Alstom Metropolis C851E

The Alstom Metropolis C851E is the upcoming third generation electric multiple unit rolling stock to be introduced on the existing North East and Circle lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Alstom under Contract 851E. It consists of six North East line trains and 23 Circle line trains. The trains will be manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL.[4] The contract, valued at S$249,854,305.00,[5] was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot.[6] Alstom is the sole bidder for this contract.[5] An additional 12 3-car trains will be purchased for use on the Circle line, from 2024 onwards.[7]

Alstom Metropolis C851E
In service
  • 2024 (NEL)
  • 2026 (CCL)
ManufacturerAlstom
Built atBarcelona, Spain
Family nameMetropolis
Number under construction66 Vehicles (22 Trainsets) (CCL)
Number built
  • 36 Vehicles (6 Trainsets) (NEL)
  • 3 Vehicles (1 Trainset) (CCL)
Formation6 per NEL trainset, 3 per CCL trainset
  • DT–Mp–Mi+Mi–Mp–DT (NEL)
  • Mc1–T–Mc2 (CCL)
Fleet numbers
  • 7087/7088 – 7097/7098 (NEL)
  • 865 – 887 (CCL)
Operator(s)
Depot(s)
Line(s) served
Specifications
Car body constructionWelded aluminium
Train length
  • 138.5 m (454 ft 4+34 in) (NEL)
  • 70.1 m (229 ft 11+78 in) (CCL)
Car length
  • 23.65 m (77 ft 7+18 in) (DT/Mc)
  • 22.8 m (74 ft 9+58 in) (Mp/Mi/T)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+58 in)
Doors1,450 mm (57+18 in), 8 per car, 4 per side
Maximum speed
  • 100 km/h (62 mph) (NEL design)
  • 90 km/h (56 mph) (NEL service, CCL design)
  • 78 km/h (48 mph) (CCL service)
Traction systemAlstom OPTONIX IGBTVVVF[1]
Acceleration1.1 m/s2 (3.6 ft/s2)
Deceleration1.3 m/s2 (4.3 ft/s2) (Emergency)
Electric system(s)
Current collector(s)
UIC classification
  • 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′ (NEL)
  • Bo′Bo′+2′2′+Bo′Bo′ (CCL)
Braking system(s)Regenerative and pneumatic
Safety system(s)Alstom URBALIS 300 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI[2][3]
Coupling systemScharfenberg
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Tender

The tender for trains under the contract C851E was closed on 2 October 2017 with Alstom being the sole bidder for this contract.[5] The LTA has shortlisted and the tender results was published.

S/N Name of tenderer Amount ($S) Offer 1[8] Amount ($S) Offer 2[8] Remarks
1 Alstom Transport S.A. / Alstom Transport (S) Pte Ltd Consortium 279,782,872.00 293,489,289.00 Offer 1 in mixed currencies; S$410,100,934.00 (Alternative in mixed currencies)

The contract 851E was awarded to the sole bidder Alstom at a cost of $250 million on 30 April 2018.[5][6]

Overview

North East Line

The 6 new trains will supplement the existing C751A and C751C trains on the North East Line when the 1.7-kilometre (1.1 mi) long extension from Punggol to Punggol Coast opens in 2024. The first train set arrived in Singapore on 4 April 2021.[9]

The trains draw 1,500 V DC power from an overhead catenary. They are fully automated (ATO GoA 4) and do not require an attendant on board. Each 6-car train (Formation: DT–Mp–Mi–Mi–Mp–DT) comprises two Driving Trailer (DT) cars at each end, and four Motor Cars (Mp and Mi). The second and fifth cars of each train (Mp) are equipped with a pantograph.

Train formation

The configuration of an SBS Transit C851E in revenue service is DT–Mp–Mi+Mi–Mp–DT

Cars of SBS Transit C851E
car type Control Cab Motor Pantograph car length Wheelchair Bay
m ft in
DT 23.65 77 ft 7.1 in
Mp 22.8 74 ft 9.6 in
Mi 22.8 74 ft 9.6 in

The car numbers of the trains range from 7x087 to 7x098, where x depends on the carriage type. Individual cars are assigned a five-digit serial number by the rail operator SBS Transit. A complete six-car trainset consists of an identical twin set of one driving trailer (DT) and two motor cars (Mi & Mp) permanently coupled together, e.g. set 7087/7088 consists of carriages 71087, 72087, 73087, 73088, 72088 and 71088.

