The Dhaka BRT (Bengali: ঢাকা বিআরটি, romanised: Dhaka Bi-Ar-Ti) or Dhaka Line Bengali: ঢাকা লাইন, romanised: Dhaka Lain) is a bus rapid transit system in Dhaka, Bangladesh. Of two routes that were originally planned, only one section of a line is under construction from 2017, with the other route being in the planning phase.

Dhaka Bus Rapid Transit
Logo of Dhaka BRT
Overview
Native nameঢাকা বিআরটি
OwnerRoad Transport and Highways Division
LocaleDhaka
Transit typeBus rapid transit
Number of lines2
Number of stations40
Daily ridership400,000 (estimated)
HeadquartersHouse 4, Road 21, Sector 4, Uttara, Dhaka
Websitedhakabrt.gov.bd
Operation
Operator(s)Dhaka Bus Rapid Transit Company Limited
Number of vehicles140
Technical
System length41 km (25 mi)
Average speed23 km/h

History edit

Planning edit

In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[1] The World Bank helped to develop this plan, which proposed the construction of a bus rapid transit system in Dhaka.[2][3] In 2011, a primary feasibility study was done for BRT by the Asian Development Bank.[4] In 1 December 2012, the ECNEC approved the Dhaka bus rapid transit project.[4] Two lines of bus rapid transit were proposed by the government for construction.[5] The budget of BRT Line 3 was fixed at ৳2,040 crores.[4]

Construction edit

 
Construction of a bus rapid transit station in House Building, Uttara

BRT Line 3 was supposed to be completed by 2016, but construction could not begin. Because of that, the government had to extend the period of construction. As the period increased, the construction budget increased by 52.20%.[4] On 1 December 2016, the government appointed Gezhouba Group as the contractor for the construction of the northern section of BRT Line 3, which was expected to complete construction within two and a half years.[6] On 19 October 2017, Bangladesh Bridge Authority signed an agreement with Jiangsu Provincial Transportation Engineering Group Co. Ltd.[7] for the construction of bridges and flyovers under the BRT project. In 2019, the Road Transport and Highways Division created a detail engineering design for the southern section of BRT Line 3.[8] The project deadline were then revised to 30 June 2020 and June 2022 respectively, but its construction could not be completed.[9] On 6 November 2022, Road Transport and Bridges Minister Obaidul Quader said that the northern section of BRT Line 3 is likely to be commissioned in May or June 2023.[10] According to December 2022, the construction of the northern section was 84.4% complete. Later, the deadline was revised to December 2024.[11]

Opening edit

On 17 June 2023, Obaidul Quader informed that the bus rapid transit service would be launched in September or October of the same year.[12]

Routes edit

BRT Line 3 edit

BRT Line 3 has two sections. The northern section extends over 21 km from Gazipur to Jasimuddin Sarani, Uttara. 25 stations are being constructed in this section. The 22 km southern section will be from Hazrat Shahjalal International Airport to Jhilmil Residential Area which will consist of 16 stations.[5]

BRT Line 3
 
Gazipur Terminal
 
BARI
 
Aarong Milk
 
BTRC Bus Depot
 
Joydebpur  
 
Bhogra (north)
 
Bhogra (south)
 
Maleker Bari
 
Hajir Pukur
 
Board Bazar
 
Open University
 
Borobari
 
Targach
 
Gazipura
 
Hossain Market
 
Tongi College
 
Cherag Ali Market
 
Mill Gate
 
Station Road
 
Tongi Bridge
 
Abdullahpur
 
House Building
 
Azampur
 
Jasimuddin Square
 
Dhaka Airport    1 

BRT Line 7 edit

The proposed line will be constructed from Purbachal New Town to Narayanganj.[5]

Criticisms edit

Due to the construction work of BRT, the vehicles plying on the route and the passengers have suffered severally.[11] Damage to the Dhaka–Mymensingh highway for the construction of the BRT had an impact on the country's economy.[13]

Initially it was decided to run articulated buses on the BRT route but later it was decided to use electric buses. Later the authority decided to run diesel buses instead.[11]

