Riesa–Chemnitz railway

The Chemnitz–Riesa railway is a two-track and electrified mainline railway in the German state of Saxony, originally built and operated by the Chemnitz-Riesa Railway Company. The line was opened between 1847 and 1852 and is one of the oldest railways in Germany. The line runs from Riesa via Döbeln to Chemnitz and is part of the Berlin–Chemnitz route.

Riesa–Döbeln–Chemnitz
Overview
Line number6265
LocaleSaxony, Germany
Service
Route number520
Technical
Line length66.03 km (41.03 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius300 m (984 ft)
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed140 km/h (87.0 mph) (maximum)
Maximum incline1.0%
Route map

-0.135
Riesa
106 m
0.64
Riesa Stw W4 junction
to Nossen
3.03
Block Oelsitz
5.694
Seerhausen
117 m
5.845
B 6 bridge (18 m)
7.490
Jahna bridge (10 m)
7.917
flood channel bridge (24 m)
9.286
B 169 bridge (13 m)
9.448
Stauchitz
129 m
9.583
Mühlweg bridge (14 m)
12.161
bridge in meadow (15 m)
13.880
bridge (14 m)
14.762
bridge (14 m)
15.185
Ostrau
159 m
15.567
Ostrau viaduct (157 m)
18.812
Zschaitz
180 m
19.500
bridge (16 m)
Döbeln–Lommatzsch narrow gauge line
narrow gauge lines
from Mügeln and Lommatzsch
23.158
Döbeln-Gärtitz
formerly Gärtitz
178 m
B 175
24.503
Döbeln Nord
formerly Großbauchlitz
176 m
24.773
Freiberger Mulde bridge (97 m)
24.875
flood channel bridge (23 m)
25.179
B 175 bridge (13 m)
25.375
Döbeln Hbf
176 m
B 175 bridge (18 m)
28.82
Limmritz (Saxony)
194 m
29.068
Wirtschaftsweg bridge (12 m)
29.981
Limmritz viaduct (260 m)
30.361
Saalbach tunnel
(128 m; roof removed, 1987)
30.522
Bachb bridge (19 m)
31.459
Saalbach viaduct (226 m)
31.63
Steina
212 m
32.362
Kummersmühle viaduct (110 m)
34.271
Diedenmühle viaduct (172 m)
34.931
Waldheim
236 m
35.073
Bahnhofstraße bridge (17 m)
to Kriebethal
35.71
Pfaffenberg tunnel
(170 m; roof removed, 1990)
36.055
Heiligenborn viaduct (173 m)
37.99
Block Reinsdorf
39.891
Neumilkau bridge (69 m)
41.59
Schweikershain
285 m
43.095
Crossen viaduct
(155 m; filled in 1991)
45.39
Erlau (Saxony)
(former station)
311 m
47.675
Leipziger Straße bridge (12 m)
48.03
Mittweida
296 m
to Dreiwerden/Ringethal
49.827
Wirtschaftsweg bridge (10 m)
50.07
Altmittweida
297 m
50.330
Altmittweida viaduct
(92 m; filled in 1991)
51.016
Wirtschaftsweg bridge (10 m)
51.741
Holzbach bridge (19 m)
53.94
Ottendorf (b Mittweida)
321 m
54.450
Ottendorf viaduct (84 m)
57.09
Oberlichtenau
340 m
58.010
A 4 bridge (58 m)
59.431
Wirtschaftsweg bridge (13 m)
59.76
Chemnitz-Kinderwaldstätte
330 m
63.40
Abzw Chemnitz-Furth
63.555
tunnel Glösaer Straße (20 m, filled in)
65.89
Chemnitz Hbf
302 m
connection to Chemnitz tram network
Source: German railway atlas[1]

History edit

 
Riesa station
 
The steel bridge at Ostrau
 
Döbeln Hauptbahnhof, opened 1868

In 1837, plans were submitted for a rail link from Riesa, a major freight hub on the Elbe river, to Chemnitz and on to Zwickau, which was significant as a coal-producing region. After the Leipzig–Dresden railway was opened, connecting the industrial city of Chemnitz to Leipzig and Dresden, even if it involved a detour via Riesa, was given the highest priority. On 9 May 1845 construction started and progressed rapidly on the northern section from Riesa to Döbeln. The line was officially opened on 30 August 1847[2] and on 22 September 1847 it was extended a short distance to Limmritz.[3] Döbeln initially only had a station in the northern district of Großbauchlitz. The current Döbeln Hauptbahnhof was only opened in its present position after the completion of the Dresden–Döbeln–Leipzig line in 1868.

