Tambar (Norwegian: Tambarfeltet) is an offshore oil field located in the southern Norwegian section of North Sea along with Ula and Gyda fields making up the UGT area, usually attributed to DONG Energy's main areas of exploration and production activity.[1] The Ula field was discovered in 1983 and came online in 2001.[2] Tambar was discovered in 1983 and became operational in July 2001. It contains confirmed 46.9 million m3 of oil.[3]

Tambar
Location of Tambar
CountryNorway
RegionSouth North Sea
Block1/3, 2/1
Offshore/onshoreOffshore
Coordinates56°58′57.92″N 2°57′31.61″E / 56.9827556°N 2.9587806°E / 56.9827556; 2.9587806
OperatorBP Norge AS
PartnersBP Norge AS (55%)
Dong Norge AS (45%)
Field history
Discovery1983
Start of productionJuly 2001
Abandonment2021
Production
Current production of oil8,800 barrels per day (~4.4×10^5 t/a)
Estimated oil in place295 million barrels (~4.02×10^7 t)
Producing formationsUpper Jurassic Ula Formation

Ownership edit

Aker BP is the operator of the field with 55% of interest in the project. DNO holds 45% of interest.[3]

Production edit

The sea depth at Tambar is approximately 68 m (223 ft). The main reservoir stands at 4,200 m (13,800 ft) in the Upper Jurassic Ula Formation.[2] Tambar has 4 production wells and 6 slots. The field has one unmanned wellhead facility without the processing equipment. It is remotely controlled from the facility at the Ula field which is located 16 km (9.9 mi) southeast of Tambar. However, the facility does have conditions to accommodate 12 people. Current [when?] production at Tambar field is 8,800 barrels per day (1,400 m3/d). Gas injection is used at Tambar and the produced oil is pumped to Ula facilities via Tambar-Ula pipeline which came online in 2007 and is then transported by a pipeline to Ekofisk oil field and on to Teesside for refining.[3] The gas produced at Tambar field is injected into Ula field to increase oil production.[4] The field is expected to produce until 2021.[3]

Tambar WHP Platform edit

Tambar WHP Platform was designed by Aker Solutions Engineering in 2000-2001.


Tambar Øst edit

Tambar Øst (East) is located just a few kilometers away from Tambar. It was discovered in 2007 and lies 4,200 m (13,800 ft) deep in the Late Jurassic Formation. It has been developed with a production well from Tambar's main facility. Production started on October 2, 2007. The produced oil is pumped to Tambar and then onto Ula field.[5]

Ownership edit

Tambar Øst is also operated by BP. BP holds 46.2%, while DONG Energyholds 43.24%, Talisman Energy - 9.76%, Norske AEDC AS (NAEDC) - 0.8%.[6][7]

See also edit

References edit

  1. ^ "DONG Ups Stake in Norway's Ula Field". Rigzone. 2008-06-02. Retrieved 2010-03-18.
  2. ^ a b OLJEDIREKTORATET Norwegian Petroleum Directorate. Tambar
  3. ^ a b c d BP operated fields. Tambar
  4. ^ Nick Terdre (2007-08-01). "Tie-ins, upgrades extend Ula lifespan". Offshore Magazine. Retrieved 2010-04-08.
  5. ^ OLJEDIREKTORATET Norwegian Petroleum Directorate. TAMBAR ØST
  6. ^ OLJEDIREKTORATET Norwegian Petroleum Directorate. TAMBAR ØST UNIT
  7. ^ "Profile: Talisman Energy Inc. (TLM)". Reuters. Archived from the original on February 1, 2013. Retrieved 2010-04-08.

External links edit

  • BP official website
  • Image of the Tambar's unmanned remotely controlled facility from Offshore Magazine

tambar, field, tambar, norwegian, tambarfeltet, offshore, field, located, southern, norwegian, section, north, along, with, gyda, fields, making, area, usually, attributed, dong, energy, main, areas, exploration, production, activity, field, discovered, 1983, . Tambar Norwegian Tambarfeltet is an offshore oil field located in the southern Norwegian section of North Sea along with Ula and Gyda fields making up the UGT area usually attributed to DONG Energy s main areas of exploration and production activity 1 The Ula field was discovered in 1983 and came online in 2001 2 Tambar was discovered in 1983 and became operational in July 2001 It contains confirmed 46 9 million m3 of oil 3 TambarLocation of TambarCountryNorwayRegionSouth North SeaBlock1 3 2 1Offshore onshoreOffshoreCoordinates56 58 57 92 N 2 57 31 61 E 56 9827556 N 2 9587806 E 56 9827556 2 9587806OperatorBP Norge ASPartnersBP Norge AS 55 Dong Norge AS 45 Field historyDiscovery1983Start of productionJuly 2001Abandonment2021ProductionCurrent production of oil8 800 barrels per day 4 4 10 5 t a Estimated oil in place295 million barrels 4 02 10 7 t Producing formationsUpper Jurassic Ula Formation Contents 1 Ownership 2 Production 3 Tambar WHP Platform 4 Tambar Ost 4 1 Ownership 5 See also 6 References 7 External linksOwnership editAker BP is the operator of the field with 55 of interest in the project DNO holds 45 of interest 3 Production editThe sea depth at Tambar is approximately 68 m 223 ft The main reservoir stands at 4 200 m 13 800 ft in the Upper Jurassic Ula Formation 2 Tambar has 4 production wells and 6 slots The field has one unmanned wellhead facility without the processing equipment It is remotely controlled from the facility at the Ula field which is located 16 km 9 9 mi southeast of Tambar However the facility does have conditions to accommodate 12 people Current when production at Tambar field is 8 800 barrels per day 1 400 m3 d Gas injection is used at Tambar and the produced oil is pumped to Ula facilities via Tambar Ula pipeline which came online in 2007 and is then transported by a pipeline to Ekofisk oil field and on to Teesside for refining 3 The gas produced at Tambar field is injected into Ula field to increase oil production 4 The field is expected to produce until 2021 3 Tambar WHP Platform editTambar WHP Platform was designed by Aker Solutions Engineering in 2000 2001 Tambar Ost editTambar Ost East is located just a few kilometers away from Tambar It was discovered in 2007 and lies 4 200 m 13 800 ft deep in the Late Jurassic Formation It has been developed with a production well from Tambar s main facility Production started on October 2 2007 The produced oil is pumped to Tambar and then onto Ula field 5 Ownership edit Tambar Ost is also operated by BP BP holds 46 2 while DONG Energyholds 43 24 Talisman Energy 9 76 Norske AEDC AS NAEDC 0 8 6 7 See also edit nbsp Norway portal nbsp Energy portal Ula oil field Gyda oil field Oselvar oil field Ekofisk oil field Norpipe North Sea oil Economy of NorwayReferences edit DONG Ups Stake in Norway s Ula Field Rigzone 2008 06 02 Retrieved 2010 03 18 a b OLJEDIREKTORATET Norwegian Petroleum Directorate Tambar a b c d BP operated fields Tambar Nick Terdre 2007 08 01 Tie ins upgrades extend Ula lifespan Offshore Magazine Retrieved 2010 04 08 OLJEDIREKTORATET Norwegian Petroleum Directorate TAMBAR OST OLJEDIREKTORATET Norwegian Petroleum Directorate TAMBAR OST UNIT Profile Talisman Energy Inc TLM Reuters Archived from the original on February 1 2013 Retrieved 2010 04 08 External links editBP official website Image of the Tambar s unmanned remotely controlled facility from Offshore Magazine Retrieved from https en wikipedia org w index php title Tambar oil field amp oldid 1146348347, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.