St Paul's Tower

St Paul's Tower is a skyscraper[1] located on Arundel Gate in Sheffield, South Yorkshire, England. Construction commenced in May 2006 and the building was topped out in August 2010, surpassing Sheffield University's Arts Tower as the tallest building in Sheffield at 101 metres (331 ft) tall. The city's first skyscraper, it was constructed as the centrepiece of the St Paul's Place project as part of the Heart of the City redevelopment of Sheffield city centre.

St Paul's Tower
St Paul's Tower when completed in April 2012
Record height
Tallest in Sheffield since 2010[note 1][I]
Preceded byArts Tower
General information
StatusCompleted
TypeResidential
LocationSt Paul's Place, Heart of the City, Sheffield, England
Coordinates53°22′44″N 1°28′06″W / 53.378947°N 1.468277°W / 53.378947; -1.468277
Construction startedMay 2006
CompletedAugust 2010
OpeningApril 2011
Cost£40 million
Height
Roof101 m (331 ft)
Top floor101 m (331 ft)
Technical details
Floor count32
Lifts/elevators2
Design and construction
Architect(s)Conran & Partners
DeveloperCity Lofts Group

The tower is set to be overtaken as the tallest building in Sheffield by the under-construction Code Sheffield development at 117 metres (384 ft), which will also become the tallest building in Yorkshire upon completion.

History

The site of St Paul's Tower was occupied from 1740 by a chapel of ease of the nearby Sheffield Cathedral known as St Paul's Church, from which the skyscraper takes its name. Sheffield Town Hall was constructed next to the church in the 1890s, and the church was subsequently demolished in 1938 to make way for an area of gardens next to the Town Hall known originally as St Paul's Gardens.

In 1977, two brutalist extensions to the Town Hall, nicknamed The Egg Box and The Wedding Cake due to their designs, were constructed over the eastern section of St Paul's Gardens (the western remainder subsequently became the Peace Gardens). These buildings were occupied by the offices of Sheffield City Council; however, their contrasting design alongside the 1890s Renaissance Revival style Town Hall proved controversial throughout their existence.

In the early 2000s, two new office buildings, namely Derwent House and Howden House, were constructed a short distance to the south along Arundel Gate to house the relocated Sheffield City Council offices, and the 1970s Town Hall Extension was subsequently emptied and demolished in 2002. This left the site once again unoccupied. Following the completion of the Peace Gardens, Millennium Square and Winter Garden as part of the Heart of the City project, attention turned to the former Egg Box site, now named St Paul's Place.

Design and development

Planning permission for the project was first granted in October 2005, with excavation work beginning in May 2006 and construction officially commencing in May 2007. The construction process of the development was originally due to be completed by late 2008.

The development includes a total of 316 one- and two-bedroom apartments located in the main skyscraper and an adjacent nine-storey mid-rise building named St Paul's View, linked by ground-floor retail. The project's design is conservatively modern, complementing the surrounding buildings such as the adjacent Grade I listed Town Hall and the modern Winter Garden. According to the official website for the project:

The light and slender tower will incorporate a variety of complementary external treatments with the use of extensive glazing, warm stone cladding, (not often seen in tall buildings), specially made terracotta rainscreen, copper cladding and bronzed aluminium louvre panels, creating a distinctive and memorable scheme.

— City Lofts, St. Paul's Building Design[2]

Construction

Administration of City Lofts Group

On 4 July 2008, it was announced that the company leading the project, City Lofts Group Plc, had gone into administration.[3] The insolvency followed from a series of large financial losses, spiralling lending costs and falling property market values. Although construction at St Paul's Tower was not immediately affected, a number of completed developments were placed under the control of the administrators Ernst & Young.[citation needed]

Cladding controversy

On 3 October 2008, the BBC Look North news programme reported that the exterior cladding for the main tower had been significantly changed due to costs and was causing concern amongst Sheffield City Council planning officials and the wider public. Two well-known websites that had been following the construction of the tower reported that the council was calling a halt to any more cladding being placed on the building pending a decision as to whether the new design complied with the original plans.[4] A revised set of design plans was drafted before being finally approved in December 2008.[5] The new plans removed or modified certain features of the build, such as the removal of the spire and increased thickness of the window frames.

