seattle Times. p. B1. Archived from the original on February 26, 2018. Retrieved January 25, 2018.
  71. ^ Bach, Ashley (December 15, 2006). . The Seattle Times. p. B3. Archived from the original on February 26, 2018. Retrieved January 25, 2018.
  72. ^ a b "Chapter 2: Alternatives Considered" (PDF). East Link Project: Draft Environmental Impact Statement. Sound Transit. December 2008. OCLC 294966116. (PDF) from the original on October 16, 2015. Retrieved January 25, 2018.
  73. ^ Tsong, Nicole (February 25, 2009). . The Seattle Times. p. B1. Archived from the original on July 19, 2019. Retrieved January 25, 2018.
  74. ^ Lindblom, Mike (May 4, 2009). . The Seattle Times. p. A1. Archived from the original on July 19, 2019. Retrieved January 25, 2018.
  75. ^ "Sound Transit Motion No. M2009-41" (PDF). Sound Transit. May 14, 2009. (PDF) from the original on August 6, 2017. Retrieved January 25, 2018.
  76. ^ Cohen, Aubrey (May 13, 2009). "Surface route chosen for Eastside light rail". Seattle Post-Intelligencer. from the original on January 21, 2018. Retrieved January 25, 2018.
  77. ^ Larin, Lindsay (October 16, 2009). "Sound Transit updates Bellevue City Council on latest light rail tunnel option". Bellevue Reporter. from the original on August 6, 2017. Retrieved January 25, 2018.
  78. ^ . Bellevue Reporter. September 24, 2009. Archived from the original on February 18, 2010. Retrieved January 25, 2018.
  79. ^ Barnett, Erica C. (September 15, 2009). "Freeman Backs Anti-Light Rail Slate on Eastside". Publicola. Retrieved January 25, 2018.
  80. ^ Lloyd, Sarah Anne (January 28, 2010). "Why Don't Rich Eastside Developers Want Light Rail in Downtown Bellevue?". The Stranger. from the original on October 4, 2016. Retrieved January 25, 2018.
  81. ^ a b Ervin, Keith (October 25, 2011). . The Seattle Times. p. A1. Archived from the original on February 19, 2018. Retrieved January 25, 2018.
  82. ^ Hicks, Joshua Adam (November 17, 2009). . Bellevue Reporter. Archived from the original on November 20, 2009. Retrieved January 25, 2018.
  83. ^ Lindblom, Mike (February 8, 2010). . The Seattle Times. p. A1. Archived from the original on January 22, 2018. Retrieved January 25, 2018.
  84. ^ . Bellevue Reporter. January 14, 2010. Archived from the original on January 23, 2010. Retrieved January 25, 2018.
  85. ^ Tsong, Nicole (March 2, 2010). . The Seattle Times. p. B2. Archived from the original on February 26, 2018. Retrieved January 25, 2018.
  86. ^ Hicks, Joshua Adam (March 23, 2010). . Bellevue Reporter. Archived from the original on March 28, 2010. Retrieved January 25, 2018.
  87. ^ Lindblom, Mike (April 22, 2010). . The Seattle Times. p. B1. Archived from the original on January 26, 2018. Retrieved January 25, 2018.
  88. ^ Hicks, Joshua Adam (April 22, 2010). "Sound Transit names preferred light-rail routes for Bellevue". Bellevue Reporter. Retrieved January 25, 2018.
  89. ^ "Sound Transit Motion No. M2010-44" (PDF). Sound Transit. April 22, 2010. (PDF) from the original on August 6, 2017. Retrieved January 25, 2018.
  90. ^ Hicks, Joshua Adam (July 1, 2010). . Bellevue Reporter. Archived from the original on July 11, 2010. Retrieved January 25, 2018.
  91. ^ Hicks, Joshua Adam (August 12, 2010). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  92. ^ Tsong, Nicole (July 21, 2010). . The Seattle Times. p. B1. Archived from the original on January 26, 2018. Retrieved January 25, 2018.
  93. ^ Hicks, Joshua Adam (July 23, 2010). . Bellevue Reporter. Archived from the original on July 30, 2010. Retrieved January 25, 2018.
  94. ^ Levy, Nat (October 4, 2010). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  95. ^ Levy, Nat (September 14, 2010). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  96. ^ . Bellevue Reporter. November 4, 2010. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  97. ^ Levy, Nat (November 30, 2010). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  98. ^ Lindblom, Mike (May 27, 2011). "The cost of dithering: Bellevue rail delayed to 2023". The Seattle Times. Retrieved January 25, 2018.
  99. ^ Levy, Nat (May 26, 2011). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  100. ^ Ervin, Keith (May 20, 2011). "Execs urge Bellevue council to settle on light-rail route". The Seattle Times. p. B1. Retrieved January 25, 2018.
  101. ^ Tsong, Nicole (January 12, 2011). "Light-rail squabble fractures Bellevue council". The Seattle Times. p. A1. Retrieved January 25, 2018.
  102. ^ Ervin, Keith (June 7, 2011). "Bellevue council probe narrowed to Wallace". The Seattle Times. p. B2. Retrieved January 25, 2018.
  103. ^ Ervin, Keith (July 26, 2011). "Bellevue official had no conflict of interest, investigator finds". The Seattle Times. p. B1. Retrieved January 25, 2018.
  104. ^ Ervin, Keith (May 27, 2013). "Bellevue council can't agree on proposed ethics code". The Seattle Times. p. B4. Retrieved January 25, 2018.
  105. ^ Ervin, Keith (November 3, 2011). "Light-rail views drive Bellevue council races". The Seattle Times. p. B2. Retrieved January 25, 2018.
  106. ^ Ervin, Keith (November 29, 2011). "Recount due in Bellevue's Stokes-Laing race". The Seattle Times. p. B1. Retrieved January 25, 2018.
  107. ^ "Pro-light-rail group is fined". The Seattle Times. December 13, 2011. p. B2.
  108. ^ Levy, Nat (May 17, 2011). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  109. ^ Levy, Nat (June 14, 2011). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  110. ^ Levy, Nat (July 7, 2011). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  111. ^ Levy, Nat (July 19, 2011). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  112. ^ "Sound Transit issues Final Environmental Impact Statement for East Link" (Press release). Sound Transit. July 7, 2011. Retrieved January 25, 2018.
  113. ^ Levy, Nat (July 12, 2011). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  114. ^ a b Ervin, Keith (July 29, 2011). . The Seattle Times. p. A1. Archived from the original on January 22, 2018. Retrieved January 25, 2018.
  115. ^ Ervin, Keith (August 9, 2011). "Bellevue keeps light-rail plan, talks with Sound Transit going". The Seattle Times. p. B2. Retrieved January 25, 2018.
  116. ^ Levy, Nat (August 9, 2011). . Bellevue Reporter. Archived from the original on October 8, 2011. Retrieved January 25, 2018.
  117. ^ Ervin, Keith (September 20, 2011). "Bellevue seeks views on light rail as deadline nears". The Seattle Times. p. B1. Retrieved January 25, 2018.
  118. ^ . Bellevue Reporter. October 25, 2011. Archived from the original on January 15, 2013. Retrieved January 25, 2018.
  119. ^ Ervin, Keith (October 25, 2011). "Bellevue council backs elevated light-rail crossing". The Seattle Times. p. B4.
  120. ^ Levy, Nat (November 15, 2011). . Bellevue Reporter. Archived from the original on January 14, 2013. Retrieved January 25, 2018.
  121. ^ "FTA issues Record of Decision approving East Link light rail alignment" (Press release). Sound Transit. November 27, 2011. from the original on May 17, 2016. Retrieved January 25, 2018.
  122. ^ "East Link Light Rail: Cost Savings Ideas Open House" (PDF). Sound Transit. April 2012. (PDF) from the original on September 10, 2015. Retrieved January 25, 2018.
  123. ^ Ervin, Keith (April 25, 2012). "Officials work to cut costs on Bellevue light-rail project". The Seattle Times. p. B3. Retrieved January 25, 2018.
  124. ^ Ervin, Keith (June 4, 2012). "Different site for light-rail station in Bellevue could save millions". The Seattle Times. p. B1. Retrieved January 25, 2018.
  125. ^ Ervin, Keith (June 6, 2012). "Bellevue considers raising road instead of elevated light-rail tracks". The Seattle Times. p. B1. Retrieved January 25, 2018.
  126. ^ Ervin, Keith (June 29, 2012). . The Seattle Times. p. B1. Archived from the original on September 24, 2016. Retrieved January 25, 2018.
  127. ^ "Sound Transit Motion No. M2012-76" (PDF). Sound Transit. October 25, 2012. Retrieved January 25, 2018.
  128. ^ Ervin, Keith (October 17, 2012). "Bellevue City Council votes to keep studying surface light rail". The Seattle Times. p. B2. Retrieved January 25, 2018.
  129. ^ Groves, Kaitlin (October 5, 2012). . Bellevue Reporter. Archived from the original on January 14, 2013. Retrieved January 25, 2018.
  130. ^ Kareiva, Celina (February 27, 2013). "Light-rail winners: Council, Sound Transit, neighbors all happy with city's new land use code". Bellevue Reporter. Retrieved January 25, 2018.
  131. ^ a b Ervin, Keith (March 16, 2013). "Bellevue, Sound Transit, judge keep light-rail plan on track". The Seattle Times. p. B1. Retrieved January 25, 2018.
  132. ^ Ervin, Keith (June 14, 2012). . The Seattle Times. p. B1. Archived from the original on June 16, 2012. Retrieved January 25, 2018.
  133. ^ "East Link Extension: 2013 SEPA Addendum" (PDF). Sound Transit. March 2013. p. 2-2. OCLC 833166559. Retrieved January 25, 2018.
  134. ^ Lindblom, Mike (April 22, 2013). . The Seattle Times. p. B1. Archived from the original on September 20, 2016. Retrieved May 15, 2014.
  135. ^ a b "Sound Transit Board approves cost-saving refinements to East Link alignment" (Press release). Sound Transit. April 25, 2013. Retrieved January 25, 2018.
  136. ^ Lindblom, Mike (April 26, 2013). . The Seattle Times. p. B1. Archived from the original on May 17, 2014. Retrieved May 15, 2014.
  137. ^ "Bellevue: Sound Transit hosts open house". The Seattle Times. May 11, 2013. p. B2.
  138. ^ "First Amendment to the Transit Way Agreement Between the City of Bellevue and the Central Puget Sound Regional Transit Authority" (PDF). City of Bellevue. June 14, 2013. (PDF) from the original on January 25, 2018. Retrieved January 25, 2018.
  139. ^ "Sound Transit identifies Bellevue site as preferred alternative for new light rail operations base" (Press release). Sound Transit. July 24, 2014. Retrieved January 25, 2018.
  140. ^ Vaughn, Alexa (June 30, 2014). "Potential rail-yard sites threaten Bellevue's businesses, vision". The Seattle Times. p. A1. Retrieved January 25, 2018.
  141. ^ Ervin, Keith (November 24, 2012). "Plan for Bellevue light-rail yard stuns city officials". The Seattle Times. p. A1. Retrieved January 25, 2018.
