fbpx
Wikipedia

South African Class NG6 4-4-0

The South African Railways Class NG6 4-4-0 of 1895 was an ex-Mozambican narrow-gauge steam locomotive from the Beira Railway era.

Beira Railway Lawley 4-4-0
South African Class NG6 4-4-0
Falcon F2, Beira Railway no. BR6, SAR no. NG106, restored as no. BR7, Sandstone Estates, 9 April 2006
Type and origin
♠ Falcon F2 – Falcon F4
Power typeSteam
DesignerFalcon Engine and Car Works
BuilderFalcon Engine and Car Works
Glasgow Railway Engineering
ModelFalcon F2 & F4
Build date1895-1898
Total produced42 (6 F2 & 36 F4)
Specifications
Configuration:
 • Whyte4-4-0 (American)
 • UIC2'Bn2
Driver1st coupled axle
Gauge2 ft (610 mm) narrow
Leading dia.24 in (610 mm)
Coupled dia.♠ 32 in (813 mm)
36 in (914 mm)
Tender wheels24 in (610 mm)
Wheelbase25 ft 2+14 in (7,677 mm)
26 ft (7,925 mm) ​
 • Engine♠ 13 ft 9+14 in (4,197 mm)
14 ft (4,267 mm)
 • Leading3 ft 10 in (1,168 mm)
 • Coupled5 ft 5 in (1,651 mm)
 • Tender6 ft (1,829 mm) (3-axle)
Length:
 • Over couplers31 ft 5+12 in (9,588 mm)
Width6 ft 4 in (1,930 mm)
Height9 ft 6+34 in (2,915 mm)
Axle load4 LT 10 cwt (4,572 kg) ​
 • Leading5 LT (5,080 kg)
 • Coupled4 LT 10 cwt (4,572 kg)
Adhesive weight9 LT (9,144 kg)
Loco weight14 LT (14,220 kg)
Tender weight♠ 6 LT 10 cwt (6,604 kg)
7 LT 10 cwt (7,620 kg)
Total weight♠ 20 LT 10 cwt (20,830 kg)
21 LT 10 cwt (21,850 kg)
Tender type3-axle
Fuel typeCoal
Fuel capacity2 LT (2.0 t)
Water cap.780 imp gal (3,550 L)
Firebox:
 • TypeRound-top
 • Grate area♠ 4.5 sq ft (0.42 m2)
5.25 sq ft (0.488 m2)
Boiler:
 • Pitch4 ft 8+12 in (1,435 mm)
 • Diameter2 ft 8+14 in (819 mm)
 • Tube plates7 ft 1+1116 in (2,176 mm)
 • Small tubes75: 1+34 in (44 mm)
Boiler pressure140 psi (965 kPa)
Safety valveSalter Ramsbottom
Heating surface:
 • Firebox♠ 29 sq ft (2.7 m2)
30 sq ft (2.8 m2)
 • Tubes♠ 233 sq ft (21.6 m2)
246 sq ft (22.9 m2)
 • Total surface♠ 262 sq ft (24.3 m2)
276 sq ft (25.6 m2)
CylindersTwo
Cylinder size♠ 8 in (203 mm) bore
9 in (229 mm) bore
15 in (381 mm) stroke
Valve gearStephenson
Loco brakeHandbrake
Train brakesVacuum
CouplersBell-and-hook
Performance figures
Tractive effort♠ 3,000 lbf (13 kN) @ 75%
3,987 lbf (17.74 kN) @ 75%
Career
OperatorsBeira Eailway
Ayrshire Railway
South African Railways
ClassSAR Class NG6
Number in classBR 42, SAR 13
NumbersBR 4-45
SAR NG96-NG108
NicknamesLawley
Delivered1895-1898
First run1895
Withdrawn1935

