AS-201 (or SA-201), flown February 26, 1966, was the first uncrewed test flight of an entire production Block I Apollo command and service module and the Saturn IB launch vehicle. The spacecraft consisted of the second Block I command module and the first Block I service module. The suborbital flight was a partially successful demonstration of the service propulsion system and the reaction control systems of both modules, and successfully demonstrated the capability of the command module's heat shield to survive re-entry from low Earth orbit.

AS-201
Launch of AS-201, the first flight of the Apollo spacecraft and Saturn IB launch vehicle
Mission typeSuborbital test flight
OperatorNASA
Mission duration37 minutes, 19.7 seconds
Range8,477 kilometers (4,577 nautical miles)
Apogee492.1 kilometers (265.7 nautical miles)
Spacecraft properties
SpacecraftApollo CSM-009
ManufacturerNorth American Aviation
Launch mass15,294 kilograms (33,718 lb)
Start of mission
Launch dateFebruary 26, 1966, 16:12:01 (1966-02-26UTC16:12:01Z) UTC
RocketSaturn IB SA-201
Launch siteCape Kennedy LC-34
End of mission
Recovered byUSS Boxer
Landing dateFebruary 26, 1966, 16:49:21 (1966-02-26UTC16:49:22Z) UTC
Landing siteSouth Atlantic Ocean
8°56′S 10°43′W / 8.933°S 10.717°W / -8.933; -10.717 (AS-201 splashdown)
← AS-105
AS-203 →
 

Vehicle configuration

Spacecraft

The command and service module CSM-009 was a Block I version, designed before the lunar orbit rendezvous method was chosen for the Apollo lunar landing; therefore it lacked capability to dock with a lunar module. Block I also employed preliminary designs of certain subsystems, and was heavier than the Block II version with lunar mission capability. All previous command and service modules flown (with one exception) were boilerplate versions.

CM-009 was the second production Block I command module to fly, the first being CM-002 flown on a Little Joe II rocket for the final launch escape system abort test, designated A-004. CM-009 varied from the production configuration by the omission of the guidance and navigation system; crew couches, displays, and associated equipment; and by the addition of a control programmer and open-loop emergency detection system.

SM-009 was the first production Block I service module to fly. It varied from the production configuration by replacement of the electrical power-generating fuel cells with batteries, and omission of the S-band communication equipment.

The launch also included a Block I launch escape system (LES), and the first flight of the Spacecraft–LM adapter (SLA) which connected the spacecraft to the launch vehicle.

Launch vehicle

The Saturn IB was the uprated version of the Saturn I rocket flown in ten earlier Apollo missions. It featured an upgrade of the first stage engines to increase thrust from 1,500,000 lbf (6,700 kN) of thrust to 1,600,000 lbf (7,100 kN), and replacement of the second stage with the S-IVB. This stage used a new liquid hydrogen-burning J-2 engine which would also be used on the S-II second stage of the Saturn V lunar launch vehicle. A modified version of the S-IVB, with an in-space restartable J-2, would also be used as the third stage of the Saturn V. It also used a new model of the guidance and control system known as the Instrument Unit, which would also be used on the Saturn V.

Objectives

The objectives of the mission were to:

  • Demonstrate the Saturn IB launch vehicle propulsion, guidance and electrical systems
  • Demonstrate structural compatibility between the launch vehicle and CSM, ensuring the spacecraft's design loads weren't exceeded
  • Demonstrate appropriate separation of all vehicle elements
  • Demonstrate the CSM's heat shield, service propulsion system (including in-space restart), CM and SM reaction control systems, environmental control of cabin pressure and temperature, partial communications, stability and control, Earth landing system, and electrical power subsystem.
  • Evaluate the Emergency Detection System in an open-loop configuration
  • Demonstrate the CM heat shield ablator at a 200 BTU/ft2/sec heat transfer rate
  • Demonstrate support facilities for launch, mission control, and recovery

The mission profile called for the Saturn IB to launch the spacecraft on an east-by-southeast heading into a high ballistic trajectory; then the CSM would separate from the SLA. The service module engine would be fired twice, then the command module would re-enter and land in the south Atlantic Ocean.

