East Demerara Water Conservancy

The East Demerara Water Conservancy (EDWC) is one of Guyana's major water storage and flood control facilities. Over 500,000 residents inhabit the basin that lies below and between the sea wall and the EDWC Dam in a 48 km band from Georgetown to Mahaica. Located in Demerara-Mahaica, the EDWC serves to irrigate thousands of hectares of rice and other crops within this area by storing rain water for dry periods and it also provides one of the primary source (about 60%) of drinking water for the capital city of Georgetown.

The irrigation network also has a number of drainage relief structures to protect the EDWC Dam from over-topping and collapse during the rainy periods including the Hope Canal, which connects the EDWC to the Atlantic Ocean. The Guyana Sugar Corporation is completely reliant on water from the EDWC.[1]

Location edit

The EDWC is located 15 miles south of the most densely populated section of the Guyana Coast. It is bounded to the North by a man-made 45 mile earthen dam and to the deep south by a natural topographic rise composing largely of ancient coastal dune formation over geological time. The EDWC Dam is constructed of clay and pagasse (an organic soil also known as tropical peat).

  • Surface Area - 130 Sq. miles
  • Catchment Area - 200 Sq. miles
  • Length of Conservancy Dam - 45 miles
  • Full Storage Level - 57.5 ft GD
  • Dead Storage Level - 53.5 ft GD
  • No. of Intake Structures - 27
  • Relief Structures - 5

History of the EDWC edit

Guyana's drainage and irrigation system has its origins in the late 1600s under the Dutch colonial rule. One of the major innovations of the time was the building of water conservancies (artificial water catchment polderized by earthen dams) to retain fresh water from upland streams during the dry seasons and release via irrigation canals and head regulators.[2]

The EDWC is one of the most important of these conservancies and it was designed over 125 years ago by William Russell and built using slave labour.

Since then, changes in the land use, climate change driven increases in rainfall intensity and a number of other factors have left the EDWC in a fragile state. The National Drainage and Irrigation Authority has worked and continues to work diligently with international assistance to maintain and protect this network.

Major projects at the EDWC edit

JICA Component I edit

The Japan International Cooperation Agency (JICA) sponsored work to improve the EDWC in an effort to assist countries vulnerable to climate change.[3] JICA provided grant aid which was utilized to improve the drainage and irrigation capacity within the EDWC by supplying eight long-reach excavators and two pontoons to the Government of Guyana.[4]

The excavators and pontoons were assembled locally and operators were given essential training in their use. They were deployed immediately after the handing over ceremony in November 2012.

JICA Component II edit

The second component of the programme was the rehabilitation of six key EDWC structures in 2016:

  1. Sara Johanna Sluice
  2. Nancy Intake
  3. Annaadale Intake
  4. Ann's Grove
  5. Shanks Intake
  6. Maduni Sluice

Phase II funds were used to obtain the country's first amphibious excavator.[5]

The EDWC-Northern Relief Channel edit

The EDWC NRC (Hope Canal) project was designed in response to the 2005 Georgetown flood due to the over-topping of the conservancy dam. The Hope Canal seeks to provide the means to release excess water in the EDWC when it is in danger of over-tapping and breaches. The project is a 10.3 km long earthen channel with a three-door head regulator at the conservancy end of the canal and an eight-door outfall sluice at the Atlantic end. Also included in the project was the construction on a public road bridge that has been in operation since February 2014.[6][7]

See also edit

References edit

  1. ^ "EDWC, BWC Board of Directors in place". Guyana Chronicle. 28 January 2021. Retrieved 1 February 2021.
  2. ^ "Guyana - THE DUTCH SETTLE IN GUYANA". countrystudies.us. Retrieved 1 February 2021.
  3. ^ INEWS (6 July 2016). "Rehabilitated EDWC project handed over to NDIA – Gov't thanks Japan for financial contribution". INews Guyana. Retrieved 1 February 2021.
  4. ^ "Japanese Gov't hands over eight long-reach excavators - for rehabilitation to EDWC". Guyana Chronicle. Retrieved 1 February 2021.
  5. ^ "Guyana acquires first amphibious excavator | Ministry of Agriculture". agriculture.gov.gy. Retrieved 1 February 2021.
  6. ^ NDIA Brochure
  7. ^ Pooran Ballchan - University of Guyana/NDIA