Between 1895 and 1898, Pauling and Company placed 42 Falcon-built types F2 and F4 tender steam locomotives with a 4-4-0 American type wheel arrangement in service on the two-foot narrow-gauge line which was being constructed for the Beira Railway in Mozambique. In 1915, thirteen of these locomotives were acquired by the South African Railways to replace locomotives which had been commandeered by the Union Defence Forces for use in German South West Africa during the First World War.[1][2]

At the end of the war, these locomotives were staged, but in 1921 they were placed back in service by the South African Railways. When a system of grouping narrow-gauge locomotives into classes was eventually introduced somewhere between 1928 and 1930, they were designated Class NG6.[2][3]

The Beira Railway edit

Construction of the first 2 ft (610 mm) narrow-gauge railway in Southern Africa began in 1892. This was the 370-kilometre long (230-mile) line of the narrow-gauge Beira Railway which eventually stretched from Beira in Mozambique to Umtali across the Rhodesian border. The border was reached in October 1897 and the full line to Umtali was opened to traffic on 4 February 1898. The work was undertaken by Pauling and Company and was subcontracted to Alfred Lawley.[2][4]

Manufacturers and characteristics edit

 
Falcon works plate

Between 1895 and 1898, the Beira Railway placed 42 Falcon types F2 and F4 tender steam locomotives with a 4-4-0 American type wheel arrangement in service, supplied in six batches by Falcon Engine and Car Works Limited in England and the Glasgow Railway Engineering Company in Scotland. In service, these locomotives were soon nicknamed Lawleys, after the Beira Railway construction subcontractor.[2][3]

Falcon F2 edit

 
Falcon F2

The first of the Falcon F2 loco­motives differed from later models of its class by having a cab which was similar to the Beira Railway's earlier three 0-6-0 locomotives, with two rectangular louvred cab windows on each side. Its boiler dome was fitted with a Salter safety valve. The locomotive was delivered by Falcon in 1895 and was numbered BR4.[4]

A further five F2 locomotives were ordered from Falcon and were also delivered in 1895, numbered in the range from BR5 to BR9. They differed in appearance from the first F2 locomotive by having larger single cab windows.[4]

Falcon F4 edit

 
Falcon F4

The next six locomotives which were ordered from Falcon in 1896, were of an altered design. The Falcon F4 was larger and heavier than the F2, with the running boards stepped down below the cab, a larger tube heating surface in the boiler, single slidebars, straight lipped funnels, Ramsbottom safety valves over the fireboxes, and a tractive effort which was increased from the 3,000 pounds-force (13 kilonewtons) at 75% of boiler pressure of the F2 to 3,987 pounds-force (18 kilonewtons). They were numbered in the range from BR10 to BR15 and could pull 180 long tons (183 tonnes) up the ruling gradients, compared to the 160 long tons (163 tonnes) which the F2 could manage.[4]

At the end of 1896, another four of these engines were delivered from Falcon, numbered in the range from BR16 to BR19. They were similar to the previous batches, but had larger three-axle tenders with an increased water capacity.[4]

The last sixteen Falcon-built locomotives were all delivered in 1897, numbered in the range from BR20 to BR35. All these Falcon-built F2 and F4 locomotives bore their engine numbers on the sandboxes on their running boards, in the form of individual brass letters and numbers.[4]

Glasgow F4 edit

The construction of the last batch of ten F4 locomotives was subcontracted by Falcon to the Glasgow Railway Engineering Company in Scotland. They were built and delivered in 1898, numbered in the range from BR36 to BR45. The Glasgow locomotives had wasp-waisted safety valves and their engine numbers, also mounted on the sandboxes, were cast oval brass plates.[4]

The manufacturing company in Glasgow was formed by Dugald Drummond in 1891, as Dugald Drummond and Sons. In 1895, when Dugald left to take up the post as locomotive engineer of the London and South Western Railway, the name of the business was changed to the Glasgow Railway Engineering Company, with his sons continuing to manage the works. While the earlier locomotives were known as the Falcon F2 and Falcon F4, this last batch of Glasgow-built locomotives were often referred to as the Drummond F4, in spite of its builder's name change.[4][5]

