Tenbury and Bewdley Railway

The Tenbury and Bewdley Railway was an English railway company that built its line from Bewdley in Worcestershire to Tenbury station, which was in Shropshire. The line connected the Severn Valley Railway at Bewdley with the Tenbury Railway at Tenbury. The Tenbury Railway connected at Woofferton with the Shrewsbury and Hereford Railway main line. Two railways were sometimes referred to as the Wyre Forest line or simply the Tenbury Line.

The Tenbury and Bewdley Railway opened its line in 1864. It passed into the control of the Great Western Railway.

The line closed to passenger trains in 1962 and to goods traffic in 1965; there is now no railway activity on the former line.

Conception edit

 
The Tenbury and Bewdley Railway

The Shrewsbury and Hereford Railway opened its line throughout on 6 December 1852.[1] Tenbury was a little over five miles from Woofferton station on that line, and a branch line was planned: it opened on 1 August 1861.[2][3][4][5]

While the Tenbury line was under construction, there was already enthusiasm to extend the line to Bewdley. There were two immediate problems, gathering enough money to pay the Parliamentary deposit, and heading off the suspected hostility of the Shrewsbury and Hereford Railway. The former was resolved by getting a £9,600 bank loan.

The Bill for the proposed Tenbury and Bewdley Railway went to Parliament in the 1860 session; the S&HR did indeed oppose it, but their opposition was overcome, and the T&BR obtained the Royal Assent on 3 July 1860; capital was to be £120,000. The line would run from a junction with the Tenbury Railway at Tenbury to the Bewdley. There it would make a junction with the Severn Valley Railway, which was then under construction; it was a branch of the Great Western Railway.[6][7] At this time the Shrewsbury and Hereford Railway amalgamated with others to form the West Midland Railway.

Construction and railway politics edit

A working arrangement with the West Midland Railway was concluded, by which the Tenbury and Bewdley Railway Company would receive 40% of gross receipts, after payment of interest on the borrowings.[8] However the Company was unable to raise the money to pay its contractor for the construction, and there was a protracted delay. Eventually in October 1861 instructions were given to commence work.[9] In September 1862 the Shareholders were informed that arrangements had been made to lease the line to the West Midland Railway, giving a dividend of 4% after the first three years.[10]

 
Tenbury Wells Station, with ex-Great Western Diesel railcar in 1949

The main line at Woofferton (the former Shrewsbury and Hereford Railway) had been leased jointly to the London and North Western Railway (50%) and the Great Western Railway and the West Midland Railway (together 50%). The Tenbury Railway was carried into the joint line status; the lease took effect on 1 July 1862.[11]

Meanwhile the construction of the Tenbury and Bewdley had not been progressing well. However eventually preparations were in hand for opening. A serious landslip in Prizeley cutting took place on 24 June, and the planned opening had to be postponed. The earthwork was stabilised, and a ceremonial opening took place on 4 August 1864, although the line had not yet been approved for passenger operation.[12]

Opening edit

Captain Tyler of the Board of Trade visited the line on 9 August 1864 and gave his consent to opening for passenger trains. The line opened fully on 13 August 1864.[note 1][13][7][5][14]

The line was worked by the Great Western Railway, with which the West Midland Railway had amalgamated in 1863; this was charged at 60% of gross receipts.[15]

Bewdley to Kidderminster line edit

 
Bewdley railway station

The junction with the Severn Valley Railway at Bewdley connected southwards, towards Droitwich Spa, and now much energy was expended in creating a shorter route to Birmingham. This was referred to as the Bewdley Curve or Bewdley Loop, although it was a line of three miles in length between Bewdley and Kidderminster. That line was opened on 1 June 1878 and enabled trains from the Tenbury direction to run direct towards Kidderminster, for Birmingham.[16]

Acquired by the GWR edit

The Tenbury and Bewdley Railway company was transferred to the ownership of the Great Western Railway from 1 February 1870. [7] A year earlier, from 1 January 1869, the lease of the Tenbury Railway was converted to outright ownership by the LNWR and GWR, under an agreement of 1 December 1868.[17]

Cleobury Mortimer and Ditton Priors Light Railway edit

The Cleobury Mortimer and Ditton Priors Light Railway was authorised under a Light Railway Order on 23 March 1901.[18] It was to build a line from a junction with the Tenbury and Bewdley Railway at Cleobury Mortimer. After considerable delay the line was opened to goods traffic on 19 July 1908,[19] passenger trains following on 21 November 1908.[20]