Preparation for flight

The first piece of the rocket to arrive at the Cape was the S-IB stage on August 14, 1965, by the barge Promise. It was built by Chrysler and featured eight H-1 engines built by Rocketdyne. The S-IVB second stage arrived next on September 18. The Instrument Unit that would control the launch vehicle arrived October 22, the command module arrived three days later and the service module on October 27.

The first stage was erected at the pad soon after arriving at Cape Kennedy. The second stage joined it on October 1. After fixing some problems in the Instrument Unit it was mated to the S-IVB on October 25. The CSM was mated on December 26.

The first problem encountered by NASA came on October 7. The RCA 110A computer which would test the rocket and thus, automating the process, was ten days behind schedule meaning that it would not be at the Cape before November 1. This meant that by the middle of October little could be done at the pad. When the computer finally did arrive it continued to have problems with the punch cards and also the capacitors that did not operate well under a protective coating. In the end however the testing of the launch vehicle was still on schedule.

Testing was running around the clock during December. Technicians were testing the CSM's fuel systems during the day and the testing was running on the rocket at night.

There was even an instance of a variant of the Y2K bug in the computer. As it ran past midnight, when the time changed from 2400 to 0001 the computer could not handle it and "turned into a pumpkin" according to an interview with Frank Bryan, a Kennedy Space Center Launch Vehicle Operations Engineering staff member.[citation needed]

In the end the testing regimen slowly completed and the plugs-out tests were completed proving that the rocket could function by itself.

Flight

Launch attempt

The first launch attempt was scheduled for February 26, 1966. There were several small delays, but when the pressure in one of the fuel tanks in the S-IVB fell below the allowed limits, the onboard computer aborted the launch four seconds before launch.

Though the problem could be fixed easily, it was thought that it could not be done within the launch window. After running a simulated launch and 150 seconds of flight to show that the rocket could operate with the lower pressure in the fuel tank, the launch was reinstated.

Flight

Finally, after months of delays and problems, the first flight of the Saturn IB lifted off from Pad 34. The first stage worked perfectly, lifting the rocket to 57 kilometers (31 nmi), when the S-IVB took over and lifted the spacecraft to 425 kilometers (229 nmi). The CSM separated and continued upwards to 488 kilometers (263 nmi).[citation needed]

The CSM then fired its own rocket to accelerate the spacecraft towards Earth. The first burn lasted for 184 seconds. It then fired later for ten seconds. This proved that the engine could restart in space, a crucial part of any crewed flight to the Moon.

It entered the atmosphere traveling 8,300 meters per second (27,000 ft/s). It splashed down 37 minutes after launch, 72 kilometers (39 nmi) from the planned touch down point, and was on board the aircraft carrier USS Boxer two hours later.

Problems

 
AS-201 CM-009 exhibited at the Strategic Air and Space Museum.

There were three problems encountered on the flight. The service module engine worked properly for only 80 seconds, interrupted by the presence of helium pressurant gas in the combustion chamber. Helium was used to pressurize the fuel tanks but should not have been in the combustion chamber. This was caused by a break in an oxidizer line that allowed helium to mix with the oxidizer.

The second problem was an electrical system failure which caused the command module to lose steering control during reentry. Last, measurements that were intended to be taken during reentry, failed due to a short circuit. Both of these problems were found to be due to incorrect wiring, and were easily fixed.

Capsule location

After the flight the capsule was also used for drop tests at White Sands Missile Range. It is now on display at the Strategic Air and Space Museum, Ashland, Nebraska.

See also

External links

  • Postlaunch report for mission AS-201 (Apollo spacecraft 009) – May 1966 NASA (PDF format)
  • Moonport: A History of Apollo Launch Facilities and Operations
  • Chariots for Apollo: A History of Manned Lunar Spacecraft
  • Strategic Air & Space Museum
  • AS-201 - First Saturn IB Launch - Apollo Test Flight (1966/02/26) on YouTube

