The Reventazón Dam is a concrete-face rock-fill dam on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. It was inaugurated on 16 September 2016,[2] and its primary purpose is the production of hydroelectric power. The US$1.4 billion project and largest power station in the country has an installed capacity of 305.5 MW and is expected to provide power for 525,000 homes.[3][4][5] Construction on the dam began in 2009. At a height of 130 metres (430 ft) and with a structural volume of 9,000,000 m3 (12,000,000 cu yd), it is the largest dam in Central America. To produce electricity, water from the reservoir is diverted about 3 km (1.9 mi) to the northeast where it reaches the power station along the Reventazón River.[6] Due to its environmental features, like offset habitats and migration corridors for jaguars and many other species, the project could be a model for other future hydroelectric power plants.[7]

Reventazón Dam
Location of Reventazón Dam in Costa Rica
CountryCosta Rica
LocationSiquirres, Limón Province,
Coordinates10°3′56.05″N 83°34′48.79″W / 10.0655694°N 83.5802194°W / 10.0655694; -83.5802194
PurposePower
Construction began2009
Opening date16 September 2016
Owner(s)Instituto Costarricense de Electricidad (ICE)
Dam and spillways
Type of damEmbankment, concrete-face rock-fill
ImpoundsReventazón River
Height130 m (430 ft)
Length527 m (1,729 ft)
Dam volume9,000,000 m3 (12,000,000 cu yd)
Reservoir
Total capacity118,000,000 m3 (96,000 acre⋅ft)
Surface area7 km2 (2.7 sq mi)
Maximum length8 km (5.0 mi)
Reventazón Hydropower Plant
Coordinates10°4′59.82″N 83°33′40.95″W / 10.0832833°N 83.5613750°W / 10.0832833; -83.5613750
Commission date2016
TypeConventional, diversion
Turbines4 × 74 MW Francis-type[1]
Installed capacity305.5 MW

See also edit

References edit

  1. ^ "Reventazón".
  2. ^ "View of the hydroelectric dam on the Reventazon River". Ezequiel Becerra. AFP. Retrieved 17 September 2016.
  3. ^ "Costa Rica's president inaugurates Central America's largest hydropower plant". China.org.cn. Retrieved 17 September 2016.
  4. ^ "Reventazón Hydropower Project". Inter-America Development Bank. 22 May 2012. Retrieved 20 December 2014.
  5. ^ "Reventazón - A new butterfly valve for the penstock of the largest hydropower project in Costa Rica". Andritz. Retrieved 20 December 2014.
  6. ^ "Project of the Month" (in Spanish). Pedregal. Retrieved 20 December 2014.[permanent dead link]
  7. ^ Joerg Hartmann; David Harrison; Je Opperman; Roger Gill (18 November 2013). The Next Frontier of Hydropower Sustainability: Planning at the System Scale (PDF) (Report). 16pp. Retrieved 17 September 2016.

reventazón, concrete, face, rock, fill, reventazón, river, about, southwest, siquirres, limón, province, costa, rica, inaugurated, september, 2016, primary, purpose, production, hydroelectric, power, billion, project, largest, power, station, country, installe. The Reventazon Dam is a concrete face rock fill dam on the Reventazon River about 8 km 5 0 mi southwest of Siquirres in Limon Province Costa Rica It was inaugurated on 16 September 2016 2 and its primary purpose is the production of hydroelectric power The US 1 4 billion project and largest power station in the country has an installed capacity of 305 5 MW and is expected to provide power for 525 000 homes 3 4 5 Construction on the dam began in 2009 At a height of 130 metres 430 ft and with a structural volume of 9 000 000 m3 12 000 000 cu yd it is the largest dam in Central America To produce electricity water from the reservoir is diverted about 3 km 1 9 mi to the northeast where it reaches the power station along the Reventazon River 6 Due to its environmental features like offset habitats and migration corridors for jaguars and many other species the project could be a model for other future hydroelectric power plants 7 Reventazon DamLocation of Reventazon Dam in Costa RicaCountryCosta RicaLocationSiquirres Limon Province Coordinates10 3 56 05 N 83 34 48 79 W 10 0655694 N 83 5802194 W 10 0655694 83 5802194PurposePowerConstruction began2009Opening date16 September 2016Owner s Instituto Costarricense de Electricidad ICE Dam and spillwaysType of damEmbankment concrete face rock fillImpoundsReventazon RiverHeight130 m 430 ft Length527 m 1 729 ft Dam volume9 000 000 m3 12 000 000 cu yd ReservoirTotal capacity118 000 000 m3 96 000 acre ft Surface area7 km2 2 7 sq mi Maximum length8 km 5 0 mi Reventazon Hydropower PlantCoordinates10 4 59 82 N 83 33 40 95 W 10 0832833 N 83 5613750 W 10 0832833 83 5613750Commission date2016TypeConventional diversionTurbines4 74 MW Francis type 1 Installed capacity305 5 MWSee also edit nbsp Costa Rica portal nbsp Water portal nbsp Renewable energy portal List of power stations in Costa RicaReferences edit Reventazon View of the hydroelectric dam on the Reventazon River Ezequiel Becerra AFP Retrieved 17 September 2016 Costa Rica s president inaugurates Central America s largest hydropower plant China org cn Retrieved 17 September 2016 Reventazon Hydropower Project Inter America Development Bank 22 May 2012 Retrieved 20 December 2014 Reventazon A new butterfly valve for the penstock of the largest hydropower project in Costa Rica Andritz Retrieved 20 December 2014 Project of the Month in Spanish Pedregal Retrieved 20 December 2014 permanent dead link Joerg Hartmann David Harrison Je Opperman Roger Gill 18 November 2013 The Next Frontier of Hydropower Sustainability Planning at the System Scale PDF Report 16pp Retrieved 17 September 2016 Map all coordinates using OpenStreetMap Download coordinates as KML GPX all coordinates GPX primary coordinates GPX secondary coordinates nbsp Wikimedia Commons has media related to Reventazon Dam Retrieved from https en wikipedia org w index php title Reventazon Dam amp oldid 1176721638, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.