For some years the Cleobury Mortimer and Ditton Priors Railway was simply a rural branch line; its passenger service ceased in 1938. The increasing international tension following the Munich crisis of 1938 resulted, among other things, in a search for sites for the storage of naval ordnance. A site at Ditton Priors was considered to be suitable, and preparations were made to construct what became the Royal Naval Armaments Depot, Ditton Priors. It opened in 1940, and the majority of the traffic moved by rail. .[21]

The site eventually extended over a very considerable area, and the development brought much goods traffic to the CM&DPR and also the Tenbury and Bewdley line. At the end of World War II the depot was used for decommissioned armaments. In 1955 the branch line was transferred to the ownership of the Ministry of Defence (Admiralty) for £40,000.[22] In 1960 the railway line was finally closed but the Royal Navy continued to use the depot as a non-rail-connected base until 1965.

Train service edit

The passenger train service indicated in the Bradshaw's Guide varied little over the years. In 1895 there were four trains daily (not Sundays) between Bewdley and Woofferton, with an additional two on the Tenbury to Woofferton section. By 1910 this had changed to five and four respectively, remaining similar from 1922 to 1960.[23][24][25][26][27]

Decline and closure edit

Tenbury & Bewdley Railway
 
The remains of Dowles Bridge

The rural nature of the Tenbury and Bewdley main line resulted in a steep decline in business as reliable road transport, both passenger and goods, developed. It became plain that the line was heavily loss-making. Closure was proposed in 1960, but a case was made concerning the hardship that closure of the line would cause, especially to schoolchildren who relied on the trains. The decision was taken to close the line from Tenbury Wells to Woofferton completely from 31 July 1961. One passenger train each way daily would run from Kidderminster via Bewdley to Tenbury Wells for a trial period of one year, at times suitable for the schools.[28]

In fact the experimental service for schoolchildren started during the school holidays, and this inauspicious start was followed by minimal use of the trains. The decision was taken to discontinue them, closing the entire line to passenger use; the closure took place on 1 August 1962, a Wednesday.[29]

After closure, a goods service was retained on the branch only as far as Tenbury from Bewdley. All connections with the Shrewsbury and Hereford main line had been removed at Woofferton on 12 November 1961. The goods service to Tenbury was withdrawn on 6 January 1964. The goods service to Cleobury Mortimer and Ditton Priors continued, but that business dwindled further, and on Good Friday 16 April 1965, from which date only the dismantling traffic continued.[30][14] With lifting of the track completed, the spans of Dowles Bridge were dismantled in March 1966 leaving only the supports standing in the river.[31]

Station list edit

  • Tenbury; opened 1 August 1861; renamed Tenbury Wells 1912; closed 1 August 1962;
  • Newnham; opened 13 August 1864; renamed Newnham Bridge 1873; closed 1 August 1962;
  • Neen Sollars; opened 13 August 1864; closed 1 August 1962;
  • Cleobury Mortimer; opened 13 August 1864; closed 1 August 1962;
  • Wyre Forest; opened July 1869; closed 1 August 1962;
  • Dowles Bridge;
  • Bewdley; opened 1 February 1862; closed 5 January 1970; subsequently part of the heritage railway.

Notes edit

  1. ^ Probably a ceremonial opening, following by a public opening on 14 August 1864.