Construction of the section from Limmritz to Waldheim presented major problems. Although work began in 1845, the cost of building viaducts, retaining walls and earthworks in the Zschopau valley quickly put the company into financial distress. Already in 1845 strikes began to occur due to the lack of payment of wages to workers; the revolution of 1848 further complicated construction. As of the line could not be operated profitable without a continuous line to Chemnitz and a loan could not be raised, the Chemnitz-Riesa Railway Company (German: Chemnitz-Riesaer Eisenbahn-Gesellschaft) asked to be taken over by the state in 1848. This took place on 31 December 1850 and the company continued construction, so that finally, on 1 September 1852, the whole line could be opened. Even now, the Limmritz–Waldheim section is known as the Bankrottmeile ("bankruptcy mile"; note that the northern German mile was 7532.5 metres long).

A line from Chemnitz to Zwickau was opened as planned by the Ore Mountains Railway Company (Erzgebirgischen Eisenbahn-Gesellschaft) in 1858 (with a branch extending from Glauchau to Gößnitz); as a result the line became known as the Lower Ore Mountains State Railway (Niedererzgebirgischen Staatsbahn). The line now connected not only to the Saxon-Bavarian State Railway (Sächsisch-Baiersche Eisenbahn-Compagnie), but also to the Upper Ore Mountains State Railway (Obererzgebirgischen Staatsbahn) between Zwickau and Schwarzenberg, Saxony, which also opened in 1858. On 1 January 1859 these lines were named the Western State Railways (Westlichen Staatsbahn).

In the Austro-Prussian War of 1866, the Ostrau viaduct was demolished by Prussian pioneers. Großbauchlitz (Döbeln Nord since 1932) station was connected in 1905 by a 1 km-long trolleybus-like system for freight from Günther's flour mill; it was replaced in 1914 by a siding. The biggest turning point in the line's history occurred after 1945. Reparations to the Soviet Union led to the complete dismantling of the second track, which made operating during the next 45 years very difficult on this heavily trafficked mainline route. The second track was restored to operations only in 1990. Prior to the electrification of 1991, the roofs of two "artificial" tunnels (which were built in the early years of the line to avoid rock falls and snow drifts) were removed.

Route edit

In Riesa station the line branches off along with the branch line to Nossen from the Leipzig–Dresden line. The line to Nossen branches off the left and runs to the south, while the Chemnitz line runs to the south-west and passes over highway B 169. The northern section runs through relatively flat land until the Döbeln area; the only significant engineering works on this section is the 130 m-long viaduct near Ostrava and the 80 m-long bridge over the Mulde outside Döbeln station. Near the Döbeln-Nord motorway junction, it crosses the A 14, and after crossing the Freiberger Mulde it runs to the now single-track and non-electrified main line from Coswig via Borsdorf to Leipzig. Döbeln Hauptbahnhof is built at the junction of two lines as a V-shaped station. The station building is located between the tracks from Riesa and Meissen.

South of Döbeln Hauptbahnhof, the Borsdorf–Coswig line branches off to the west and the line then crosses highways B 169 and B 175. The line enters the valley of the Zschopau near Limmritz. The section from Limmritz to Waldheim has the greatest concentration of engineering works on the entire route. Since as a result of the construction of this section, the Chemnitz-Riesa railway company went bankrupt and had to be taken over by the state, it is commonly known even today as the "bankruptcy mile". The line crosses the 14 arches of the 270 m-long and 32-m high Limmritz viaduct over the Zschopau. Immediately afterwards it used to pass through the 128 m-long Saalbach tunnel, which had its roof removed in 1991 in preparations for the line's electrification. The line then follows a steep and rocky slope along the left bank of the river, which it crosses on the 49 m-high, 210 m-long Diedenmühle Bridge over Steinaer Bach (stream), which here flows in a deep valley to the Zschopau. In Waldheim station, the disused line from Rochlitz branched off to the west until its closure in 1997.

