The Easington Gas Terminal is one of six main gas terminals in the UK, and is situated on the North Sea coast at Easington, East Riding of Yorkshire and Dimlington. The other main gas terminals are at St Fergus, Aberdeenshire; Bacton, Norfolk; Teesside; Theddlethorpe, Lincolnshire and Rampside gas terminal, Barrow, Cumbria. The whole site consists of four plants: two run by Perenco, one by Centrica and one by Gassco.[1] The Easington Gas Terminals are protected by Ministry of Defence Police officers[2] and are provided with resources by the Centre for the Protection of National Infrastructure.

Easington Gas Terminal
Easington and Dimlington gas terminals
Shown within the East Riding of Yorkshire
Alternative namesEasington
General information
TypeGas terminal
LocationEasington, East Riding of Yorkshire, HU12 0TG
Coordinates53°39′17″N 0°07′11″E / 53.65480°N 0.11978°E / 53.65480; 0.11978
Current tenantsCentrica Storage, Perenco-UK, Gassco
CompletedMarch 1967
OwnerCentrica Storage, Perenco-UK, Gassco
Technical details
Floor area87.5 acres (Dimlington)

History edit

BP Easington Terminal opened in March 1967.[3] This was the first time that North Sea Gas had been brought ashore in the UK from the West Sole field.[4] In 1980 British Gas purchased the field Rough and in 1983 began conversion to a storage field. BP Dimlington opened in October 1988. BP's Ravenspurn North field was added in 1990 and the Johnston field was added in 1994. The Easington Catchment Area was added in 2000, and the Juno development in 2003. Up to 20% of the winter peak demand for gas is exported from Easington via Feeder 9 through the Humber Gas Tunnel.[5]

Discovery of gas in the North Sea edit

Britain's first oil rig, the Sea Gem, first discovered gas in the North Sea[6] on 20 August 1965. It was not a large enough field, but at the time it was not even known that there was a large amount of gas under the North Sea. Unfortunately the rig sank in December later that year, when it capsized.[7] The Forties and Brent oilfields were discovered later in 1970[8] and 1971[9] respectively.

Langeled pipeline edit

Since October 2006, gas has been brought into the UK direct from the Norwegian Sleipner gas field via the Langeled pipeline, the world's longest subsea pipeline before the completion of the Nord Stream pipeline, owned by Gassco which itself is owned by the Kingdom of Norway.[10]

Operation edit

The sites are run by and gas is produced by Perenco (after BP sold its operations to them in 2012),[11] Gassco and Centrica Storage Ltd. Gas can be transferred to and from the Centrica Storage plant at Easington dependent on grid demand. The control of the Perenco sites takes place at the Dimlington site, and conditioning of the gas also takes place there. The function that is at the Perenco Easington site is the connection to the National Transmission System. Gas flows from the Easington terminal via a 24-inch diameter, 90-mile (140 km) pipeline known as Feeder No 1 across the Humber to Totley near Sheffield.[12] Perenco Easington used to compress gas as well, but from 2007–9, the construction of the £125 million Onshore Compression and Terminal Integration Project (OCTIP) situated all compression and processing from the gas fields at the Dimlington site.[13] As part of the facility, two RB211-GT61 gas turbines, built by Rolls-Royce Energy Systems in Mount Vernon, Ohio, were installed in a £12.7 million contract.

 
The Langeled pipeline collects gas - around 20% of the UK's needs - from the Nyhamna Gas Plant, and the Ormen Lange gas field; from 2006-11, the Langeled pipeline was the longest undersea pipeline in the world

Centrica Rough Terminal edit

The Rough (facility) is a partially depleted offshore gas field that was converted for storage by British Gas. It is currently operated by Centrica Storage Ltd (a subsidiary of Centrica).[14] The Rough Terminal also processes gas for the newly developed York field.[15] The Rough Terminal used to receive gas from the Amethyst gasfield which was until 1988 owned by Britoil but this is now processed by Perenco. Since 2013 The Rough Terminal has also processed gas from the York field on behalf of Centrica Energy.

Langeled Receiving Facilities edit

The Langeled pipeline, which is controlled at the UK end by Gassco (Centrica Storage Ltd before 2011), can transfer up to 2,500 m cubic feet of gas per day from Nyhamna in Norway.[16]

Perenco Easington edit

The gas is collected from the Hyde, Hoton, Newsham and West Sole natural gas fields.[17] It can process up to 300 m cubic feet of gas per day. A gas turbine power generator is used to compress the gas.

