The Sengkang LRT is a 10.7-kilometre (6.6 mi) automated guideway transit line in Singapore. The line, which initially opened on 18 January 2003, connects the residential districts and suburbs of Sengkang to Sengkang Town Centre, where it connects with the North East MRT line, Sengkang Bus Interchange, Compass One and Compassvale Bus Interchange. It is the second line of the LRT system in Singapore and like all other LRT lines, it is fully elevated and uses automated trains. It is the first LRT line to be operated by SBS Transit.

Sengkang LRT
A C810 on the Sengkang LRT
Overview
Native nameLaluan LRT Sengkang
盛港轻轨线
செங்காங் லைட் ரெயில் வரி
StatusOperational
OwnerLand Transport Authority
LocaleSingapore
TerminiSengkang
Stations14
Service
TypeAutomated guideway transit/People mover
SystemLight Rail Transit (Singapore)
Services4
Operator(s)SBS Transit Ltd (ComfortDelGro Corporation)
Depot(s)Sengkang
Rolling stockMitsubishi Crystal Mover (C810)
Mitsubishi Crystal Mover (C810A)
Mitsubishi Crystal Mover (C810D) (Future)
Daily ridership27,541 (July 2020)[1]
History
Opened
  • 18 January 2003; 20 years ago (2003-01-18) (East Loop)
  • 29 January 2005; 18 years ago (2005-01-29) (West Loop)
Technical
Line length10.7 km (6.6 mi)
CharacterFully elevated
Track gauge1,850 mm (6 ft 2732 in)
Guideway span: 3.2 m (10 ft 6 in)
Electrification750 V DC Third rail
SignallingKyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI[2]
Route map

West loop
 SW5  Fernvale
 SW6 
Layar
Thanggam
 SW4 
Kupang
 SW3 
 SW7 
Tongkang
Farmway
 SW2 
 SW8 
Renjong
Cheng Lim
 SW1 
Sengkang East Road
 STC 
 NE16 
Sengkang
non-revenue track
to Punggol LRT
 SE5 
Ranggung
Compassvale
 SE1 
Punggol Road
 SE4 
Kangkar
Rumbia
 SE2 
Bakau  SE3 
East loop

History

Planning for the Sengkang LRT line was underway when the Bukit Panjang LRT was opened by then-Prime Minister Goh Chok Tong on 6 November 1999.[3] Construction began in January 2000 for both the East Loop and West Loop. Meanwhile, the Sengkang LRT line was awarded to Singapore Bus Service (present-day SBS Transit) on 20 May 1999.[4][5]

On 18 January 2003, the East Loop was opened, the first section of the line to do so.[6] The West Loop, with the exception of Farmway, Cheng Lim and Kupang stations, commenced operations on 29 January 2005. These three stations then opened on 15 November 2007, 1 January 2013 and 27 June 2015 respectively.[7][8]

Improvements

On 31 October 2012, the Land Transport Authority announced that starting from first quarter of 2016, both the Sengkang and Punggol LRT systems would be upgraded to two-car trains, doubling the passenger capacity. An additional 16 more cars were to be ordered, bringing the total fleet size to 57. The longer trains also required modifications to the signalling and communication system.[9]

On 22 December 2015, the line began operating two-car trains, five years after plans to raise the capacity of the increasingly packed light-rail system were announced.[10]

Around the end of 2016, two-car trains started being deployed on both directions of the West Loop during the weekday peak hours, due to the increasing number of commuters living in new HDB flats located near Thanggam, Kupang and Farmway stations. Before this, two-car trains were only deployed towards the direction of Cheng Lim during morning peak hours, and towards the direction of Renjong during evening peak hours.[citation needed]

On 15 December 2017, the Land Transport Authority said there will be limited services on parts of the Sengkang-Punggol LRT (SPLRT) on most Sundays from 14 January 2018 to 25 February that year, to facilitate renewal and improvement works (except 18 February as it is a Chinese New Year holiday). Only one platform will open for service at 5.30am on Sundays. The other platform will open from 7am.[11][12][13] On 22nd of that month, SBS Transit said the arrangement is expected to continue until end April that year.[14][15]

