Alto Lindoso Dam (Portuguese: Barragem do Alto Lindoso) is a concrete double curvature arch dam on the Lima River. It is located in the municipality Ponte da Barca, in Viana do Castelo District, Portugal. The dam lies in Peneda-Gerês National Park close to the border with Spain. The reservoir created by the dam is known as Alto Lindoso reservoir or Lindoso reservoir.

Alto Lindoso Dam
Location of Alto Lindoso Dam in Portugal
Official nameBarragem do Alto Lindoso
Locationmunicipality Ponte da Barca, Viana do Castelo District, Portugal
Coordinates41°52′19.2″N 8°12′9″W / 41.872000°N 8.20250°W / 41.872000; -8.20250
PurposePower
StatusOperational
Construction began1983
Opening date1992
Owner(s)Companhia Portuguesa de Produção de Electricidade
Dam and spillways
Type of damConcrete double curvature arch dam
ImpoundsLima
Height (foundation)110 m (360 ft)
Length297 m (974 ft)
Elevation at crest339 m (1,112 ft)
Width (crest)4 m (13 ft)
Width (base)21 m (69 ft)
Dam volume308,500 m3 (10,890,000 cu ft)
Spillway type2 shaft spillways
Spillway capacity2,760 m3 (97,000 cu ft)
Reservoir
Total capacity379,010,000 m3 (307,270 acre⋅ft)
Active capacity347,910,000 m3 (282,060 acre⋅ft)
Surface area10.72 km2 (4.14 sq mi)
Normal elevation338 m (1,109 ft)
Operator(s)Energias de Portugal
Commission date1992
TypePumped-storage
Hydraulic head288 m (945 ft) (max)
Turbines2 x 317 MW Francis-type
Installed capacity630 MW
Annual generation933.8 GWh

History edit

Construction of the dam began in 1983.[1] On 15 August 1991 the land behind the dam lying in Spain was compulsorily acquired by Portuguese company EDP (Electricidade de Portugal), based on an old deal between dictators General Franco of Spain and António de Oliveira Salazar of Portugal. Residents of the five villages which were going to be drowned by the dam, Aceredo, Buscalque, O Bao, A Reloeira and Lantemil, supported by left-leaning political parties, immediately began protests against the building of the dam,[2] including a ten-day hunger strike. In the end, with no option but to move, the residents of Aceredo (a town with 70 houses and 120 citizens) relocated bodies from their cemetery, and a historic church was moved to a different town. Some moved to nearby villages, others far away.[3]

The dam was completed in 1992 and drowned the five villages.[2] It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam is used for power production.[1]

Dam edit

 

Alto Lindoso Dam is 110 m (360 ft) tall (height above foundation) and 297 m (974 ft) long double curvature arch dam with a crest altitude of 339 m (1,112 ft).[1] The width at the base is 21 m (69 ft) (crest 4 m (13 ft)).[4] The volume of the dam is 308,500 m3 (10,890,000 cu ft). The dam contains two shaft spillways with three gates each (combined maximum discharge 2,760 m3 (97,000 cu ft)/s) and two bottom outlets (combined maximum discharge 400 m3 (14,000 cu ft)/s).[1]

Reservoir edit

 
A Sentinel-2 image of the reservoir.

At full reservoir level of 338 m (maximum flood level of 339 m) the reservoir of the dam has a surface area of 10.72 km²[4][5] and its total capacity is 379.01 million m³. Its active capacity is 347.91 (270)[6] million m³. Minimum operating level is 280 m.[1] With the 347.9 million m³ of water, 224.6 GWh of electricity can be produced.[7]

The formerly drowned village of Aceredo in 2022 emerged again after prolonged drought.[8][9]

Power plant edit

The pumped-storage[5] hydroelectric power plant went operational in 1992. It is owned by CPPE, but operated by EDP. The plant has a nameplate capacity of 630[1][5][7] (634)[6] MW. Its average annual generation is somewhat more than 900 GWh.[7][10][6][1][5]

The power station contains 2 Francis turbine-generators of 317 MW (350 MVA) each in an underground powerhouse 340 m below the surface.[4] The turbine rotates at 214.3 rpm. The minimum hydraulic head is 227 m, the maximum 288 m. Maximum flow per turbine is 125 m³/s.[7]

