Suez Canal Bridge

The Suez Canal Bridge, also known as the Egyptian–Japanese Friendship Bridge, Al Salam Bridge, Al Salam Peace Bridge or Mubarak Peace Bridge, is a road bridge crossing the Suez Canal at El-Qantara, whose name means "the bridge" in Egyptian Arabic. The bridge links the continents of Africa and Asia.

Suez Canal Bridge
Coordinates30°49′42″N 32°19′03″E / 30.828248°N 32.317572°E / 30.828248; 32.317572
CarriesFour lanes vehicular traffic[1]
CrossesSuez Canal
LocaleEl Qantara, Egypt
Owner
  • General Authority for Roads, Bridges & Transport
  • Ministry of Transport and Communication
[1]
Maintained byGeneral Authority for Roads, Bridges & Transport, Ministry of Transport and Communication
Characteristics
DesignCable-stayed bridge semi-fan arrangement, H-pylon, hollow box[1]
MaterialSteel and reinforced concrete[1]
Total length3.9 km (2.4 mi)[1]
Width22.8 m (75 ft)[2]
Height154 m (505 ft) (pylons)[1]
Longest span404 m (1,325 ft)[1]
Clearance below70 m (230 ft)[1]
History
DesignerKajima
Constructed byConsortium consisting of: [3]
Construction start1995
OpenedOctober 9, 2001; 22 years ago (October 9, 2001)
Location

Design and construction edit

 
Detail view of one of the main pylons

The bridge was built with assistance from the Japanese government. The main contractor was Kajima Corporation.[3]

The Japanese grant, accounting for 60% of the construction cost (or 13.5 billion yen), was agreed to during the visit of then-President Hosni Mubarak to Japan in March 1995, as part of a larger project to develop the Sinai Peninsula. Egypt bore the remaining 40% (9 billion yen). The bridge was opened in October 2001.

The bridge, which has a 70-metre (229 ft 8 in) clearance over the canal and is 3.9 kilometres (2.4 mi) long, consists of a 400-metre (1,300 ft) cable-stayed main span and two 1.8-kilometre (1.1 mi) long approach spans.

The height of the two main pylons supporting the main span is 154 metres (505 ft) each. The towers were designed in the shape of Pharaonic obelisks.

The clearance under the bridge is 70 metres (229 ft 8 in). Therefore, the maximum height of ships that can pass through the Suez Canal (Suezmax) is 68 metres (223 ft 1 in) above the waterline.[4]

Significant developments in the region edit

The Suez Canal Bridge was part of a major drive to develop the areas surrounding the Suez Canal, including other projects such as the Ahmed Hamdi Tunnel under the Suez Canal (completed in 1981), the El Ferdan Railway Bridge, and the Suez Canal overhead powerline crossing.

References edit

  1. ^ a b c d e f g h Suez Canal Bridge at Structurae
  2. ^ Matsumoto T, Mukoyama T, Yonezawa E, Yamazaki T, Fujita T (2018). "On Orthotropic Steel Deck Pavement of Suez Canal Bridge". Journal of JSCE. 6: 49–68. doi:10.2208/journalofjsce.6.1_49. Retrieved 25 July 2020.
  3. ^ a b "Kajima's Spectacular Suez Canal Bridge Project" (PDF). Kajima. Retrieved March 16, 2014.
  4. ^ "SCA – Rules of Navigation". www.suezcanal.gov.eg. Retrieved 2022-10-29.

External links edit

  • Embassy of Japan in Egypt: Economic Cooperation ( Official Development Assistance, ODA )
  • Planning, design and construction aspects of the Suez Canal cable stayed bridge

suez, canal, bridge, confused, with, ferdan, railway, bridge, also, known, egyptian, japanese, friendship, bridge, salam, bridge, salam, peace, bridge, mubarak, peace, bridge, road, bridge, crossing, suez, canal, qantara, whose, name, means, bridge, egyptian, . Not to be confused with El Ferdan Railway Bridge The Suez Canal Bridge also known as the Egyptian Japanese Friendship Bridge Al Salam Bridge Al Salam Peace Bridge or Mubarak Peace Bridge is a road bridge crossing the Suez Canal at El Qantara whose name means the bridge in Egyptian Arabic The bridge links the continents of Africa and Asia Suez Canal BridgeCoordinates30 49 42 N 32 19 03 E 30 828248 N 32 317572 E 30 828248 32 317572CarriesFour lanes vehicular traffic 1 CrossesSuez CanalLocaleEl Qantara EgyptOwnerGeneral Authority for Roads Bridges amp TransportMinistry of Transport and Communication 1 Maintained byGeneral Authority for Roads Bridges amp Transport Ministry of Transport and CommunicationCharacteristicsDesignCable stayed bridge semi fan arrangement H pylon hollow box 1 MaterialSteel and reinforced concrete 1 Total length3 9 km 2 4 mi 1 Width22 8 m 75 ft 2 Height154 m 505 ft pylons 1 Longest span404 m 1 325 ft 1 Clearance below70 m 230 ft 1 HistoryDesignerKajimaConstructed byConsortium consisting of KajimaJFE HoldingsNippon Steel 3 Construction start1995OpenedOctober 9 2001 22 years ago October 9 2001 Location Contents 1 Design and construction 2 Significant developments in the region 3 References 4 External linksDesign and construction edit nbsp Detail view of one of the main pylons The bridge was built with assistance from the Japanese government The main contractor was Kajima Corporation 3 The Japanese grant accounting for 60 of the construction cost or 13 5 billion yen was agreed to during the visit of then President Hosni Mubarak to Japan in March 1995 as part of a larger project to develop the Sinai Peninsula Egypt bore the remaining 40 9 billion yen The bridge was opened in October 2001 The bridge which has a 70 metre 229 ft 8 in clearance over the canal and is 3 9 kilometres 2 4 mi long consists of a 400 metre 1 300 ft cable stayed main span and two 1 8 kilometre 1 1 mi long approach spans The height of the two main pylons supporting the main span is 154 metres 505 ft each The towers were designed in the shape of Pharaonic obelisks The clearance under the bridge is 70 metres 229 ft 8 in Therefore the maximum height of ships that can pass through the Suez Canal Suezmax is 68 metres 223 ft 1 in above the waterline 4 Significant developments in the region editThe Suez Canal Bridge was part of a major drive to develop the areas surrounding the Suez Canal including other projects such as the Ahmed Hamdi Tunnel under the Suez Canal completed in 1981 the El Ferdan Railway Bridge and the Suez Canal overhead powerline crossing References edit a b c d e f g h Suez Canal Bridge at Structurae Matsumoto T Mukoyama T Yonezawa E Yamazaki T Fujita T 2018 On Orthotropic Steel Deck Pavement of Suez Canal Bridge Journal of JSCE 6 49 68 doi 10 2208 journalofjsce 6 1 49 Retrieved 25 July 2020 a b Kajima s Spectacular Suez Canal Bridge Project PDF Kajima Retrieved March 16 2014 SCA Rules of Navigation www suezcanal gov eg Retrieved 2022 10 29 External links edit nbsp Wikimedia Commons has media related to Suez Canal Bridge Embassy of Japan in Egypt Economic Cooperation Official Development Assistance ODA Planning design and construction aspects of the Suez Canal cable stayed bridge Retrieved from https en wikipedia org w index php title Suez Canal Bridge amp oldid 1179369261, wikipedia, wiki, book, books, library,