From 27 May to 7 October that year, limited services on Sundays will continue on the Sengkang-Punggol LRT (SPLRT). One platform will open at 5.30am and the other platform will open at 5.30pm.[16][17]

On 5 February 2021, the Land Transport Authority announced that it has purchased 17 two-car trains for the Sengkang and Punggol LRT systems. The new trains will be delivered progressively from 2024 to 2027. In addition to new trains, the Sengkang Depot will also be expanded to 11.1 ha (27.4 acres) from the existing 3.5 ha (8.6 acres) to ensure there is capacity and maintenance space for the new trains. The expansion of the depot will also see two new reception tracks being built to shorten the train launching time. To ensure there is enough electricity to support the larger fleet of trains, 3 new power stations will be built, increasing the total number of power stations supporting the system to 8 once completed.[18]

Stations

Sengkang LRT line stations timeline
Date Project Description
18 January 2003 East Loop East Loop completely opened in both directions throughout the day.
29 January 2005 West Loop West Loop (except for Cheng Lim, Farmway and Kupang) opened in uni-directional manner.[19][20]
15 November 2007 Farmway opened for passenger service.[21]
4 January 2010 West Loop operated in both directions during the morning and evening peak hours on weekdays.[22]
1 January 2013 West Loop operated in both directions throughout the day and Cheng Lim was opened for passenger service.[23]
27 June 2015 Kupang opened for passenger service.[24]
 
Stations on the line.

List

Station code Station name Images Interchange;
Adjacent transportation
Opening Location(s)
 STC  NE16  Sengkang    North East Line  

  Sengkang
18 January 2003;
20 years ago
Sengkang
East Loop
 SE1  Compassvale   18 January 2003;
20 years ago
Sengkang
 SE2  Rumbia  
 SE3  Bakau  
 SE4  Kangkar  
 SE5  Ranggung  
West Loop
 SW1  Cheng Lim   1 January 2013;
10 years ago
Sengkang
 SW2  Farmway   15 November 2007;
15 years ago
 SW3  Kupang   27 June 2015;
8 years ago
 SW4  Thanggam   29 January 2005;
18 years ago
 SW5  Fernvale  
 SW6  Layar  
 SW7  Tongkang  
 SW8  Renjong  

Services

There are four services in total, with two on each loop. However, on the Electronic Display, they will not show the service letters.

Service Terminal via Loop Direction
A Sengkang Renjong West Loop Renjong to Cheng Lim
Clockwise direction
B Sengkang Cheng Lim West Loop Cheng Lim to Renjong
Anti-clockwise direction
C Sengkang Compassvale East Loop Compassvale to Ranggung
Clockwise direction
D Sengkang Ranggung East Loop Ranggung to Compassvale
Anti-clockwise direction

Rolling stock

 
A Mitsubishi Crystal Mover C810 train on the Sengkang LRT East Loop.

The Sengkang LRT operates on the Mitsubishi Heavy Industries Crystal Mover rolling stock shared with the Punggol LRT. An initial 41 trainsets entered service in 2003 under C810, with an additional 16 trainsets were delivered in 2016 under C810A, bearing only minor exterior differences from its predecessor. They are maintained and stabled at Sengkang Depot, with a service track between the Punggol and Sengkang LRT systems for the Punggol LRT trains to head to and from the depot.

The procurement of a further 34 vehicles (17 two-car trains) to boost the capacity of the Sengkang-Punggol LRT was announced by the Land Transport Authority in February 2021.

These trains, also known as automated people movers, are rubber-tyred for minimized operating noise within built-up areas and guided by two side rails and a power rail on either side. They operate in both single-car and double-car arrangements.