References edit

  1. ^ Beddoes & Smith 1995, p. 10.
  2. ^ Beddoes & Smith 1995, p. 14.
  3. ^ Richard K Morriss, Railways of Shropshire: A brief history, Shropshire Libraries, Shrewsbury, 1981, ISBN 0 903802 27 9, pages 39 and 40
  4. ^ E T MacDermot, History of the Great Western Railway, published by the Great Western Railway, London, 1921, volume 1, page 869
  5. ^ a b Ernest F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, page 317
  6. ^ Beddoes & Smith 1995, p. 16.
  7. ^ a b c Donald J Grant, Directory of the Railway Companies of Great Britain, Matador Publishers, Kibworth Beauchamp, 2017, ISBN 978 1785893 537, page 558
  8. ^ Beddoes & Smith 1995, p. 17.
  9. ^ Beddoes & Smith 1995, p. 19.
  10. ^ Beddoes & Smith 1995, p. 22.
  11. ^ Beddoes & Smith 1995, p. 23.
  12. ^ Beddoes & Smith 1995, p. 29.
  13. ^ Beddoes & Smith 1995, p. 32.
  14. ^ a b Rex Christiansen, A Regional History of the Railways of Great Britain: volume 13: Thames and Severn, David and Charles (Publishers) Limited, Newton Abbot, 1981, ISBN 0 7153 8004 4, page 113
  15. ^ Beddoes & Smith 1995, p. 35.
  16. ^ Beddoes & Smith 1995, p. 43.
  17. ^ Beddoes & Smith 1995, p. 39.
  18. ^ Beddoes & Smith 1995, p. 55.
  19. ^ Beddoes & Smith 1995, p. 65.
  20. ^ Beddoes & Smith 1995, p. 68.
  21. ^ Beddoes & Smith 1995, pp. 129–130.
  22. ^ Beddoes & Smith 1995, p. 177.
  23. ^ Bradshaw's Rail Times for Great Britain and Ireland: December 1895, reprint, Middleton Press, Midhurst, 2018, ISBN 978 1 908174 11 6
  24. ^ Bradshaw's April 1910 Railway Guide, David and Charles, Newton Abbot, 1968, ISBN 0 7153 4246 0
  25. ^ Bradshaw's 1922 Railway Guide, Guild Publishing London, 1985
  26. ^ Bradshaw's July 1938 Railway Guide, David & Charles Reprints, Newton Abbot, 1969, ISBN 0 7153 4686 5
  27. ^ Western Region of British Railways, Passenger Timetable, Summer 1960
  28. ^ Beddoes & Smith 1995, p. 190.
  29. ^ Beddoes & Smith 1995, p. 193.
  30. ^ Beddoes & Smith 1995, pp. 195–196.
  31. ^ Beddoes & Smith 1995, p. 198.

Bibliography edit

  • Beddoes, Keith; Smith, William H. (1995). The Tenbury & Bewdley Railway. Wild Swan Publications. ISBN 1-874103-27-5.

