fbpx
Wikipedia

Punggol LRT line

The Punggol LRT is an automated guideway transit line in Singapore. The line, which initially opened on 29 January 2005, connects the residential districts and suburbs of Punggol to Punggol Town Centre, where it connects with the North East MRT line and the Punggol Bus Interchange. It is the third line of the LRT system in Singapore and like all other LRT lines, it is fully elevated and uses automated trains.

Punggol LRT
A C810 on the Punggol LRT
Overview
Native nameLaluan LRT Punggol
榜鹅轻轨线
பொங்கோல் எல்ஆர்டி வரி
StatusOperational
OwnerLand Transport Authority
LocaleSingapore
TerminiPunggol
Stations14 (excluding Teck Lee)
Service
TypeAutomated guideway transit/People mover
SystemLight Rail Transit (Singapore)
Services4
Operator(s)SBS Transit Ltd (ComfortDelGro Corporation)
Depot(s)Sengkang
Rolling stockMitsubishi Crystal Mover (C810)
Mitsubishi Crystal Mover (C810A)
Mitsubishi Crystal Mover (C810D) (Future)
Daily ridership23,698 (July 2020)[1]
History
Opened
  • 29 January 2005; 18 years ago (2005-01-29) (East Loop)
  • 29 June 2014; 9 years ago (2014-06-29) (West Loop)
Technical
Line length10.3 km (6.4 mi)
CharacterFully elevated
Track gauge1,850 mm (6 ft 2732 in)
Guide rail span: 3.2 m (10 ft 6 in)
Electrification750 V DC Third rail[2]
SignallingKyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI[3]
Route map

West loop
 PW4 
Samudera
Punggol Point
 PW3 
 PW5 
Nibong
Teck Lee
 PW2 
Punggol Waterway
 PW6 
Sumang
Sam Kee
 PW1 
 PW7 
Soo Teck
 CP4 
 NE17 
non-revenue track
to Sengkang LRT
Punggol
 PTC 
Punggol Rd
 PE1 
Cove
Damai
 PE7 
 PE2 
Meridian
Oasis
 PE6 
 PE3 
Coral Edge
Kadaloor
 PE5 
 PE4 
Riviera
 CP3 
East loop
Concourse level of Punggol MRT/LRT station, with escalators leading up to the LRT platform.

The first phase is a 10.3-kilometre (6.4 mi) line with 15 stations in two loops. It is the second LRT line to be operated by SBS Transit.

History edit

Plans for the Punggol LRT line were drawn up and announced in January 1999 with the development of Punggol New Town. Construction began in June 2000 by a consortium comprising Sembcorp Industries, Mitsubishi Heavy Industries and Mitsubishi Corporation, at a cost of S$354 million. Meanwhile, the Punggol LRT line was awarded to Singapore Bus Service (present-day SBS Transit) on 20 May 1999.[4][5] The first phase was completed in June 2004 and underwent testing by the Land Transport Authority. The system was handed over to SBS Transit on 1 December that year, which conducted more trial runs and staff training before the opening of the East Loop on 29 January 2005.[6][7][8] However, due to limited developments around some stations on the loop at the time, only the stretch of stations from Cove station to Kadaloor station were opened.[9] The West Loop opened in stages from 29 June 2014.[10]

A covered middle track at Punggol station and two short track pieces branching from Teck Lee station had already been built in anticipation of a possible branch line to Punggol North, but these plans were subsequently cancelled, and a new Punggol Coast MRT station is being built instead.[11]

Improvements edit

On 31 October 2012, the Land Transport Authority announced that by 2016 the Sengkang and Punggol LRT lines would be upgraded to two-car trains, doubling the passenger capacity. An additional 16 more cars were to be ordered, bringing the total fleet size to 57. The longer trains also required modifications to the signaling and communication system.[12]

On 29 December 2016, trains started operating in the two-car formations on the line's East loop during morning and evening peak hours from 6.45 am to 8.45 am and from 6.15 pm to 8.15 pm. Service frequency will be maintained at three to four minutes during morning and evening peak hours.[13]