Train control

The line is equipped with Kyosan APM fixed block signalling system for Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[25] The subsystems consist of Automatic train protection (ATP) to govern train speed, Automatic Train Supervision (ATS) to track and schedule trains, and a computer-based interlocking (CBI) system that prevents incorrect signal and track points settings.

Incidents

  • On 20 April 2015, the East Loop suffered a brief service disruption due to a power fault.[26]
  • On 8 May that year, more than two weeks after the April disruption, another service disruption occurred on the West Loop, stranding a number of trains for three hours at 1700 hrs.[27]
  • On 16 February 2018, the first day of Chinese New Year, a train broke down near Sengkang station from the West Loop due to a dislodged power collector shoe at 1109 hrs. A rescue train managed to haul the faulty train away and services were resumed approximately two hours later.[28]

Gallery

 
Tongkang LRT station is in the centre, with Sengkang Depot behind it. In the distant background lies the HDB blocks of the Fernvale neighbourhood.
 
Panoramic view showing the Sengkang LRT line (SKLRT). Renjong LRT station lies to the left, and the Sengkang Depot for North East line and SKLRT to the right. In the distant background lie Buangkok and Hougang.

References

  1. ^ "Land Transport DataMall". mytransport.sg. from the original on 21 August 2020. Retrieved 20 August 2020.
  2. ^ . 2018. p. 19 to 20. Archived from the original on 16 June 2020. Retrieved 16 June 2020.
  3. ^ "Speech By Mr Mah Bow Tan Minister For Communications At The Sengkang LRT Exhibition At Ngee Ann City" (PDF). NAS. (PDF) from the original on 1 October 2020.
  4. ^ "Appointment of operator for the North East MRT line". NAS. 20 May 1999. from the original on 23 November 2019. Retrieved 22 November 2019.
  5. ^ "SBS to run North-East line Tibs to merge with SMRT". The Straits Times (retrieved from NLB). 21 May 1999. from the original on 6 October 2019. Retrieved 6 October 2019.
  6. ^ "Free LRT service in Sengkang". Today (retrieved from NLB). 17 January 2003. from the original on 8 July 2019. Retrieved 13 October 2019.
  7. ^ "Cheng Lim LRT station To Open And Sengkang West LRT to Run in Both Directions". SBS Transit. 21 December 2012. from the original on 24 December 2012. Retrieved 21 December 2012.
  8. ^ "Kupang LRT station to open on Saturday, 27 June 2015" (PDF). SBS Transit. 15 June 2015. (PDF) from the original on 24 November 2015. Retrieved 15 June 2015.
  9. ^ . Land Transport Authority. 31 October 2012. Archived from the original on 22 October 2013. Retrieved 12 October 2013.
  10. ^ Tan, Christopher (24 December 2015). "2-car trains roll out on Sengkang LRT". The Straits Times. from the original on 28 October 2017. Retrieved 28 October 2017.