South of Waldheim station the line used to run through the 170-metre-long Pfaffenberg tunnel, which was also had its roof removed prior to the electrification of the line. The line then crosses the Zschopau again on the 41 m-high and 211 m-long Heiligenborn viaduct. East of the viaduct is a 28 m-high and 165 m-long steel girder bridge of the abandoned freight railway to Kriebethal near Kriebstein. The Chemnitz line turns slightly toward the southwest, away from the Kriebstein line (which runs on a more southerly course) and the Zschopau to reach its westernmost point just before Eger. It then runs fairly directly to the south to Mittweida, Altmittweida and Oberlichtenau, where it crosses the A 4. This bridge was replaced completely as part of the upgrade of the A 4 at the end of the 1990s to six lanes. On its way to its southern end at Chemnitz Hauptbahnhof, the line is joined by the Dresden–Werdau line from the east and the line from Leipzig from the west.

Services edit

A Regionalbahn service (RB 45) runs on the Elsterwerda–Riesa–Chemnitz hourly. It used to be operated by DB Regio until mid-June 2016 mainly with class 143 locomotives, hauling two double-deck carriages. Since 12 June 2016 those services are operated by Mitteldeutsche Regiobahn with Alstom Coradia Continental electric multiple units. Additional suburban services are run between Mittweida and Chemnitz by City-Bahn Chemnitz.

 
Mitteldeutsche Eisenbahn locomotive in Döbeln Hauptbahnhof

There are also freight transport on the line, particularly coal trains to Chemnitz and Mitteldeutsche Eisenbahn tanker trains on the section between Riesa and Döbeln Hauptbahnhof.

Notes edit

  1. ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. p. 59, 71, 133. ISBN 978-3-89494-139-0.
  2. ^ "Ankündigungen: Chemnitzer–Riesaer Eisenbahn". Deutsche Allgemeine Zeitung (in German). No. 240. 28 August 1847. p. 2095.
  3. ^ "Ankündigungen: Chemnitzer–Riesaer Eisenbahn". Deutsche Allgemeine Zeitung (in German). No. 265. 22 September 1847. p. 2295.

References edit

  • Berger, Manfred (1991). "Die Chemnitz-Riesaer Eisenbahn". Historische Bahnhofsbauten I (in German). Berlin: transpress Verlagsgesellschaft mbH. pp. 83–90.
  • Berger, Thomas; et al. (2002). 150 Jahre Eisenbahnstrecke Riesa – Chemnitz. Eisenbahn in Chemnitz (in German). Dresden: Verein Sächsischer Eisenbahnfreunde e.V.