  142. ^ Ervin, Keith (October 25, 2013). "Mars Hill wants to move Bellevue church to Sound Transit-owned site". The Seattle Times. p. A1. Retrieved January 25, 2018.
  143. ^ Thompson, Lynn (April 10, 2015). "Bellevue mayor on revised light-rail deal: 'Lemonade with sweetener'". The Seattle Times. p. B1. from the original on January 6, 2016. Retrieved January 25, 2018.
  144. ^ "Sound Transit Resolution No. R2015-04" (PDF). Sound Transit. April 23, 2015. Retrieved January 25, 2018.
  145. ^ "U.S. Department of Transportation Announces $1.33 Billion Loan for Sound Transit's Link Light Rail Extension from Seattle to Redmond" (Press release). Federal Transit Administration. January 16, 2015. from the original on May 24, 2017. Retrieved January 25, 2018.
  146. ^ a b "Sound Transit kicks off East Link light rail construction" (Press release). Sound Transit. April 22, 2016. from the original on April 25, 2016. Retrieved April 22, 2016.
  147. ^ "Sound Transit, Bellevue moving forward with East Link" (Press release). Sound Transit. April 23, 2015. from the original on September 7, 2015. Retrieved January 25, 2018.
  148. ^ Whittenberg, Jake (April 13, 2016). "Home demolitions begin Monday in Bellevue for East Link light rail". KING 5 News. Retrieved April 22, 2016.
  149. ^ Lindblom, Mike (February 25, 2017). "Bellevue transit tunnel underway, but no giant drill for this job". The Seattle Times. p. B2. from the original on March 17, 2017. Retrieved January 25, 2018.
  150. ^ Zhou, Nuoya (June 29, 2017). "Sound Transit begins to install light rail on floating bridge". The Seattle Times. from the original on July 3, 2017. Retrieved January 25, 2018.
  151. ^ Metzger, Katie (June 5, 2017). "I-90 center lanes closed as of June 4 for light rail construction". Mercer Island Reporter. from the original on September 17, 2017. Retrieved January 25, 2018.
  152. ^ "New I-90 HOV lane from Mercer Island to Bellevue opens today" (Press release). Sound Transit. March 29, 2012. from the original on September 19, 2015. Retrieved January 25, 2018.
  153. ^ Lindblom, Mike (June 1, 2017). "Mercer Island braces for new I-90 bottlenecks as light-rail work begins". The Seattle Times. p. A1. from the original on June 19, 2017. Retrieved January 25, 2018.
  154. ^ Metzger, Katie (July 3, 2017). "East Link light rail construction underway on I-90 bridge". Mercer Island Reporter. from the original on September 17, 2017. Retrieved January 25, 2018.
  155. ^ Lindblom, Mike (May 5, 2017). "Park-and-ride closure in Bellevue: Commuters angry, feeling stranded". The Seattle Times. p. A1. from the original on August 31, 2017. Retrieved January 25, 2018.
  156. ^ "June 2017 Progress Report: Link Light Rail Program" (PDF). Sound Transit. June 2017. p. 45. Retrieved January 25, 2018.
  157. ^ "From the Boardroom: East Link Update, 2018 Financial Plan and more". The Platform. Sound Transit. October 27, 2017. Retrieved January 25, 2018.
  158. ^ "First elevated section of East Link extension under construction in downtown Bellevue" (Press release). Sound Transit. December 12, 2017. Retrieved January 25, 2018.
  159. ^ "Light rail guideway construction underway in BelRed" (Press release). Sound Transit. March 29, 2018. Retrieved April 5, 2018.
  160. ^ Banner, Ellen (June 6, 2018). "The rail link from Seattle to Bellevue takes shape". The Seattle Times. Retrieved June 14, 2018.
  161. ^ Crowe, Michael (May 22, 2018). "Construction worker dies after fall at Bellevue light rail site". KING 5 News. Retrieved May 22, 2018.
  162. ^ "Sound Transit completes East Link Bellevue tunnel excavation" (Press release). Sound Transit. July 20, 2018. Retrieved July 20, 2018.
  163. ^ "Sound Transit completes construction of East Link Bellevue tunnel" (Press release). Sound Transit. August 19, 2020. Retrieved August 19, 2020.
  164. ^ "East Link construction reaches 50-percent completion milestone" (Press release). Sound Transit. April 5, 2019. Retrieved April 5, 2019.
  165. ^ Kunkler, Aaron (April 5, 2018). "Construction underway at Sound Transit's Operations and Maintenance Facility East". Redmond Reporter. Retrieved April 4, 2018.
  166. ^ Sullivan, Chris (October 11, 2018). "East Link project hits 30 percent completion as Seattle construction begins". KIRO Radio. Retrieved November 15, 2018.
  167. ^ Gray, Bruce (November 15, 2018). "East Link light rail line already transforming Eastside skyline". The Platform. Sound Transit. Retrieved November 15, 2018.
  168. ^ Newcomb, Tim (January 7, 2019). "East Link Rail Installation Underway with Ballasted Trackbed". Engineering News-Record. Retrieved January 7, 2019.
  169. ^ "East Link Light Rail". City of Bellevue. Retrieved January 25, 2018.
  170. ^ Hockett, Charlie (February 1, 2021). "East Link: You asked, we answer". The Platform. Sound Transit. Retrieved February 2, 2021.
  171. ^ "Test trains now running on East Link light rail from Bellevue to Redmond". KING 5 News. November 9, 2021. Retrieved November 14, 2021.
  172. ^ Cunningham, Rachelle (February 8, 2022). "East Link train testing moves into live wire stages". The Platform. Sound Transit. Retrieved February 8, 2022.
  173. ^ a b Lindblom, Mike (August 18, 2022). "More delays for light rail to Bellevue, Redmond, Federal Way, Lynnwood". The Seattle Times. Retrieved August 18, 2022.
  174. ^ Lindblom, Mike (April 28, 2022). "Sound Transit's light-rail project to the Eastside is running late". The Seattle Times. Retrieved May 2, 2022.
  175. ^ Lindblom, Mike; Banner, Ellen (April 14, 2023). "Bad light-rail ties on I-90 bridge can't be fixed, must be rebuilt". The Seattle Times. Retrieved April 19, 2023.
  176. ^ Lindblom, Mike (November 9, 2022). "An Eastside-only light-rail line? Here's why it might happen". The Seattle Times. Retrieved November 9, 2022.
  177. ^ Timm, Julie (December 8, 2022). "An update on Link projects in construction". The Platform. Sound Transit. Retrieved December 10, 2022.
  178. ^ Lindblom, Mike (January 13, 2023). "Lynnwood or Bellevue: Which city should get light-rail service first?". The Seattle Times. Retrieved January 17, 2023.
  179. ^ "2024 Service Plan Proposal – East Subarea". Sound Transit. July 2023. Archived from the original on July 13, 2023. Retrieved July 13, 2023.
  180. ^ a b c d e Lindblom, Mike (August 24, 2023). "Eastside-only light rail should open in March, Sound Transit says". The Seattle Times. Retrieved August 24, 2023.
  181. ^ a b Belman, Brooke (August 24, 2023). "Get ready for new Link service on the Eastside next spring". The Platform. Sound Transit. Retrieved August 24, 2023.
  182. ^ Lindblom, Mike (November 1, 2023). "Look both ways! Eastside light-rail trains begin practice runs". The Seattle Times. Retrieved November 1, 2023.
  183. ^ Stiles, Marc (February 26, 2016). "Light rail may reach Federal Way, downtown Redmond after all". Puget Sound Business Journal. Retrieved January 25, 2018.
  184. ^ Lindblom, Mike (November 14, 2016). "Where Sound Transit 3 projects could speed up or slow down". The Seattle Times. p. B1. from the original on August 28, 2017. Retrieved January 25, 2018.
  185. ^ a b "Sound Transit to study elevated light rail in downtown Redmond" (Press release). Sound Transit. June 23, 2017. Retrieved January 25, 2018.
  186. ^ "ST breaks ground on $1.5B Redmond Link extension". Seattle Daily Journal of Commerce. October 24, 2019. Retrieved October 24, 2019.
  187. ^ Lindblom, Mike (March 24, 2020). "Sound Transit sues longtime ally Microsoft in effort to condemn land for Redmond light rail". The Seattle Times. Retrieved March 24, 2020.
  188. ^ a b c d e f "Sound Transit Resolution No. R2013-09" (PDF). Sound Transit. April 25, 2013. Retrieved January 25, 2018.
  189. ^ Thompson, Lynn (August 15, 2016). "Neighbors worry about Mercer Slough amid East Link light-rail construction". The Seattle Times. p. A1. from the original on July 11, 2017. Retrieved January 25, 2018.
  190. ^ Murray, Ryan (January 14, 2016). "Sound Transit gives tunnel presentation to emotional crowd". Bellevue Reporter. Retrieved January 25, 2018.
  191. ^ a b "Location & stations". Sound Transit. from the original on January 21, 2018. Retrieved January 25, 2018.
  192. ^ "Locations and stations — Downtown Redmond Link Extension". Sound Transit. Retrieved January 25, 2018.
  193. ^ "2018 Service Implementation Plan" (PDF). Sound Transit. March 2018. pp. 64–66. (PDF) from the original on January 19, 2018. Retrieved February 5, 2023.
  194. ^ "Lynnwood Link Extension: Northgate to Lynnwood City Center" (PDF). Lynnwood Link Connections. King County Metro. February 2023. Retrieved February 3, 2023.
  195. ^ "Appendix E: Operating Plan Summary" (PDF). East Link Project: Final Environmental Impact Statement. Sound Transit. July 2011. p. E-1. OCLC 740478022. Retrieved January 25, 2018.
  196. ^ "East Link Extension Overview Folio" (PDF). Sound Transit. October 2016. (PDF) from the original on September 2, 2017. Retrieved January 25, 2018.
  197. ^ Lindblom, Mike (June 25, 2017). "Reprieve for bus riders in Seattle's transit tunnel, but cascading projects to multiply traffic challenges". The Seattle Times. p. B1. from the original on July 28, 2017. Retrieved January 25, 2018.
  198. ^ "Route 550". Sound Transit. from the original on January 7, 2018. Retrieved January 25, 2018.
  199. ^ Christianson, Bill (September 30, 2011). "RapidRide bus service begins this weekend". Bellevue Reporter. Retrieved January 25, 2018.
  200. ^ (PDF) (Map). King County Metro. September 2017. Archived from the original (PDF) on January 26, 2018. Retrieved January 25, 2018.
  201. ^ a b Sound Transit future service (PDF) (Map). Sound Transit. March 2022. Retrieved November 17, 2022.
  202. ^ Shaner, Zee (April 9, 2020). "New line names coming in 2021". The Platform. Sound Transit. Retrieved April 9, 2020.
  203. ^ "South Kirkland to Central Issaquah via Bellevue Light Rail" (PDF). Sound Transit. July 1, 2016. Retrieved January 25, 2018.