  • The first digit is always a 7.
  • The second digit identifies the car number, where the first car has a 1, the second has a 2 & the third has a 3.
  • The third digit is always a 0.
  • The fourth digit and fifth digit are the train identification numbers. A full length train of 6 cars have 2 different identification numbers e.g. 7087/7088 (normal coupling) or 7087/7098 (cross coupling).
  • Alstom built sets 7087/7088-7097/7098.

Circle Line

The 23 new trains will supplement the existing C830 and C830C trains on the Circle Line when the 4.3km long extension from HarbourFront to Marina Bay opens in 2026. The first train set arrived in Singapore on 11 March 2022.[10]

The trains draw 750 V DC power from a bottom-contact third rail. They are fully automated (ATO GoA 4) and do not require an attendant on board. Each 3-car train (Formation: Mc1–Tc–Mc2) comprises two Motor Cars (Mc1 and Mc2) at each end, and an unpowered Trailer Car (Tc) in the middle.

Train formation

The configuration of an SMRT C851E in revenue service is Mc1–T–Mc2

Cars of SMRT C851E
car type Control Cab Motor Collector Shoe car length Wheelchair Bay
m ft in
Mc 23.65 77 ft 7.1 in
T 22.8 74 ft 9.6 in

The car numbers of the trains range from 865x to 887x, where x depends on the carriage type. Individual cars are assigned a 4 digit serial number by the rail operator SMRT Trains. A complete three-car trainset consists of one trailer (T) and two driving motor (Mc) cars permanently coupled together, e.g. set 865 consists of carriages 8651, 8652, 8653.

  • The first digit is always an 8.
  • The second and third digits identify the set number.
  • The fourth digit identifies the car number, where the first car has a 1, the second has a 2 and the third has a 3.
  • Alstom built sets 865-887.

Features

To enable a more robust maintenance regime, all the new trains are equipped with condition monitoring systems to gather data from equipment on the trains. This enables continuous monitoring of the health of the equipment and allows the operator to carry out predictive maintenance for the trains. Contact shoe sensors on the new Circle Line trains enables the operator to react promptly and take necessary measures if any dislodgement is detected.

In addition, two of the new Circle Line three-car trains are each fitted with an Automatic Track Inspection (ATI) System, which enables monitoring of the running rails, track equipment and sleepers while the trains are in operation. The ATI System supplements existing track inspection activities for timely and more effective identification of rail and trackside components which require maintenance.[4]

References

  1. ^ . French Chamber Singapore. Archived from the original on 24 September 2015. Retrieved 9 August 2015.
  2. ^ "Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world" (PDF). pp. 4 to 8. (PDF) from the original on 16 June 2020. Retrieved 16 June 2020.
  3. ^ "URBALIS Evolution: Controlling the Performance" (PDF). p. 4. (PDF) from the original on 16 June 2020. Retrieved 16 June 2020.
  4. ^ a b "Alstom to Supply 17 New Trains for North East Line Extension and Circle Line 6". Land Transport Authority. 30 April 2018. Retrieved 23 November 2019.
  5. ^ a b c d "Tender information | Land Transport Authority". www.lta.gov.sg. Retrieved 2 May 2018.
  6. ^ a b hermesauto (30 April 2018). "Alstom to supply 17 new MRT trains for North East Line and Circle Line". The Straits Times. Retrieved 30 April 2018.
  7. ^ "Joint News Release by the Land Transport Authority (LTA) & SMRT - Upgrading the Circle Line in Preparation for Circle Line 6". Land Transport Authority. 25 July 2019. Retrieved 23 November 2019.
  8. ^ a b "851E Schedule" (PDF). www.lta.gov.sg. Retrieved 15 September 2018.
  9. ^ "First of six new trains for North-East Line arrived in Singapore". Unscrambled.sg. 12 April 2021. Retrieved 16 March 2022.
  10. ^ "New train for Circle Line MRT arrives in Singapore; first of 23 to be shipped here". The Straits Times. 11 March 2022. Retrieved 16 March 2022.