External links edit

  • Severn Valley Railway

tenbury, bewdley, railway, english, railway, company, that, built, line, from, bewdley, worcestershire, tenbury, station, which, shropshire, line, connected, severn, valley, railway, bewdley, with, tenbury, railway, tenbury, tenbury, railway, connected, wooffe. The Tenbury and Bewdley Railway was an English railway company that built its line from Bewdley in Worcestershire to Tenbury station which was in Shropshire The line connected the Severn Valley Railway at Bewdley with the Tenbury Railway at Tenbury The Tenbury Railway connected at Woofferton with the Shrewsbury and Hereford Railway main line Two railways were sometimes referred to as the Wyre Forest line or simply the Tenbury Line The Tenbury and Bewdley Railway opened its line in 1864 It passed into the control of the Great Western Railway The line closed to passenger trains in 1962 and to goods traffic in 1965 there is now no railway activity on the former line Contents 1 Conception 2 Construction and railway politics 3 Opening 4 Bewdley to Kidderminster line 5 Acquired by the GWR 6 Cleobury Mortimer and Ditton Priors Light Railway 7 Train service 8 Decline and closure 9 Station list 10 Notes 11 References 12 Bibliography 13 External linksConception edit nbsp The Tenbury and Bewdley RailwayThe Shrewsbury and Hereford Railway opened its line throughout on 6 December 1852 1 Tenbury was a little over five miles from Woofferton station on that line and a branch line was planned it opened on 1 August 1861 2 3 4 5 While the Tenbury line was under construction there was already enthusiasm to extend the line to Bewdley There were two immediate problems gathering enough money to pay the Parliamentary deposit and heading off the suspected hostility of the Shrewsbury and Hereford Railway The former was resolved by getting a 9 600 bank loan The Bill for the proposed Tenbury and Bewdley Railway went to Parliament in the 1860 session the S amp HR did indeed oppose it but their opposition was overcome and the T amp BR obtained the Royal Assent on 3 July 1860 capital was to be 120 000 The line would run from a junction with the Tenbury Railway at Tenbury to the Bewdley There it would make a junction with the Severn Valley Railway which was then under construction it was a branch of the Great Western Railway 6 7 At this time the Shrewsbury and Hereford Railway amalgamated with others to form the West Midland Railway Construction and railway politics editA working arrangement with the West Midland Railway was concluded by which the Tenbury and Bewdley Railway Company would receive 40 of gross receipts after payment of interest on the borrowings 8 However the Company was unable to raise the money to pay its contractor for the construction and there was a protracted delay Eventually in October 1861 instructions were given to commence work 9 In September 1862 the Shareholders were informed that arrangements had been made to lease the line to the West Midland Railway giving a dividend of 4 after the first three years 10 nbsp Tenbury Wells Station with ex Great Western Diesel railcar in 1949The main line at Woofferton the former Shrewsbury and Hereford Railway had been leased jointly to the London and North Western Railway 50 and the Great Western Railway and the West Midland Railway together 50 The Tenbury Railway was carried into the joint line status the lease took effect on 1 July 1862 11 Meanwhile the construction of the Tenbury and Bewdley had not been progressing well However eventually preparations were in hand for opening A serious landslip in Prizeley cutting took place on 24 June and the planned opening had to be postponed The earthwork was stabilised and a ceremonial opening took place on 4 August 1864 although the line had not yet been approved for passenger operation 12 Opening editCaptain Tyler of the Board of Trade visited the line on 9 August 1864 and gave his consent to opening for passenger trains The line opened fully on 13 August 1864 note 1 13 7 5 14 The line was worked by the Great Western Railway with which the West Midland Railway had amalgamated in 1863 this was charged at 60 of gross receipts 15 Bewdley to Kidderminster line edit nbsp Bewdley railway stationThe junction with the Severn Valley Railway at Bewdley connected southwards towards Droitwich Spa and now much energy was expended in creating a shorter route to Birmingham This was referred to as the Bewdley Curve or Bewdley Loop although it was a line of three miles in length between Bewdley and Kidderminster That line was opened on 1 June 1878 and enabled trains from the Tenbury direction to run direct towards Kidderminster for Birmingham 16 Acquired by the GWR editThe Tenbury and Bewdley Railway company was transferred to the ownership of the Great Western Railway from 1 February 1870 7 A year earlier from 1 January 1869 the lease of the Tenbury Railway was converted to outright ownership by the LNWR and GWR under an agreement of 1 December 1868 17 Cleobury Mortimer and Ditton Priors Light Railway editMain article Cleobury Mortimer and Ditton Priors Light Railway The Cleobury Mortimer and Ditton Priors Light Railway was authorised under a Light Railway Order on 23 March 1901 18 It was to build a line from a junction with the Tenbury and Bewdley Railway at Cleobury Mortimer After considerable delay the line was opened to goods traffic on 19 July 1908 19 passenger trains following on 21 November 1908 20 For some years the Cleobury Mortimer and Ditton Priors Railway was simply a rural branch line its passenger service ceased in 1938 The increasing international tension following the Munich crisis of 1938 resulted among other things in a search for sites for the storage of naval ordnance A site at Ditton Priors was considered to be