Bogor–Ciawi–Sukabumi Toll Road

Bogor-Ciawi–Sukabumi Toll Road or Bocimi Toll Road is a highway of 53.6-kilometre (33.3 mi) toll road link, which is under construction that will connect Bogor Regency, Bogor city, Sukabumi Regency and Sukabumi city in West Java, Indonesia. The 15.35-kilometre (9.54 mi) first section of the toll road between Ciawi and Cigombong was inaugurated by Indonesia's President Joko Widodo on 3 December 2018. [1]

Bogor-Ciawi-Sukabumi
Bocimi
Route information
Maintained by PT. Trans Jabar Toll
Length53.6 km (33.3 mi)
Major junctions
FromBogor
Major intersections
ToSukabumi
Location
CountryIndonesia
Major cities
Highway system

Sections

Bocimi Toll Road consists of four sections, including

  • Section I- Ciawi-Cigombong 15.3 km (9.5 mi), formally opened on 1 December 2018.[2]
  • Section II-Cigombong-Cibadak 12 km (7.5 mi), in development
  • Section III-Cibadak-West Sukabumi 14 km (8.7 mi), pre-development, and
  • Section IV- West Sukabumi-East Sukabumi 13 km (8.1 mi), pre-development.

The toll road section I is expected to be fully operational by 2019.[3] The cost of this toll road is about Rp 7.7 trillion.

History

According to BPJT (Indonesian Toll Road Authority), a Concession Toll Road Agreement (PPJT) was initially signed by consortium PT. Bukaka Teknik Utama (PT Bukaka Teknik Utama 35%, PT. Graha Multitama Sejahtera 32.5%, PT. Karya Perkasa Insani 33.5%). In 2011, Bakrie group took over the majority shareholder of this toll road segment with PT. Trans Jabar Toll as operator. The composition of the shareholder were Bakrie Toll Road 60%, PT. Marga Sarana Jabar 25%, and PT. Bukaka Teknik Utama 15%. By the year 2014, MNC group acquired PT Bakrie Toll Road. Unfortunately, the Bocimi Toll Road project was not performed well. Finally, the progress of this project has been increasing significantly since PT. Waskita Toll Road become the shareholder majority of PT. Trans Jabar Toll in 2015. PT. Waskita Toll Road has 81.64% of shareholder while the rest are PT. Bukaka Mega Investama and PT. Jasa Sarana.[4]

Exits

ProvinceLocationkmmiExitNameDestinationsNotes
West JavaEast Bogor, Bogor47.229.3  Jagorawi Toll Road
South Bogor, Bogor48.530.148Ciawi Selatan Toll Gate
  • Northern terminus
  • North-bound exit & South-bound entry only
Caringin, Bogor Regency53.233.153Caringin Toll Gate
  • Caringin
  • Cikereteg
  • Cijeruk
Cigombong, Bogor Regency60.037.360Cigombong Toll Gate
  • Cigombong
  • Cicurug
Cibadak, Sukabumi RegencyTBACibadak Toll Gate
  • TBA
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ "This New Toll Road Drastically Cuts the Time It Takes You to Drive to Sukabumi". Jakarta Globe. Retrieved 4 December 2018.
  2. ^ Sylke Febrina Laucereno (December 1, 2018). "Jokowi: Tol Bocimi akan Tersambung ke Bandung hingga Cilacap".
  3. ^ "Tol Bocimi Akan Beroperasi pada 2019". Liputan 6. Retrieved 10 November 2017.
  4. ^ R Adhi KSP (2010-10-05). "Tol Bogor-Sukabumi Dibangun Tahun 2011". Properti. KOMPAS.com. Retrieved 2017-11-10.