External links edit

KML is not from Wikidata
  •   Media related to East Link Extension at Wikimedia Commons
  • Project website

line, sound, transit, east, link, extension, redirects, here, other, uses, eastlink, disambiguation, east, link, extension, also, known, line, future, light, rail, line, serving, eastside, region, seattle, metropolitan, area, state, washington, will, part, sou. East Link Extension redirects here For other uses see Eastlink disambiguation The East Link Extension also known as the 2 Line is a future light rail line serving the Eastside region of the Seattle metropolitan area in the U S state of Washington It will be part of Sound Transit s Link light rail system running 18 miles 29 km from west to east and serving 12 stations in Downtown Seattle Mercer Island Bellevue and Redmond The first section of the 2 Line between South Bellevue and Redmond Technology stations is scheduled to open in 2024 It is planned to be followed in 2025 by an extension east to Downtown Redmond and west to Seattle where it will continue into the Downtown Seattle Transit Tunnel and share stations with the 1 Line through to Lynnwood City Center station 2 LineConstruction in the median of Interstate 90 on the East Channel Bridge seen in July 2019OverviewOther name s East Link Extension Blue LineStatusUnder constructionOwnerSound TransitLocaleSeattle Washington U S TerminiSouth Bellevue west 2024 Lynnwood City Center west 2025 Redmond Technology east 2024 Downtown Redmond east 2025 Stations8 2024 25 2025 Websitesoundtransit org eastlinkServiceTypeLight railSystemLink light railHistoryPlanned opening2024 South Bellevue to Redmond Technology 2025 Lynnwood to Downtown Redmond TechnicalLine lengthNew segments 18 miles 29 km 1 Number of tracks2CharacterAt grade elevated and undergroundTrack gauge4 ft 8 1 2 in 1 435 mm ElectrificationOverhead line 1 500 V DCOperating speed55 mph 89 km h Route mapLegendLynnwood Extension 2025 NorthgateRooseveltU DistrictUniversity of WashingtonMontlake CutCapitol HillWestlakeUniversity StreetPioneer SquareInternational District Chinatown1 Line to Angle LakeJudkins ParkHomer M Hadley Memorial Bridgeover Lake WashingtonMercer IslandEast Channel Bridgeover Lake WashingtonSouth BellevueEast MainBellevue DowntownWilburtonOperations and MaintenanceFacility EastSpring DistrictBelRedOverlake VillageRedmond Technology 2024 Marymoor VillageDowntown Redmond 2025 This diagram viewtalkeditThe East Link project was approved by voters in the 2008 Sound Transit 2 ballot measure with construction costs projected at 3 7 billion The line will use the Homer M Hadley Memorial Bridge one of the Interstate 90 floating bridges which was constructed in 1989 with the intent to convert its reversible express lanes to light rail Early transit plans from the 1960s proposed an Eastside rail system but preliminary planning on the system did not begin until Sound Transit s formation in the early 1990s The proposed alignment of the East Link project was debated by the Bellevue city council in the early 2010s with members split on two different routes south of Downtown Bellevue city funding for the downtown segment s tunnel was also debated and ultimately included in the final agreement The alignment was finalized in 2013 after more than two years of debate and delayed the beginning of construction to 2016 and the completion of the project from 2021 to 2023 The line will be the world s first railway constructed on a floating bridge and is expected to carry 50 000 daily riders by 2030 Contents 1 History 1 1 Background and early proposals 1 2 Planning and ballot measures 1 3 Floating bridge engineering and litigation 1 4 Route refinement in Bellevue 1 5 Construction and delays 1 6 Starter Line concept 1 7 Downtown Redmond Extension 2 Route 2 1 Stations 3 Service plans 4 References 5 External linksHistory editBackground and early proposals edit The Eastside suburbs underwent rapid development into bedroom communities after the 1940 opening of the first Lake Washington floating bridge which replaced a cross lake ferry system as the main connection to Seattle 2 3 While private bus operators ran routes over the Lake Washington Floating Bridge from Seattle to Eastside towns the municipal Seattle Transit System opted not to extend its routes 4 The 1963 opening of the Evergreen Point Floating Bridge fueled further growth leading to traffic congestion on both bridges during peak periods 5 6 By 1965 more than 150 000 people lived on the Eastside the King County government predicted in 1965 that up to 550 000 people would live in Eastside cities by 1990 7 In the 1960s the construction of a rapid transit system for the Seattle metropolitan area was explored by municipal and regional governments The initial system serving the city of Seattle would be extended east to Bellevue via Mercer Island and an additional floating bridge in a later phase to be built by 1990 8 The state government amended its plans for a parallel floating bridge to Mercer Island to include exclusive right of way for rapid transit 9 The Eastside section of the rapid transit system was expanded to include branches to Eastgate and the Bel Red area with provisions to extend the system to Redmond Intermediate stations would be located at Rainier Avenue in Seattle on Mercer Island and in Downtown Bellevue 10 11 The proposal funded with federal grants was put to a public vote as part of the Forward Thrust referendums in 1968 and 1970 requiring a 60 percent majority in order to use increased property taxes During both referendums voters were unable to meet the required majority to approve the rapid transit plan the first earned a simple majority while the second failed due to local economic conditions 12 13 Metro Transit was created by a 1972 referendum to operate a countywide bus system and resumed planning work for a Seattle Eastside transit system to be built using the new Interstate 90 floating bridge 14 A transit element for the new floating bridge was requested by the Puget Sound Council of Governments and a group of municipal leaders from Seattle and the Eastside seeking to avoid additional traffic 15 A memorandum of agreement signed by the Washington State Highway Commission Metro Transit and local governments in late 1976 designated the center two lanes of the eight lane bridge for use by transit and Mercer Island residents 16 with possible conversion to a fixed guideway system in the future 13 17 The Puget Sound Council of Governments PSCOG a regional planning organization determined in a 1981 study that light rail would be a feasible way to relieve traffic on the Interstate 90 corridor and recommended that Metro include it in their long term plan 18 A joint study by Metro and the PSCOG in 1986 explored several alternative routes for an Eastside light rail system recommending a route across the Interstate 90 bridge and branching from Downtown Bellevue to Kirkland and Bothell via the Eastside railway and Downtown Redmond via State Route 520 19 20 While the light rail plan was left unfunded provisions were made to accommodate a future Eastside light rail connection in the Downtown Seattle bus tunnel that opened in 1990 13 In 1990 the state legislature called for the creation of a regional transit authority to fund the construction of a light rail system serving the Seattle metropolitan area 21 A work group known as the Joint Regional Policy Committee drafted a transit plan in March 1993 that conceived of a 105 mile 169 km rapid rail system with a line between Seattle Bellevue and Redmond served by through trains from Snohomish County 22 23 The plan recommended a hybrid rail and bus system with rail serving as the primary form of high capacity transit on the Interstate 90 corridor 24 1 9 Later that year the Central Puget Sound Regional Transit Authority later renamed Sound Transit was established and began planning a package of transit projects for a public referendum 25 The committee s plan was downsized to 69 miles 111 km of light rail including a line from Seattle to Bellevue and Overlake and submitted to voters on March 14 1995 26 27 The 6 7 billion transit package was rejected by voters in part due to an opposition campaign funded by Bellevue developer Kemper Freeman 28 29 A smaller 3 9 billion system was proposed the following year with a light rail line serving Seattle and Seattle Tacoma International Airport instead of a system spanning the entire metropolitan area express buses from Seattle to the Eastside would be funded by the package in place of light rail service 30 The removal of the Eastside light rail line was opposed by politicians and business groups in the area with prominent developers funding an opposition campaign 30 31 The package was approved by the Puget Sound region s voters on November 5 1996 earning a majority of votes in Eastside cities 32 33 Express buses between Seattle and the Eastside funded by Sound Transit began operating in 1999 34 Planning and ballot measures edit In the late 1990s Sound Transit and the Washington State Department of Transportation WSDOT co led a study into congestion relief measures on the State Route 520 corridor including the use of light rail on either of the floating bridges 35 36 The final Trans Lake Washington Study published in 2002 recommended further development of a high capacity fixed transit system on Interstate 90 to supplement a new floating bridge carrying State Route 520 13 37 While the Trans Lake Washington Study was underway Sound Transit formed a steering committee in 1998 to assess configuration options for Interstate 90 and its existing reversible express lane 13 38 The committee recommended the addition of high occupancy vehicle lanes HOV lanes to both directions of Interstate 90 by narrowing the existing lanes leaving the reversible lanes ready for future transit use 13 39 The lane conversion coupled with additional HOV ramps on Mercer Island was approved by Sound Transit WSDOT and the Federal Highway Administration FHWA in 2004 An amendment to the 1976 memorandum signed by Metro and municipal governments to build the Interstate 90 bridge was drafted and signed authorizing the conversion of the reversible lanes for high capacity transit 13 Sound Transit added the Eastside high capacity transit project to its preliminary long range plan in 2004 exploring several conceptual corridors and modes that branched out from a main line on Interstate 90 40 The Bellevue Overlake corridor was chosen as the preferred routing of the Eastside line which would be either light rail trains or a bus rapid transit system that could be converted to rail in July 2005 13 41 Light rail was chosen as the preferred mode by Sound Transit in July 2006 42 after receiving endorsements from the city councils of Bellevue Kirkland and Redmond 43 The 3 9 billion light rail project named East Link would be part of the next regional transit ballot measure and run from Seattle to Bellevue the Microsoft campus and downtown Redmond 44 A 15 mile 24 km segment of East Link was included as part of 50 miles 80 km of light rail in the 47 billion Roads and Transit package which combined Sound Transit projects with highway expansion Under the plan light rail service from Seattle to the Overlake Hospital Medical Center east of Downtown Bellevue would begin in 2021 followed by an extension to the Microsoft campus in Overlake by 2027 the segment between Overlake and downtown Redmond would be prioritized for future extension using additional funding with engineering and property acquisition work covered by the Roads and Transit package 45 46 The package attracted opposition from environmentalists developer Kemper Freeman and Eastside elected officials 45 and failed to pass in the November 2007 election 47 Sound Transit continued to hold public hearings and open houses on the design of East Link after the rejection of the Roads and Transit package as part of the environmental review process 48 A smaller transit only package named Sound Transit 2 with 34 miles 55 km of light rail was passed by voters in November 2008 including funds for East Link 49 The 18 billion plan projected that light rail trains would reach Bellevue in 2020 and Overlake Transit Center in 2021 and also included preliminary engineering for an eventual extension to downtown Redmond 