Fowler tenders edit

In addition to the three-axle tenders which were delivered with all the F2 and F4 locomotives, two larger bogie tenders were ordered from John Fowler and Company of Leeds. One of these was attached to no. BR5 after its three-axle tender was wrecked in an accident. Both these bogie tenders later turned up in South Africa, attached to numbers BR6 and BR8.[4]

Service edit

Beira Railway edit

In service, it turned out that the Lawleys were not adequate to the task. Since rapid growth in traffic soon overwhelmed the narrow-gauge line, it was widened to Cape gauge by 1900. As a result, the whole Lawley locomotive fleet, together with the rest of the Beira Railway's narrow-gauge locomotives, were staged at Bamboo Creek (Villa Machado) near Beira, with the exception of those locomotives which were required for the Ayrshire Railway which was still under construction at the time.[1][2][4]

Ayrshire Railway edit

The Ayrshire Railway used much of the redundant Beira Railway equipment, including six of the F4 locomotives, one of them Falcon-built and the other five Glasgow-built. They remained in service there until this line was also converted to Cape gauge in 1914 and became the Sinoia branch of the Beira, Mashonaland and Rhodesia Railway.[4]

Union Defence Force edit

During the First World War, when South African forces conducted a campaign to drive German forces from Deutsch-Südwest-Afrika (DSWA), narrow-gauge locomotives were urgently required on the Otavi Railway in that territory to replace those which were destroyed by the retreating German forces. Several South African Railways (SAR) locomotives from the various narrow-gauge lines were therefore commandeered by the Union Defence Forces (UDF). To replace these, thirteen of the Lawleys in staging at Bamboo Creek were purchased by the South African Department of Defence and brought to South Africa in 1915. They were renumbered in the range from NG96 to NG108 and, after being repaired, nine of them were placed in service while the other four were cannibalised for spare parts.[1][2][3][4]

As the DSWA campaign drew to a close and many of the ex-German narrow-gauge locomotives were repaired, the SAR locomotives on active service gradually returned to their home lines in South Africa. As a result, the Lawleys were staged once again after less than two years of service in South Africa.[2]

South African Railways edit

 

In 1921, Lawley numbers NG101 and NG102 were re-commissioned and placed in SAR service on the branchline from Pienaarsrivier to Pankop, off the mainline between Pretoria and Pietersburg. The Lawleys were the smallest tender steam locomotives to ever see service on the SAR. They performed quite well on this line, since the branch was a light railway with slow speeds and small rolling stock.[1][2][3]

During 1924, construction commenced on the narrow-gauge branchline between Upington and Kakamas in the Northern Cape Province and, during 1925, on the branch from Fort Beaufort to Seymour in the Eastern Cape. The remaining Lawleys were then also recovered from storage and placed in service once again. They remained in service when these branchlines were opened to traffic, even though it was usually only in a standby capacity.[2][3]

Also in 1924, Lawley no. NG98 joined the Dutton road-rail tractors on the narrow-gauge line from Naboomspruit to Singlewood. By 1927, it was joined by no. NG103, but by this time the Singlewood branch was being regauged to Cape gauge and, by 11 June 1928, it was extended to Zebediela.[6][7][8]

The system of grouping narrow-gauge locomotives into classes was adopted by the SAR somewhere between 1928 and 1930 and, at that point, the Lawley locomotives were designated Class NG6. The steady increase in loads on the narrow-gauge branches eventually once again proved to be more than the Lawleys were capable of and they were eventually withdrawn. The last one, no. NG103, was retired in 1935.[2][9]