Perenco Dimlington edit

Dimlington is the larger site of the four. The natural gas condensate is transferred to the Dimlington terminal. Dimlington also processes dry gas from the (former) Cleeton, Ravenspurn South, Ravenspurn North, Johnston, the Easington Catchment Area (Neptune and Mercury), and the Juno development (Whittle, Wollaston, Minerva and Apollo) gas fields. The Dimlington site has the control room for all of Perenco's gas fields that ship gas to the Easington site. Dimlington can handle up to 950m cubic feet of gas per day.[18]

Fire risk edit

All sites are a considerable fire hazard, so have large water reservoirs for fire fighting containing about one million and three million litres of water each.[clarification needed]

 
View from the north in November 2008

Dimlington gas fields edit

Cleeton edit

Cleeton and Ravenspurn South form part of the Villages Complex. Both were discovered in 1976. Gas production began in April 1987. Production stopped in 1999. Now used as a hub for the Easington Catchment Area. Named after the scientist, Claud E. Cleeton.

Ravenspurn South edit

Discovered in April 1983, 43 miles (70 km) off the East Riding of Yorkshire coast. Gas production began in October 1989. Gas via Cleeton to Dimlington. Named after Ravenspurn, the former coastal town. Owned and operated by Perenco.

Ravenspurn North edit

Discovered in October 1984 and developed in April 1988 by Hamilton Brothers. First gas produced in October 1989, and BP took over the operatorship of the field from BHP on 12 January 1998. Gas via Cleeton to Dimlington. Operated by Perenco and owned mostly by them, with smaller parts owned by Centrica Resources Ltd and E.ON Ruhrgas UK EU Ltd.

Johnston edit

Operated by E.ON Ruhrgas, and previously to them, Caledonia EU, and also by Consort EU Ltd. Discovered in April 1990. Gas first produced in October 1994. Pipeline to Dimlington via Ravenspurn North and Cleeton. Owned 50% by Dana Petroleum (E&P) Ltd and E.ON Ruhrgas UK EU Ltd.

Babbage edit

Discovered in 1989 with the first gas being brought ashore in August 2010.[19] Gas will be transported via West Sole to Dimlington. Owned 40% by Dana Petroleum (E&P) Ltd, 47% by E.ON Ruhrgas UK EU Ltd and 13% by Centrica Resources Ltd. Named after the mathematician, Charles Babbage.[20]

Easington Catchment Area edit

Consists of Neptune and Mercury fields. Operated by BG Group. Transported to Dimlington via BP's Cleeton.

Mercury discovered in February 1983 and production started in November 1999. Named after the planet Mercury. 73% owned by BG Group. Neptune discovered in November 1985 and production started in November 1999. Named after the planet Neptune. 79% owned by BG Group.

Juno development edit

These are the most recent of the Dimlington gas fields. Named after Juno, the Roman goddess.

BG Group operates the Minerva, Apollo and Artemis fields, and owns 65% of these fields. Production started in 2003. Artemis was discovered in August 1974, and named after Artemis the Greek hunter goddess. Apollo was discovered in July 1987, named after Apollo the Greek sungod, brother of Artemis. Minerva was discovered in January 1969, named after the Roman goddess Minerva.

BP operates the Whittle and Wollaston fields. They are 30% owned by BG Group. Production started in 2002. Wollaston was discovered in April 1989, and named after William Hyde Wollaston, the Norfolk chemist. Whittle was discovered in July 1990, and named after Frank Whittle.

Easington gas fields edit

These fields are around 43 miles (70 km) off the East Riding of Yorkshire coast. These fields are connected to the national grid by BP and Rough Terminals. Some of these were one of the 'Villages' gas fields; named after villages lost to the sea along the Holderness coast. These villages include: Cleeton, Dimlington, Hoton, Hyde, Newsham and Ravenspurn.