On 15 August 2022, 5 people were killed when a girder of the project fell on a private vehicle at Jasimuddin Square, Uttara. As a result, Mayor Atiqul Islam announced the closure of BRT construction in the Dhaka North City Corporation area until all types of compliance certificates are received from the contractors.[14] The government's investigative team held the contractors accountable for the accident.[15] As a result, the two contractors were declared ineligible for upcoming construction projects except the BRT project.[16]

References edit

  1. ^ Rahman, Shamim (23 December 2022). "পুরোটাই উড়ালপথে নির্মাণ ভারতের 'মেট্রো ম্যান' শ্রীধরনের পরামর্শে". Bonikbarta.net (in Bengali). from the original on 26 December 2022. Retrieved 26 December 2022.
  2. ^ Zaman, Sheikh Shahriar (25 December 2022). "মেট্রোরেল ছিল বিরাট এক চ্যালেঞ্জ". Bangla Tribune (in Bengali). from the original on 25 December 2022. Retrieved 26 December 2022.
  3. ^ Rahman, Shamim (24 December 2022). "মেট্রোরেলেও ছাপ রেখে গেছেন অধ্যাপক জামিলুর রেজা চৌধুরী". Bonikbarta.net (in Bengali). from the original on 27 December 2022. Retrieved 27 December 2022.
  4. ^ a b c d Hossain, Anowar (4 August 2021). "'BRT project becomes a burden as it proceeds at snail's pace, costs double'". Prothom Alo. from the original on 13 March 2023. Retrieved 13 March 2023.
  5. ^ a b c Abdullah, Matin (13 April 2018). "৪৬ মেগা প্রকল্প বাস্তবায়নে শঙ্কা". Jugantor (in Bengali). from the original on 13 March 2023. Retrieved 13 March 2023.
  6. ^ "বিমানবন্দর টু গাজীপুর বাস র‍্যাপিড ট্রানজিট". Bangladesh Pratidin (in Bengali). 2 December 2016. from the original on 13 March 2023. Retrieved 13 March 2023.
  7. ^ "Contract to construct elevated flyover, 10-lane bridge signed". New Age. 20 October 2017. from the original on 26 February 2020. Retrieved 14 March 2023.
  8. ^ "'BRT route transports 30,000 passengers in an hour'". The Independent. 28 January 2019. from the original on 13 March 2023. Retrieved 13 March 2023.
  9. ^ "বিআরটির উত্তরা-টঙ্গী অংশ খুলছে আজ". Kaler Kantho (in Bengali). 6 November 2022. from the original on 18 November 2022. Retrieved 13 March 2023.
  10. ^ "Dhaka BRT to open fully for traffic in June next year: Quader". The Business Standard. 6 November 2022. from the original on 13 March 2023. Retrieved 13 March 2023.
  11. ^ a b c Adhikari, Tuhin Subhra (18 January 2023). "BRT line-3: Promises falling flat". The Daily Star. from the original on 13 March 2023. Retrieved 13 March 2023.
  12. ^ "সেপ্টেম্বর-অক্টোবর নাগাদ শেষ হবে বিআরটি প্রকল্প". Banglanews24.com (in Bengali). 17 June 2023. Retrieved 12 July 2023.
  13. ^ Mithu, Ariful Islam (21 January 2022). "Why BRT-3 fails, again and again, to hit the target". The Business Standard. from the original on 20 May 2022. Retrieved 14 March 2023.
  14. ^ "দুর্ঘটনা: ঢাকা উত্তরে বিআরটির সব ধরণের নির্মাণকাজ বন্ধ ঘোষণা করেছেন মেয়র আতিকুল ইসলাম". BBC Bangla (in Bengali). 16 August 2022. from the original on 16 August 2022. Retrieved 14 March 2023.
  15. ^ "Dhaka BRT girder tragedy: Probe body finds 12 reasons for the accident". Daily Sun. 4 September 2022. from the original on 4 September 2022. Retrieved 14 March 2023.
  16. ^ "BRT contractor won't get any more projects: Quader". Thefinancialexpress.com.bd. 17 October 2022. from the original on 17 October 2022. Retrieved 14 March 2023.