  11. ^ "Limited service along Sengkang-Punggol LRT on Sundays in Jan, Feb to facilitate rail works". from the original on 16 December 2017. Retrieved 17 December 2017.
  12. ^ "Limited Sengkang-Punggol LRT services on Sunday mornings from 14 Jan". from the original on 21 December 2017. Retrieved 17 December 2017.
  13. ^ "Limited service on Sundays for Sengkang-Punggol LRT". 16 December 2017. from the original on 18 December 2017. Retrieved 17 December 2017.
  14. ^ "Maintenance work to resume on Sengkang and Punggol LRT systems on 4 Mar". from the original on 23 February 2018. Retrieved 23 February 2018.
  15. ^ "Maintenance works to resume on Sengkang and Punggol LRT systems". 22 February 2018. from the original on 23 February 2018. Retrieved 23 February 2018.
  16. ^ "SBS Transit extends limited service on Sundays for Sengkang, Punggol LRT to October". 11 May 2018. from the original on 14 May 2018. Retrieved 14 May 2018.
  17. ^ "Limited service hours on Sundays for Sengkang-Punggol LRT to be extended". from the original on 15 May 2018. Retrieved 14 May 2018.
  18. ^ "Sengkang-Punggol LRT to get 17 new two-car trains to boost capacity". CNA. 5 February 2021. Retrieved 6 February 2021.
  19. ^ "Punggol LRT and Sengkang LRT West Loop to Commence Revenue Service on 29 January 2005". SBS Transit. 10 January 2005. from the original on 30 August 2019. Retrieved 30 August 2019.
  20. ^ "Punggol LRT (East Loop) And Sengkang LRT (West Loop) Commence Revenue Service Today". SBS Transit. 29 January 2005. from the original on 11 February 2013. Retrieved 29 June 2014.
  21. ^ "Farmway LRT Station to open on 15 November 2007". SBS Transit. 14 November 2007. from the original on 7 September 2017. Retrieved 7 September 2017.
  22. ^ "SK West Loop Peak Hours" (PDF). SBS Transit. 16 December 2009. (PDF) from the original on 19 February 2016. Retrieved 30 August 2019.
  23. ^ "Cheng Lim LRT Station To Open And Sengkang West LRT to Run in Both Directions". SBS Transit. 21 December 2012. from the original on 24 December 2012. Retrieved 21 December 2012.
  24. ^ "Kupang LRT Station to open on Saturday, 27 June 2015" (PDF). SBS Transit. 15 June 2015. (PDF) from the original on 24 November 2015. Retrieved 15 June 2015.
  25. ^ . www.kyosan.co.jp. Archived from the original on 16 July 2017. Retrieved 13 June 2017.
  26. ^ migration (20 April 2015). "Sengkang LRT East Loop train service stopped briefly". The Straits Times. from the original on 25 August 2019. Retrieved 25 August 2019.
  27. ^ "Sengkang LRT trains stuck on tracks due to power fault". The Online Citizen. 9 May 2015. from the original on 25 August 2019. Retrieved 25 August 2019.
  28. ^ hermesauto (16 February 2018). "Sengkang LRT train breaks down on first day of CNY, passengers get down and walk on tracks". The Straits Times. from the original on 25 August 2019. Retrieved 25 August 2019.