50 51 Floating bridge engineering and litigation edit nbsp Looking east on the Homer M Hadley Memorial Bridge in 2016In 2005 WSDOT conducted a live load test on the Interstate 90 floating bridge using 65 foot 20 m flatbed trucks carrying concrete weights to simulate the weight of light rail trains and test its performance Using the results which matched those from an earlier computer simulation WSDOT concluded that the bridge could carry the weight of light rail trains after minor changes to sections of the transition spans were made during construction 52 Sound Transit later determined in an engineering study that rail joints could be designed to accommodate the multi directional movement of the floating bridge with special design considerations and speed restrictions 53 54 In 2008 the state legislature s Joint Transportation Committee commissioned an independent review of potential issues that would arise with light rail operations on the floating bridge The panel identified 23 issues including stray currents from the electrical system that could cause corrosion the weight of the tracks and catenary on top of the deck the design of the expansion joints and a needed seismic upgrade for the bridge 55 The panel recommended several mitigation measures for the identified issues which were accepted for consideration by Sound Transit and gave the preliminary go ahead on the project 56 57 Sound Transit authorized a 53 million budget for preliminary engineering work on the floating bridge segment in 2011 contracting out to a team led by Parsons Brinckerhoff and Balfour Beatty 58 59 Preliminary design on the track bridge system to be used over the bridge s expansion joints was completed in early 2012 following the development of computer models and prototypes tested at the University of Washington 60 A 5 000 foot long 1 500 m replica of the bridge s light rail tracks complete with an electrified overhead line was built for field testing at the Transportation Technology Center in Pueblo Colorado using two light rail vehicles from Central Link 58 59 The track bridge system was designed to accommodate the bridge s six ranges of motion changes in lake level and allow for trains to operate at the full speed of 55 miles per hour 89 km h 59 60 The 43 foot long 13 m track bridges consist of curved steel platforms placed under the tracks connected to the railroad ties by pivoting bearings that move independently of the tracks allowing them to remain parallel the pivoting bearings would also stabilize the railroad ties during an earthquake moving slightly apart to accommodate the seismic waves 60 Under the steel platforms a series of flexible bearings would allow for the tracks to rise and fall by up to 3 6 inches 9 1 cm while following the motion of the bridge deck 60 Trains would be halted from the bridge in the event of a major windstorm with gusts of 40 miles per hour 64 km h from the north or 50 miles per hour 80 km h from the south 60 The design of the system which would make East Link the first railway over a floating bridge ever constructed 60 was recognized by Popular Science magazine in their 2017 Best of What s New awards 61 The design of the seismic system and steel frames to be installed inside the floating pontoons added 225 million in construction costs increasing the construction budget by 46 percent and was paid for using contingency funds 62 The use of the floating bridge for light rail service remained controversial after the passage of Sound Transit 2 in 2008 Bellevue developer Kemper Freeman filed a lawsuit against the state government in 2009 arguing that the 18th amendment of the state constitution prohibited the use of the gas tax funded bridge for non road uses 63 The case was argued before the state supreme court 64 who ruled in April 2011 that the case should be heard in a lower court first 65 66 Days later Freeman re filed the lawsuit in the Kittitas County Superior Court naming Governor Christine Gregoire and Secretary of Transportation Paula Hammond as defendants 67 A judge in the Kittitas court issued a summary judgement in favor of Sound Transit and WSDOT effectively halting the lawsuit 68 A third lawsuit was filed by Freeman in the state supreme court where a 7 2 decision in September 2013 deemed that the conversion of the express lanes for light rail was not unconstitutional 69 Route refinement in Bellevue edit The Sound Transit 2 package did not include a specific route for East Link in Bellevue and Redmond due to the time needed to evaluate alignment options 70 The Sound Transit Board divided the line into five segments and identified 19 total potential alignments including tunnel routes in Downtown Bellevue favored by the city s government that were studied in the project s draft environmental impact statement in 2008 71 72 In southern Bellevue named Segment B the alternatives considered included an at grade line along Bellevue Way an at grade or elevated alignment on 112th Avenue Southeast and a route following Interstate 405 on the east side of Mercer Slough Nature Park In Downtown Bellevue Segment C three alternatives called for tunnels while two were elevated guideways along 110th or 112th avenues and a sixth alignment consisted of an at grade line split between 108th and 110th avenues In the Bel Red area Segment D the alignments traveled above or along new east west streets proposed by the city transitioning into an at grade and retained cut alignment along State Route 520 to Overlake Transit Center The Overlake to Redmond segment Segment E studied by the project but not funded for construction diverged at West Lake Sammamish Parkway generally serving stations at the Redmond Town Center mall and on the east side of Marymoor Park 72 The Bellevue City Council endorsed the 112th Avenue alignment along with a tunnel in Downtown Bellevue under 106th Avenue in February 2009 73 Microsoft voiced its opposition to the tunnel alignment which the company believed would jeopardize funding for the segment of the line serving its corporate headquarters in Overlake the tunnel was estimated to add 600 million in costs to the project s budget 74 On May 14 2009 Sound Transit Board chose the two street surface alignment on 108th and 110th avenues as its preferred alternative but indicated that it would prefer a tunnel under 108th Avenue if 500 million in additional funding could be found 75 76 In September the Bellevue City Council requested further review of the options in Downtown Bellevue and together with Sound Transit proposed a short tunnel under 110th Avenue with one station that would be cheaper to construct and avoid disruptions to the existing Bellevue Transit Center and the 12th Street corridor 77 78 The composition of the Bellevue City Council was changed later in the year with candidates backed by light rail opponent Kemper Freeman winning a majority in the November election 79 80 81 New councilmember Kevin Wallace proposed the Vision Line an elevated alignment that followed Interstate 405 and the Eastside Rail Corridor with its downtown station connected by skybridges and moving walkways 82 83 Bellevue continued to consider four new downtown alignments as well as options in the South Bellevue area 84 The city council considered routing trains through the Mercer Slough and on the Eastside Rail Corridor until the National Park Service spoke out against the plan 85 In March 2010 the city council unanimously endorsed the 110th Avenue tunnel alternative which would cost an additional 285 million and drafted a cost savings plan that would levy a local tax to pay for the tunnel 86 A new alignment in the South Bellevue area using the east sides of Bellevue Way and 112th Avenue along with the city covering the cost of street reconstruction and utility relocation was also proposed in order to save 75 million in costs 87 The Sound Transit Board made the revised tunnel and South Bellevue alignment its new preferred route in April and requested further study into the impacts of rail construction in the Surrey Downs area 88 Sound Transit also approved the exploration of alternative designs for the Overlake Hospital station the alignment through the Bel Red area and the Overlake Village station in Redmond 89 An additional downtown option using a shorter tunnel beginning at Northeast 2nd Street and an at grade crossing of Main Street was also proposed by Sound Transit to help reduce costs amid an expected shortfall in revenue 90 91 nbsp Map of the preferred alignments selected by Sound Transit B2M colored blue and the Bellevue City Council majority B7 colored red In July the Bellevue City Council voted 4 3 to reject Sound Transit s six proposed South Bellevue options in favor of its preferred alternative B7 using the Eastside Rail Corridor 92 The Sound Transit Board voted to continue studying the 112th Avenue alignment and identified the corridor as its preferred route B2M drawing criticism from Bellevue mayor Don Davidson who spoke before the board 93 The city council responded by approving 670 000 in funds towards study into the B7 alternative to provide an even comparison to Sound Transit s proposed 112th Avenue alignment 94 The three councilmembers who voted against the study called it a hypocritical move in the face of financial conservation during the Great Recession and feared that it would extend the planning period by several years 95 Sound Transit released its supplemental draft environmental impact statement in November finding that the B7 alternative would be costlier to construct and require more wetland mitigation and displace more businesses 96 A public hearing on the document later that month in Bellevue was filled by supporters of the B7 alternative who outnumbered those arguing in favor of B2M 97 The delays in deciding the Bellevue route moved the projected opening date for East Link from 2021 to 2022 for an at grade alignment and 2023 for a tunneled line 98 99 A group of fourteen business executives representing Boeing Microsoft T Mobile USA and Symetra among others sent a letter to the Bellevue city council in May requesting it to cooperate with Sound Transit and expedite the planning process 100 The divided opinions of the Bellevue city council led by B7 supporter Kevin Wallace and B2M supporter Claudia Balducci also a Sound Transit Boardmember resulted in heated debates one of which devolved into a shouting match and accusations of conflicting interests in decisions related to the light rail project 101 In April 2011 the city council hired an independent investigator to probe for possible conflicts of interest related to the East Link decision Balducci through her involvement on the Sound Transit Board and councilmember Grant Degginger whose law firm represented Sound Transit in disputes over other projects were investigated and cleared of any wrongdoing under state laws 102 Wallace himself became the subject of a separate investigation by the City Attorney s Office after court documents revealed that his real estate company had negotiated with a freight railroad looking to use the Eastside Rail Corridor he was later cleared by the independent investigator having not sought to profit from city council activities 103 The City of Bellevue adopted an ethics code in 2013 that banned specific conflicts of interest as a result of the investigation 104 In the November 2011 city council election Freeman and other anti light rail developers funded challengers to Balducci and Chelminiak themselves funded by Spring District developer Wright Runstad as well as opposition messages and advertisements 81 105 Balducci and Chelminiak were re elected and joined by newly elected councilmember John Stokes replacing Degginger in continuing the 4 3 makeup of the council 106 107 The preliminary Bellevue city council report was released in May 2011 finding that the B7 alternative would be feasible but cost up to 140 million more than Sound Transit s B2M alternative The study received a mixed reaction from the council and members of the public and the final version was cut after the cost of the study increased to 730 000 108 109 After the release of the study high level talks with Sound Transit were initiated by a delegation of Bellevue officials including city manager Steve Sarkozy and councilmembers Degginger and