riesa, chemnitz, railway, chemnitz, riesa, railway, track, electrified, mainline, railway, german, state, saxony, originally, built, operated, chemnitz, riesa, railway, company, line, opened, between, 1847, 1852, oldest, railways, germany, line, runs, from, ri. The Chemnitz Riesa railway is a two track and electrified mainline railway in the German state of Saxony originally built and operated by the Chemnitz Riesa Railway Company The line was opened between 1847 and 1852 and is one of the oldest railways in Germany The line runs from Riesa via Dobeln to Chemnitz and is part of the Berlin Chemnitz route Riesa Dobeln ChemnitzOverviewLine number6265LocaleSaxony GermanyServiceRoute number520TechnicalLine length66 03 km 41 03 mi Number of tracks2Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeMinimum radius300 m 984 ft Electrification15 kV 16 7 Hz AC overhead catenaryOperating speed140 km h 87 0 mph maximum Maximum incline1 0 Route mapLegend from Dresden 0 135 Riesa 106 m to Leipzig 0 64 Riesa Stw W4 junction to Nossen 3 03 Block Oelsitz 5 694 Seerhausen 117 m 5 845 B 6 bridge 18 m 7 490 Jahna bridge 10 m 7 917 flood channel bridge 24 m 9 286 B 169 bridge 13 m 9 448 Stauchitz 129 m 9 583 Muhlweg bridge 14 m 12 161 bridge in meadow 15 m 13 880 bridge 14 m 14 762 bridge 14 m 15 185 Ostrau 159 m 15 567 Ostrau viaduct 157 m 18 812 Zschaitz 180 m 19 500 bridge 16 m Dobeln Lommatzsch narrow gauge line narrow gauge linesfrom Mugeln and Lommatzsch 23 158 Dobeln Gartitz formerly Gartitz 178 m B 175 24 503 Dobeln Nordformerly Grossbauchlitz 176 m 24 773 Freiberger Mulde bridge 97 m 24 875 flood channel bridge 23 m 25 179 B 175 bridge 13 m 25 375 Dobeln Hbf Keilbahnhof 176 m from Meissen to Leipzig B 175 bridge 18 m 28 82 Limmritz Saxony 194 m 29 068 Wirtschaftsweg bridge 12 m 29 981 Limmritz viaduct 260 m 30 361 Saalbach tunnel 128 m roof removed 1987 30 522 Bachb bridge 19 m 31 459 Saalbach viaduct 226 m 31 63 Steina 212 m 32 362 Kummersmuhle viaduct 110 m 34 271 Diedenmuhle viaduct 172 m from Rochlitz 34 931 Waldheim 236 m 35 073 Bahnhofstrasse bridge 17 m to Kriebethal 35 71 Pfaffenberg tunnel 170 m roof removed 1990 36 055 Heiligenborn viaduct 173 m 37 99 Block Reinsdorf 39 891 Neumilkau bridge 69 m 41 59 Schweikershain 285 m 43 095 Crossen viaduct 155 m filled in 1991 45 39 Erlau Saxony former station 311 m 47 675 Leipziger Strasse bridge 12 m 48 03 Mittweida 296 m to Dreiwerden Ringethal 49 827 Wirtschaftsweg bridge 10 m 50 07 Altmittweida 297 m 50 330 Altmittweida viaduct 92 m filled in 1991 51 016 Wirtschaftsweg bridge 10 m 51 741 Holzbach bridge 19 m 53 94 Ottendorf b Mittweida 321 m 54 450 Ottendorf viaduct 84 m 57 09 Oberlichtenau 340 m 58 010 A 4 bridge 58 m 59 431 Wirtschaftsweg bridge 13 m 59 76 Chemnitz Kinderwaldstatte 330 m 63 40 Abzw Chemnitz Furth to Chemnitz Hilbersdorf marshalling yard 63 555 tunnel Glosaer Strasse 20 m filled in freight lines KCCh and RCCh from Neukieritzsch from Dresden Hbf 65 89 Chemnitz Hbf 302 m connection to Chemnitz tram network to Adorf to Abzw Werdau Bogendreieck Source German railway atlas 1 Contents 1 History 2 Route 3 Services 4 Notes 5 ReferencesHistory edit nbsp Riesa station nbsp The steel bridge at Ostrau nbsp Dobeln Hauptbahnhof opened 1868 In 1837 plans were submitted for a rail link from Riesa a major freight hub on the Elbe river to Chemnitz and on to Zwickau which was significant as a coal producing region After the Leipzig Dresden railway was opened connecting the industrial city of Chemnitz to Leipzig and Dresden even if it involved a detour via Riesa was given the highest priority On 9 May 1845 construction started and progressed rapidly on the northern section from Riesa to Dobeln The line was officially opened on 30 August 1847 2 and on 22 September 1847 it was extended a short distance to Limmritz 3 Dobeln initially only had a station in the northern district of Grossbauchlitz The current Dobeln Hauptbahnhof was only opened in its present position after the completion of the Dresden Dobeln Leipzig line in 1868 Construction of the section from Limmritz to Waldheim presented major problems Although work began in 1845 the cost of building viaducts retaining walls and earthworks in the Zschopau valley quickly put the company into financial distress Already in 1845 strikes began to occur due to the lack of payment of wages to workers the revolution of 1848 further complicated construction As of the line could not be operated profitable without a continuous line to Chemnitz and a loan could not be raised the Chemnitz Riesa Railway Company German Chemnitz Riesaer Eisenbahn Gesellschaft asked to be taken over by the state in 1848 This took place on 31 December 1850 and the company continued construction so that finally on 1 September 1852 the whole line could be opened Even now the Limmritz Waldheim section is known as the Bankrottmeile bankruptcy mile note that the northern German mile was 7532 5 metres long A line from Chemnitz to Zwickau was opened as planned by the Ore Mountains Railway Company Erzgebirgischen Eisenbahn Gesellschaft in 1858 with a branch extending from Glauchau to Gossnitz as a result the line became known as the Lower Ore Mountains State Railway Niedererzgebirgischen Staatsbahn The line now connected not only to the Saxon Bavarian State Railway Sachsisch Baiersche Eisenbahn