As lower reservoir for Alto Lindoso the reservoir of Touvedo dam is used,[5] which is connected via a tailrace tunnel with a length of 4,883 m.[4][10]

See also edit

References edit

  1. ^ a b c d e f g "ALTO LINDOSO DAM". APA Barragens de Portugal. Retrieved 13 February 2015.
  2. ^ a b Pontevedra, Silvia R. (14 December 2012). "Memoria de un pueblo ahogado". El País (in Spanish). Retrieved 21 February 2022.
  3. ^ Johnson, Cara (15 February 2022). "After A Drought, This Decades-Old Spanish Ghost Village Has Reemerged From The Bottom Of A Reservoir". All That's Interesting. Retrieved 21 February 2022.
  4. ^ a b c d (in Portuguese). Museu da Electricidade. Archived from the original on 22 April 2015. Retrieved 13 February 2015.
  5. ^ a b c d e "Alto Lindoso Hydroelectric Power Plant Portugal". Global Energy Observatory. Retrieved 13 February 2015.
  6. ^ a b c (PDF) (in Portuguese). Rede Eléctrica Nacional, S.A. p. 30 (28). Archived from the original (PDF) on 27 June 2021. Retrieved 13 February 2015.
  7. ^ a b c d (in Portuguese). Energias de Portugal. Archived from the original on 5 November 2014. Retrieved 13 February 2015.
  8. ^ "Week in pictures: 12–18 February 2022". BBC News. 19 February 2022. Retrieved 19 February 2022.
  9. ^ "Ghost village emerges in Spain as drought empties reservoir". The Guardian. 12 February 2022. Retrieved 21 February 2022.
  10. ^ a b (PDF) (in Portuguese). Energias de Portugal. p. 16-17 (14-15). Archived from the original (PDF) on 3 November 2014. Retrieved 13 February 2015.