Occupants

St Paul's Tower predominantly consists of apartments, containing a mixture of one and two bedrooms. However, provision for retail space was provided at the ground level of both the main skyscraper, fronting onto Arundel Gate, and the adjacent St Paul's View mid-rise, fronting onto Millennium Square; the two buildings are linked by ground-floor retail.

The entire ground-floor retail space of St Paul's Tower has been occupied by a Sainsbury's Local supermarket since July 2011. On the St Paul's View side of the building, the retail space is currently split between two restaurants: a Cosmo's and a Pizza Express.

References

  1. ^ Under the Emporis Standards Committee, a skyscraper is defined as a multi-storey building which is at least 100m. Any building from 35m to 100m tall is generally considered to be a high rise building.
  2. ^ "St. Paul's Building Design". StPauls-Sheffield.com. Retrieved 17 April 2017.
  3. ^ . Telegraph.co.uk. 5 July 2008. Archived from the original on 5 July 2008. Retrieved 17 April 2017.
  4. ^ See "St Paul's tower cladding?? Have read the council aren't happy -and neither am I!". Sheffield Forum
  5. ^ "Changes To Sheffields St Pauls Tower Approved - Article #1885". SkyscraperNews.com. Retrieved 17 April 2017.

Notes

  1. ^ Construction of Code Sheffield commenced in March 2022. Once completed, it will become the tallest building in the city, with a height of 117 m (384 ft).

External links

Records
Preceded by
Arts Tower
78 m (256 ft)
Tallest building in Sheffield
2010 – present
Succeeded by
incumbent