east, demerara, water, conservancy, edwc, guyana, major, water, storage, flood, control, facilities, over, residents, inhabit, basin, that, lies, below, between, wall, edwc, band, from, georgetown, mahaica, located, demerara, mahaica, edwc, serves, irrigate, t. The East Demerara Water Conservancy EDWC is one of Guyana s major water storage and flood control facilities Over 500 000 residents inhabit the basin that lies below and between the sea wall and the EDWC Dam in a 48 km band from Georgetown to Mahaica Located in Demerara Mahaica the EDWC serves to irrigate thousands of hectares of rice and other crops within this area by storing rain water for dry periods and it also provides one of the primary source about 60 of drinking water for the capital city of Georgetown The irrigation network also has a number of drainage relief structures to protect the EDWC Dam from over topping and collapse during the rainy periods including the Hope Canal which connects the EDWC to the Atlantic Ocean The Guyana Sugar Corporation is completely reliant on water from the EDWC 1 Contents 1 Location 2 History of the EDWC 3 Major projects at the EDWC 3 1 JICA Component I 3 2 JICA Component II 3 3 The EDWC Northern Relief Channel 4 See also 5 ReferencesLocation editThe EDWC is located 15 miles south of the most densely populated section of the Guyana Coast It is bounded to the North by a man made 45 mile earthen dam and to the deep south by a natural topographic rise composing largely of ancient coastal dune formation over geological time The EDWC Dam is constructed of clay and pagasse an organic soil also known as tropical peat Surface Area 130 Sq miles Catchment Area 200 Sq miles Length of Conservancy Dam 45 miles Full Storage Level 57 5 ft GD Dead Storage Level 53 5 ft GD No of Intake Structures 27 Relief Structures 5History of the EDWC editGuyana s drainage and irrigation system has its origins in the late 1600s under the Dutch colonial rule One of the major innovations of the time was the building of water conservancies artificial water catchment polderized by earthen dams to retain fresh water from upland streams during the dry seasons and release via irrigation canals and head regulators 2 The EDWC is one of the most important of these conservancies and it was designed over 125 years ago by William Russell and built using slave labour Since then changes in the land use climate change driven increases in rainfall intensity and a number of other factors have left the EDWC in a fragile state The National Drainage and Irrigation Authority has worked and continues to work diligently with international assistance to maintain and protect this network Major projects at the EDWC editJICA Component I edit The Japan International Cooperation Agency JICA sponsored work to improve the EDWC in an effort to assist countries vulnerable to climate change 3 JICA provided grant aid which was utilized to improve the drainage and irrigation capacity within the EDWC by supplying eight long reach excavators and two pontoons to the Government of Guyana 4 The excavators and pontoons were assembled locally and operators were given essential training in their use They were deployed immediately after the handing over ceremony in November 2012 JICA Component II edit The second component of the programme was the rehabilitation of six key EDWC structures in 2016 Sara Johanna Sluice Nancy Intake Annaadale Intake Ann s Grove Shanks Intake Maduni SluicePhase II funds were used to obtain the country s first amphibious excavator 5 The EDWC Northern Relief Channel edit The EDWC NRC Hope Canal project was designed in response to the 2005 Georgetown flood due to the over topping of the conservancy dam The Hope Canal seeks to provide the means to release excess water in the EDWC when it is in danger of over tapping and breaches The project is a 10 3 km long earthen channel with a three door head regulator at the conservancy end of the canal and an eight door outfall sluice at the Atlantic end Also included in the project was the construction on a public road bridge that has been in operation since February 2014 6 7 See also editWater supply and sanitation in Guyana Agriculture in Guyana Geography of GuyanaReferences edit EDWC BWC Board of Directors in place Guyana Chronicle 28 January 2021 Retrieved 1 February 2021 Guyana THE DUTCH SETTLE IN GUYANA countrystudies us Retrieved 1 February 2021 INEWS 6 July 2016 Rehabilitated EDWC project handed over to NDIA Gov t thanks Japan for financial contribution INews Guyana Retrieved 1 February 2021 Japanese Gov t hands over eight long reach excavators for rehabilitation to EDWC Guyana Chronicle Retrieved 1 February 2021 Guyana acquires first amphibious excavator Ministry of Agriculture agriculture gov gy Retrieved 1 February 2021 NDIA Brochure Pooran Ballchan University of Guyana NDIA Retrieved from https en wikipedia org w index php title East Demerara Water Conservancy amp oldid 1045241234, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.