Industrial edit

Several Lawleys were sold into private use with some surviving in service until 1957, often being sold or resold between users. Known users were, amongst others, Premier Portland Cement in Bulawayo, the Rhodesian Native Timber Concessions at Gwaai, the Cam and Motor Mine at Gatooma, the Selukwe Peak Light Railway of the Selukwe Chrome Mine, the Lupane Forest Estates, the Igusi Saw Mills and the Arcturus Mine east of Salisbury, all these in Rhodesia. In South Africa, some went to the Zebediela citrus plantations in the northern Transvaal.[2][4]

Works numbers edit

Since frames, boilers and tenders were exchanged between locomotives during the process of building nine serviceable locomotives from the thirteen which were purchased from Bamboo Creek in 1915, the original identities of these locomotives were not always accurately recorded. The Lawley locomotive models, builders and works numbers are listed in the table, which includes the engine numbers of those SAR locomotives of which the Beira Railway engine numbers are known.[4]

Preservation edit

Two locomotives have been restored to running condition at the Sandstone Estates near Ficksburg in the Free State. One is Falcon F2 no. BR7, later SAR no. NG106, which was restored by Sandstone as no. BR7 in the original green Beira Railway livery, while the other is Falcon F4 no. BR25, later SAR no. NG97, which was restored in the black SAR livery.

Illustration edit

The main picture shows the restored Falcon F2, Beira Railway no. BR6, SAR no. NG106, restored as no. BR7, at Sandstone Estates on 9 April 2006. Those following also illustrate Lawleys in SAR service.

References edit

  1. ^ a b c d Railway Modelling Scene, South Africa, May/June 1985, article written by Neill Mardell
  2. ^ a b c d e f g h i j k Paxton, Leith; Bourne, David (1985). Locomotives of the South African Railways (1st ed.). Cape Town: Struik. pp. 103–104. ISBN 0869772112.
  3. ^ a b c d e Espitalier, T.J.; Day, W.A.J. (1945). The Locomotive in South Africa – A Brief History of Railway Development. Chapter VII – South African Railways (Continued). South African Railways and Harbours Magazine, October 1945. p. 781.
  4. ^ a b c d e f g h i j k l m n o Baxter, Antony. The Two Foot Gauge Enigma (1st ed.). Plateway Press. pp. 37-45 & Appendix V. ISBN 1-871980-34-8.
  5. ^ Pattison, R.G. (2005). Thundering Smoke, (1st ed.). Sable Publishing House. ISBN 0-9549488-1-5
  6. ^ Cash, R.G. (2015). The Stronach-Dutton Roadrail System of Traction. The Narrow Gauge, Autumn 2015. The Narrow Gauge Railway Society. pp. 30-31.
  7. ^ Statement Showing, in Chronological Order, the Date of Opening and the Mileage of Each Section of Railway, Statement No. 19, p. 188, ref. no. 200954-13
  8. ^ Statement Showing, in Chronological Order, the Date of Opening and the Mileage of Each Section of Railway, Statement No. 19, p. 189, ref. no. 200954-13
  9. ^ South African Railways and Harbours Narrow Gauge Locomotive Diagram Book, 2'0" Gauge, S.A.R. Mechanical Dept. Drawing Office, Pretoria, 28 November 1932