  This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

this, article, includes, list, references, related, reading, external, links, sources, remain, unclear, because, lacks, inline, citations, please, help, improve, this, article, introducing, more, precise, citations, february, 2011, learn, when, remove, this, t. This article includes a list of references related reading or external links but its sources remain unclear because it lacks inline citations Please help to improve this article by introducing more precise citations February 2011 Learn how and when to remove this template message AS 201 or SA 201 flown February 26 1966 was the first uncrewed test flight of an entire production Block I Apollo command and service module and the Saturn IB launch vehicle The spacecraft consisted of the second Block I command module and the first Block I service module The suborbital flight was a partially successful demonstration of the service propulsion system and the reaction control systems of both modules and successfully demonstrated the capability of the command module s heat shield to survive re entry from low Earth orbit AS 201Launch of AS 201 the first flight of the Apollo spacecraft and Saturn IB launch vehicleMission typeSuborbital test flightOperatorNASAMission duration37 minutes 19 7 secondsRange8 477 kilometers 4 577 nautical miles Apogee492 1 kilometers 265 7 nautical miles Spacecraft propertiesSpacecraftApollo CSM 009ManufacturerNorth American AviationLaunch mass15 294 kilograms 33 718 lb Start of missionLaunch dateFebruary 26 1966 16 12 01 1966 02 26UTC16 12 01Z UTCRocketSaturn IB SA 201Launch siteCape Kennedy LC 34End of missionRecovered byUSS BoxerLanding dateFebruary 26 1966 16 49 21 1966 02 26UTC16 49 22Z UTCLanding siteSouth Atlantic Ocean8 56 S 10 43 W 8 933 S 10 717 W 8 933 10 717 AS 201 splashdown Apollo program AS 105AS 203 Contents 1 Vehicle configuration 1 1 Spacecraft 1 2 Launch vehicle 2 Objectives 3 Preparation for flight 4 Flight 4 1 Launch attempt 4 2 Flight 5 Problems 6 Capsule location 7 See also 8 External linksVehicle configuration EditSpacecraft Edit Main article Apollo command and service module The command and service module CSM 009 was a Block I version designed before the lunar orbit rendezvous method was chosen for the Apollo lunar landing therefore it lacked capability to dock with a lunar module Block I also employed preliminary designs of certain subsystems and was heavier than the Block II version with lunar mission capability All previous command and service modules flown with one exception were boilerplate versions CM 009 was the second production Block I command module to fly the first being CM 002 flown on a Little Joe II rocket for the final launch escape system abort test designated A 004 CM 009 varied from the production configuration by the omission of the guidance and navigation system crew couches displays and associated equipment and by the addition of a control programmer and open loop emergency detection system SM 009 was the first production Block I service module to fly It varied from the production configuration by replacement of the electrical power generating fuel cells with batteries and omission of the S band communication equipment The launch also included a Block I launch escape system LES and the first flight of the Spacecraft LM adapter SLA which connected the spacecraft to the launch vehicle Launch vehicle Edit Main article Saturn IB The Saturn IB was the uprated version of the Saturn I rocket flown in ten earlier Apollo missions It featured an upgrade of the first stage engines to increase thrust from 1 500 000 lbf 6 700 kN of thrust to 1 600 000 lbf 7 100 kN and replacement of the second stage with the S IVB This stage used a new liquid hydrogen burning J 2 engine which would also be used on the S II second stage of the Saturn V lunar launch vehicle A modified version of the S IVB with an in space restartable J 2 would also be used as the third stage of the Saturn V It also used a new model of the guidance and control system known as the Instrument Unit which would also be used on the Saturn V Objectives EditThe objectives of the mission were to Demonstrate the Saturn IB launch vehicle propulsion guidance and electrical systems Demonstrate structural compatibility between the launch vehicle and CSM ensuring the spacecraft s design loads weren t exceeded Demonstrate appropriate separation of all vehicle elements Demonstrate the CSM s heat shield service propulsion system including in space restart CM and SM reaction control systems environmental control of cabin pressure and temperature partial communications stability and control Earth landing system and electrical power subsystem Evaluate the Emergency Detection System in an open loop configuration Demonstrate the CM heat shield ablator at a 200 BTU ft2 sec heat transfer rate Demonstrate support facilities for launch mission control and recoveryThe mission profile called for the Saturn IB to launch the spacecraft on an