West Sole edit

Discovered in December 1965, 42 miles (68 km) east of the Humber. It is a faulted dome whose maximum dimensions are about 12 by 3 miles (19.3 by 4.8 km) wide, lying at a depth of 9,000 feet (2,700 m). The reservoir comprises about 400 feet (120 m) of Permian Rotliegendes sandstone, and the gas has a high methane content and low nitrogen (1.3%).[21] Gas first produced in March 1967. It had initial recoverable reserves of 61 billion m3.[22] Owned and operated by BP until 2012. Acquired by Perenco 2012

Hyde edit

Discovered in May 1982. Gas first produced in August 1993. Was owned 55% by BP and 45% by Statoil. BP took control in January 1997, in exchange for its Jupiter gas field.

Newsham edit

Discovered in October 1989. Production began March 1996. Enters the West Sole pipeline. Owned and operated by BP.

Hoton edit

Discovered in February 1977. Gas first produced in December 2001. Owned and operated by BP. Named after Hoton, one of the East Riding of Yorkshire lost villages that fell into the sea due to coastal erosion.

Amethyst East and West edit

Amethyst East discovered in October 1972 and Amethyst West in April 1970. Owned 59.5% by BP, 24% by BG Group, 9% by Centrica, and 7.5% by Murphy. Amethyst East began in October 1990 and Amethyst West in July 1992. Control of the platform is entirely from Dimlington and therefore operated by BP. Comprises the Amethyst gasfield. Acquired by Perenco 2012

Rough edit

Discovered in May 1968. It had initial recoverable reserves of 14 billion m3.[22] Gas production began in 1975, and it was bought by British Gas in 1980. In 1983, they decided to convert it into gas storage. The gas storage started February 1985. As a depleted gas field, it is used as a storage facility, for essentially the whole of the UK, giving four days worth of gas. Originally owned by BG Storage Ltd (BGSL), who were bought by Dynegy Europe Ltd in November 2001 for £421 million. BGSL became known as Dynegy Storage Ltd, based in Solihull. This company was bought by Centrica on 14 November 2002 for £304 million. Centrica was essentially buying the Easington plant. To operate the field Centrica has to comply with a set of undertakings laid down by DECC and Ofgem due to its unique position in the UK gas market.

York edit

Owned and operated by Centrica. Gas back to Centrica Rough Terminal via new pipeline.[23]

Helvellyn edit

Discovered in February 1985 with the first gas coming on stream in 2004. Operated by ATP Oil and Gas. Owned 50% by ATP Oil & Gas (UK) Ltd and First Oil Expro Ltd.[24] Gas back to Easington via the Amethyst field. Named after Helvellyn in Cumbria.

 
Gas pipeline being built in North Yorkshire in June 2006, for connection to Easington

Rose edit

Discovered in March 1998. Owned and operated by Centrica with the gas pumped back to Easington via the Amethyst field. The operation started in 2004 and was plugged and abandoned in 2015.[25]