Wallace 110 The negotiations moved into public sessions in mid July focusing on design modifications to Sound Transit s B2M alternative on 112th Avenue that would lessen impacts on nearby homeowners 111 A final environmental impact statement was published on July 15 112 which excluded a modified version of the B7 alternative 113 and the Sound Transit Board selected a modified version of its 112th Avenue route and the 110th Avenue tunnel as its preferred route on July 28 The new version included an HOV lane on Bellevue Way grade separation on 112th Avenue the replacement of a station at Southeast 8th Street with one at Main Street and a noise wall and landscape buffer next to the tracks 114 The Bellevue city council approved a preliminary agreement in August in support of the 112th Avenue alignment and continued its negotiations with Sound Transit ahead of a memorandum of agreement due later in the year 115 116 Further modifications in September eliminated a retained cut trench favored by the city council and moved the planned crossover from the east side of 112th Avenue to the west side from Southeast 6th Street to Southeast 15th Street 117 The deadline for the memorandum was originally set for October but it was extended into November while awaiting additional public comments solicited by the city council The city council also asked for a grade separated overpass for light rail trains crossing 112th Avenue at Southeast 15th Street 118 119 An umbrella memorandum of understanding between Sound Transit and the City of Bellevue was approved unanimously by the city council on November 15 placing East Link on 112th Avenue and funding the downtown tunnel with a 100 million contribution from the city 120 After the signing of an agreement with WSDOT to use the Interstate 90 floating bridge Sound Transit received a Record of Decision for the East Link project issued by the Federal Transit Administration FTA formally ending the environmental review process 121 Sound Transit initiated design work on East Link in early 2012 commissioning a cost savings analysis for the Bellevue segments to find elements where project costs could be reduced 122 The analysis was released for public comment in April proposing 60 million in savings by moving the downtown station out of the 110th Avenue tunnel removing trenches from the 112th Avenue section and moving the historic Frederick W Winters House out of the planned guideway 123 124 Bellevue proposed an additional design change for the 112th Avenue corridor moving the planned elevated flyover for trains into a trench under the raised road after Surrey Downs residents complained of the potential visual and noise impacts 125 A shortlist of design modifications was approved for further study by the Sound Transit Board in late June with an endorsement from the city council 126 After the publication of the final cost savings analysis in September the Sound Transit Board and Bellevue city council voted to endorse the proposed design modifications to the downtown station 112th Avenue crossing and Winters House trench 127 128 The design modifications to Bellevue Way and 112th Avenue were opposed by residents of the Enatai and Surrey Downs neighborhoods who claimed that the changes would restrict road access and lower property values and quality of life 129 After threatening to block property acquisition and delay the project further a group representing Enatai residents agreed to changes in the city code that were approved by the city council in February 2013 giving homeowners a larger setback from the tracks and more time to negotiate property sales to Sound Transit 130 The city council also approved a streamlined permitting process that would expedite planning within Bellevue 131 The Enatai group had previously sued Sound Transit over impacts to the Mercer Slough and the Winters House 132 but the lawsuit was rejected by the U S District Court in March 2013 131 A supplemental environmental impact statement was released in late March incorporating the Bellevue design modifications and requesting further design of pedestrian bridges over State Route 520 near Overlake Village station in Redmond 133 The Bellevue city council unanimously approved a final alignment for East Link on April 22 2013 including up to 53 million in cost savings identified in the 2012 analysis 134 135 Days later Sound Transit approved the same final alignment and design modifications 135 136 Public open houses on final design and property acquisitions began in May 137 and an amended transitway agreement was signed by the City of Bellevue in June 138 In July 2014 Sound Transit selected a former rail yard located west of the Spring District and its station as the site of the project s 25 acre 10 ha satellite operations and maintenance facility 139 140 The proposed site initially came as a surprise to the City of Bellevue who had hoped to use it for transit oriented development and also attracted an offer from the Mars Hill Church to share the site which was later rejected 141 142 After negotiations with the city the design of the facility was amended to add 1 6 million square feet 150 000 m2 of commercial and residential development on part of the shrunken yard and asked Sound Transit to improve nearby pedestrian and bicycle connections 143 In 2015 Sound Transit adopted a 3 7 billion budget for the East Link project funded primarily by tax revenue and bond proceeds from the Sound Transit 2 package 144 The FTA agreed to contribute a 1 33 billion loan for the project as well as 88 7 million in grants 145 The City of Bellevue also contributed 100 million towards the construction of the downtown tunnel after signing an updated memorandum of understanding in 2015 146 147 Construction and delays edit nbsp Groundbreaking ceremony for East Link in Bellevue on April 22 2016Sound Transit broke ground on the project s Downtown Bellevue tunnel on April 22 2016 beginning its construction with the demolition of homes in the Surrey Downs area 146 148 The tunnel was excavated using sequential mining as opposed to tunnel boring machines used for Sound Transit s other light rail projects 149 To prepare for East Link construction on the express lanes of the Interstate 90 floating bridge which began in June 2017 150 WSDOT added HOV lanes to the outer lanes of the freeway between Rainier Avenue in Seattle and Bellevue Way The 283 million project was completed in stages from 2008 to 2012 reducing lane and shoulder widths on the floating bridge to accommodate the new lanes 151 152 The bridge s express lanes were closed to traffic on June 5 2017 and will be rebuilt for light rail trains 153 Construction was scheduled to move from the pontoons to the bridge deck in 2019 154 Demolition work in the South Bellevue Bel Red and Overlake segments of the line also began in early 2017 including the closure of the South Bellevue Park and Ride which was replaced with several temporary parking lots around the Eastside 155 156 By the end of the year site grading and preparation was underway in Mercer Island and along State Route 520 in Overlake 157 The first segment of elevated guideway was erected at the future Bellevue Downtown station in December 2017 and in Bel Red in March 2018 158 159 Work on the line s crossing over Interstate 405 in Bellevue began in early 2018 with a falsework constructed under the arches for the bridge 160 During installation of girders near Overlake Village in late May a construction worker was killed after falling from a column near State Route 520 and 148th Avenue 161 Excavation of the Bellevue tunnel was completed in July 2018 approximately five months ahead of schedule 162 and substantial finishing work on the structure was declared complete in August 2020 163 Construction on the entire project reached the halfway milestone in April 2019 including 2 86 miles 4 60 km of elevated guideway and 1 mile 1 6 km of tracks 164 nbsp Mercer Island track partially installed in the I 90 median December 2018Construction of the line s operations and maintenance facility in the Spring District began in April 2018 and is scheduled to be completed in 2020 It will include space for 96 light rail vehicles and integrate housing and office space 165 The Rainier Freeway Station was closed in September 2018 and work on the Judkins Park station began shortly thereafter with the demolition of a freeway overpass 166 By mid November installation of rails and ties began on Mercer Island had begun and work on the elevated guideway near South Bellevue had transitioned towards girder installation using a traveling form system 167 168 Construction was originally scheduled to conclude across all segments in 2020 169 but was delayed by a work stop during the COVID 19 pandemic 170 Train testing on the section between Downtown Bellevue and Redmond Technology station began in November 2021 171 Live wire tests at full speed with trainsets began between Bellevue Downtown and Spring District stations in February 2022 172 Light rail service was anticipated to begin in June 2023 but was delayed after a series of concrete structures mainly over 5 455 plinths under the tracks on the 4 mile 6 4 km Interstate 90 segment were found in early 2022 to be in need of replacement or reinforcement 173 174 Demolition of the faulty plinths began in September 2022 after repairs were deemed infeasible and was followed by rebuilding over several work zones Service on the floating bridge section is anticipated to begin in 2025 175 Starter Line concept edit Balducci several Eastside mayors and other leaders endorsed a plan in 2022 to open a truncated Bellevue Redmond version of the 2 Line in 2023 to serve local trips while awaiting the completion of the Seattle Bellevue section with its extended timeline 176 Sound Transit presented two operational scenarios in December 2022 a truncated 2 Line between South Bellevue and Redmond Technology stations that begins service in early 2024 and is followed by extensions in 2025 or a full opening of the initial line and Downtown Redmond extension in early 2025 177 The 6 3 mile 10 1 km starter line would run with 10 minute frequencies and would require service on the Lynnwood Link Extension to be halved until early 2025 178 179 On August 24 2023 the Sound Transit Board approved a new operating plan for the 2 Line that included the starter line which is projected to open in March 2024 180 The line would debut with two car trainsets that run at 10 minute frequencies for 16 hours per day between South Bellevue and Redmond Technology stations The remaining sections to Seattle and Downtown Redmond are planned to open in 2025 along with the full length of the 2 Line to Lynnwood 180 181 Pre revenue service testing on the starter line began on November 1 with plans to run simulated service at a later date 182 Downtown Redmond Extension edit The 3 7 mile 6 0 km Overlake to downtown Redmond segment of East Link was granted engineering and design funding in Sound Transit 2 passed by voters in 2008 leaving a future ballot measure to fund construction 50 During a funding shortfall in 2010 Sound Transit suspended engineering work on the downtown Redmond segment which was later restored in 2016 183 The Sound Transit Board studied several alternative alignments in the downtown Redmond area and selected a route through Marymoor Park and on a disused railroad terminating at the Redmond Town Center mall 114 The project was included in the Sound Transit 3 ballot measure passed by voters in 2016 184 and preliminary design work began the following year 185 The project began construction in 2019 and is expected open in 2025 several months later than the original late 2024 schedule 173 186 Sound Transit filed a lawsuit against Microsoft in March 2020 for access to land in the future right of way on State Route 520 after a dispute over payment for the property and easement 187 Route edit nbsp Map of East Link and its stationsEast Link diverges from the 1 Line at International District Chinatown station located near the end of the Downtown Seattle Transit Tunnel The tracks ascend on an existing ramp used by buses leaving the tunnel and turn east to follow Interstate 90 over Interstate 5 188 The line will use the freeway s former express lanes which weave under the westbound lanes and onto the