paul, tower, confused, with, wignacourt, tower, fortification, protecting, paul, malta, skyscraper, located, arundel, gate, sheffield, south, yorkshire, england, construction, commenced, 2006, building, topped, august, 2010, surpassing, sheffield, university, . Not to be confused with the Wignacourt Tower a fortification protecting St Paul s Bay in Malta St Paul s Tower is a skyscraper 1 located on Arundel Gate in Sheffield South Yorkshire England Construction commenced in May 2006 and the building was topped out in August 2010 surpassing Sheffield University s Arts Tower as the tallest building in Sheffield at 101 metres 331 ft tall The city s first skyscraper it was constructed as the centrepiece of the St Paul s Place project as part of the Heart of the City redevelopment of Sheffield city centre St Paul s TowerSt Paul s Tower when completed in April 2012Record heightTallest in Sheffield since 2010 note 1 I Preceded byArts TowerGeneral informationStatusCompletedTypeResidentialLocationSt Paul s Place Heart of the City Sheffield EnglandCoordinates53 22 44 N 1 28 06 W 53 378947 N 1 468277 W 53 378947 1 468277Construction startedMay 2006CompletedAugust 2010OpeningApril 2011Cost 40 millionHeightRoof101 m 331 ft Top floor101 m 331 ft Technical detailsFloor count32Lifts elevators2Design and constructionArchitect s Conran amp PartnersDeveloperCity Lofts GroupThe tower is set to be overtaken as the tallest building in Sheffield by the under construction Code Sheffield development at 117 metres 384 ft which will also become the tallest building in Yorkshire upon completion Contents 1 History 2 Design and development 3 Construction 3 1 Administration of City Lofts Group 3 2 Cladding controversy 4 Occupants 5 References 5 1 Notes 6 External linksHistory EditThe site of St Paul s Tower was occupied from 1740 by a chapel of ease of the nearby Sheffield Cathedral known as St Paul s Church from which the skyscraper takes its name Sheffield Town Hall was constructed next to the church in the 1890s and the church was subsequently demolished in 1938 to make way for an area of gardens next to the Town Hall known originally as St Paul s Gardens In 1977 two brutalist extensions to the Town Hall nicknamed The Egg Box and The Wedding Cake due to their designs were constructed over the eastern section of St Paul s Gardens the western remainder subsequently became the Peace Gardens These buildings were occupied by the offices of Sheffield City Council however their contrasting design alongside the 1890s Renaissance Revival style Town Hall proved controversial throughout their existence In the early 2000s two new office buildings namely Derwent House and Howden House were constructed a short distance to the south along Arundel Gate to house the relocated Sheffield City Council offices and the 1970s Town Hall Extension was subsequently emptied and demolished in 2002 This left the site once again unoccupied Following the completion of the Peace Gardens Millennium Square and Winter Garden as part of the Heart of the City project attention turned to the former Egg Box site now named St Paul s Place Design and development EditPlanning permission for the project was first granted in October 2005 with excavation work beginning in May 2006 and construction officially commencing in May 2007 The construction process of the development was originally due to be completed by late 2008 The development includes a total of 316 one and two bedroom apartments located in the main skyscraper and an adjacent nine storey mid rise building named St Paul s View linked by ground floor retail The project s design is conservatively modern complementing the surrounding buildings such as the adjacent Grade I listed Town Hall and the modern Winter Garden According to the official website for the project The light and slender tower will incorporate a variety of complementary external treatments with the use of extensive glazing warm stone cladding not often seen in tall buildings specially made terracotta rainscreen copper cladding and bronzed aluminium louvre panels creating a distinctive and memorable scheme City Lofts St Paul s Building Design 2 Construction EditAdministration of City Lofts Group Edit On 4 July 2008 it was announced that the company leading the project City Lofts Group Plc had gone into administration 3 The insolvency followed from a series of large financial losses spiralling lending costs and falling property market values Although construction at St Paul s Tower was not immediately affected a number of completed developments were placed under the control of the administrators Ernst amp Young citation needed Cladding controversy Edit On 3 October 2008 the BBC Look North news programme reported that the exterior cladding for the main tower had been significantly changed due to costs and was causing concern amongst Sheffield City Council planning officials and the wider public Two well known websites that had been following the construction of the tower reported that the council was calling a halt to any more cladding being placed on the building pending a decision as to whether the new design complied with the original plans 4 A revised set of design plans was drafted before being finally approved in December 2008 5 The new plans removed or modified certain features of the build such as the removal of the spire and increased thickness of the window frames Occupants EditSt Paul s Tower predominantly consists of apartments containing a mixture of one and two bedrooms However provision for retail space was provided at the ground level of both the main skyscraper fronting onto Arundel Gate and the adjacent St Paul s View mid rise fronting onto Millennium Square the two buildings are linked by ground floor retail The entire ground floor retail space of St Paul s Tower has been occupied by a Sainsbury s Local supermarket since July 2011 On the St Paul s View side of the building the retail space is currently split between two restaurants a Cosmo s and a Pizza Express References Edit Under the Emporis Standards Committee a skyscraper is defined as a multi storey building which is at least 100m Any building from 35m to 100m tall is generally considered to be a high rise building St Paul s Building Design StPauls Sheffield com Retrieved 17 April 2017 Money Telegraph co uk 5 July 2008 Archived from the original on 5 July 2008 Retrieved 17 April 2017 See St Paul s tower cladding Have read the council aren t happy and neither am I Sheffield Forum Changes To Sheffields St Pauls Tower Approved Article 1885 SkyscraperNews com Retrieved 17 April 2017 Notes Edit Construction of Code Sheffield commenced in March 2022 Once completed it will become the tallest building in the city with a height of 117 m 384 ft External links EditRecordsPreceded byArts Tower78 m 256 ft Tallest building in Sheffield2010 present Succeeded byincumbent Retrieved from https en wikipedia org w index php title St Paul 27s Tower amp oldid 1148212839, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.