See also edit

References edit

  1. ^ "Gassco". www.gassco.no. Retrieved 27 January 2016.
  2. ^ "MoD officers guard gas terminals". BBC. 16 January 2007. Retrieved 27 January 2016.
  3. ^ "National Gas Archive - History of the Gas Industry". www.gasarchive.org. Retrieved 27 January 2016.[permanent dead link]
  4. ^ "Terrington DM - Case Study BP". terringtondm.com. Retrieved 27 January 2016.
  5. ^ Casci, Mark (14 July 2020). "Work to complete the world's largest hydraulically inserted gas pipe completes under Humber Estuary". The Yorkshire Post. Retrieved 15 December 2020.
  6. ^ Davey, Ed (21 February 2014). "North Sea still has vital role in keeping the lights on". The Telegraph. Retrieved 27 January 2016.
  7. ^ Small, Sheona (9 January 2016). "Flawed gem turned triumph to tragedy". Cumbernauld News. Retrieved 27 January 2016.
  8. ^ Macalister, Terry (11 October 2014). "The Forties oil field is 50, but there are no happy returns in the North Sea now". The Guardian. Retrieved 27 January 2016.
  9. ^ "Shell announces end of Brent Alpha and Brent Bravo production". BBC News. 29 October 2014. Retrieved 27 January 2016.
  10. ^ Madslien, Jorn (24 June 2004). "New pipeline to deliver a fifth of UK gas". BBC. Retrieved 27 January 2016.
  11. ^ "BP to sell gas assets stakes to Perenco UK". Offshore Technology. Retrieved 27 January 2016.
  12. ^ Tiratsoo, E.N. (1972). Natural Gas. Beaconsfield: Scientific Press Limited. pp. 221–2.
  13. ^ "BP Invests in New North Sea Gas Reserves". Offshore Technology. 27 June 2007. Retrieved 27 January 2016.
  14. ^ "Centrica Storage - About us - Who we are". Centrica SL. Retrieved 27 January 2016.
  15. ^ (PDF). Centrica SL. 20 July 2015. p. 5. Archived from the original (PDF) on 9 September 2015. Retrieved 27 January 2016.
  16. ^ Cooney, Michael (12 December 2012). "World's Longest Under Water Gas Pipeline, 1166km "Giant Serpent" - Industry Tap". Industry Tap. Retrieved 27 January 2016.
  17. ^ "BP PLC - BP AGREES SALE OF SOUTHERN GAS ASSETS TO PERENCO". Morning Star. Retrieved 27 January 2016.
  18. ^ "Perenco UK - Oil and Gas A Leading Independent Exploration and Production Company". www.perenco-uk.com. Retrieved 27 January 2016.
  19. ^ "Babbage Gas Field, North Sea". Offshore Technology. Retrieved 27 January 2016.
  20. ^ "Prices and technology drive 'dash' for North Sea Gas". BBC News. 25 March 2013. Retrieved 10 February 2016.
  21. ^ Tiratsoo, E.N. (1972). Natural Gas. Beaconsfield: Scientific Press Ltd. p. 208.
  22. ^ a b Cassidy, Richard (1979). Gas: Natural Energy. London: Frederick Muller Limited. p. 54.
  23. ^ "New Gas Flow At Terminal Costain". costain.com. 13 May 2013. Retrieved 27 January 2016.
  24. ^ . First Oil Expro. Archived from the original on 5 February 2016. Retrieved 28 January 2016.
  25. ^ "Rose Decommissioning Programmes" (PDF). Centrica Energy. 15 May 2015. p. 6. Retrieved 28 January 2016.

External links edit

  • Centrica Storage 28 September 2008 at the Wayback Machine
  • Centrica's purchase of the plant at Ofgem
  • World War Two bomb found in March 2008