External links

  • Sengkang LRT line

sengkang, line, this, article, about, line, station, line, sengkang, station, sengkang, kilometre, automated, guideway, transit, line, singapore, line, which, initially, opened, january, 2003, connects, residential, districts, suburbs, sengkang, sengkang, town. This article is about the LRT line For the MRT LRT station on the line see Sengkang MRT LRT station The Sengkang LRT is a 10 7 kilometre 6 6 mi automated guideway transit line in Singapore The line which initially opened on 18 January 2003 connects the residential districts and suburbs of Sengkang to Sengkang Town Centre where it connects with the North East MRT line Sengkang Bus Interchange Compass One and Compassvale Bus Interchange It is the second line of the LRT system in Singapore and like all other LRT lines it is fully elevated and uses automated trains It is the first LRT line to be operated by SBS Transit Sengkang LRTA C810 on the Sengkang LRTOverviewNative nameLaluan LRT Sengkang 盛港轻轨线 ச ங க ங ல ட ர ய ல வர StatusOperationalOwnerLand Transport AuthorityLocaleSingaporeTerminiSengkangStations14ServiceTypeAutomated guideway transit People moverSystemLight Rail Transit Singapore Services4Operator s SBS Transit Ltd ComfortDelGro Corporation Depot s SengkangRolling stockMitsubishi Crystal Mover C810 Mitsubishi Crystal Mover C810A Mitsubishi Crystal Mover C810D Future Daily ridership27 541 July 2020 1 HistoryOpened18 January 2003 20 years ago 2003 01 18 East Loop 29 January 2005 18 years ago 2005 01 29 West Loop TechnicalLine length10 7 km 6 6 mi CharacterFully elevatedTrack gauge1 850 mm 6 ft 27 32 in Guideway span 3 2 m 10 ft 6 in Electrification750 V DC Third railSignallingKyosan APM fixed block ATC under ATO GoA 4 UTO with subsystems of ATP ATS and CBI 2 Route mapLegendWest loop SW5 Fernvale SW6 Layar Thanggam SW4 Kupang SW3 Sengkang Depot Sungei Punggol SW7 Tongkang Farmway SW2 SW8 Renjong Cheng Lim SW1 Sengkang East Road STC NE16 Sengkang non revenue trackto Punggol LRTNorth East Lineto HarbourFront North East Lineto Punggol SE5 Ranggung Compassvale SE1 Punggol Road SE4 Kangkar Rumbia SE2 Bakau SE3 East loopThis diagram viewtalkedit Contents 1 History 1 1 Improvements 2 Stations 2 1 Services 3 Rolling stock 4 Train control 5 Incidents 6 Gallery 7 References 8 External linksHistory EditPlanning for the Sengkang LRT line was underway when the Bukit Panjang LRT was opened by then Prime Minister Goh Chok Tong on 6 November 1999 3 Construction began in January 2000 for both the East Loop and West Loop Meanwhile the Sengkang LRT line was awarded to Singapore Bus Service present day SBS Transit on 20 May 1999 4 5 On 18 January 2003 the East Loop was opened the first section of the line to do so 6 The West Loop with the exception of Farmway Cheng Lim and Kupang stations commenced operations on 29 January 2005 These three stations then opened on 15 November 2007 1 January 2013 and 27 June 2015 respectively 7 8 Improvements Edit On 31 October 2012 the Land Transport Authority announced that starting from first quarter of 2016 both the Sengkang and Punggol LRT systems would be upgraded to two car trains doubling the passenger capacity An additional 16 more cars were to be ordered bringing the total fleet size to 57 The longer trains also required modifications to the signalling and communication system 9 On 22 December 2015 the line began operating two car trains five years after plans to raise the capacity of the increasingly packed light rail system were announced 10 Around the end of 2016 two car trains started being deployed on both directions of the West Loop during the weekday peak hours due to the increasing number of commuters living in new HDB flats located near Thanggam Kupang and Farmway stations Before this two car trains were only deployed towards the direction of Cheng Lim during morning peak hours and towards the direction of Renjong during evening peak hours citation needed On 15 December 2017 the Land Transport Authority said there will be limited services on parts of the Sengkang Punggol LRT SPLRT on most Sundays from 14 January 2018 to 25 February that year to facilitate renewal and improvement works except 18 February as it is a Chinese New Year holiday Only one platform will open for service at 5 30am on Sundays The other platform will open from 7am 11 12 13 On 22nd of that month SBS Transit said the arrangement is expected to continue until end April that year 14 15 From 27 May to 7 October that year limited services on Sundays will continue on the Sengkang Punggol LRT SPLRT One platform will open at 5 30am and the other platform