south, african, class, south, african, railways, class, 1895, mozambican, narrow, gauge, steam, locomotive, from, beira, railway, beira, railway, lawley, 0falcon, beira, railway, ng106, restored, sandstone, estates, april, 2006type, origin, falcon, falcon, f4p. The South African Railways Class NG6 4 4 0 of 1895 was an ex Mozambican narrow gauge steam locomotive from the Beira Railway era Beira Railway Lawley 4 4 0South African Class NG6 4 4 0Falcon F2 Beira Railway no BR6 SAR no NG106 restored as no BR7 Sandstone Estates 9 April 2006Type and origin Falcon F2 Falcon F4Power typeSteamDesignerFalcon Engine and Car WorksBuilderFalcon Engine and Car WorksGlasgow Railway EngineeringModelFalcon F2 amp F4Build date1895 1898Total produced42 6 F2 amp 36 F4 SpecificationsConfiguration Whyte4 4 0 American UIC2 Bn2Driver1st coupled axleGauge2 ft 610 mm narrowLeading dia 24 in 610 mm Coupled dia 32 in 813 mm 36 in 914 mm Tender wheels24 in 610 mm Wheelbase 25 ft 2 1 4 in 7 677 mm 26 ft 7 925 mm Engine 13 ft 9 1 4 in 4 197 mm 14 ft 4 267 mm Leading3 ft 10 in 1 168 mm Coupled5 ft 5 in 1 651 mm Tender6 ft 1 829 mm 3 axle Length Over couplers31 ft 5 1 2 in 9 588 mm Width6 ft 4 in 1 930 mm Height9 ft 6 3 4 in 2 915 mm Axle load4 LT 10 cwt 4 572 kg Leading5 LT 5 080 kg Coupled4 LT 10 cwt 4 572 kg Adhesive weight9 LT 9 144 kg Loco weight14 LT 14 220 kg Tender weight 6 LT 10 cwt 6 604 kg 7 LT 10 cwt 7 620 kg Total weight 20 LT 10 cwt 20 830 kg 21 LT 10 cwt 21 850 kg Tender type3 axleFuel typeCoalFuel capacity2 LT 2 0 t Water cap 780 imp gal 3 550 L Firebox TypeRound top Grate area 4 5 sq ft 0 42 m2 5 25 sq ft 0 488 m2 Boiler Pitch4 ft 8 1 2 in 1 435 mm Diameter2 ft 8 1 4 in 819 mm Tube plates7 ft 1 11 16 in 2 176 mm Small tubes 75 1 3 4 in 44 mm Boiler pressure140 psi 965 kPa Safety valve Salter RamsbottomHeating surface Firebox 29 sq ft 2 7 m2 30 sq ft 2 8 m2 Tubes 233 sq ft 21 6 m2 246 sq ft 22 9 m2 Total surface 262 sq ft 24 3 m2 276 sq ft 25 6 m2 CylindersTwoCylinder size 8 in 203 mm bore 9 in 229 mm bore 15 in 381 mm strokeValve gearStephensonLoco brakeHandbrakeTrain brakesVacuumCouplersBell and hookPerformance figuresTractive effort 3 000 lbf 13 kN 75 3 987 lbf 17 74 kN 75 CareerOperatorsBeira EailwayAyrshire RailwaySouth African RailwaysClassSAR Class NG6Number in classBR 42 SAR 13NumbersBR 4 45SAR NG96 NG108NicknamesLawleyDelivered1895 1898First run1895Withdrawn1935 Between 1895 and 1898 Pauling and Company placed 42 Falcon built types F2 and F4 tender steam locomotives with a 4 4 0 American type wheel arrangement in service on the two foot narrow gauge line which was being constructed for the Beira Railway in Mozambique In 1915 thirteen of these locomotives were acquired by the South African Railways to replace locomotives which had been commandeered by the Union Defence Forces for use in German South West Africa during the First World War 1 2 At the end of the war these locomotives were staged but in 1921 they were placed back in service by the South African Railways When a system of grouping narrow gauge locomotives into classes was eventually introduced somewhere between 1928 and 1930 they were designated Class NG6 2 3 Contents 1 The Beira Railway 2 Manufacturers and characteristics 2 1 Falcon F2 2 2 Falcon F4 2 3 Glasgow F4 2 4 Fowler tenders 3 Service 3 1 Beira Railway 3 2 Ayrshire Railway 3 3 Union Defence Force 3 4 South African Railways 3 5 Industrial 4 Works numbers 5 Preservation 6 Illustration 7 ReferencesThe Beira Railway editConstruction of the first 2 ft 610 mm narrow gauge railway in Southern Africa began in 1892 This was the 370 kilometre long 230 mile line of the narrow gauge Beira Railway which eventually stretched from Beira in Mozambique to Umtali across the Rhodesian border The border was reached in October 1897 and the full line to Umtali was opened to traffic on 4 February 1898 The work was undertaken by Pauling and Company and was