    alstom, metropolis, c851e, upcoming, third, generation, electric, multiple, unit, rolling, stock, introduced, existing, north, east, circle, lines, singapore, mass, rapid, transit, system, manufactured, alstom, under, contract, 851e, consists, north, east, lin. The Alstom Metropolis C851E is the upcoming third generation electric multiple unit rolling stock to be introduced on the existing North East and Circle lines of Singapore s Mass Rapid Transit MRT system manufactured by Alstom under Contract 851E It consists of six North East line trains and 23 Circle line trains The trains will be manufactured and assembled in Alstom s manufacturing facility in Barcelona Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL 4 The contract valued at S 249 854 305 00 5 was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot 6 Alstom is the sole bidder for this contract 5 An additional 12 3 car trains will be purchased for use on the Circle line from 2024 onwards 7 Alstom Metropolis C851EIn service2024 NEL 2026 CCL ManufacturerAlstomBuilt atBarcelona SpainFamily nameMetropolisNumber under construction66 Vehicles 22 Trainsets CCL Number built36 Vehicles 6 Trainsets NEL 3 Vehicles 1 Trainset CCL Formation6 per NEL trainset 3 per CCL trainsetDT Mp Mi Mi Mp DT NEL Mc1 T Mc2 CCL Fleet numbers7087 7088 7097 7098 NEL 865 887 CCL Operator s SBS Transit Ltd ComfortDelGro Corporation SMRT Trains Ltd SMRT Corporation Depot s Sengkang NEL Kim Chuan CCL Line s served NEL North East line CCL Circle lineSpecificationsCar body constructionWelded aluminiumTrain length138 5 m 454 ft 4 3 4 in NEL 70 1 m 229 ft 11 7 8 in CCL Car length23 65 m 77 ft 7 1 8 in DT Mc 22 8 m 74 ft 9 5 8 in Mp Mi T Width3 2 m 10 ft 6 in Height3 7 m 12 ft 1 5 8 in Doors1 450 mm 57 1 8 in 8 per car 4 per sideMaximum speed100 km h 62 mph NEL design 90 km h 56 mph NEL service CCL design 78 km h 48 mph CCL service Traction systemAlstom OPTONIX IGBT VVVF 1 Acceleration1 1 m s2 3 6 ft s2 Deceleration1 3 m s2 4 3 ft s2 Emergency Electric system s NEL 1 500 V DC overhead catenary CCL 750 V DC third railCurrent collector s NEL Pantograph CCL Contact shoeUIC classification2 2 Bo Bo Bo Bo Bo Bo Bo Bo 2 2 NEL Bo Bo 2 2 Bo Bo CCL Braking system s Regenerative and pneumaticSafety system s Alstom URBALIS 300 moving block CBTC ATC under ATO GoA 4 UTO with subsystems of ATP Iconis ATS and Smartlock CBI 2 3 Coupling systemScharfenbergTrack gauge1 435 mm 4 ft 8 1 2 in standard gauge Contents 1 Tender 2 Overview 2 1 North East Line 2 1 1 Train formation 2 2 Circle Line 2 2 1 Train formation 3 Features 4 ReferencesTender EditThe tender for trains under the contract C851E was closed on 2 October 2017 with Alstom being the sole bidder for this contract 5 The LTA has shortlisted and the tender results was published S N Name of tenderer Amount S Offer 1 8 Amount S Offer 2 8 Remarks1 Alstom Transport S A Alstom Transport S Pte Ltd Consortium 279 782 872 00 293 489 289 00 Offer 1 in mixed currencies S 410 100 934 00 Alternative in mixed currencies The contract 851E was awarded to the sole bidder Alstom at a cost of 250 million on 30 April 2018 5 6 Overview EditNorth East Line Edit The 6 new trains will supplement the existing C751A and C751C trains on the North East Line when the 1 7 kilometre 1 1 mi long extension from Punggol to Punggol Coast opens in 2024 The first train set arrived in Singapore on 4 April 2021 9 The trains draw 1 500 V DC power from an overhead catenary They are fully automated ATO GoA 4 and do not require an attendant on board Each 6 car train Formation DT Mp Mi Mi Mp DT comprises two Driving Trailer DT cars at each end and four Motor Cars Mp and Mi The second and fifth cars of each train Mp are equipped with a pantograph Train formation Edit The configuration of an SBS Transit C851E in revenue service is DT Mp Mi Mi Mp DT Cars of SBS Transit C851Ecar type Control Cab Motor Pantograph car length Wheelchair Baym ft inDT 23 65 77 ft 7 1 in Mp 22 8 74 ft 9 6 in Mi 22 8 74 ft 9 6 in The car numbers of the trains range from 7x087 to 7x098 where x depends on the carriage type Individual cars are assigned a five digit serial number by the rail operator SBS Transit A complete six car trainset consists of an identical twin set of one