easington, terminal, main, terminals, situated, north, coast, easington, east, riding, yorkshire, dimlington, other, main, terminals, fergus, aberdeenshire, bacton, norfolk, teesside, theddlethorpe, lincolnshire, rampside, terminal, barrow, cumbria, whole, sit. The Easington Gas Terminal is one of six main gas terminals in the UK and is situated on the North Sea coast at Easington East Riding of Yorkshire and Dimlington The other main gas terminals are at St Fergus Aberdeenshire Bacton Norfolk Teesside Theddlethorpe Lincolnshire and Rampside gas terminal Barrow Cumbria The whole site consists of four plants two run by Perenco one by Centrica and one by Gassco 1 The Easington Gas Terminals are protected by Ministry of Defence Police officers 2 and are provided with resources by the Centre for the Protection of National Infrastructure Easington Gas TerminalEasington and Dimlington gas terminalsShown within the East Riding of YorkshireAlternative namesEasingtonGeneral informationTypeGas terminalLocationEasington East Riding of Yorkshire HU12 0TGCoordinates53 39 17 N 0 07 11 E 53 65480 N 0 11978 E 53 65480 0 11978Current tenantsCentrica Storage Perenco UK GasscoCompletedMarch 1967OwnerCentrica Storage Perenco UK GasscoTechnical detailsFloor area87 5 acres Dimlington Contents 1 History 1 1 Discovery of gas in the North Sea 1 2 Langeled pipeline 2 Operation 2 1 Centrica Rough Terminal 2 2 Langeled Receiving Facilities 2 3 Perenco Easington 2 4 Perenco Dimlington 2 5 Fire risk 3 Dimlington gas fields 3 1 Cleeton 3 2 Ravenspurn South 3 3 Ravenspurn North 3 4 Johnston 3 5 Babbage 3 6 Easington Catchment Area 3 7 Juno development 4 Easington gas fields 4 1 West Sole 4 2 Hyde 4 3 Newsham 4 4 Hoton 4 5 Amethyst East and West 4 6 Rough 4 7 York 4 8 Helvellyn 4 9 Rose 5 See also 6 References 7 External linksHistory editBP Easington Terminal opened in March 1967 3 This was the first time that North Sea Gas had been brought ashore in the UK from the West Sole field 4 In 1980 British Gas purchased the field Rough and in 1983 began conversion to a storage field BP Dimlington opened in October 1988 BP s Ravenspurn North field was added in 1990 and the Johnston field was added in 1994 The Easington Catchment Area was added in 2000 and the Juno development in 2003 Up to 20 of the winter peak demand for gas is exported from Easington via Feeder 9 through the Humber Gas Tunnel 5 Discovery of gas in the North Sea edit Britain s first oil rig the Sea Gem first discovered gas in the North Sea 6 on 20 August 1965 It was not a large enough field but at the time it was not even known that there was a large amount of gas under the North Sea Unfortunately the rig sank in December later that year when it capsized 7 The Forties and Brent oilfields were discovered later in 1970 8 and 1971 9 respectively Langeled pipeline edit Since October 2006 gas has been brought into the UK direct from the Norwegian Sleipner gas field via the Langeled pipeline the world s longest subsea pipeline before the completion of the Nord Stream pipeline owned by Gassco which itself is owned by the Kingdom of Norway 10 Operation editThe sites are run by and gas is produced by Perenco after BP sold its operations to them in 2012 11 Gassco and Centrica Storage Ltd Gas can be transferred to and from the Centrica Storage plant at Easington dependent on grid demand The control of the Perenco sites takes place at the Dimlington site and conditioning of the gas also takes place there The function that is at the Perenco Easington site is the connection to the National Transmission System Gas flows from the Easington terminal via a 24 inch diameter 90 mile 140 km pipeline known as Feeder No 1 across the Humber to Totley near Sheffield 12 Perenco Easington used to compress gas as well but from 2007 9 the construction of the 125 million Onshore Compression and Terminal Integration Project OCTIP situated all compression and processing from the gas fields at the Dimlington site 13 As part of the facility two RB211 GT61 gas turbines built by Rolls Royce Energy Systems in Mount Vernon Ohio were installed in a 12 7 million contract nbsp The Langeled pipeline collects gas around 20 of the UK s needs from the Nyhamna Gas Plant and the Ormen Lange gas field from 2006 11 the Langeled pipeline was the longest undersea pipeline in the world Centrica Rough Terminal edit The Rough facility is a partially depleted offshore gas field that was converted for storage by British Gas It is currently operated by Centrica Storage Ltd a subsidiary of Centrica 14 The Rough Terminal also processes gas for the newly developed York field 15 The Rough Terminal used to receive gas from the Amethyst gasfield which was until 1988 owned by Britoil but this is now processed by Perenco Since 2013 The Rough Terminal has also processed gas from the York field on behalf of Centrica Energy Langeled Receiving Facilities edit The Langeled pipeline which is controlled at the