subcontracted to Alfred Lawley 2 4 Manufacturers and characteristics edit nbsp Falcon works plate Between 1895 and 1898 the Beira Railway placed 42 Falcon types F2 and F4 tender steam locomotives with a 4 4 0 American type wheel arrangement in service supplied in six batches by Falcon Engine and Car Works Limited in England and the Glasgow Railway Engineering Company in Scotland In service these locomotives were soon nicknamed Lawleys after the Beira Railway construction subcontractor 2 3 Falcon F2 edit nbsp Falcon F2 The first of the Falcon F2 loco motives differed from later models of its class by having a cab which was similar to the Beira Railway s earlier three 0 6 0 locomotives with two rectangular louvred cab windows on each side Its boiler dome was fitted with a Salter safety valve The locomotive was delivered by Falcon in 1895 and was numbered BR4 4 A further five F2 locomotives were ordered from Falcon and were also delivered in 1895 numbered in the range from BR5 to BR9 They differed in appearance from the first F2 locomotive by having larger single cab windows 4 Falcon F4 edit nbsp Falcon F4 The next six locomotives which were ordered from Falcon in 1896 were of an altered design The Falcon F4 was larger and heavier than the F2 with the running boards stepped down below the cab a larger tube heating surface in the boiler single slidebars straight lipped funnels Ramsbottom safety valves over the fireboxes and a tractive effort which was increased from the 3 000 pounds force 13 kilonewtons at 75 of boiler pressure of the F2 to 3 987 pounds force 18 kilonewtons They were numbered in the range from BR10 to BR15 and could pull 180 long tons 183 tonnes up the ruling gradients compared to the 160 long tons 163 tonnes which the F2 could manage 4 At the end of 1896 another four of these engines were delivered from Falcon numbered in the range from BR16 to BR19 They were similar to the previous batches but had larger three axle tenders with an increased water capacity 4 The last sixteen Falcon built locomotives were all delivered in 1897 numbered in the range from BR20 to BR35 All these Falcon built F2 and F4 locomotives bore their engine numbers on the sandboxes on their running boards in the form of individual brass letters and numbers 4 Glasgow F4 edit The construction of the last batch of ten F4 locomotives was subcontracted by Falcon to the Glasgow Railway Engineering Company in Scotland They were built and delivered in 1898 numbered in the range from BR36 to BR45 The Glasgow locomotives had wasp waisted safety valves and their engine numbers also mounted on the sandboxes were cast oval brass plates 4 The manufacturing company in Glasgow was formed by Dugald Drummond in 1891 as Dugald Drummond and Sons In 1895 when Dugald left to take up the post as locomotive engineer of the London and South Western Railway the name of the business was changed to the Glasgow Railway Engineering Company with his sons continuing to manage the works While the earlier locomotives were known as the Falcon F2 and Falcon F4 this last batch of Glasgow built locomotives were often referred to as the Drummond F4 in spite of its builder s name change 4 5 Fowler tenders edit In addition to the three axle tenders which were delivered with all the F2 and F4 locomotives two larger bogie tenders were ordered from John Fowler and Company of Leeds One of these was attached to no BR5 after its three axle tender was wrecked in an accident Both these bogie tenders later turned up in South Africa attached to numbers BR6 and BR8 4 Service editBeira Railway edit Main article Beira Bulawayo railway In service it turned out that the Lawleys were not adequate to the task Since rapid growth in traffic soon overwhelmed the narrow gauge line it was widened to Cape gauge by 1900 As a result the whole Lawley locomotive fleet together with the rest of the Beira Railway s narrow gauge