On 15 December 2017, the Land Transport Authority said there will be limited services on parts of the Sengkang-Punggol LRT (SPLRT) on most Sundays from 14 January 2018 to 25 February that year, to facilitate renewal and improvement works from (except 18 February as it is a Chinese New Year holiday). Only one platform will open for service at 5.30am on Sundays. The other platform will open from 7am.[14][15][16] On 22nd of that month, SBS Transit said the arrangement is expected to continue until end April that year.[17][18]

From 27 May to 7 October that year, limited services on Sundays will continue on the Sengkang-Punggol LRT (SPLRT). One platform will open at 5.30am and the other platform will open at 5.30pm.[19][20]

On 5 February 2021, the Land Transport Authority announced that it has purchased 17 two-car trains for the Punggol and Sengkang LRT systems. The new trains will be delivered progressively from 2024 to 2027. In addition to new trains, the Sengkang Depot will also be expanded to 11.1 ha from the existing 3.5 ha to ensure that is capacity and maintenance space for the new trains. The expansion of the depot will also see two new reception tracks being built to shorten the train launching time. To ensure there is enough electricity to support the larger fleet of trains, 3 new power stations will be built, increasing the total number of power stations supporting the system to 8 once completed.[21]

Stations edit

Punggol LRT line stations timeline
Date Project Description
29 January 2005 East Loop East Loop (except Oasis and Damai stations) opened for uni-directional operation.[22]
15 June 2007 Oasis opened.[23][24]
20 June 2011 Damai opened. East Loop became fully operational in both directions throughout the day.[25]
29 June 2014 West Loop West Loop (except for Sam Kee, Teck Lee, Punggol Point and Samudera) opened for uni-directional operation.[10]
29 February 2016 Sam Kee opened.[26]
29 December 2016 Punggol Point opened.[13][27]
31 March 2017 Samudera opened.[28]
29 September 2018 West loop became fully operational in both directions throughout the day, except for Teck Lee, which is yet to be opened.[27]
Future (2024, possible for upcoming Punggol Digital District) Opening of Teck Lee
 
Stations on the line.

Legend

 
Elevated
   
Line terminus
 
Transfer outside paid area
 
Ground-level
 
Wheelchair accessible
 
Bus interchange
 
Underground
 
Civil Defence Shelter
           
Other transportation modes

List

Station code Station name Images Interchange;
Adjacent transportation
Opening Location(s)
 PTC  NE17  CP4 
   
Punggol      North East Line 
   CRL Punggol Extension  (2032)

  Punggol
29 January 2005;
18 years ago
Punggol
East Loop
 PE1 
   
Cove   29 January 2005;
18 years ago
Punggol
 PE2 
   
Meridian  
 PE3 
   
Coral Edge  
 PE4  CP3 
   
Riviera      CRL Punggol Extension    (2032)
 PE5 
   
Kadaloor  
 PE6 
   
Oasis   15 June 2007;
16 years ago
 PE7 
   
Damai   20 June 2011;
12 years ago
West Loop
 PW1 
   
Sam Kee   29 February 2016;
7 years ago
Punggol
 PW2 
   
Teck Lee   (Not in operation) TBA (2024 for upcoming Punggol Digital District)
 PW3 
   
Punggol Point   29 December 2016;
6 years ago
 PW4 
   
Samudera   31 March 2017;
6 years ago
 PW5 
   
Nibong   29 June 2014;
9 years ago
 PW6 
   
Sumang  
 PW7 
   
Soo Teck  

Services edit

There are four services in total, with two on each loop. However, on the Electronic Display, they will not show the service letters.

Service Terminal via Loop Direction
A Punggol Soo Teck West Loop Soo Teck to Sam Kee
Clockwise direction
B Punggol Cove East Loop Cove to Damai
Anti-clockwise direction
C Punggol Damai East Loop Damai to Cove
Clockwise direction
D Punggol Sam Kee West Loop Sam Kee to Soo Teck
Anti-clockwise direction

Rolling stock edit

 
A Mitsubishi Crystal Mover C810 train pulling into Cove LRT station.

The Punggol LRT operates on the Mitsubishi Heavy Industries Crystal Mover rolling stock shared with the Sengkang LRT. An initial 41 trainsets entered service in 2003 under C810, with an additional 16 trainsets were delivered in 2016 under C810A, bearing only minor exterior differences from its predecessor. They are maintained and stabled at Sengkang Depot, with a service track between the Punggol and Sengkang LRT systems for the Punggol LRT trains to head to and from the depot.

