fbpx
Wikipedia

Shuozhou–Huanghua railway

The Shuozhou–Huanghua railway (Chinese: 朔黄铁路) is a double-track electrified railway in China. It is used for the transportation of coal.[1]

Shuozhou–Huanghua railway
Overview
Native name朔黄铁路
StatusOperational
Termini
  • Shenchi
  • Gangkou
Service
TypeHeavy rail
History
Opened
  • May 18, 2000 (2000-05-18) (Shenchi–Suning)
  • 2001 (Suning–Huanghua)
Technical
Line length379 km (235 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V

History edit

The line was jointly funded by Shenhua Group, Hebei province, and the Ministry of Railways. Construction began in November 1997. The section from Shenchi to Suning opened on 18 May 2000. The section from Suning to Huanghua port opened in October 2001.[2]

Specification edit

From its western terminus at Shenchi South to its eastern terminus at Gangkou, the railway travels 588 kilometres (365 mi) and descends 1,527 metres (5,010 ft).[2]

References edit

  1. ^ "朔黄铁路开通运营20周年 运量累计超33亿吨" (in Chinese). 人民网. 18 May 2020. Retrieved 11 May 2021.
  2. ^ a b "我国西煤东运第二大通道朔黄铁路通过国家验收" (in Chinese). The Central People's Government of the People's Republic of China. 11 October 2005. Retrieved 11 May 2021.


shuozhou, huanghua, railway, chinese, 朔黄铁路, double, track, electrified, railway, china, used, transportation, coal, overviewnative, name朔黄铁路statusoperationalterminishenchigangkouservicetypeheavy, railhistoryopenedmay, 2000, 2000, shenchi, suning, 2001, suning,. The Shuozhou Huanghua railway Chinese 朔黄铁路 is a double track electrified railway in China It is used for the transportation of coal 1 Shuozhou Huanghua railwayOverviewNative name朔黄铁路StatusOperationalTerminiShenchiGangkouServiceTypeHeavy railHistoryOpenedMay 18 2000 2000 05 18 Shenchi Suning 2001 Suning Huanghua TechnicalLine length379 km 235 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification50 Hz 25 000 VHistory editThe line was jointly funded by Shenhua Group Hebei province and the Ministry of Railways Construction began in November 1997 The section from Shenchi to Suning opened on 18 May 2000 The section from Suning to Huanghua port opened in October 2001 2 Specification editFrom its western terminus at Shenchi South to its eastern terminus at Gangkou the railway travels 588 kilometres 365 mi and descends 1 527 metres 5 010 ft 2 References edit 朔黄铁路开通运营20周年 运量累计超33亿吨 in Chinese 人民网 18 May 2020 Retrieved 11 May 2021 a b 我国西煤东运第二大通道朔黄铁路通过国家验收 in Chinese The Central People s Government of the People s Republic of China 11 October 2005 Retrieved 11 May 2021 nbsp This People s Republic of China rail related article is a stub You can help Wikipedia by expanding it vte Retrieved from https en wikipedia org w index php title Shuozhou Huanghua railway amp oldid 1179514881, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.