locomotives were staged at Bamboo Creek Villa Machado near Beira with the exception of those locomotives which were required for the Ayrshire Railway which was still under construction at the time 1 2 4 Ayrshire Railway edit The Ayrshire Railway used much of the redundant Beira Railway equipment including six of the F4 locomotives one of them Falcon built and the other five Glasgow built They remained in service there until this line was also converted to Cape gauge in 1914 and became the Sinoia branch of the Beira Mashonaland and Rhodesia Railway 4 Union Defence Force edit During the First World War when South African forces conducted a campaign to drive German forces from Deutsch Sudwest Afrika DSWA narrow gauge locomotives were urgently required on the Otavi Railway in that territory to replace those which were destroyed by the retreating German forces Several South African Railways SAR locomotives from the various narrow gauge lines were therefore commandeered by the Union Defence Forces UDF To replace these thirteen of the Lawleys in staging at Bamboo Creek were purchased by the South African Department of Defence and brought to South Africa in 1915 They were renumbered in the range from NG96 to NG108 and after being repaired nine of them were placed in service while the other four were cannibalised for spare parts 1 2 3 4 Numbers NG96 NG97 and NG98 were placed in service on the Hopefield line from Kalbaskraal to Saldanha Numbers NG101 NG102 and NG103 were placed in service on the Langkloof line from Port Elizabeth to Avontuur Numbers NG104 NG105 and NG106 were placed in service on the various Natal branches 4 As the DSWA campaign drew to a close and many of the ex German narrow gauge locomotives were repaired the SAR locomotives on active service gradually returned to their home lines in South Africa As a result the Lawleys were staged once again after less than two years of service in South Africa 2 South African Railways edit nbsp In 1921 Lawley numbers NG101 and NG102 were re commissioned and placed in SAR service on the branchline from Pienaarsrivier to Pankop off the mainline between Pretoria and Pietersburg The Lawleys were the smallest tender steam locomotives to ever see service on the SAR They performed quite well on this line since the branch was a light railway with slow speeds and small rolling stock 1 2 3 During 1924 construction commenced on the narrow gauge branchline between Upington and Kakamas in the Northern Cape Province and during 1925 on the branch from Fort Beaufort to Seymour in the Eastern Cape The remaining Lawleys were then also recovered from storage and placed in service once again They remained in service when these branchlines were opened to traffic even though it was usually only in a standby capacity 2 3 Also in 1924 Lawley no NG98 joined the Dutton road rail tractors on the narrow gauge line from Naboomspruit to Singlewood By 1927 it was joined by no NG103 but by this time the Singlewood branch was being regauged to Cape gauge and by 11 June 1928 it was extended to Zebediela 6 7 8 The system of grouping narrow gauge locomotives into classes was adopted by the SAR somewhere between 1928 and 1930 and at that point the Lawley locomotives were designated Class NG6 The steady increase in loads on the narrow gauge branches eventually once again proved to be more than the Lawleys were capable of and they were eventually withdrawn The last one no NG103 was retired in 1935 2 9 Industrial edit Several Lawleys were sold into private use with some surviving in service until 1957 often being sold or resold between users Known users were amongst others Premier Portland Cement in Bulawayo the Rhodesian Native Timber Concessions at Gwaai the Cam and Motor Mine at Gatooma the Selukwe Peak Light Railway of the Selukwe Chrome Mine the Lupane Forest Estates the Igusi Saw Mills and the Arcturus Mine east of Salisbury all these in