dhaka, bengali, আরট, romanised, dhaka, dhaka, line, bengali, ইন, romanised, dhaka, lain, rapid, transit, system, dhaka, bangladesh, routes, that, were, originally, planned, only, section, line, under, construction, from, 2017, with, other, route, being, planni. The Dhaka BRT Bengali ঢ ক ব আরট romanised Dhaka Bi Ar Ti or Dhaka Line Bengali ঢ ক ল ইন romanised Dhaka Lain is a bus rapid transit system in Dhaka Bangladesh Of two routes that were originally planned only one section of a line is under construction from 2017 with the other route being in the planning phase Dhaka Bus Rapid TransitLogo of Dhaka BRTOverviewNative nameঢ ক ব আরট OwnerRoad Transport and Highways DivisionLocaleDhakaTransit typeBus rapid transitNumber of lines2Number of stations40Daily ridership400 000 estimated HeadquartersHouse 4 Road 21 Sector 4 Uttara DhakaWebsitedhakabrt gov bdOperationOperator s Dhaka Bus Rapid Transit Company LimitedNumber of vehicles140TechnicalSystem length41 km 25 mi Average speed23 km h Contents 1 History 1 1 Planning 1 2 Construction 1 3 Opening 2 Routes 2 1 BRT Line 3 2 2 BRT Line 7 3 Criticisms 4 ReferencesHistory editPlanning edit In 2005 the World Bank published a study report recommending that the government of Bangladesh build a transit system in Dhaka In the same year American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka 1 The World Bank helped to develop this plan which proposed the construction of a bus rapid transit system in Dhaka 2 3 In 2011 a primary feasibility study was done for BRT by the Asian Development Bank 4 In 1 December 2012 the ECNEC approved the Dhaka bus rapid transit project 4 Two lines of bus rapid transit were proposed by the government for construction 5 The budget of BRT Line 3 was fixed at 2 040 crores 4 Construction edit nbsp Construction of a bus rapid transit station in House Building UttaraBRT Line 3 was supposed to be completed by 2016 but construction could not begin Because of that the government had to extend the period of construction As the period increased the construction budget increased by 52 20 4 On 1 December 2016 the government appointed Gezhouba Group as the contractor for the construction of the northern section of BRT Line 3 which was expected to complete construction within two and a half years 6 On 19 October 2017 Bangladesh Bridge Authority signed an agreement with Jiangsu Provincial Transportation Engineering Group Co Ltd 7 for the construction of bridges and flyovers under the BRT project In 2019 the Road Transport and Highways Division created a detail engineering design for the southern section of BRT Line 3 8 The project deadline were then revised to 30 June 2020 and June 2022 respectively but its construction could not be completed 9 On 6 November 2022 Road Transport and Bridges Minister Obaidul Quader said that the northern section of BRT Line 3 is likely to be commissioned in May or June 2023 10 According to December 2022 the construction of the northern section was 84 4 complete Later the deadline was revised to December 2024 11 Opening edit On 17 June 2023 Obaidul Quader informed that the bus rapid transit service would be launched in September or October of the same year 12 Routes editBRT Line 3 edit BRT Line 3 has two sections The northern section extends over 21 km from Gazipur to Jasimuddin Sarani Uttara 25 stations are being constructed in this section The 22 km southern section will be from Hazrat Shahjalal International Airport to Jhilmil Residential Area which will consist of 16 stations 5 vteBRT Line 3Legend nbsp Gazipur Terminal nbsp BARI nbsp Aarong Milk nbsp BTRC Bus Depot nbsp Joydebpur nbsp nbsp Bhogra north nbsp Bhogra south nbsp Maleker Bari nbsp Hajir Pukur nbsp Board Bazar nbsp Open University nbsp Borobari nbsp Targach nbsp Gazipura nbsp Hossain Market nbsp Tongi College nbsp Cherag Ali Market nbsp Mill Gate nbsp Station Road nbsp Tongi Bridge nbsp