roadway s median as I 90 passes around the north side of Beacon Hill East Link then stops at Judkins Park station near the freeway s interchange with Rainier Avenue before entering the Mount Baker Tunnel 24 2 8 The tracks travel onto the Homer M Hadley Memorial Bridge a floating bridge that will be renovated to accommodate light rail towards Mercer Island On the island East Link travels under Aubrey Davis Park and stops at a station at the center of the city s central business district After traversing the East Channel Bridge the light rail tracks leave I 90 and cross over to the east side of Bellevue Way traveling north on an elevated guideway through South Bellevue station The tracks descend into a trench running along the west edge of Mercer Slough Nature Park with lids near the historic Frederick W Winters House and other intersections 188 189 East Link then turns northeastward to follow 112th Avenue Southeast crossing under the street to its west side near Surrey Downs Park and stops at East Main station before turning sharply westward into a tunnel 188 The 1 985 foot long 605 m tunnel travels under 110th Avenue Northeast in Downtown Bellevue and makes a sharp turn to the east at Bellevue Downtown station adjacent to Bellevue Transit Center at the eastern edge of Downtown Bellevue 190 191 The tracks continue onto an elevated viaduct that travels over Interstate 405 and turn north over the Eastside Rail Corridor Trains reach Wilburton station on the north side of Northeast 8th Street and follow the Eastside Rail Corridor while descending to ground level near Lake Bellevue 188 At Northeast 12th Street the tracks turn east while the Eastside Rail Corridor continues north along another set of tracks leading to Link s East operations and maintenance facility Trains continue into a trench with a station at 120th Avenue in the center of the Spring District development 188 The tracks cross over Kelsey Creek and return to street level at BelRed station traveling northeast in the median of Northeast Spring Boulevard and 136th Place Northeast After crossing Northeast 20th Street trains ascend onto an elevated guideway that follows the south side of State Route 520 crossing over the 148th Avenue Northeast interchange and stopping at Overlake Village station East Link descends to ground level and turns north along the freeway and approaches its initial terminus at Redmond Technology station located at Northeast 40th Street on the Microsoft Redmond campus 188 191 The Downtown Redmond Extension will continue along State Route 520 towards downtown Redmond stopping at a station northeast of Marymoor Park The extension then turns west crossing under the freeway and terminates at Downtown Redmond station near the intersection of Cleveland Street and 166th Avenue Northeast 185 192 Stations edit Station City Location Plannedopening 181 Type Connections and notesContinues into Downtown Seattle Transit Tunnel towards LynnwoodInternational District Chinatown Seattle 5th Avenue S and S Jackson Street 2025 Underground Transfer to Sounder commuter rail Amtrak First Hill StreetcarJudkins Park Interstate 90 and Rainier Avenue S 2025 SurfaceMercer Island Mercer Island Interstate 90 and 80th Avenue SE 2025 Surface Park and ride 447 stallsSouth Bellevue Bellevue 2700 Bellevue Way SE 2024 Elevated Park and ride 1 500 stallsEast Main 112th Avenue SE and Main Street 2024 SurfaceBellevue Downtown NE 6th Street and 110th Avenue NE 2024 Retained cut Transfer to RapidRide B LineWilburton 116th Avenue NE and NE 8th Street 2024 Elevated Transfer to RapidRide B LineSpring District NE 15th Street and 120th Avenue NE 2024 Retained cutBelRed NE Spring Boulevard and 130th Avenue NE 2024 Surface Park and ride 300 stallsOverlake Village Redmond 152nd Avenue NE and NE Shen Street 2024 Surface Transfer to RapidRide B LineRedmond Technology 156th Avenue NE and NE 40th Street 2024 Surface Transfer to RapidRide B LinePark and ride 300 stallsMarymoor Village State Route 520 and NE 70th Street 2025 Surface Park and ride 1 400 stallsDowntown Redmond Cleveland Street and 166th Avenue NE 2025 Elevated Transfer to RapidRide B LineService plans editWhen fully opened in 2025 the 2 Line formerly known during planning as the Blue Line is planned to operate between Lynnwood and Redmond serving all stations on the East Link Extension and sharing tracks with the 1 Line from Lynnwood to Downtown Seattle 180 193 The initial starter line opening in 2024 would have ten minute frequencies and serve eight stations between South Bellevue and Redmond Technology 180 The Seattle Redmond section to open fully in 2025 180 would have trains every eight minutes at peak and ten minutes mid day and on weekends with a combined frequency of four minutes at peak and five minutes off peak on the Lynnwood Seattle shared with the 1 Line 194 The 2011 final environmental impact statement had initially assumed three car operations with a headway of eight minutes during peak twelve minutes during the day on weekdays and weekends and fifteen minutes during early morning and late evening service 195 East Link trains are anticipated to carry 50 000 daily passengers by 2030 and take 20 minutes to travel from International District Chinatown station to Downtown Bellevue and 10 minutes from Downtown Bellevue to Redmond Technology station 196 Sound Transit s current bus service on the west half of the corridor Sound Transit Express Route 550 carries over 10 000 daily passengers and takes 35 minutes to travel from Seattle to Bellevue 197 198 King County Metro s RapidRide B Line operates on the east half of the corridor traveling between Bellevue and Overlake at a frequency of 10 to 15 minutes 199 200 The 2 Line is planned to be extended to the Mariner area of Everett by 2037 while 3 Line trains replacing the 1 Line would continue on to Downtown Everett 201 202 Sound Transit plans to expand light rail service to Kirkland and Issaquah by 2044 as part of the Sound Transit 3 program The preliminary design for the 4 Line includes tracks shared with East Link through Downtown Bellevue between East Main and Wilburton stations 201 203 References edit Sound Transit updates East Link preferred route Press release Sound Transit April 22 2010 Archived from the original on January 27 2018 Retrieved January 26 2018 Reynolds Peggy November 26 1990 The biggest thing afloat The Seattle Times p A5 Archived from the original on September 1 2017 Retrieved January 25 2018 Whitely Peyton April 16 1998 Before the Bridge From 1870 to 1950 most Eastsiders who wanted to cross Lake Washington traveled by ferry The Seattle Times p B3 Archived from the original on September 1 2017 Retrieved February 19 2018 Four Bus Lines Will Use Floating Bridge The Seattle Times June 30 1940 p 2 Barr Robert A July 27 1970 Evergreen Bridge Congestion Under Study The Seattle Times p A7 Whitely Peyton November 26 1972 Reversible lane tops ideas for Evergreen Point bridge The Seattle Times p A5 Moody Dick November 28 1965 East Side May Have 550 000 in 1990 The Seattle Times p 1 Moody Dick November 3 1965 More Answers Due On Rapid Transit The Seattle Times p 12 Robinson Herb June 27 1967 New Bridge Plan Tied To Transit The Seattle Times p 2 Lane Bob April 26 1970 Rapid Transit How It Will Serve The Seattle Times p B1 Moody Dick November 9 1966 City Moving Toward System of Subways The Seattle Times p 37 Cohen Josh October 14 2016 How Seattle blew its chance at a subway system Crosscut com Archived from the original on September 17 2017 Retrieved January 25 2018 a b c d e f g h Past and Present I 90 East Corridor HCT Alternatives Studies PDF Report Sound Transit March 2006 pp 8 14 Archived PDF from the original on September 12 2017 Retrieved January 25 2018 Lane Bob June 17 1975 Study weighs transit substitutes for I 90 bridge The Seattle Times p A14 Lane Bob January 25 1976 A safe guess New I 90 won t be a miracle The Seattle Times p D4 Pryne Eric November 10 1976 Mercer Is view of I 90 Negotiators slugged it out with the giant The Seattle Times p H1 Metro re emphasizes its 2 transit lanes support The Seattle Times January 16 1976 p E4 Lane Bob March 22 1981 Light rail system might solve transit problems says study The Seattle Times p A16 Corsaletti Louis T January 29 1986 Hub plan is answer to transportation woes but some suburban areas say it overlooks needs The Seattle Times p D3 LRT Trunk Route Schematic Map Multi Corridor Project Summary Report Municipality of Metropolitan Seattle and Puget Sound Council of Governments November 1986 p 44 OCLC 15608855 Bergsman Jerry August 21 1990 Everett s OK may speed regional transit The Seattle Times p C2 Williams Marla Schaefer David May 30 1993 Transit plan paves costly road to future The Seattle Times p B1 Alternatives PDF Regional Transit System Plan Final Environmental Impact Statement Report Regional Transit Project March 1993 p 35 OCLC 27723634 Archived PDF from the original on October 1 2015 Retrieved January 25 2018 via Sound Transit a b East Link Project Final Environmental Impact Statement Report Sound Transit July 2011 OCLC 740478022 Archived from the original on February 27 2017 Retrieved January 25 2018 Schaefer David July 7 1993 Regional transit unit gets go ahead The Seattle Times p B3 Schaefer David February 12 1995 On the right track Questions answers to the 6 7 billion proposal The Seattle Times p A1 The Regional Transit System Proposal East King County PDF Central Puget Sound Regional Transit Authority February 1995 pp 5 6 Archived from the original PDF on September 30 2015 Retrieved January 25 2018 Schaefer David Murakami Kery March 15 1995 Transit plan derailed Pierce Snohomish county voters say no to 6 7 billion proposal The Seattle Times p A1 Archived from the original on January 19 2018 Retrieved January 25 2018 Schaefer David Ervin Keith March 6 1995 A long road to opposition Kemper Freeman Jr vs the RTA The Seattle Times p A1 Archived from the original on October 7 2008 Retrieved January 25 2018 a b Schaefer David October 6 1996 Looking at the new transit proposal The Seattle Times p A1 Archived from the original on September 18 2017 Retrieved January 25 2018 Ervin Keith May 6 1996 New transit plan has friends jumping track The Seattle Times p A1 Schaefer David November 7 1996 Transit plan can trace surprise success to suburbs The Seattle Times p B1 Archived from the original on January 5 2017 Retrieved January 25 2018 Schaefer David November 6 1996 Voters back transit plan on fourth try The Seattle Times p A1 Archived from the original on March 3 2016 Retrieved January 25 2018 Whitely Peyton September 17 1999 Buses ready to roll The Seattle Times p B1 Archived from the original on March 4 2016 Retrieved January 25 2018 Whitely Peyton November 22 1997 Lake Washington traffic study would involve variety of groups The Seattle Times p A11 Whitely Peyton November 5 1998 Cross lake traffic solutions trimmed The Seattle Times p B3 Whitely Peyton January 31 2002 12 options get go ahead on Highway 520 The Seattle Times p B1 Whitely Peyton August 23 2000 2 options offered for I 90 s future The Seattle Times p B1 Hadley Jane July 16 2003 Eastside Seattle bridge the gap Seattle Post Intelligencer p B1 Archived from the original on January 27 2018 Retrieved January 25 2018 Pryne Eric November 19 2004 Eastside transit proposals unveiled The Seattle Times p B1 Executive Summary PDF Final Supplemental Environmental Impact Statement on the Regional Transit Long Range Plan Report Sound Transit July 2005 p 1 6 OCLC 60557791 Archived from the original PDF on January 27 2018 Retrieved January 25 2018 Chiu Lisa Lindblom Mike July 14 2006 Sound Transit s board endorses light rail link between Seattle Eastside The Seattle Times p A1 Archived from the original on January 10 2018 Retrieved January 25 2018 Chiu Lisa July 6 2006 Eastside sounds off about Sound Transit s new plans The Seattle Times p B3 Archived from the original on January 27 2018 Retrieved January 25 2018 Chiu Lisa September 13 2006 Light rail options on the table Sound Transit to unveil East Link plans The Seattle Times p B1 Archived from the original on January 27 2018 Retrieved January 25 2018 a b Bach Ashley October 16 2007 Transit package s Eastside benefits debated The Seattle Times p B1 Archived from the original on January 27 2018 Retrieved January 