bogor, ciawi, sukabumi, toll, road, bogor, ciawi, sukabumi, toll, road, bocimi, toll, road, highway, kilometre, toll, road, link, which, under, construction, that, will, connect, bogor, regency, bogor, city, sukabumi, regency, sukabumi, city, west, java, indon. Bogor Ciawi Sukabumi Toll Road or Bocimi Toll Road is a highway of 53 6 kilometre 33 3 mi toll road link which is under construction that will connect Bogor Regency Bogor city Sukabumi Regency and Sukabumi city in West Java Indonesia The 15 35 kilometre 9 54 mi first section of the toll road between Ciawi and Cigombong was inaugurated by Indonesia s President Joko Widodo on 3 December 2018 1 Bogor Ciawi Sukabumi BocimiRoute informationMaintained by PT Trans Jabar TollLength53 6 km 33 3 mi Major junctionsFromBogorMajor intersectionsAH2 Jagorawi Toll RoadDepok Antasari Toll RoadToSukabumiLocationCountryIndonesiaMajor citiesBogorBogor RegencySukabumi RegencySukabumiHighway systemTransport in Indonesia Contents 1 Sections 2 History 3 Exits 4 See also 5 ReferencesSections EditBocimi Toll Road consists of four sections including Section I Ciawi Cigombong 15 3 km 9 5 mi formally opened on 1 December 2018 2 Section II Cigombong Cibadak 12 km 7 5 mi in development Section III Cibadak West Sukabumi 14 km 8 7 mi pre development and Section IV West Sukabumi East Sukabumi 13 km 8 1 mi pre development The toll road section I is expected to be fully operational by 2019 3 The cost of this toll road is about Rp 7 7 trillion History EditAccording to BPJT Indonesian Toll Road Authority a Concession Toll Road Agreement PPJT was initially signed by consortium PT Bukaka Teknik Utama PT Bukaka Teknik Utama 35 PT Graha Multitama Sejahtera 32 5 PT Karya Perkasa Insani 33 5 In 2011 Bakrie group took over the majority shareholder of this toll road segment with PT Trans Jabar Toll as operator The composition of the shareholder were Bakrie Toll Road 60 PT Marga Sarana Jabar 25 and PT Bukaka Teknik Utama 15 By the year 2014 MNC group acquired PT Bakrie Toll Road Unfortunately the Bocimi Toll Road project was not performed well Finally the progress of this project has been increasing significantly since PT Waskita Toll Road become the shareholder majority of PT Trans Jabar Toll in 2015 PT Waskita Toll Road has 81 64 of shareholder while the rest are PT Bukaka Mega Investama and PT Jasa Sarana 4 Exits EditProvinceLocationkmmiExitNameDestinationsNotesWest JavaEast Bogor Bogor47 229 3 Jagorawi Toll RoadSouth Bogor Bogor48 530 148Ciawi Selatan Toll GateCiawiTajurPuncakNorthern terminusNorth bound exit amp South bound entry onlyCaringin Bogor Regency53 233 153Caringin Toll GateCaringinCikeretegCijerukCigombong Bogor Regency60 037 360Cigombong Toll GateCigombongCicurugCibadak Sukabumi RegencyTBACibadak Toll GateTBA1 000 mi 1 609 km 1 000 km 0 621 mi Concurrency terminus Electronic toll collection Incomplete access Route transition UnopenedSee also Edit Indonesia portalTrans Java toll roadReferences Edit This New Toll Road Drastically Cuts the Time It Takes You to Drive to Sukabumi Jakarta Globe Retrieved 4 December 2018 Sylke Febrina Laucereno December 1 2018 Jokowi Tol Bocimi akan Tersambung ke Bandung hingga Cilacap Tol Bocimi Akan Beroperasi pada 2019 Liputan 6 Retrieved 10 November 2017 R Adhi KSP 2010 10 05 Tol Bogor Sukabumi Dibangun Tahun 2011 Properti KOMPAS com Retrieved 2017 11 10 Retrieved from https en wikipedia org w index php title Bogor Ciawi Sukabumi Toll Road amp oldid 1118055912, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.