suitable and preparations were made to construct what became the Royal Naval Armaments Depot Ditton Priors It opened in 1940 and the majority of the traffic moved by rail 21 The site eventually extended over a very considerable area and the development brought much goods traffic to the CM amp DPR and also the Tenbury and Bewdley line At the end of World War II the depot was used for decommissioned armaments In 1955 the branch line was transferred to the ownership of the Ministry of Defence Admiralty for 40 000 22 In 1960 the railway line was finally closed but the Royal Navy continued to use the depot as a non rail connected base until 1965 Train service editThe passenger train service indicated in the Bradshaw s Guide varied little over the years In 1895 there were four trains daily not Sundays between Bewdley and Woofferton with an additional two on the Tenbury to Woofferton section By 1910 this had changed to five and four respectively remaining similar from 1922 to 1960 23 24 25 26 27 Decline and closure editvteTenbury amp Bewdley RailwayLegend nbsp nbsp Welsh Marches lineto Hereford nbsp nbsp nbsp Woofferton nbsp nbsp nbsp Woofferton Junction nbsp nbsp Welsh Marches lineto Shrewsbury nbsp Easton Court nbsp Tenbury Wells nbsp Newnham Bridge nbsp Neen Sollars nbsp Cleobury Mortimer nbsp nbsp Cleobury Mortimer amp Ditton PriorsLight Railway nbsp Brown Clee Hill quarries nbsp nbsp Wyre Forest nbsp nbsp Wyre Forest nbsp Dowles Bridgeover River Severn dismantled1964 nbsp nbsp Severn Valley Railwayto Bridgnorth nbsp nbsp nbsp nbsp nbsp nbsp Bewdley nbsp nbsp Severn Valley Railwayto Kidderminster nbsp The remains of Dowles BridgeThe rural nature of the Tenbury and Bewdley main line resulted in a steep decline in business as reliable road transport both passenger and goods developed It became plain that the line was heavily loss making Closure was proposed in 1960 but a case was made concerning the hardship that closure of the line would cause especially to schoolchildren who relied on the trains The decision was taken to close the line from Tenbury Wells to Woofferton completely from 31 July 1961 One passenger train each way daily would run from Kidderminster via Bewdley to Tenbury Wells for a trial period of one year at times suitable for the schools 28 In fact the experimental service for schoolchildren started during the school holidays and this inauspicious start was followed by minimal use of the trains The decision was taken to discontinue them closing the entire line to passenger use the closure took place on 1 August 1962 a Wednesday 29 After closure a goods service was retained on the branch only as far as Tenbury from Bewdley All connections with the Shrewsbury and Hereford main line had been removed at Woofferton on 12 November 1961 The goods service to Tenbury was withdrawn on 6 January 1964 The goods service to Cleobury Mortimer and Ditton Priors continued but that business dwindled further and on Good Friday 16 April 1965 from which date only the dismantling traffic continued 30 14 With lifting of the track completed the spans of Dowles Bridge were dismantled in March 1966 leaving only the supports standing in the river 31 Station list editTenbury opened 1 August 1861 renamed Tenbury Wells 1912 closed 1 August 1962 Newnham opened 13 August 1864 renamed Newnham Bridge 1873 closed 1 August 1962 Neen Sollars opened 13 August 1864 closed 1 August 1962 Cleobury Mortimer opened 13 August 1864 closed 1 August 1962 Wyre Forest opened July 1869 closed 1 August 1962 Dowles Bridge Bewdley opened 1 February 1862 closed 5 January 1970 subsequently part of the heritage railway Notes edit Probably a ceremonial opening following by a public opening on 14 August 1864 References edit Beddoes amp Smith 1995 p 10 Beddoes amp Smith 1995 p 14 Richard K Morriss Railways of Shropshire A brief history Shropshire Libraries Shrewsbury 1981 ISBN 0 903802 27 9 pages 39 and 40 E T MacDermot History of the Great Western Railway published by the Great Western Railway London 1921 volume 1 page 869 a b Ernest F Carter An Historical Geography of the Railways of the British Isles Cassell London 1959 page 317 Beddoes amp Smith 1995 p 16 a b c Donald J Grant Directory of the Railway Companies of Great Britain Matador Publishers Kibworth Beauchamp 2017 ISBN 978 1785893 537 page 558 Beddoes amp Smith 1995 p 17 Beddoes amp Smith 1995 p 19 Beddoes amp Smith 1995 p 22 Beddoes amp Smith 1995 p 23 Beddoes amp Smith 1995 p 29 Beddoes amp Smith 1995 p 32 a b Rex Christiansen A Regional History of the Railways of Great Britain volume 13 Thames and Severn David and Charles Publishers Limited Newton Abbot 1981 ISBN 0 7153 8004 4 page 113 Beddoes amp Smith 1995 p 35 Beddoes amp Smith 1995 p 43 Beddoes amp Smith 1995 p 39 Beddoes amp Smith 1995 p 55 Beddoes amp Smith 1995 p 65 Beddoes amp Smith 1995 p 68 Beddoes amp Smith 1995 pp 129 130 Beddoes amp Smith 1995 p 177 Bradshaw s Rail Times for Great Britain and Ireland December 1895 reprint Middleton Press Midhurst 2018 ISBN 978 1 908174 11 6 Bradshaw s April 1910 Railway Guide David and Charles Newton Abbot 1968 ISBN 0 7153 4246 0 Bradshaw s 1922 Railway Guide Guild Publishing London 1985 Bradshaw s July 1938 Railway Guide David amp Charles Reprints Newton Abbot 1969 ISBN 0 7153 4686 5 Western Region of British Railways Passenger Timetable Summer 1960 Beddoes amp Smith 1995 p 190 Beddoes amp Smith 1995 p 193 Beddoes amp Smith 1995 pp 195 196 Beddoes amp Smith 1995 p 198 Bibliography editBeddoes Keith Smith William H 1995 The Tenbury amp Bewdley Railway Wild Swan Publications ISBN 1 874103 27 5 External links editSevern Valley Railway Retrieved from https en wikipedia org w index php title Tenbury and Bewdley Railway amp oldid 1193603933, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.