The procurement of a further 34 vehicles (17 two-car trains) to boost the capacity of the Sengkang-Punggol LRT was announced by the Land Transport Authority in February 2021.

These trains, also known as automated people movers, are rubber-tyred for minimized operating noise within built-up areas and guided by two side rails and a power rail on either side. They operate in both single-car and double-car arrangements.

Train formation edit

The original system consists of single-car C810s. Each unit is 11.2 metres (37 ft) long and can carry up to 105 passengers. 16 original C810s were modified to allow two-car train operation and 16 C810As came with this configuration. This boosted the capacity to 204 passengers per trip.

Train control edit

The line is equipped with Kyosan APM fixed block signalling system for Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[29] The subsystems consist of Automatic train protection (ATP) to govern train speed, Automatic Train Supervision (ATS) to track and schedule trains, and a computer-based interlocking (CBI) system that prevents incorrect signal and track points settings.

References edit

  1. ^ "Land Transport DataMall". mytransport.sg. from the original on 21 August 2020. Retrieved 20 August 2020.
  2. ^ Hiroyuki Mochidome; Masahisa Masukawa; Yasuyuki Suzuki; Makoto Kashiwa; Shinichi Sadamitsu; Hiroyuki Kouno (June 2003). "Automated People Mover System 'Crystal Mover' for Singapore's LTA" (PDF). Technical Review. Mitsubishi Heavy Industries, Ltd. 40 (3). (PDF) from the original on 1 July 2016. Retrieved 26 June 2016.
  3. ^ . 2018. p. 19 to 20. Archived from the original on 16 June 2020. Retrieved 16 June 2020.
  4. ^ "Appointment of operator for the North East MRT line". NAS. 20 May 1999. from the original on 23 November 2019. Retrieved 22 November 2019.
  5. ^ "SBS to run North-East line Tibs to merge with SMRT". The Straits Times (retrieved from NLB). 21 May 1999. from the original on 6 October 2019. Retrieved 6 October 2019.
  6. ^ "Speech By Mr Yeo Cheow Tong At The Official Opening Of Punggol LRT On 29 January 2005". mot.gov.sg. from the original on 1 October 2020. Retrieved 25 April 2020.
  7. ^ "Punggol LRT completed". Today. 2 December 2004.
  8. ^ "Punggol LRT to open on 29 Jan". Today. 28 January 2005.
  9. ^ "Selected stops for Punggol LRT". The New Paper. 11 January 2005.
  10. ^ a b . SBS Transit. 18 June 2014. Archived from the original on 22 June 2014. Retrieved 29 June 2014.
  11. ^ "Singapore's Lost Railways Hunt - The Unfinished Punggol North LRT". YouTube. En Garde Post. 2 August 2023. Retrieved 15 August 2023.
  12. ^ . Land Transport Authority. 31 October 2012. Archived from the original on 22 October 2013. Retrieved 12 October 2013.
  13. ^ a b "Commencement of Two-Car Operations on Punggol LRT East Loop & Opening of Punggol Point LRT station on 29 December 2016". SBS Transit. 29 December 2016. from the original on 30 December 2016. Retrieved 29 December 2016.
  14. ^ "Limited service along Sengkang-Punggol LRT on Sundays in Jan, Feb to facilitate rail works". from the original on 16 December 2017. Retrieved 17 December 2017.
  15. ^ "Limited Sengkang-Punggol LRT services on Sunday mornings from 14 Jan". from the original on 21 December 2017. Retrieved 17 December 2017.
  16. ^ hermes (16 December 2017). "Limited service on Sundays for Sengkang-Punggol LRT". from the original on 18 December 2017. Retrieved 17 December 2017.
  17. ^ "Maintenance work to resume on Sengkang and Punggol LRT systems on 4 Mar". from the original on 23 February 2018. Retrieved 23 February 2018.
  18. ^ hermesauto (22 February 2018). "Maintenance works to resume on Sengkang and Punggol LRT systems". from the original on 23 February 2018. Retrieved 23 February 2018.
  19. ^ hermesauto (11 May 2018). "SBS Transit extends limited service on Sundays for Sengkang, Punggol LRT to October". from the original on 14 May 2018. Retrieved 14 May 2018.
  20. ^ "Limited service hours on Sundays for Sengkang-Punggol LRT to be extended". from the original on 15 May 2018. Retrieved 14 May 2018.
  21. ^ "Sengkang-Punggol LRT to get 17 new two-car trains to boost capacity". Channel NewsAsia. 5 February 2021. Retrieved 6 February 2021.
  22. ^ . SBS Transit. 10 January 2005. Archived from the original on 30 August 2019. Retrieved 30 August 2019.
  23. ^ . Channel NewsAsia$3. 14 June 2007. Archived from the original on 16 June 2007. Retrieved 29 August 2019.
  24. ^ "Opening of Oasis LRT station". SBS Transit. 14 June 2007. from the original on 14 October 2013. Retrieved 29 June 2014.
  25. ^ "Opening of Damai station & Punggol LRT Operating in Both Directions from 20 June" (PDF). SBS Transit. 17 June 2011. (PDF) from the original on 24 September 2015. Retrieved 29 June 2014.
  26. ^ "Sam Kee station on Punggol LRT System to open for Passenger Services". SBS Transit. 18 February 2016. from the original on 1 March 2016. Retrieved 18 February 2016.
  27. ^ a b "LTA | News Room | News Releases | Joint News Release by the Land Transport Authority (LTA) & SBS Transit - Commencement of Two-Car Operations on Punggol LRT East Loop & Opening of Punggol Point LRT Station on 29 December 2016". lta.gov.sg. from the original on 5 February 2020. Retrieved 5 February 2020.
  28. ^ "Opening of Samudera Station on Punggol West LRT Loop". SBS Transit. 20 March 2017. from the original on 9 September 2017. Retrieved 8 September 2019.
  29. ^ . kyosan.co.jp. Archived from the original on 16 July 2017. Retrieved 13 June 2017.