UK end by Gassco Centrica Storage Ltd before 2011 can transfer up to 2 500 m cubic feet of gas per day from Nyhamna in Norway 16 Perenco Easington edit The gas is collected from the Hyde Hoton Newsham and West Sole natural gas fields 17 It can process up to 300 m cubic feet of gas per day A gas turbine power generator is used to compress the gas Perenco Dimlington edit Dimlington is the larger site of the four The natural gas condensate is transferred to the Dimlington terminal Dimlington also processes dry gas from the former Cleeton Ravenspurn South Ravenspurn North Johnston the Easington Catchment Area Neptune and Mercury and the Juno development Whittle Wollaston Minerva and Apollo gas fields The Dimlington site has the control room for all of Perenco s gas fields that ship gas to the Easington site Dimlington can handle up to 950m cubic feet of gas per day 18 Fire risk edit All sites are a considerable fire hazard so have large water reservoirs for fire fighting containing about one million and three million litres of water each clarification needed nbsp View from the north in November 2008Dimlington gas fields editCleeton edit Cleeton and Ravenspurn South form part of the Villages Complex Both were discovered in 1976 Gas production began in April 1987 Production stopped in 1999 Now used as a hub for the Easington Catchment Area Named after the scientist Claud E Cleeton Ravenspurn South edit Discovered in April 1983 43 miles 70 km off the East Riding of Yorkshire coast Gas production began in October 1989 Gas via Cleeton to Dimlington Named after Ravenspurn the former coastal town Owned and operated by Perenco Ravenspurn North edit Discovered in October 1984 and developed in April 1988 by Hamilton Brothers First gas produced in October 1989 and BP took over the operatorship of the field from BHP on 12 January 1998 Gas via Cleeton to Dimlington Operated by Perenco and owned mostly by them with smaller parts owned by Centrica Resources Ltd and E ON Ruhrgas UK EU Ltd Johnston edit Operated by E ON Ruhrgas and previously to them Caledonia EU and also by Consort EU Ltd Discovered in April 1990 Gas first produced in October 1994 Pipeline to Dimlington via Ravenspurn North and Cleeton Owned 50 by Dana Petroleum E amp P Ltd and E ON Ruhrgas UK EU Ltd Babbage edit Discovered in 1989 with the first gas being brought ashore in August 2010 19 Gas will be transported via West Sole to Dimlington Owned 40 by Dana Petroleum E amp P Ltd 47 by E ON Ruhrgas UK EU Ltd and 13 by Centrica Resources Ltd Named after the mathematician Charles Babbage 20 Easington Catchment Area edit Consists of Neptune and Mercury fields Operated by BG Group Transported to Dimlington via BP s Cleeton Mercury discovered in February 1983 and production started in November 1999 Named after the planet Mercury 73 owned by BG Group Neptune discovered in November 1985 and production started in November 1999 Named after the planet Neptune 79 owned by BG Group Juno development edit These are the most recent of the Dimlington gas fields Named after Juno the Roman goddess BG Group operates the Minerva Apollo and Artemis fields and owns 65 of these fields Production started in 2003 Artemis was discovered in August 1974 and named after Artemis the Greek hunter goddess Apollo was discovered in July 1987 named after Apollo the Greek sungod brother of Artemis Minerva was discovered in January 1969 named after the Roman goddess Minerva BP operates the Whittle and Wollaston fields They are 30 owned by BG Group Production started in 2002 Wollaston was discovered in April 1989 and named after William Hyde Wollaston the Norfolk chemist Whittle was discovered in July 1990 and named after Frank Whittle Easington gas fields editThese fields are around 43 miles 70 km off the East Riding of Yorkshire coast These fields are connected to the national grid by BP and Rough Terminals Some of these were one of the Villages gas fields named after villages lost to the sea along the Holderness coast These villages include Cleeton Dimlington Hoton Hyde Newsham and Ravenspurn West Sole edit Main article West Sole Discovered in December 1965 42 miles 68 km east of the Humber It is a faulted dome whose maximum dimensions are about 12 by 3 miles 19 3 by 4 8 km wide lying at a depth of 9 000 feet 2 700 m The reservoir comprises about 400 feet 120 m of Permian Rotliegendes sandstone and the gas has a high methane content and low nitrogen 1 3 21 Gas first produced in March 1967 It had initial recoverable reserves of 61 billion m3 22 Owned and operated by BP until 2012 Acquired by Perenco 2012 Hyde edit Discovered in May 1982 Gas first produced in August 1993 Was owned 55 by BP and 45 by Statoil BP took control in January 1997 in exchange for its Jupiter gas field Newsham edit Discovered in October 1989 Production began March 1996 Enters the West Sole pipeline Owned and operated by BP Hoton edit Discovered in February 1977 Gas first produced in December 