will open at 5 30pm 16 17 On 5 February 2021 the Land Transport Authority announced that it has purchased 17 two car trains for the Sengkang and Punggol LRT systems The new trains will be delivered progressively from 2024 to 2027 In addition to new trains the Sengkang Depot will also be expanded to 11 1 ha 27 4 acres from the existing 3 5 ha 8 6 acres to ensure there is capacity and maintenance space for the new trains The expansion of the depot will also see two new reception tracks being built to shorten the train launching time To ensure there is enough electricity to support the larger fleet of trains 3 new power stations will be built increasing the total number of power stations supporting the system to 8 once completed 18 Stations EditSengkang LRT line stations timeline Date Project Description18 January 2003 East Loop East Loop completely opened in both directions throughout the day 29 January 2005 West Loop West Loop except for Cheng Lim Farmway and Kupang opened in uni directional manner 19 20 15 November 2007 Farmway opened for passenger service 21 4 January 2010 West Loop operated in both directions during the morning and evening peak hours on weekdays 22 1 January 2013 West Loop operated in both directions throughout the day and Cheng Lim was opened for passenger service 23 27 June 2015 Kupang opened for passenger service 24 Stations on the line List Station code Station name Images Interchange Adjacent transportation Opening Location s STC NE16 Sengkang North East Line Sengkang 18 January 2003 20 years ago SengkangEast Loop SE1 Compassvale 18 January 2003 20 years ago Sengkang SE2 Rumbia SE3 Bakau SE4 Kangkar SE5 Ranggung West Loop SW1 Cheng Lim 1 January 2013 10 years ago Sengkang SW2 Farmway 15 November 2007 15 years ago SW3 Kupang 27 June 2015 8 years ago SW4 Thanggam 29 January 2005 18 years ago SW5 Fernvale SW6 Layar SW7 Tongkang SW8 Renjong Services Edit There are four services in total with two on each loop However on the Electronic Display they will not show the service letters Service Terminal via Loop DirectionA Sengkang Renjong West Loop Renjong to Cheng LimClockwise directionB Sengkang Cheng Lim West Loop Cheng Lim to RenjongAnti clockwise directionC Sengkang Compassvale East Loop Compassvale to RanggungClockwise directionD Sengkang Ranggung East Loop Ranggung to CompassvaleAnti clockwise directionRolling stock Edit A Mitsubishi Crystal Mover C810 train on the Sengkang LRT East Loop The Sengkang LRT operates on the Mitsubishi Heavy Industries Crystal Mover rolling stock shared with the Punggol LRT An initial 41 trainsets entered service in 2003 under C810 with an additional 16 trainsets were delivered in 2016 under C810A bearing only minor exterior differences from its predecessor They are maintained and stabled at Sengkang Depot with a service track between the Punggol and Sengkang LRT systems for the Punggol LRT trains to head to and from the depot The procurement of a further 34 vehicles 17 two car trains to boost the capacity of the Sengkang Punggol LRT was announced by the Land Transport Authority in February 2021 These trains also known as automated people movers are rubber tyred for minimized operating noise within built up areas and guided by two side rails and a power rail on either side They operate in both single car and double car arrangements Train control EditThe line is equipped with Kyosan APM fixed block signalling system for Automatic train control ATC under Automatic train operation ATO GoA 4 UTO 25 The subsystems consist of Automatic train protection ATP to govern train speed Automatic Train Supervision ATS to track and schedule trains and a computer based interlocking CBI system that prevents incorrect signal and track points settings Incidents EditOn 20 April 2015 the East Loop suffered a brief service disruption due to a power fault 26 On 8 May that year more than two weeks after the April disruption another service disruption occurred on the West Loop stranding a number of trains for three hours at 1700 hrs 27 On 16 February 2018 the first day of Chinese New Year a train broke down near Sengkang station from the West Loop due to a dislodged power collector shoe at 1109 hrs A rescue train managed to haul the faulty train away and services were resumed approximately two hours later 28 Gallery Edit Tongkang LRT station is in the centre with Sengkang Depot behind it In the distant background lies the HDB blocks of the Fernvale neighbourhood Panoramic view showing the Sengkang LRT line SKLRT Renjong LRT station lies to the left and the Sengkang Depot for North East line and SKLRT to the right In the