External links edit

  • Punggol LRT line

punggol, line, this, article, about, line, station, line, punggol, station, punggol, automated, guideway, transit, line, singapore, line, which, initially, opened, january, 2005, connects, residential, districts, suburbs, punggol, punggol, town, centre, where,. This article is about the LRT line For the MRT LRT station on the line see Punggol MRT LRT station The Punggol LRT is an automated guideway transit line in Singapore The line which initially opened on 29 January 2005 connects the residential districts and suburbs of Punggol to Punggol Town Centre where it connects with the North East MRT line and the Punggol Bus Interchange It is the third line of the LRT system in Singapore and like all other LRT lines it is fully elevated and uses automated trains Punggol LRTA C810 on the Punggol LRTOverviewNative nameLaluan LRT Punggol 榜鹅轻轨线 ப ங க ல எல ஆர ட வர StatusOperationalOwnerLand Transport AuthorityLocaleSingaporeTerminiPunggolStations14 excluding Teck Lee ServiceTypeAutomated guideway transit People moverSystemLight Rail Transit Singapore Services4Operator s SBS Transit Ltd ComfortDelGro Corporation Depot s SengkangRolling stockMitsubishi Crystal Mover C810 Mitsubishi Crystal Mover C810A Mitsubishi Crystal Mover C810D Future Daily ridership23 698 July 2020 1 HistoryOpened29 January 2005 18 years ago 2005 01 29 East Loop 29 June 2014 9 years ago 2014 06 29 West Loop TechnicalLine length10 3 km 6 4 mi CharacterFully elevatedTrack gauge1 850 mm 6 ft 27 32 in Guide rail span 3 2 m 10 ft 6 in Electrification750 V DC Third rail 2 SignallingKyosan APM fixed block ATC under ATO GoA 4 UTO with subsystems of ATP ATS and CBI 3 Route mapLegendWest loop PW4 Samudera Punggol Point PW3 PW5 Nibong Teck Lee PW2 Punggol Waterway PW6 Sumang Sam Kee PW1 PW7 Soo Teck CP4 North East Lineto HarbourFront North East Lineto Punggol Coast NE17 non revenue trackto Sengkang LRT Punggol PTC Punggol Rd PE1 Cove Damai PE7 PE2 Meridian Oasis PE6 PE3 Coral Edge Kadaloor PE5 PE4 Riviera Cross Island Lineto Pasir Ris CP3 East loopThis diagram viewtalkeditConcourse level of Punggol MRT LRT station with escalators leading up to the LRT platform The first phase is a 10 3 kilometre 6 4 mi line with 15 stations in two loops It is the second LRT line to be operated by SBS Transit Contents 1 History 1 1 Improvements 2 Stations 2 1 Services 3 Rolling stock 4 Train formation 5 Train control 6 References 7 External linksHistory editPlans for the Punggol LRT line were drawn up and announced in January 1999 with the development of Punggol New Town Construction began in June 2000 by a consortium comprising Sembcorp Industries Mitsubishi Heavy Industries and Mitsubishi Corporation at a cost of S 354 million Meanwhile the Punggol LRT line was awarded to Singapore Bus Service present day SBS Transit on 20 May 1999 4 5 The first phase was completed in June 2004 and underwent testing by the Land Transport Authority The system was handed over to SBS Transit on 1 December that year which conducted more trial runs and staff training before the opening of the East Loop on 29 January 2005 6 7 8 However due to limited developments around some stations on the loop at the time only the stretch of stations from Cove station to Kadaloor station were opened 9 The West Loop opened in stages from 29 June 2014 10 A covered middle track at Punggol station and two short track pieces branching from Teck Lee station had already been built in anticipation of a possible branch line to Punggol North but these plans were subsequently cancelled and a new Punggol Coast MRT station is being built instead 11 Improvements