Compagnie but also to the Upper Ore Mountains State Railway Obererzgebirgischen Staatsbahn between Zwickau and Schwarzenberg Saxony which also opened in 1858 On 1 January 1859 these lines were named the Western State Railways Westlichen Staatsbahn In the Austro Prussian War of 1866 the Ostrau viaduct was demolished by Prussian pioneers Grossbauchlitz Dobeln Nord since 1932 station was connected in 1905 by a 1 km long trolleybus like system for freight from Gunther s flour mill it was replaced in 1914 by a siding The biggest turning point in the line s history occurred after 1945 Reparations to the Soviet Union led to the complete dismantling of the second track which made operating during the next 45 years very difficult on this heavily trafficked mainline route The second track was restored to operations only in 1990 Prior to the electrification of 1991 the roofs of two artificial tunnels which were built in the early years of the line to avoid rock falls and snow drifts were removed Route editIn Riesa station the line branches off along with the branch line to Nossen from the Leipzig Dresden line The line to Nossen branches off the left and runs to the south while the Chemnitz line runs to the south west and passes over highway B 169 The northern section runs through relatively flat land until the Dobeln area the only significant engineering works on this section is the 130 m long viaduct near Ostrava and the 80 m long bridge over the Mulde outside Dobeln station Near the Dobeln Nord motorway junction it crosses the A 14 and after crossing the Freiberger Mulde it runs to the now single track and non electrified main line from Coswig via Borsdorf to Leipzig Dobeln Hauptbahnhof is built at the junction of two lines as a V shaped station The station building is located between the tracks from Riesa and Meissen South of Dobeln Hauptbahnhof the Borsdorf Coswig line branches off to the west and the line then crosses highways B 169 and B 175 The line enters the valley of the Zschopau near Limmritz The section from Limmritz to Waldheim has the greatest concentration of engineering works on the entire route Since as a result of the construction of this section the Chemnitz Riesa railway company went bankrupt and had to be taken over by the state it is commonly known even today as the bankruptcy mile The line crosses the 14 arches of the 270 m long and 32 m high Limmritz viaduct over the Zschopau Immediately afterwards it used to pass through the 128 m long Saalbach tunnel which had its roof removed in 1991 in preparations for the line s electrification The line then follows a steep and rocky slope along the left bank of the river which it crosses on the 49 m high 210 m long Diedenmuhle Bridge over Steinaer Bach stream which here flows in a deep valley to the Zschopau In Waldheim station the disused line from Rochlitz branched off to the west until its closure in 1997 South of Waldheim station the line used to run through the 170 metre long Pfaffenberg tunnel which was also had its roof removed prior to the electrification of the line The line then crosses the Zschopau again on the 41 m high and 211 m long Heiligenborn viaduct East of the viaduct is a 28 m high and 165 m long steel girder bridge of the abandoned freight railway to Kriebethal near Kriebstein The Chemnitz line turns slightly toward the southwest away from the Kriebstein line which runs on a more southerly course and the Zschopau to reach its westernmost point just before Eger It then runs fairly directly to the south to Mittweida Altmittweida and Oberlichtenau where it crosses the A 4 This bridge was replaced completely as part of the upgrade of the A 4 at the end of the 1990s to six lanes On its way to its southern end at Chemnitz Hauptbahnhof the line is joined by the Dresden Werdau line from the east and the line from Leipzig from the west Services editA Regionalbahn service RB 45 runs on the Elsterwerda Riesa Chemnitz hourly It used to be operated by DB Regio until mid June 2016 mainly with class 143 locomotives hauling two double deck carriages Since 12 June 2016 those services are operated by Mitteldeutsche Regiobahn with Alstom Coradia Continental electric multiple units Additional suburban services are run between Mittweida and Chemnitz by City Bahn Chemnitz nbsp Mitteldeutsche Eisenbahn locomotive in Dobeln Hauptbahnhof There are also freight transport on the line particularly coal trains to Chemnitz and Mitteldeutsche Eisenbahn tanker trains on the section between Riesa and Dobeln Hauptbahnhof Notes edit Eisenbahnatlas Deutschland German railway atlas Schweers Wall 2009 p 59 71 133 ISBN 978 3 89494 139 0 Ankundigungen Chemnitzer Riesaer Eisenbahn Deutsche Allgemeine Zeitung in German No 240 28 August 1847 p 2095 Ankundigungen Chemnitzer Riesaer Eisenbahn Deutsche Allgemeine Zeitung in German No 265 22 September 1847 p 2295 References editBerger Manfred 1991 Die Chemnitz Riesaer Eisenbahn Historische Bahnhofsbauten I in German Berlin transpress Verlagsgesellschaft mbH pp 83 90 Berger Thomas et al 2002 150 Jahre Eisenbahnstrecke Riesa Chemnitz Eisenbahn in Chemnitz in German Dresden Verein Sachsischer Eisenbahnfreunde e V Retrieved from https en wikipedia org w index php title Riesa Chemnitz railway amp oldid 1188412898, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.