The Wilcherry Hill Project was originally a proposed iron ore mine and associated infrastructure on Eyre Peninsula, South Australia. It was proposed by Ironclad Mining Ltd which later merged with Trafford Resources to become Tyranna Resources. As of 2018, the Wilcherry Project is a joint venture between Alliance Resources (67.35%) and Tyranna Resources (32.65%). The venture is exploring for economic concentrations of any of gold, tin, copper, zinc, lead, silver, iron, bismuth, tungsten and uranium.[1]

Location edit

The mine site is located approximately 40 km north of Kimba, on central Eyre Peninsula, South Australia. The mine site access road will extend south from the mine site to the township of Kimba.[2]

Mining and processing edit

The project will consist of two mining stages:

  • Stage 1A – open cut mining of high grade magnetite ore from four primary ore bodies and several associated satellite ore deposits. Processing of this ore will be through dry crushing and screening and dry magnetic separation.
  • Stage 1B – mining and processing of mined and stockpiled lower grade ore using dry processing and an additional wet magnetic separation process.[2]

Product transport and export edit

With a proposed full production rate of 2 million tonnes per annum and an identified resource of approximately 10 million tonnes, the projected operational life is anticipated to be five years.[2]

Initially the ore was planned to be shipped from Port Adelaide via road, then rail freight.[2] This plan has been abandoned in favour of exporting through Lucky Bay. The existing passenger ferry harbour there will require significant expansion to facilitate the transshipment of iron ore into Panamax or small Capesize vessels.[3]

In August 2014, Ironclad announced that the company was considering selling direct-shipping ore from Wilcherry Hill to Whyalla-based iron ore exporter, Arrium.[4]

Environmental approvals edit

Ironclad mining received federal environmental approval (with conditions) on 23 September 2011.

Conditions were set in response to the presence of two threatened species within the project area: the slender-billed thornbill and the malleefowl.[2]

References edit

  1. ^ "Wilcherry Project, South Australia (Alliance 67.35%)". Alliance Resources. Retrieved 4 March 2018.
  2. ^ a b c d e Australian Government - Department of Environment "Ironclad Mining Limited /Mining/Uno Pastoral Station, Northern Eyre Peninsula/SA/Wilcherry Hill Project" Retrieved 2013-11-21.
  3. ^ Lloyd's List Australia "Ironclad drops Port Adelaide, opts for container system at Lucky Bay" Retrieved 2013-11-21.
  4. ^ "Discussions with Arrium regarding potential iron ore sale" (PDF). Ironclad Mining Ltd. 2014-08-21. Retrieved 2014-08-22.

wilcherry, hill, project, originally, proposed, iron, mine, associated, infrastructure, eyre, peninsula, south, australia, proposed, ironclad, mining, which, later, merged, with, trafford, resources, become, tyranna, resources, 2018, wilcherry, project, joint,. The Wilcherry Hill Project was originally a proposed iron ore mine and associated infrastructure on Eyre Peninsula South Australia It was proposed by Ironclad Mining Ltd which later merged with Trafford Resources to become Tyranna Resources As of 2018 the Wilcherry Project is a joint venture between Alliance Resources 67 35 and Tyranna Resources 32 65 The venture is exploring for economic concentrations of any of gold tin copper zinc lead silver iron bismuth tungsten and uranium 1 Contents 1 Location 2 Mining and processing 3 Product transport and export 4 Environmental approvals 5 ReferencesLocation editThe mine site is located approximately 40 km north of Kimba on central Eyre Peninsula South Australia The mine site access road will extend south from the mine site to the township of Kimba 2 Mining and processing editThe project will consist of two mining stages Stage 1A open cut mining of high grade magnetite ore from four primary ore bodies and several associated satellite ore deposits Processing of this ore will be through dry crushing and screening and dry magnetic separation Stage 1B mining and processing of mined and stockpiled lower grade ore using dry processing and an additional wet magnetic separation process 2 Product transport and export editWith a proposed full production rate of 2 million tonnes per annum and an identified resource of approximately 10 million tonnes the projected operational life is anticipated to be five years 2 Initially the ore was planned to be shipped from Port Adelaide via road then rail freight 2 This plan has been abandoned in favour of exporting through Lucky Bay The existing passenger ferry harbour there will require significant expansion to facilitate the transshipment of iron ore into Panamax or small Capesize vessels 3 In August 2014 Ironclad announced that the company was considering selling direct shipping ore from Wilcherry Hill to Whyalla based iron ore exporter Arrium 4 Environmental approvals editIronclad mining received federal environmental approval with conditions on 23 September 2011 Conditions were set in response to the presence of two threatened species within the project area the slender billed thornbill and the malleefowl 2 References edit Wilcherry Project South Australia Alliance 67 35 Alliance Resources Retrieved 4 March 2018 a b c d e Australian Government Department of Environment Ironclad Mining Limited Mining Uno Pastoral Station Northern Eyre Peninsula SA Wilcherry Hill Project Retrieved 2013 11 21 Lloyd s List Australia Ironclad drops Port Adelaide opts for container system at Lucky Bay Retrieved 2013 11 21 Discussions with Arrium regarding potential iron ore sale PDF Ironclad Mining Ltd 2014 08 21 Retrieved 2014 08 22 Retrieved from https en wikipedia org w index php title Wilcherry Hill amp oldid 994489292, wikipedia, wiki, book, books, library,