edit On 31 October 2012 the Land Transport Authority announced that by 2016 the Sengkang and Punggol LRT lines would be upgraded to two car trains doubling the passenger capacity An additional 16 more cars were to be ordered bringing the total fleet size to 57 The longer trains also required modifications to the signaling and communication system 12 On 29 December 2016 trains started operating in the two car formations on the line s East loop during morning and evening peak hours from 6 45 am to 8 45 am and from 6 15 pm to 8 15 pm Service frequency will be maintained at three to four minutes during morning and evening peak hours 13 On 15 December 2017 the Land Transport Authority said there will be limited services on parts of the Sengkang Punggol LRT SPLRT on most Sundays from 14 January 2018 to 25 February that year to facilitate renewal and improvement works from except 18 February as it is a Chinese New Year holiday Only one platform will open for service at 5 30am on Sundays The other platform will open from 7am 14 15 16 On 22nd of that month SBS Transit said the arrangement is expected to continue until end April that year 17 18 From 27 May to 7 October that year limited services on Sundays will continue on the Sengkang Punggol LRT SPLRT One platform will open at 5 30am and the other platform will open at 5 30pm 19 20 On 5 February 2021 the Land Transport Authority announced that it has purchased 17 two car trains for the Punggol and Sengkang LRT systems The new trains will be delivered progressively from 2024 to 2027 In addition to new trains the Sengkang Depot will also be expanded to 11 1 ha from the existing 3 5 ha to ensure that is capacity and maintenance space for the new trains The expansion of the depot will also see two new reception tracks being built to shorten the train launching time To ensure there is enough electricity to support the larger fleet of trains 3 new power stations will be built increasing the total number of power stations supporting the system to 8 once completed 21 Stations editPunggol LRT line stations timeline Date Project Description29 January 2005 East Loop East Loop except Oasis and Damai stations opened for uni directional operation 22 15 June 2007 Oasis opened 23 24 20 June 2011 Damai opened East Loop became fully operational in both directions throughout the day 25 29 June 2014 West Loop West Loop except for Sam Kee Teck Lee Punggol Point and Samudera opened for uni directional operation 10 29 February 2016 Sam Kee opened 26 29 December 2016 Punggol Point opened 13 27 31 March 2017 Samudera opened 28 29 September 2018 West loop became fully operational in both directions throughout the day except for Teck Lee which is yet to be opened 27 Future 2024 possible for upcoming Punggol Digital District Opening of Teck Lee nbsp Stations on the line Legend nbsp Elevated nbsp nbsp Line terminus nbsp Transfer outside paid area nbsp Ground level nbsp Wheelchair accessible nbsp Bus interchange nbsp Underground nbsp Civil Defence Shelter nbsp nbsp nbsp nbsp nbsp nbsp Other transportation modesList Station code Station name Images Interchange Adjacent transportation Opening Location s PTC NE17 CP4 nbsp nbsp Punggol nbsp nbsp North East Line nbsp CRL Punggol Extension 2032 nbsp Punggol 29 January 2005 18 years ago PunggolEast Loop PE1 nbsp nbsp Cove nbsp 29 January 2005 18 years ago Punggol PE2 nbsp nbsp Meridian nbsp PE3 nbsp nbsp Coral Edge nbsp PE4 CP3 nbsp nbsp Riviera nbsp nbsp CRL Punggol Extension nbsp 2032 PE5 nbsp nbsp Kadaloor nbsp PE6 nbsp nbsp Oasis nbsp 15 June 2007 16 years ago PE7 nbsp nbsp Damai nbsp 20 June 2011 12 years agoWest Loop