alto, lindoso, portuguese, barragem, alto, lindoso, concrete, double, curvature, arch, lima, river, located, municipality, ponte, barca, viana, castelo, district, portugal, lies, peneda, gerês, national, park, close, border, with, spain, reservoir, created, kn. Alto Lindoso Dam Portuguese Barragem do Alto Lindoso is a concrete double curvature arch dam on the Lima River It is located in the municipality Ponte da Barca in Viana do Castelo District Portugal The dam lies in Peneda Geres National Park close to the border with Spain The reservoir created by the dam is known as Alto Lindoso reservoir or Lindoso reservoir Alto Lindoso DamLocation of Alto Lindoso Dam in PortugalOfficial nameBarragem do Alto LindosoLocationmunicipality Ponte da Barca Viana do Castelo District PortugalCoordinates41 52 19 2 N 8 12 9 W 41 872000 N 8 20250 W 41 872000 8 20250PurposePowerStatusOperationalConstruction began1983Opening date1992Owner s Companhia Portuguesa de Producao de ElectricidadeDam and spillwaysType of damConcrete double curvature arch damImpoundsLimaHeight foundation 110 m 360 ft Length297 m 974 ft Elevation at crest339 m 1 112 ft Width crest 4 m 13 ft Width base 21 m 69 ft Dam volume308 500 m3 10 890 000 cu ft Spillway type2 shaft spillwaysSpillway capacity2 760 m3 97 000 cu ft ReservoirTotal capacity379 010 000 m3 307 270 acre ft Active capacity347 910 000 m3 282 060 acre ft Surface area10 72 km2 4 14 sq mi Normal elevation338 m 1 109 ft Operator s Energias de PortugalCommission date1992TypePumped storageHydraulic head288 m 945 ft max Turbines2 x 317 MW Francis typeInstalled capacity630 MWAnnual generation933 8 GWh Contents 1 History 2 Dam 3 Reservoir 4 Power plant 5 See also 6 ReferencesHistory editConstruction of the dam began in 1983 1 On 15 August 1991 the land behind the dam lying in Spain was compulsorily acquired by Portuguese company EDP Electricidade de Portugal based on an old deal between dictators General Franco of Spain and Antonio de Oliveira Salazar of Portugal Residents of the five villages which were going to be drowned by the dam Aceredo Buscalque O Bao A Reloeira and Lantemil supported by left leaning political parties immediately began protests against the building of the dam 2 including a ten day hunger strike In the end with no option but to move the residents of Aceredo a town with 70 houses and 120 citizens relocated bodies from their cemetery and a historic church was moved to a different town Some moved to nearby villages others far away 3 The dam was completed in 1992 and drowned the five villages 2 It is owned by Companhia Portuguesa de Producao de Electricidade CPPE The dam is used for power production 1 Dam edit nbsp Alto Lindoso Dam is 110 m 360 ft tall height above foundation and 297 m 974 ft long double curvature arch dam with a crest altitude of 339 m 1 112 ft 1 The width at the base is 21 m 69 ft crest 4 m 13 ft 4 The volume of the dam is 308 500 m3 10 890 000 cu ft The dam contains two shaft spillways with three gates each combined maximum discharge 2 760 m3 97 000 cu ft s and two bottom outlets combined maximum discharge 400 m3 14 000 cu ft s 1 Reservoir edit nbsp A Sentinel 2 image of the reservoir At full reservoir level of 338 m maximum flood level of 339 m the reservoir of the dam has a surface area of 10 72 km 4 5 and its total capacity is 379 01 million m Its active capacity is 347 91 270 6 million m Minimum operating level is 280 m 1 With the 347 9 million m of water 224 6 GWh of electricity can be produced 7 The formerly drowned village of Aceredo in 2022 emerged again after prolonged drought 8 9 Power plant editThe pumped storage 5 hydroelectric power plant went operational in 1992 It is owned by CPPE but operated by EDP The plant has a nameplate capacity of 630 1 5 7 634 6 MW Its average annual generation is somewhat more than 900 GWh 7 10 6 1 5 The power station contains 2 Francis turbine generators of 317 MW 350 MVA each in an underground powerhouse 340 m below the surface 4 The turbine rotates at 214 3 rpm The minimum hydraulic head is 227 m the maximum 288 m Maximum flow per turbine is 125 m s 7 As lower reservoir for Alto Lindoso the reservoir of Touvedo dam is used 5 which is connected via a tailrace tunnel with a length of 4 883 m 4 10 See also edit nbsp Portugal portal nbsp Water portal nbsp Renewable energy portal List of power stations in Portugal List of dams and reservoirs in PortugalReferences edit a b c d e f g ALTO LINDOSO DAM APA Barragens de Portugal Retrieved 13 February 2015 a b Pontevedra Silvia R 14 December 2012 Memoria de un pueblo ahogado El Pais in Spanish Retrieved 21 February 2022 Johnson Cara 15 February 2022 After A Drought This Decades Old Spanish Ghost Village Has Reemerged From The Bottom Of A Reservoir All That s Interesting Retrieved 21 February 2022 a b c d Central do Alto Lindoso in Portuguese Museu da Electricidade Archived from the original on 22 April 2015 Retrieved 13 February 2015 a b c d e Alto Lindoso Hydroelectric Power Plant Portugal Global Energy Observatory Retrieved 13 February 2015 a b c Hidroelectricidade em Portugal memoria e desafio PDF in Portuguese Rede Electrica Nacional S A p 30 28 Archived from the original PDF on 27 June 2021 Retrieved 13 February 2015 a b c d Alto Lindoso Informacao Tecnica in Portuguese Energias de Portugal Archived from the original on 5 November 2014 Retrieved 13 February 2015 Week in pictures 12 18 February 2022 BBC News 19 February 2022 Retrieved 19 February 2022 Ghost village emerges in Spain as drought empties reservoir The Guardian 12 February 2022 Retrieved 21 February 2022 a b DECLARACAO AMBIENTAL 2012 PDF in Portuguese Energias de Portugal p 16 17 14 15 Archived from the original PDF on 3 November 2014 Retrieved 13 February 2015 nbsp Wikimedia Commons has media related to Alto Lindoso Dam Retrieved from https en wikipedia org w index php title Alto Lindoso Dam amp oldid 1176753982, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.