Rhodesia In South Africa some went to the Zebediela citrus plantations in the northern Transvaal 2 4 Works numbers editSince frames boilers and tenders were exchanged between locomotives during the process of building nine serviceable locomotives from the thirteen which were purchased from Bamboo Creek in 1915 the original identities of these locomotives were not always accurately recorded The Lawley locomotive models builders and works numbers are listed in the table which includes the engine numbers of those SAR locomotives of which the Beira Railway engine numbers are known 4 Class NG6 4 4 0 LawleyBuilders models works numbers and renumbering Builder Model Yearbuilt Worksno Beirano Ayrshireno SARno Falcon F2 1895 230 4 Falcon F2 1895 231 5 104 Falcon F2 1895 232 6 106 Falcon F2 1895 233 7 Falcon F2 1895 234 8 105 Falcon F2 1895 235 9 Falcon F4 1896 242 10 99 Falcon F4 1896 243 11 Falcon F4 1896 244 12 Falcon F4 1896 245 13 100 Falcon F4 1896 246 14 103 Falcon F4 1896 247 15 Falcon F4 1896 254 16 Falcon F4 1896 255 17 Falcon F4 1896 256 18 Falcon F4 1896 257 19 Falcon F4 1897 258 20 Falcon F4 1897 259 21 Falcon F4 1897 260 22 Falcon F4 1897 261 23 96 Falcon F4 1897 262 24 Falcon F4 1897 263 25 97 Falcon F4 1897 264 26 98 Falcon F4 1897 265 27 Falcon F4 1897 266 28 Falcon F4 1897 267 29 101 Falcon F4 1897 268 30 30 Falcon F4 1897 269 31 Falcon F4 1897 270 32 Falcon F4 1897 271 33 102 Falcon F4 1897 272 34 Falcon F4 1897 273 35 Glasgow F4 1898 36 Glasgow F4 1898 37 Glasgow F4 1898 38 Glasgow F4 1898 39 Glasgow F4 1898 40 40 Glasgow F4 1898 41 41 Glasgow F4 1898 42 42 Glasgow F4 1898 43 43 Glasgow F4 1898 44 44 Glasgow F4 1898 45Preservation editTwo locomotives have been restored to running condition at the Sandstone Estates near Ficksburg in the Free State One is Falcon F2 no BR7 later SAR no NG106 which was restored by Sandstone as no BR7 in the original green Beira Railway livery while the other is Falcon F4 no BR25 later SAR no NG97 which was restored in the black SAR livery Illustration editThe main picture shows the restored Falcon F2 Beira Railway no BR6 SAR no NG106 restored as no BR7 at Sandstone Estates on 9 April 2006 Those following also illustrate Lawleys in SAR service nbsp SAR F2 no NG106 ex no BR6 with a Fowler tender Fort Beaufort c 1930 nbsp SAR F2 no NG105 ex no BR8 with a Fowler tender Fort Beaufort c 1930 nbsp No BR6 SAR F2 no NG106 Sandstone Estates 9 April 2006References edit nbsp Wikimedia Commons has media related to South African Class NG6 4 4 0 a b c d Railway Modelling Scene South Africa May June 1985 article written by Neill Mardell a b c d e f g h i j k Paxton Leith Bourne David 1985 Locomotives of the South African Railways 1st ed Cape Town Struik pp 103 104 ISBN 0869772112 a b c d e Espitalier T J Day W A J 1945 The Locomotive in South Africa A Brief History of Railway Development Chapter VII South African Railways Continued South African Railways and Harbours Magazine October 1945 p 781 a b c d e f g h i j k l m n o Baxter Antony The Two Foot Gauge Enigma 1st ed Plateway Press pp 37 45 amp Appendix V ISBN 1 871980 34 8 Pattison R G 2005 Thundering Smoke 1st ed Sable Publishing House ISBN 0 9549488 1 5 Cash R G 2015 The Stronach Dutton Roadrail System of Traction The Narrow Gauge Autumn 2015 The Narrow Gauge Railway Society pp 30 31 Statement Showing in Chronological Order the Date of Opening and the Mileage of Each Section of Railway Statement No 19 p 188 ref no 200954 13 Statement Showing in Chronological Order the Date of Opening and the Mileage of Each Section of Railway Statement No 19 p 189 ref no 200954 13 South African Railways and Harbours Narrow Gauge Locomotive Diagram Book 2 0 Gauge S A R Mechanical Dept Drawing Office Pretoria 28 November 1932 Retrieved from https en wikipedia org w index php title South African Class NG6 4 4 0 amp oldid 1144562515, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.