PW1 nbsp nbsp Sam Kee nbsp 29 February 2016 7 years ago Punggol PW2 nbsp nbsp Teck Lee nbsp Not in operation TBA 2024 for upcoming Punggol Digital District PW3 nbsp nbsp Punggol Point nbsp 29 December 2016 6 years ago PW4 nbsp nbsp Samudera nbsp 31 March 2017 6 years ago PW5 nbsp nbsp Nibong nbsp 29 June 2014 9 years ago PW6 nbsp nbsp Sumang nbsp PW7 nbsp nbsp Soo Teck nbsp Services edit There are four services in total with two on each loop However on the Electronic Display they will not show the service letters Service Terminal via Loop DirectionA Punggol Soo Teck West Loop Soo Teck to Sam KeeClockwise directionB Punggol Cove East Loop Cove to DamaiAnti clockwise directionC Punggol Damai East Loop Damai to CoveClockwise directionD Punggol Sam Kee West Loop Sam Kee to Soo TeckAnti clockwise directionRolling stock edit nbsp A Mitsubishi Crystal Mover C810 train pulling into Cove LRT station The Punggol LRT operates on the Mitsubishi Heavy Industries Crystal Mover rolling stock shared with the Sengkang LRT An initial 41 trainsets entered service in 2003 under C810 with an additional 16 trainsets were delivered in 2016 under C810A bearing only minor exterior differences from its predecessor They are maintained and stabled at Sengkang Depot with a service track between the Punggol and Sengkang LRT systems for the Punggol LRT trains to head to and from the depot The procurement of a further 34 vehicles 17 two car trains to boost the capacity of the Sengkang Punggol LRT was announced by the Land Transport Authority in February 2021 These trains also known as automated people movers are rubber tyred for minimized operating noise within built up areas and guided by two side rails and a power rail on either side They operate in both single car and double car arrangements Train formation editThe original system consists of single car C810s Each unit is 11 2 metres 37 ft long and can carry up to 105 passengers 16 original C810s were modified to allow two car train operation and 16 C810As came with this configuration This boosted the capacity to 204 passengers per trip Train control editThe line is equipped with Kyosan APM fixed block signalling system for Automatic train control ATC under Automatic train operation ATO GoA 4 UTO 29 The subsystems consist of Automatic train protection ATP to govern train speed Automatic Train Supervision ATS to track and schedule trains and a computer based interlocking CBI system that prevents incorrect signal and track points settings References edit Land Transport DataMall mytransport sg Archived from the original on 21 August 2020 Retrieved 20 August 2020 Hiroyuki Mochidome Masahisa Masukawa Yasuyuki Suzuki Makoto Kashiwa Shinichi Sadamitsu Hiroyuki Kouno June 2003 Automated People Mover System Crystal Mover for Singapore s LTA PDF Technical Review Mitsubishi Heavy Industries Ltd 40 3 Archived PDF from the original on 1 July 2016 Retrieved 26 June 2016 Kyosan Corporate Report 2018 2018 p 19 to 20 Archived from the original on 16 June 2020 Retrieved 16 June 2020 Appointment of operator for the North East MRT line NAS 20 May 1999 Archived from the original on 23 November 2019 Retrieved 22 November 2019 SBS to run North East line Tibs to merge with SMRT The Straits Times retrieved from NLB 21 May 1999 Archived from the original on 6 October 2019 Retrieved 6 October 2019 Speech By Mr Yeo Cheow Tong At The Official Opening Of Punggol LRT On 29 January 2005 mot gov sg Archived from the original on 1 October 2020 Retrieved 25 April 2020 Punggol LRT completed Today 2 December 2004 Punggol LRT to open on 29 Jan Today 28 January 2005 Selected stops for Punggol LRT The