driving trailer DT and two motor cars Mi amp Mp permanently coupled together e g set 7087 7088 consists of carriages 71087 72087 73087 73088 72088 and 71088 The first digit is always a 7 The second digit identifies the car number where the first car has a 1 the second has a 2 amp the third has a 3 The third digit is always a 0 The fourth digit and fifth digit are the train identification numbers A full length train of 6 cars have 2 different identification numbers e g 7087 7088 normal coupling or 7087 7098 cross coupling Alstom built sets 7087 7088 7097 7098 Circle Line Edit The 23 new trains will supplement the existing C830 and C830C trains on the Circle Line when the 4 3km long extension from HarbourFront to Marina Bay opens in 2026 The first train set arrived in Singapore on 11 March 2022 10 The trains draw 750 V DC power from a bottom contact third rail They are fully automated ATO GoA 4 and do not require an attendant on board Each 3 car train Formation Mc1 Tc Mc2 comprises two Motor Cars Mc1 and Mc2 at each end and an unpowered Trailer Car Tc in the middle Train formation Edit The configuration of an SMRT C851E in revenue service is Mc1 T Mc2 Cars of SMRT C851Ecar type Control Cab Motor Collector Shoe car length Wheelchair Baym ft inMc 23 65 77 ft 7 1 in T 22 8 74 ft 9 6 in The car numbers of the trains range from 865x to 887x where x depends on the carriage type Individual cars are assigned a 4 digit serial number by the rail operator SMRT Trains A complete three car trainset consists of one trailer T and two driving motor Mc cars permanently coupled together e g set 865 consists of carriages 8651 8652 8653 The first digit is always an 8 The second and third digits identify the set number The fourth digit identifies the car number where the first car has a 1 the second has a 2 and the third has a 3 Alstom built sets 865 887 Features EditTo enable a more robust maintenance regime all the new trains are equipped with condition monitoring systems to gather data from equipment on the trains This enables continuous monitoring of the health of the equipment and allows the operator to carry out predictive maintenance for the trains Contact shoe sensors on the new Circle Line trains enables the operator to react promptly and take necessary measures if any dislodgement is detected In addition two of the new Circle Line three car trains are each fitted with an Automatic Track Inspection ATI System which enables monitoring of the running rails track equipment and sleepers while the trains are in operation The ATI System supplements existing track inspection activities for timely and more effective identification of rail and trackside components which require maintenance 4 References Edit Alstom to supply 34 Metropolis trains and signalling upgrade to Singapore metro French Chamber Singapore Archived from the original on 24 September 2015 Retrieved 9 August 2015 Singapore Northeast Line will soon be the largest fully automatic metro system in the world PDF pp 4 to 8 Archived PDF from the original on 16 June 2020 Retrieved 16 June 2020 URBALIS Evolution Controlling the Performance PDF p 4 Archived PDF from the original on 16 June 2020 Retrieved 16 June 2020 a b Alstom to Supply 17 New Trains for North East Line Extension and Circle Line 6 Land Transport Authority 30 April 2018 Retrieved 23 November 2019 a b c d Tender information Land Transport Authority www lta gov sg Retrieved 2 May 2018 a b hermesauto 30 April 2018 Alstom to supply 17 new MRT trains for North East Line and Circle Line The Straits Times Retrieved 30 April 2018 Joint News Release by the Land Transport Authority LTA amp SMRT Upgrading the Circle Line in Preparation for Circle Line 6 Land Transport Authority 25 July 2019 Retrieved 23 November 2019 a b 851E Schedule PDF www lta gov sg Retrieved 15 September 2018 First of six new trains for North East Line arrived in Singapore Unscrambled sg 12 April 2021 Retrieved 16 March 2022 New train for Circle Line MRT arrives in Singapore first of 23 to be shipped here The Straits Times 11 March 2022 Retrieved 16 March 2022 Tender document Retrieved from https en wikipedia org w index php title Alstom Metropolis C851E amp oldid 1131999035, wikipedia, wiki, book, books, library,