Abdullahpur nbsp House Building nbsp Azampur nbsp Jasimuddin Square nbsp Dhaka Airport nbsp 1 BRT Line 7 edit The proposed line will be constructed from Purbachal New Town to Narayanganj 5 Criticisms editDue to the construction work of BRT the vehicles plying on the route and the passengers have suffered severally 11 Damage to the Dhaka Mymensingh highway for the construction of the BRT had an impact on the country s economy 13 Initially it was decided to run articulated buses on the BRT route but later it was decided to use electric buses Later the authority decided to run diesel buses instead 11 On 15 August 2022 5 people were killed when a girder of the project fell on a private vehicle at Jasimuddin Square Uttara As a result Mayor Atiqul Islam announced the closure of BRT construction in the Dhaka North City Corporation area until all types of compliance certificates are received from the contractors 14 The government s investigative team held the contractors accountable for the accident 15 As a result the two contractors were declared ineligible for upcoming construction projects except the BRT project 16 References edit Rahman Shamim 23 December 2022 প র ট ই উড লপথ ন র ম ণ ভ রত র ম ট র ম য ন শ র ধরন র পর মর শ Bonikbarta net in Bengali Archived from the original on 26 December 2022 Retrieved 26 December 2022 Zaman Sheikh Shahriar 25 December 2022 ম ট র র ল ছ ল ব র ট এক চ য ল ঞ জ Bangla Tribune in Bengali Archived from the original on 25 December 2022 Retrieved 26 December 2022 Rahman Shamim 24 December 2022 ম ট র র ল ও ছ প র খ গ ছ ন অধ য পক জ ম ল র র জ চ ধ র Bonikbarta net in Bengali Archived from the original on 27 December 2022 Retrieved 27 December 2022 a b c d Hossain Anowar 4 August 2021 BRT project becomes a burden as it proceeds at snail s pace costs double Prothom Alo Archived from the original on 13 March 2023 Retrieved 13 March 2023 a b c Abdullah Matin 13 April 2018 ৪৬ ম গ প রকল প ব স তব য ন শঙ ক Jugantor in Bengali Archived from the original on 13 March 2023 Retrieved 13 March 2023 ব ম নবন দর ট গ জ প র ব স র য প ড ট র নজ ট Bangladesh Pratidin in Bengali 2 December 2016 Archived from the original on 13 March 2023 Retrieved 13 March 2023 Contract to construct elevated flyover 10 lane bridge signed New Age 20 October 2017 Archived from the original on 26 February 2020 Retrieved 14 March 2023 BRT route transports 30 000 passengers in an hour The Independent 28 January 2019 Archived from the original on 13 March 2023 Retrieved 13 March 2023 ব আরট র উত তর টঙ গ অ শ খ লছ আজ Kaler Kantho in Bengali 6 November 2022 Archived from the original on 18 November 2022 Retrieved 13 March 2023 Dhaka BRT to open fully for traffic in June next year Quader The Business Standard 6 November 2022 Archived from the original on 13 March 2023 Retrieved 13 March 2023 a b c Adhikari Tuhin Subhra 18 January 2023 BRT line 3 Promises falling flat The Daily Star Archived from the original on 13 March 2023 Retrieved 13 March 2023 স প ট ম বর অক ট বর ন গ দ শ ষ হব ব আরট প রকল প Banglanews24 com in Bengali 17 June 2023 Retrieved 12 July 2023 Mithu Ariful Islam 21 January 2022 Why BRT 3 fails again and again to hit the target The Business Standard Archived from the original on 20 May 2022 Retrieved 14 March 2023 দ র ঘটন ঢ ক উত তর ব আরট র সব ধরণ র ন র ম ণক জ বন ধ ঘ ষণ কর ছ ন ম য র আত ক ল ইসল ম BBC Bangla in Bengali 16 August 2022 Archived from the original on 16 August 2022 Retrieved 14 March 2023 Dhaka BRT girder tragedy Probe body finds 12 reasons for the accident Daily Sun 4 September 2022 Archived from the original on 4 September 2022 Retrieved 14 March 2023 BRT contractor won t get any more projects Quader Thefinancialexpress com bd 17 October 2022 Archived from the original on 17 October 2022 Retrieved 14 March 2023 Retrieved from https en wikipedia org w index php title Dhaka BRT amp oldid 1167915898, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.