2001 Owned and operated by BP Named after Hoton one of the East Riding of Yorkshire lost villages that fell into the sea due to coastal erosion Amethyst East and West edit Amethyst East discovered in October 1972 and Amethyst West in April 1970 Owned 59 5 by BP 24 by BG Group 9 by Centrica and 7 5 by Murphy Amethyst East began in October 1990 and Amethyst West in July 1992 Control of the platform is entirely from Dimlington and therefore operated by BP Comprises the Amethyst gasfield Acquired by Perenco 2012 Rough edit Discovered in May 1968 It had initial recoverable reserves of 14 billion m3 22 Gas production began in 1975 and it was bought by British Gas in 1980 In 1983 they decided to convert it into gas storage The gas storage started February 1985 As a depleted gas field it is used as a storage facility for essentially the whole of the UK giving four days worth of gas Originally owned by BG Storage Ltd BGSL who were bought by Dynegy Europe Ltd in November 2001 for 421 million BGSL became known as Dynegy Storage Ltd based in Solihull This company was bought by Centrica on 14 November 2002 for 304 million Centrica was essentially buying the Easington plant To operate the field Centrica has to comply with a set of undertakings laid down by DECC and Ofgem due to its unique position in the UK gas market York edit Owned and operated by Centrica Gas back to Centrica Rough Terminal via new pipeline 23 Helvellyn edit Discovered in February 1985 with the first gas coming on stream in 2004 Operated by ATP Oil and Gas Owned 50 by ATP Oil amp Gas UK Ltd and First Oil Expro Ltd 24 Gas back to Easington via the Amethyst field Named after Helvellyn in Cumbria nbsp Gas pipeline being built in North Yorkshire in June 2006 for connection to Easington Rose edit Discovered in March 1998 Owned and operated by Centrica with the gas pumped back to Easington via the Amethyst field The operation started in 2004 and was plugged and abandoned in 2015 25 See also editList of oil and gas fields of the North Sea Oil fields operated by BP St Fergus Gas Terminal Bacton Gas Terminal Energy in the United KingdomReferences edit Gassco www gassco no Retrieved 27 January 2016 MoD officers guard gas terminals BBC 16 January 2007 Retrieved 27 January 2016 National Gas Archive History of the Gas Industry www gasarchive org Retrieved 27 January 2016 permanent dead link Terrington DM Case Study BP terringtondm com Retrieved 27 January 2016 Casci Mark 14 July 2020 Work to complete the world s largest hydraulically inserted gas pipe completes under Humber Estuary The Yorkshire Post Retrieved 15 December 2020 Davey Ed 21 February 2014 North Sea still has vital role in keeping the lights on The Telegraph Retrieved 27 January 2016 Small Sheona 9 January 2016 Flawed gem turned triumph to tragedy Cumbernauld News Retrieved 27 January 2016 Macalister Terry 11 October 2014 The Forties oil field is 50 but there are no happy returns in the North Sea now The Guardian Retrieved 27 January 2016 Shell announces end of Brent Alpha and Brent Bravo production BBC News 29 October 2014 Retrieved 27 January 2016 Madslien Jorn 24 June 2004 New pipeline to deliver a fifth of UK gas BBC Retrieved 27 January 2016 BP to sell gas assets stakes to Perenco UK Offshore Technology Retrieved 27 January 2016 Tiratsoo E N 1972 Natural Gas Beaconsfield Scientific Press Limited pp 221 2 BP Invests in New North Sea Gas Reserves Offshore Technology 27 June 2007 Retrieved 27 January 2016 Centrica Storage About us Who we are Centrica SL Retrieved 27 January 2016 operational guide pdf PDF Centrica SL 20 July 2015 p 5 Archived from the original PDF on 9 September 2015 Retrieved 27 January 2016 Cooney Michael 12 December 2012 World s Longest Under Water Gas Pipeline 1166km Giant Serpent Industry Tap Industry Tap Retrieved 27 January 2016 BP PLC BP AGREES SALE OF SOUTHERN GAS ASSETS TO PERENCO Morning Star Retrieved 27 January 2016 Perenco UK Oil and Gas A Leading Independent Exploration and Production Company www perenco uk com Retrieved 27 January 2016 Babbage Gas Field North Sea Offshore Technology Retrieved 27 January 2016 Prices and technology drive dash for North Sea Gas BBC News 25 March 2013 Retrieved 10 February 2016 Tiratsoo E N 1972 Natural Gas Beaconsfield Scientific Press Ltd p 208 a b Cassidy Richard 1979 Gas Natural Energy London Frederick Muller Limited p 54 New Gas Flow At Terminal Costain costain com 13 May 2013 Retrieved 27 January 2016 Helvellyn First Oil Expro Archived from the original on 5 February 2016 Retrieved 28 January 2016 Rose Decommissioning Programmes PDF Centrica Energy 15 May 2015 p 6 Retrieved 28 January 2016 External links editCentrica Storage Archived 28 September 2008 at the Wayback Machine Centrica s purchase of the plant at Ofgem World War Two bomb found in March 2008 Retrieved from https en wikipedia org w index php title Easington Gas Terminal amp oldid 1209207156, wikipedia, wiki, book, books, library,