25 2018 Board adopts Sound Transit 2 Plan proposing 50 miles of light rail expansions Press release Sound Transit May 23 2007 Archived from the original on January 27 2018 Retrieved January 25 2018 Garber Andrew November 7 2007 Huge roads transit plan gets trounced The Seattle Times p A1 Archived from the original on August 27 2016 Retrieved January 25 2018 Light rail input sought at meeting The Seattle Times January 5 2008 p B3 Lange Larry November 5 2008 Sound Transit s package is passing I 985 falling short Seattle Post Intelligencer p A14 Archived from the original on April 16 2012 Retrieved January 25 2018 a b Sound Transit 2 A Mass Transit Guide The Regional Transit System Plan for Central Puget Sound PDF Sound Transit July 2008 p 7 Archived from the original PDF on December 2 2016 Retrieved January 25 2018 Lindblom Mike July 25 2008 Sound Transit sending voters 17 9 billion rail and bus plan The Seattle Times p A1 Archived from the original on January 27 2018 Retrieved January 25 2018 Pryne Eric December 16 2005 Test shows I 90 bridge can take light rail The Seattle Times p B4 Archived from the original on January 27 2018 Retrieved January 25 2018 Parsons Brinckerhoff Quade amp Douglas Inc March 2006 East Corridor HCT Summary of I 90 Floating Bridge Homer Hadley Studies PDF Sound Transit Archived PDF from the original on January 20 2018 Retrieved January 25 2018 Lindblom Mike July 21 2006 I 90 floating bridge can be made safe for rail officials say The Seattle Times p B1 Archived from the original on March 11 2011 Retrieved January 25 2018 Lange Larry June 19 2008 Panel studies adding trains to I 90 bridge Seattle Post Intelligencer p B5 Archived from the original on November 7 2017 Retrieved January 25 2018 Slovan Margie August 13 2008 Light rail on I 90 bridge gets a preliminary OK Seattle Daily Journal of Commerce Archived from the original on January 27 2018 Retrieved January 25 2018 Independent review team confirms that light rail can run on I 90 floating bridge PDF Sound Transit February 12 2009 Archived from the original PDF on June 13 2010 Retrieved January 25 2018 a b Harrison John A Cooper Thomas R Lawrence Lina Williams Bryan Duran Ketchum Charity Sleavin John 2017 Integration of Light Rail on the I 90 Floating Bridge Across Lake Washington PDF Transportation Research Record Transportation Research Board 2607 74 81 doi 10 3141 2607 10 ISSN 0361 1981 OCLC 723878893 S2CID 117185460 Archived from the original PDF on November 7 2017 Retrieved January 25 2018 a b c Cooper Thomas Sleavin John Foan Andy Thonstad Travis March 2014 Unprecedented Connections PDF Civil Engineering American Society of Civil Engineers 84 3 56 76 doi 10 1061 ciegag 0000483 ISSN 2381 0688 OCLC 1010682357 Retrieved January 25 2018 a b c d e f Lindblom Mike May 14 2017 World s first light rail on a floating bridge For I 90 Sound Transit had to invent a brilliant solution The Seattle Times p A1 Archived from the original on September 2 2017 Retrieved January 25 2018 Sound Transit floating bridge tech for light rail wins award Metro Magazine November 1 2017 Archived from the original on November 1 2017 Retrieved January 25 2018 Lindblom Mike March 24 2017 I 90 light rail cost estimate takes a 225 million jump The Seattle Times p A1 Archived from the original on September 28 2017 Retrieved January 25 2018 Long Katherine May 2 2010 Kemper Freeman is suing to stop light rail expansion to Eastside The Seattle Times p A1 Archived from the original on February 26 2018 Retrieved January 25 2018 Lindblom Mike September 17 2010 Rail foes challenge I 90 plan The Seattle Times p B1 Archived from the original on February 26 2018 Retrieved January 25 2018 Lindblom Mike April 22 2011 I 90 light rail opponents led by Kemper Freeman lose case at high court The Seattle Times p B1 Archived from the original on February 26 2018 Retrieved January 25 2018 Lindblom Mike March 10 2012 Kemper Freeman loses lawsuit light rail can be built on I 90 bridge The Seattle Times p B1 Retrieved January 25 2018 I 90 lawsuit moves east to Ellensburg Mercer Island Reporter June 1 2011 Retrieved January 25 2018 Kittitas County judge rules against Kemper Freeman light rail case Bellevue Reporter March 9 2012 Retrieved January 25 2018 Ervin Keith Lindblom Mike September 13 2013 High court rejects Kemper Freeman attempt to stop I 90 light rail The Seattle Times p B1 Archived from the original on September 23 2015 Retrieved January 25 2018 Chiu Lisa September 30 2006 Path for light rail to wait after vote The Seattle Times p B1 Archived from the original on February 26 2018 Retrieved January 25 2018 Bach Ashley December 15 2006 Panel Tunnel won t be only option studied for light rail The Seattle Times p B3 Archived from the original on February 26 2018 Retrieved January 25 2018 a b Chapter 2 Alternatives Considered PDF East Link Project Draft Environmental Impact Statement Sound Transit December 2008 OCLC 294966116 Archived PDF from the original on October 16 2015 Retrieved January 25 2018 Tsong Nicole February 25 2009 Bellevue envisions tunnel for light rail The Seattle Times p B1 Archived from the original on July 19 2019 Retrieved January 25 2018 Lindblom Mike May 4 2009 Bellevue eyes Sound Transit train tunnel Microsoft wants surface route The Seattle Times p A1 Archived from the original on July 19 2019 Retrieved January 25 2018 Sound Transit Motion No M2009 41 PDF Sound Transit May 14 2009 Archived PDF from the original on August 6 2017 Retrieved January 25 2018 Cohen Aubrey May 13 2009 Surface route chosen for Eastside light rail Seattle Post Intelligencer Archived from the original on January 21 2018 Retrieved January 25 2018 Larin Lindsay October 16 2009 Sound Transit updates Bellevue City Council on latest light rail tunnel option Bellevue Reporter Archived from the original on August 6 2017 Retrieved January 25 2018 Sound Transit presenting another routing alternative for light rail in Downtown Bellevue Bellevue Reporter September 24 2009 Archived from the original on February 18 2010 Retrieved January 25 2018 Barnett Erica C September 15 2009 Freeman Backs Anti Light Rail Slate on Eastside Publicola Retrieved January 25 2018 Lloyd Sarah Anne January 28 2010 Why Don t Rich Eastside Developers Want Light Rail in Downtown Bellevue The Stranger Archived from the original on October 4 2016 Retrieved January 25 2018 a b Ervin Keith October 25 2011 Bellevue council elections divide developers The Seattle Times p A1 Archived from the original on February 19 2018 Retrieved January 25 2018 Hicks Joshua Adam November 17 2009 New light rail plan avoids downtown core Bellevue Reporter Archived from the original on November 20 2009 Retrieved January 25 2018 Lindblom Mike February 8 2010 Light rail vision elevated track would run along I 405 The Seattle Times p A1 Archived from the original on January 22 2018 Retrieved January 25 2018 Bellevue City Council will consider changing preferred light rail routes Bellevue Reporter January 14 2010 Archived from the original on January 23 2010 Retrieved January 25 2018 Tsong Nicole March 2 2010 Bellevue drops Mercer Slough light rail route The Seattle Times p B2 Archived from the original on February 26 2018 Retrieved January 25 2018 Hicks Joshua Adam March 23 2010 Bellevue City Council unanimous on new downtown light rail tunnel Bellevue Reporter Archived from the original on March 28 2010 Retrieved January 25 2018 Lindblom Mike April 22 2010 Bellevue council s offer keeps light rail tunnel alive The Seattle Times p B1 Archived from the original on January 26 2018 Retrieved January 25 2018 Hicks Joshua Adam April 22 2010 Sound Transit names preferred light rail routes for Bellevue Bellevue Reporter Retrieved January 25 2018 Sound Transit Motion No M2010 44 PDF Sound Transit April 22 2010 Archived PDF from the original on August 6 2017 Retrieved January 25 2018 Hicks Joshua Adam July 1 2010 New tunnel more grumbling as Bellevue light rail decision nears Bellevue Reporter Archived from the original on July 11 2010 Retrieved January 25 2018 Hicks Joshua Adam August 12 2010 Sound Transit will re think Bellevue tunnel in light of bad economy Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Tsong Nicole July 21 2010 Bellevue council sticks with light rail route Sound Transit opposes The Seattle Times p B1 Archived from the original on January 26 2018 Retrieved January 25 2018 Hicks Joshua Adam July 23 2010 Sound Transit board makes light rail decision exchanges barbs with Bellevue mayor Bellevue Reporter Archived from the original on July 30 2010 Retrieved January 25 2018 Levy Nat October 4 2010 Bellevue council votes for more study of its preferred light rail route Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Levy Nat September 14 2010 Council continues analysis on railway corridor route for Bellevue light rail Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Sound Transit releases East Link SDEIS Bellevue Reporter November 4 2010 Archived from the original on October 8 2011 Retrieved January 25 2018 Levy Nat November 30 2010 Debate between south Bellevue light rail alignments dominates public hearing Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Lindblom Mike May 27 2011 The cost of dithering Bellevue rail delayed to 2023 The Seattle Times Retrieved January 25 2018 Levy Nat May 26 2011 Sound Transit ready to pull the trigger on East Link Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Ervin Keith May 20 2011 Execs urge Bellevue council to settle on light rail route The Seattle Times p B1 Retrieved January 25 2018 Tsong Nicole January 12 2011 Light rail squabble fractures Bellevue council The Seattle Times p A1 Retrieved January 25 2018 Ervin Keith June 7 2011 Bellevue council probe narrowed to Wallace The Seattle Times p B2 Retrieved January 25 2018 Ervin Keith July 26 2011 Bellevue official had no conflict of interest investigator finds The Seattle Times p B1 Retrieved January 25 2018 Ervin Keith May 27 2013 Bellevue council can t agree on proposed ethics code The Seattle Times p B4 Retrieved January 25 2018 Ervin Keith November 3 2011 Light rail views drive Bellevue council races The Seattle Times p B2 Retrieved January 25 2018 Ervin Keith November 29 2011 Recount due in Bellevue s Stokes Laing race The Seattle Times p B1 Retrieved January 25 2018 Pro light rail group is fined The Seattle Times December 13 2011 p B2 Levy Nat May 17 2011 Council gets look at consultant s light rail report Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Levy Nat June 14 2011 Council wraps up East Link study Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Levy Nat July 7 2011 Bellevue Sound Transit engaged in high level discussions over light rail route Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Levy Nat July 19 2011 Bellevue Sound Transit down to the wire on light rail deal Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Sound Transit issues Final Environmental Impact Statement for East Link Press release Sound Transit July 7 2011 Retrieved January 25 2018 Levy Nat July 12 2011 Bellevue Sound Transit to meet over light rail route Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 a b Ervin Keith July 29 2011 Sound Transit approves East Link light rail route The Seattle Times p A1 Archived from the original on January 22 2018 Retrieved January 25 2018 Ervin Keith August 9 2011 Bellevue keeps light rail plan talks with Sound Transit going The Seattle Times p B2 Retrieved January 25 2018 Levy Nat August 9 2011 Bellevue OKs outline of light rail talks with Sound Transit over route Bellevue Reporter Archived from the original on October 8 2011 Retrieved January 25 2018 Ervin Keith September 20 2011 Bellevue seeks views on light rail as deadline nears The Seattle Times p B1 Retrieved January 25 2018 Bellevue council wants more time for light rail negotiations sets public hearing Bellevue Reporter October 25 2011 Archived from the original on January 15 2013 Retrieved January 25 2018 Ervin Keith October 25 2011 Bellevue council backs elevated light rail crossing The Seattle Times p B4 Levy Nat November 15 2011 It s unanimous Bellevue City Council OKs light rail agreement Bellevue Reporter Archived from the original on January 14 2013 Retrieved January 25 2018 FTA issues Record of Decision approving East Link light rail