east by southeast heading into a high ballistic trajectory then the CSM would separate from the SLA The service module engine would be fired twice then the command module would re enter and land in the south Atlantic Ocean Preparation for flight EditThe first piece of the rocket to arrive at the Cape was the S IB stage on August 14 1965 by the barge Promise It was built by Chrysler and featured eight H 1 engines built by Rocketdyne The S IVB second stage arrived next on September 18 The Instrument Unit that would control the launch vehicle arrived October 22 the command module arrived three days later and the service module on October 27 The first stage was erected at the pad soon after arriving at Cape Kennedy The second stage joined it on October 1 After fixing some problems in the Instrument Unit it was mated to the S IVB on October 25 The CSM was mated on December 26 The first problem encountered by NASA came on October 7 The RCA 110A computer which would test the rocket and thus automating the process was ten days behind schedule meaning that it would not be at the Cape before November 1 This meant that by the middle of October little could be done at the pad When the computer finally did arrive it continued to have problems with the punch cards and also the capacitors that did not operate well under a protective coating In the end however the testing of the launch vehicle was still on schedule Testing was running around the clock during December Technicians were testing the CSM s fuel systems during the day and the testing was running on the rocket at night There was even an instance of a variant of the Y2K bug in the computer As it ran past midnight when the time changed from 2400 to 0001 the computer could not handle it and turned into a pumpkin according to an interview with Frank Bryan a Kennedy Space Center Launch Vehicle Operations Engineering staff member citation needed In the end the testing regimen slowly completed and the plugs out tests were completed proving that the rocket could function by itself Flight EditLaunch attempt Edit The first launch attempt was scheduled for February 26 1966 There were several small delays but when the pressure in one of the fuel tanks in the S IVB fell below the allowed limits the onboard computer aborted the launch four seconds before launch Though the problem could be fixed easily it was thought that it could not be done within the launch window After running a simulated launch and 150 seconds of flight to show that the rocket could operate with the lower pressure in the fuel tank the launch was reinstated Flight Edit Finally after months of delays and problems the first flight of the Saturn IB lifted off from Pad 34 The first stage worked perfectly lifting the rocket to 57 kilometers 31 nmi when the S IVB took over and lifted the spacecraft to 425 kilometers 229 nmi The CSM separated and continued upwards to 488 kilometers 263 nmi citation needed The CSM then fired its own rocket to accelerate the spacecraft towards Earth The first burn lasted for 184 seconds It then fired later for ten seconds This proved that the engine could restart in space a crucial part of any crewed flight to the Moon It entered the atmosphere traveling 8 300 meters per second 27 000 ft s It splashed down 37 minutes after launch 72 kilometers 39 nmi from the planned touch down point and was on board the aircraft carrier USS Boxer two hours later Problems Edit AS 201 CM 009 exhibited at the Strategic Air and Space Museum There were three problems encountered on the flight The service module engine worked properly for only 80 seconds interrupted by the presence of helium pressurant gas in the combustion chamber Helium was used to pressurize the fuel tanks but should not have been in the combustion chamber This was caused by a break in an oxidizer line that allowed helium to mix with the oxidizer The second problem was an electrical system failure which caused the command module to lose steering control during reentry Last measurements that were intended to be taken during reentry failed due to a short circuit Both of these problems were found to be due to incorrect wiring and were easily fixed Capsule location EditAfter the flight the capsule was also used for drop tests at White Sands Missile Range It is now on display at the Strategic Air and Space Museum Ashland Nebraska See also Edit Spaceflight portalSplashdownExternal links EditPostlaunch report for mission AS 201 Apollo spacecraft 009 May 1966 NASA PDF format https web archive org web 20020616023612 http nssdc gsfc nasa gov database MasterCatalog sc APST201 Moonport A History of Apollo Launch Facilities and Operations Chariots for Apollo A History of Manned Lunar Spacecraft Strategic Air amp Space Museum AS 201 First Saturn IB Launch Apollo Test Flight 1966 02 26 on YouTube This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration Retrieved from https en wikipedia org w index php title AS 201 amp oldid 1135913996, wikipedia, wiki, book, books, library,