New Paper 11 January 2005 a b Punggol West LRT System to Commence Passenger Service and North East line to Add More Train Trips SBS Transit 18 June 2014 Archived from the original on 22 June 2014 Retrieved 29 June 2014 Singapore s Lost Railways Hunt The Unfinished Punggol North LRT YouTube En Garde Post 2 August 2023 Retrieved 15 August 2023 2 car System for Sengkang Punggol LRT by 2016 Improvements to Choa Chu Kang LRT station Land Transport Authority 31 October 2012 Archived from the original on 22 October 2013 Retrieved 12 October 2013 a b Commencement of Two Car Operations on Punggol LRT East Loop amp Opening of Punggol Point LRT station on 29 December 2016 SBS Transit 29 December 2016 Archived from the original on 30 December 2016 Retrieved 29 December 2016 Limited service along Sengkang Punggol LRT on Sundays in Jan Feb to facilitate rail works Archived from the original on 16 December 2017 Retrieved 17 December 2017 Limited Sengkang Punggol LRT services on Sunday mornings from 14 Jan Archived from the original on 21 December 2017 Retrieved 17 December 2017 hermes 16 December 2017 Limited service on Sundays for Sengkang Punggol LRT Archived from the original on 18 December 2017 Retrieved 17 December 2017 Maintenance work to resume on Sengkang and Punggol LRT systems on 4 Mar Archived from the original on 23 February 2018 Retrieved 23 February 2018 hermesauto 22 February 2018 Maintenance works to resume on Sengkang and Punggol LRT systems Archived from the original on 23 February 2018 Retrieved 23 February 2018 hermesauto 11 May 2018 SBS Transit extends limited service on Sundays for Sengkang Punggol LRT to October Archived from the original on 14 May 2018 Retrieved 14 May 2018 Limited service hours on Sundays for Sengkang Punggol LRT to be extended Archived from the original on 15 May 2018 Retrieved 14 May 2018 Sengkang Punggol LRT to get 17 new two car trains to boost capacity Channel NewsAsia 5 February 2021 Retrieved 6 February 2021 Punggol LRT and Sengkang LRT West Loop to Commence Revenue Service on 29 January 2005 SBS Transit 10 January 2005 Archived from the original on 30 August 2019 Retrieved 30 August 2019 Oasis station on Punggol LRT Loop opens on Friday Channel NewsAsia 3 14 June 2007 Archived from the original on 16 June 2007 Retrieved 29 August 2019 Opening of Oasis LRT station SBS Transit 14 June 2007 Archived from the original on 14 October 2013 Retrieved 29 June 2014 Opening of Damai station amp Punggol LRT Operating in Both Directions from 20 June PDF SBS Transit 17 June 2011 Archived PDF from the original on 24 September 2015 Retrieved 29 June 2014 Sam Kee station on Punggol LRT System to open for Passenger Services SBS Transit 18 February 2016 Archived from the original on 1 March 2016 Retrieved 18 February 2016 a b LTA News Room News Releases Joint News Release by the Land Transport Authority LTA amp SBS Transit Commencement of Two Car Operations on Punggol LRT East Loop amp Opening of Punggol Point LRT Station on 29 December 2016 lta gov sg Archived from the original on 5 February 2020 Retrieved 5 February 2020 Opening of Samudera Station on Punggol West LRT Loop SBS Transit 20 March 2017 Archived from the original on 9 September 2017 Retrieved 8 September 2019 Products and Services Kyosan Electric Mfg Co Ltd kyosan co jp Archived from the original on 16 July 2017 Retrieved 13 June 2017 External links editPunggol LRT line nbsp Wikimedia Commons has media related to Light Rail Transit Sengkang Punggol Retrieved from https en wikipedia org w index php title Punggol LRT line amp oldid 1178016374 Stations, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.