alignment Press release Sound Transit November 27 2011 Archived from the original on May 17 2016 Retrieved January 25 2018 East Link Light Rail Cost Savings Ideas Open House PDF Sound Transit April 2012 Archived PDF from the original on September 10 2015 Retrieved January 25 2018 Ervin Keith April 25 2012 Officials work to cut costs on Bellevue light rail project The Seattle Times p B3 Retrieved January 25 2018 Ervin Keith June 4 2012 Different site for light rail station in Bellevue could save millions The Seattle Times p B1 Retrieved January 25 2018 Ervin Keith June 6 2012 Bellevue considers raising road instead of elevated light rail tracks The Seattle Times p B1 Retrieved January 25 2018 Ervin Keith June 29 2012 Light rail plan moves ahead in Bellevue UW Northgate project OK d The Seattle Times p B1 Archived from the original on September 24 2016 Retrieved January 25 2018 Sound Transit Motion No M2012 76 PDF Sound Transit October 25 2012 Retrieved January 25 2018 Ervin Keith October 17 2012 Bellevue City Council votes to keep studying surface light rail The Seattle Times p B2 Retrieved January 25 2018 Groves Kaitlin October 5 2012 City faces emotional opposition to light rail savings plan Bellevue Reporter Archived from the original on January 14 2013 Retrieved January 25 2018 Kareiva Celina February 27 2013 Light rail winners Council Sound Transit neighbors all happy with city s new land use code Bellevue Reporter Retrieved January 25 2018 a b Ervin Keith March 16 2013 Bellevue Sound Transit judge keep light rail plan on track The Seattle Times p B1 Retrieved January 25 2018 Ervin Keith June 14 2012 2 groups sue over Bellevue light rail plan as it moves ahead The Seattle Times p B1 Archived from the original on June 16 2012 Retrieved January 25 2018 East Link Extension 2013 SEPA Addendum PDF Sound Transit March 2013 p 2 2 OCLC 833166559 Retrieved January 25 2018 Lindblom Mike April 22 2013 In historic step Bellevue approves light rail route The Seattle Times p B1 Archived from the original on September 20 2016 Retrieved May 15 2014 a b Sound Transit Board approves cost saving refinements to East Link alignment Press release Sound Transit April 25 2013 Retrieved January 25 2018 Lindblom Mike April 26 2013 Sound Transit signs off on Bellevue s light rail route The Seattle Times p B1 Archived from the original on May 17 2014 Retrieved May 15 2014 Bellevue Sound Transit hosts open house The Seattle Times May 11 2013 p B2 First Amendment to the Transit Way Agreement Between the City of Bellevue and the Central Puget Sound Regional Transit Authority PDF City of Bellevue June 14 2013 Archived PDF from the original on January 25 2018 Retrieved January 25 2018 Sound Transit identifies Bellevue site as preferred alternative for new light rail operations base Press release Sound Transit July 24 2014 Retrieved January 25 2018 Vaughn Alexa June 30 2014 Potential rail yard sites threaten Bellevue s businesses vision The Seattle Times p A1 Retrieved January 25 2018 Ervin Keith November 24 2012 Plan for Bellevue light rail yard stuns city officials The Seattle Times p A1 Retrieved January 25 2018 Ervin Keith October 25 2013 Mars Hill wants to move Bellevue church to Sound Transit owned site The Seattle Times p A1 Retrieved January 25 2018 Thompson Lynn April 10 2015 Bellevue mayor on revised light rail deal Lemonade with sweetener The Seattle Times p B1 Archived from the original on January 6 2016 Retrieved January 25 2018 Sound Transit Resolution No R2015 04 PDF Sound Transit April 23 2015 Retrieved January 25 2018 U S Department of Transportation Announces 1 33 Billion Loan for Sound Transit s Link Light Rail Extension from Seattle to Redmond Press release Federal Transit Administration January 16 2015 Archived from the original on May 24 2017 Retrieved January 25 2018 a b Sound Transit kicks off East Link light rail construction Press release Sound Transit April 22 2016 Archived from the original on April 25 2016 Retrieved April 22 2016 Sound Transit Bellevue moving forward with East Link Press release Sound Transit April 23 2015 Archived from the original on September 7 2015 Retrieved January 25 2018 Whittenberg Jake April 13 2016 Home demolitions begin Monday in Bellevue for East Link light rail KING 5 News Retrieved April 22 2016 Lindblom Mike February 25 2017 Bellevue transit tunnel underway but no giant drill for this job The Seattle Times p B2 Archived from the original on March 17 2017 Retrieved January 25 2018 Zhou Nuoya June 29 2017 Sound Transit begins to install light rail on floating bridge The Seattle Times Archived from the original on July 3 2017 Retrieved January 25 2018 Metzger Katie June 5 2017 I 90 center lanes closed as of June 4 for light rail construction Mercer Island Reporter Archived from the original on September 17 2017 Retrieved January 25 2018 New I 90 HOV lane from Mercer Island to Bellevue opens today Press release Sound Transit March 29 2012 Archived from the original on September 19 2015 Retrieved January 25 2018 Lindblom Mike June 1 2017 Mercer Island braces for new I 90 bottlenecks as light rail work begins The Seattle Times p A1 Archived from the original on June 19 2017 Retrieved January 25 2018 Metzger Katie July 3 2017 East Link light rail construction underway on I 90 bridge Mercer Island Reporter Archived from the original on September 17 2017 Retrieved January 25 2018 Lindblom Mike May 5 2017 Park and ride closure in Bellevue Commuters angry feeling stranded The Seattle Times p A1 Archived from the original on August 31 2017 Retrieved January 25 2018 June 2017 Progress Report Link Light Rail Program PDF Sound Transit June 2017 p 45 Retrieved January 25 2018 From the Boardroom East Link Update 2018 Financial Plan and more The Platform Sound Transit October 27 2017 Retrieved January 25 2018 First elevated section of East Link extension under construction in downtown Bellevue Press release Sound Transit December 12 2017 Retrieved January 25 2018 Light rail guideway construction underway in BelRed Press release Sound Transit March 29 2018 Retrieved April 5 2018 Banner Ellen June 6 2018 The rail link from Seattle to Bellevue takes shape The Seattle Times Retrieved June 14 2018 Crowe Michael May 22 2018 Construction worker dies after fall at Bellevue light rail site KING 5 News Retrieved May 22 2018 Sound Transit completes East Link Bellevue tunnel excavation Press release Sound Transit July 20 2018 Retrieved July 20 2018 Sound Transit completes construction of East Link Bellevue tunnel Press release Sound Transit August 19 2020 Retrieved August 19 2020 East Link construction reaches 50 percent completion milestone Press release Sound Transit April 5 2019 Retrieved April 5 2019 Kunkler Aaron April 5 2018 Construction underway at Sound Transit s Operations and Maintenance Facility East Redmond Reporter Retrieved April 4 2018 Sullivan Chris October 11 2018 East Link project hits 30 percent completion as Seattle construction begins KIRO Radio Retrieved November 15 2018 Gray Bruce November 15 2018 East Link light rail line already transforming Eastside skyline The Platform Sound Transit Retrieved November 15 2018 Newcomb Tim January 7 2019 East Link Rail Installation Underway with Ballasted Trackbed Engineering News Record Retrieved January 7 2019 East Link Light Rail City of Bellevue Retrieved January 25 2018 Hockett Charlie February 1 2021 East Link You asked we answer The Platform Sound Transit Retrieved February 2 2021 Test trains now running on East Link light rail from Bellevue to Redmond KING 5 News November 9 2021 Retrieved November 14 2021 Cunningham Rachelle February 8 2022 East Link train testing moves into live wire stages The Platform Sound Transit Retrieved February 8 2022 a b Lindblom Mike August 18 2022 More delays for light rail to Bellevue Redmond Federal Way Lynnwood The Seattle Times Retrieved August 18 2022 Lindblom Mike April 28 2022 Sound Transit s light rail project to the Eastside is running late The Seattle Times Retrieved May 2 2022 Lindblom Mike Banner Ellen April 14 2023 Bad light rail ties on I 90 bridge can t be fixed must be rebuilt The Seattle Times Retrieved April 19 2023 Lindblom Mike November 9 2022 An Eastside only light rail line Here s why it might happen The Seattle Times Retrieved November 9 2022 Timm Julie December 8 2022 An update on Link projects in construction The Platform Sound Transit Retrieved December 10 2022 Lindblom Mike January 13 2023 Lynnwood or Bellevue Which city should get light rail service first The Seattle Times Retrieved January 17 2023 2024 Service Plan Proposal East Subarea Sound Transit July 2023 Archived from the original on July 13 2023 Retrieved July 13 2023 a b c d e Lindblom Mike August 24 2023 Eastside only light rail should open in March Sound Transit says The Seattle Times Retrieved August 24 2023 a b Belman Brooke August 24 2023 Get ready for new Link service on the Eastside next spring The Platform Sound Transit Retrieved August 24 2023 Lindblom Mike November 1 2023 Look both ways Eastside light rail trains begin practice runs The Seattle Times Retrieved November 1 2023 Stiles Marc February 26 2016 Light rail may reach Federal Way downtown Redmond after all Puget Sound Business Journal Retrieved January 25 2018 Lindblom Mike November 14 2016 Where Sound Transit 3 projects could speed up or slow down The Seattle Times p B1 Archived from the original on August 28 2017 Retrieved January 25 2018 a b Sound Transit to study elevated light rail in downtown Redmond Press release Sound Transit June 23 2017 Retrieved January 25 2018 ST breaks ground on 1 5B Redmond Link extension Seattle Daily Journal of Commerce October 24 2019 Retrieved October 24 2019 Lindblom Mike March 24 2020 Sound Transit sues longtime ally Microsoft in effort to condemn land for Redmond light rail The Seattle Times Retrieved March 24 2020 a b c d e f Sound Transit Resolution No R2013 09 PDF Sound Transit April 25 2013 Retrieved January 25 2018 Thompson Lynn August 15 2016 Neighbors worry about Mercer Slough amid East Link light rail construction The Seattle Times p A1 Archived from the original on July 11 2017 Retrieved January 25 2018 Murray Ryan January 14 2016 Sound Transit gives tunnel presentation to emotional crowd Bellevue Reporter Retrieved January 25 2018 a b Location amp stations Sound Transit Archived from the original on January 21 2018 Retrieved January 25 2018 Locations and stations Downtown Redmond Link Extension Sound Transit Retrieved January 25 2018 2018 Service Implementation Plan PDF Sound Transit March 2018 pp 64 66 Archived PDF from the original on January 19 2018 Retrieved February 5 2023 Lynnwood Link Extension Northgate to Lynnwood City Center PDF Lynnwood Link Connections King County Metro February 2023 Retrieved February 3 2023 Appendix E Operating Plan Summary PDF East Link Project Final Environmental Impact Statement Sound Transit July 2011 p E 1 OCLC 740478022 Retrieved January 25 2018 East Link Extension Overview Folio PDF Sound Transit October 2016 Archived PDF from the original on September 2 2017 Retrieved January 25 2018 Lindblom Mike June 25 2017 Reprieve for bus riders in Seattle s transit tunnel but cascading projects to multiply traffic challenges The Seattle Times p B1 Archived from the original on July 28 2017 Retrieved January 25 2018 Route 550 Sound Transit Archived from the original on January 7 2018 Retrieved January 25 2018 Christianson Bill September 30 2011 RapidRide bus service begins this weekend Bellevue Reporter Retrieved January 25 2018 Metro Transit System Northeast Area PDF Map King County Metro September 2017 Archived from the original PDF on January 26 2018 Retrieved January 25 2018 a b Sound Transit future service PDF Map Sound Transit March 2022 Retrieved November 17 2022 Shaner Zee April 9 2020 New line names coming in 2021 The Platform Sound Transit Retrieved April 9 2020 South Kirkland to Central Issaquah via Bellevue Light Rail PDF Sound Transit July 1 2016 Retrieved January 25 2018 External links editKML file edit help Template Attached KML 2 Line Sound Transit KML is not from Wikidata nbsp Media related to East Link Extension at Wikimedia Commons Project website Retrieved from https en wikipedia org w index php title 2 Line Sound Transit amp oldid 1183090775, wikipedia, wiki, book, books, library,