Tinau Hydropower Plant (Nepali: तिनाउ जलविद्युत आयोजना, Tinau Jalbidyut Ayojana) is a run-of-river hydro-electric plant located in Rupandehi District of Nepal. The flow from Tinau River is used to generate 1.024 MW electricity.[1]

Tinau Hydropower Plant
Location of Tinau Hydropower Plant in Nepal
Official nameTinau Hydropower Plant
CountryNepal
Coordinates27°44′20″N 83°27′43″E / 27.7390°N 83.4620°E / 27.7390; 83.4620
PurposePower
StatusOperational
Owner(s)Nepal Electricity Authority
Dam and spillways
Type of damGravity
ImpoundsTinau River
Tinau Hydropower Plant
Coordinates27°44′20″N 83°27′43″E / 27.7390°N 83.4620°E / 27.7390; 83.4620
Commission date2038-01-01 BS
TypeRun-of-the-river
Turbines2 Francis-type hotizotal turbines
Installed capacity1.024 MW

The plant was constructed in the leadership of Odd Hoftun.[2][3] It was commissioned in 1978 with two 250-kW turbine-generators with total capacity of 500-kW. The project was later upgraded to 1.024 MW in assistance from ADB. The project has 2.462 km long tunnel, underground desilting chamber, and semi-underground powerhouse.[4] The weir is 10 m high and 63 m long.[5] The design flow is 2.5 m3/s.[6] The power plant was initially owned by Butwal Power Company, a private company that constructed the plant. After the expiry of licence, the ownership was transferred to Nepal Electricity Authority (NEA).[1]

The plant had suffered damage due to flood in 1983.[7]

Significance Edit

The plant is considered instrumental to train Nepali Technicians/Engineers in various disciplines such as tunnelling, hydropower construction.[5]

Gallery Edit

See also Edit

List of power stations in Nepal

References Edit

  1. ^ a b "Operating Projects :: Hydro (Above 1MW)".
  2. ^ Magazine, New Spolight. "On Hydropower". SpotlightNepal. Retrieved 2020-08-06.
  3. ^ Shrestha, Bhola. "The energy to do it ourselves- Nepali Times Buzz ( Nepali Times)". Retrieved 2020-08-06.
  4. ^ Summary ReportTechnical Assistance for Developing an Enabling Policy Environment to Accelerate Development of Clean Energy Through Mini and Small Hydropower in Nepal. Practical Action Consulting Ltd. 2017. p. 11.
  5. ^ a b Poudel, Som Nath (2012). "Tinau river conservation and integrated water resource management". Hydro Nepal: Journal of Water, Energy and Environment. 10: 24–31. doi:10.3126/hn.v10i0.7099. ISSN 2392-4101.
  6. ^ "Tinau Hydropower". Retrieved 2020-08-06.
  7. ^ "Nepal seeks rehab construction of 1-MW Tinau hydro project". Hydro Review. 2015-10-22. Retrieved 2020-08-06.


tinau, hydropower, plant, nepali, जलव, आय, जन, tinau, jalbidyut, ayojana, river, hydro, electric, plant, located, rupandehi, district, nepal, flow, from, tinau, river, used, generate, electricity, location, nepalofficial, namecountrynepalcoordinates27, 7390, 4. Tinau Hydropower Plant Nepali त न उ जलव द य त आय जन Tinau Jalbidyut Ayojana is a run of river hydro electric plant located in Rupandehi District of Nepal The flow from Tinau River is used to generate 1 024 MW electricity 1 Tinau Hydropower PlantLocation of Tinau Hydropower Plant in NepalOfficial nameTinau Hydropower PlantCountryNepalCoordinates27 44 20 N 83 27 43 E 27 7390 N 83 4620 E 27 7390 83 4620PurposePowerStatusOperationalOwner s Nepal Electricity AuthorityDam and spillwaysType of damGravityImpoundsTinau RiverTinau Hydropower PlantCoordinates27 44 20 N 83 27 43 E 27 7390 N 83 4620 E 27 7390 83 4620Commission date2038 01 01 BSTypeRun of the riverTurbines2 Francis type hotizotal turbinesInstalled capacity1 024 MWThe plant was constructed in the leadership of Odd Hoftun 2 3 It was commissioned in 1978 with two 250 kW turbine generators with total capacity of 500 kW The project was later upgraded to 1 024 MW in assistance from ADB The project has 2 462 km long tunnel underground desilting chamber and semi underground powerhouse 4 The weir is 10 m high and 63 m long 5 The design flow is 2 5 m3 s 6 The power plant was initially owned by Butwal Power Company a private company that constructed the plant After the expiry of licence the ownership was transferred to Nepal Electricity Authority NEA 1 The plant had suffered damage due to flood in 1983 7 Contents 1 Significance 2 Gallery 3 See also 4 ReferencesSignificance EditThe plant is considered instrumental to train Nepali Technicians Engineers in various disciplines such as tunnelling hydropower construction 5 Gallery Edit nbsp Intake view nbsp Underground Powerhouse locationSee also Edit nbsp Nepal portal nbsp Water portal nbsp Renewable energy portalList of power stations in NepalReferences Edit a b Operating Projects Hydro Above 1MW Magazine New Spolight On Hydropower SpotlightNepal Retrieved 2020 08 06 Shrestha Bhola The energy to do it ourselves Nepali Times Buzz Nepali Times Retrieved 2020 08 06 Summary ReportTechnical Assistance for Developing an Enabling Policy Environment to Accelerate Development of Clean Energy Through Mini and Small Hydropower in Nepal Practical Action Consulting Ltd 2017 p 11 a b Poudel Som Nath 2012 Tinau river conservation and integrated water resource management Hydro Nepal Journal of Water Energy and Environment 10 24 31 doi 10 3126 hn v10i0 7099 ISSN 2392 4101 Tinau Hydropower Retrieved 2020 08 06 Nepal seeks rehab construction of 1 MW Tinau hydro project Hydro Review 2015 10 22 Retrieved 2020 08 06 Map all coordinates using OpenStreetMapDownload coordinates as KML GPX all coordinates GPX primary coordinates GPX secondary coordinates nbsp This article about a hydroelectric power plant is a stub You can help Wikipedia by expanding it vte Retrieved from https en wikipedia org w index php title Tinau Hydropower Plant amp oldid 1170163190, wikipedia, wiki, book, books, library,