distant background lie Buangkok and Hougang References Edit Land Transport DataMall mytransport sg Archived from the original on 21 August 2020 Retrieved 20 August 2020 Kyosan Corporate Report 2018 2018 p 19 to 20 Archived from the original on 16 June 2020 Retrieved 16 June 2020 Speech By Mr Mah Bow Tan Minister For Communications At The Sengkang LRT Exhibition At Ngee Ann City PDF NAS Archived PDF from the original on 1 October 2020 Appointment of operator for the North East MRT line NAS 20 May 1999 Archived from the original on 23 November 2019 Retrieved 22 November 2019 SBS to run North East line Tibs to merge with SMRT The Straits Times retrieved from NLB 21 May 1999 Archived from the original on 6 October 2019 Retrieved 6 October 2019 Free LRT service in Sengkang Today retrieved from NLB 17 January 2003 Archived from the original on 8 July 2019 Retrieved 13 October 2019 Cheng Lim LRT station To Open And Sengkang West LRT to Run in Both Directions SBS Transit 21 December 2012 Archived from the original on 24 December 2012 Retrieved 21 December 2012 Kupang LRT station to open on Saturday 27 June 2015 PDF SBS Transit 15 June 2015 Archived PDF from the original on 24 November 2015 Retrieved 15 June 2015 2 car System for Sengkang Punggol LRT by 2016 Improvements to Choa Chu Kang LRT station Land Transport Authority 31 October 2012 Archived from the original on 22 October 2013 Retrieved 12 October 2013 Tan Christopher 24 December 2015 2 car trains roll out on Sengkang LRT The Straits Times Archived from the original on 28 October 2017 Retrieved 28 October 2017 Limited service along Sengkang Punggol LRT on Sundays in Jan Feb to facilitate rail works Archived from the original on 16 December 2017 Retrieved 17 December 2017 Limited Sengkang Punggol LRT services on Sunday mornings from 14 Jan Archived from the original on 21 December 2017 Retrieved 17 December 2017 Limited service on Sundays for Sengkang Punggol LRT 16 December 2017 Archived from the original on 18 December 2017 Retrieved 17 December 2017 Maintenance work to resume on Sengkang and Punggol LRT systems on 4 Mar Archived from the original on 23 February 2018 Retrieved 23 February 2018 Maintenance works to resume on Sengkang and Punggol LRT systems 22 February 2018 Archived from the original on 23 February 2018 Retrieved 23 February 2018 SBS Transit extends limited service on Sundays for Sengkang Punggol LRT to October 11 May 2018 Archived from the original on 14 May 2018 Retrieved 14 May 2018 Limited service hours on Sundays for Sengkang Punggol LRT to be extended Archived from the original on 15 May 2018 Retrieved 14 May 2018 Sengkang Punggol LRT to get 17 new two car trains to boost capacity CNA 5 February 2021 Retrieved 6 February 2021 Punggol LRT and Sengkang LRT West Loop to Commence Revenue Service on 29 January 2005 SBS Transit 10 January 2005 Archived from the original on 30 August 2019 Retrieved 30 August 2019 Punggol LRT East Loop And Sengkang LRT West Loop Commence Revenue Service Today SBS Transit 29 January 2005 Archived from the original on 11 February 2013 Retrieved 29 June 2014 Farmway LRT Station to open on 15 November 2007 SBS Transit 14 November 2007 Archived from the original on 7 September 2017 Retrieved 7 September 2017 SK West Loop Peak Hours PDF SBS Transit 16 December 2009 Archived PDF from the original on 19 February 2016 Retrieved 30 August 2019 Cheng Lim LRT Station To Open And Sengkang West LRT to Run in Both Directions SBS Transit 21 December 2012 Archived from the original on 24 December 2012 Retrieved 21 December 2012 Kupang LRT Station to open on Saturday 27 June 2015 PDF SBS Transit 15 June 2015 Archived PDF from the original on 24 November 2015 Retrieved 15 June 2015 Products and Services Kyosan Electric Mfg Co Ltd www kyosan co jp Archived from the original on 16 July 2017 Retrieved 13 June 2017 migration 20 April 2015 Sengkang LRT East Loop train service stopped briefly The Straits Times Archived from the original on 25 August 2019 Retrieved 25 August 2019 Sengkang LRT trains stuck on tracks due to power fault The Online Citizen 9 May 2015 Archived from the original on 25 August 2019 Retrieved 25 August 2019 hermesauto 16 February 2018 Sengkang LRT train breaks down on first day of CNY passengers get down and walk on tracks The Straits Times Archived from the original on 25 August 2019 Retrieved 25 August 2019 Wikimedia Commons has media related to Sengkang Pungool LRT External links EditSengkang LRT line Retrieved from https en wikipedia org w index php title Sengkang LRT line amp oldid 1166215173, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.