fbpx
Wikipedia

Relief (sternwheeler 1858)

Relief was a stern-wheel driven steamboat that operated on the Willamette River from 1858 to 1865. Relief ran for a short time on the route from Portland to Oregon City, Oregon. After being bought out by the competition, Relief was lined around Willamette Falls to the upper Willamette, where it became the first steamboat to reach Springfield. This vessel should not be confused with a later vessel, also named Relief, which operated on the Columbia and Lewis rivers from 1906 to 1931.

Advertisement for Relief and other steamers, placed January 21, 1860.
History
Operator(1) Cassedy, Athey, O’Laughlin, Sturtevant & Co.; (2) John C. Ainsworth; (3) Upper Willamette Transportation Line; (4) People's Transportation Co.
RouteWillamette River
In service1858
Out of service1865
FateDismantled at Canemah, Oregon
General characteristics
Class and typeriverine all-purpose
Tonnage97 gross tons.
Length110 ft (33.5 m) over hull (exclusive of fantail)
Beam24 ft (7.3 m) over hull (exclusive of guards
Depth3.5 ft (1.07 m)
Installed powertwin steam engines, horizontally mounted, each with bore of 13 in (33.0 cm) and stroke of 4 ft (1.22 m), 9.6 nominal horsepower
Propulsionstern-wheel

Construction edit

Relief was built in 1858 for the firm of Cassidy (or Cassedy) & Co.[1] The steamer was reported to have been well-built.[2]

Relief was built at Linn City, Oregon, across the Willamette River from Oregon City, where another steamer, the Carrie Ladd was being built at the same time.[3] Construction was under way by early April, 1858.[4]

The original owners were also referred to as O’Loughlin and Company[3] and as Cassedy, Athey, O’Laughlin, Sturtevant & Co.[4]

Design edit

Relief was designed to navigate the Clackamas Rapids, on the Willamette River not far below Oregon City, at any season of the year.[4]

Dimensions edit

Relief was either 102 ft (31.1 m) or 110 ft (33.5 m) long, measured over the hull, and excluding the extension of the main deck over the stern, called the “fantail” on which the stern-wheel was mounted.[1][5]

Relief had a beam of 24 ft (7.3 m), exclusive of the guards, which were heavy timbers installed along the sides of the vessel at the top edge of the hull as protective measure.[1] The depth of hold was 3.5 ft (1.07 m).[1]

The overall size of the vessel was 97 gross tons, which was a unit of volume rather than weight.[1]

Engineering edit

Relief was driven by a stern-wheel, turned by twin steam engines, horizontally mounted, each with bore of 13 in (33.0 cm) and stroke of 4 ft (1.22 m), generating 9.6 nominal horsepower.[1] The machinery was manufactured by Rossi & Sons at their Willamette Iron Works.[5]

Operations edit

Relief made its trial trip on Monday, August 16, 1858.[5] The steamer was scheduled to make a run to Vancouver, W.T. on August 21, 1858.[5]

Opposition to the Jennie Clark edit

Cassedy and Company placed Relief into service in August 1858, running in opposition to the steamer Jennie Clark, which was owned by John C. Ainsworth and Jacob Kamm.[2] In November 1858, Cassedy advertised rates on the Relief, running between Portland and Oregon City, as $2.50 per ton for freight and 50 cents for passengers.[6] Cassedy held out the following appeal:

Merchants, farmers, and travelers, who have any interest in having prices kept down at the present reasonable rates, would do well to patronize our boat. Of what permanent advantage will it be to the community to give their custom to a MONEYED MONOPOLY, which will carry free for a short time to break down competition, so as to be able to put the screws on again?[6]

Cassedy also reminded that the steamers Jennie Clark, Express and Carrie Ladd all belonged to a single company.[6]

Cassedy held only a minority interest in the company.[2] The other principal shareholders, of whom one O’Loughlin, a ferryman, was one, did not agree with Cassedy on how the boat should be operated.[2] O’Loughlin was suspicious of his partners, and kept a close watch on the purser, one Sturdevant (or Sturtevant), who was also a shareholder.[2]

Control purchased by competitor edit

The competition between Relief and Jennie Clark grew so hot that Captain Ainsworth secretly bought up the majority of shares of the Relief, then had the boat tied up.[2]

Transfer to upper Willamette River edit

The next year, Ainsworth sold Relief to Captain John Wilson Cochran (1823-1913), who had the steamer lined around Willamette Falls, to be placed on the Upper Willamette River.[2]

On Tuesday, October 4, 1859, with Captain Cochran in command, Relief returned to Oregon City from Corvallis, with 85 tons of freight, the largest load ever carried by the steamer up to that time.[7] Freight rates at that time on the upper Willamette River were $12 per ton for freight going upriver, and $7 per ton for freight going downriver from Corvallis, $6 per ton for downriver cargo from Salem.[7]

As of November 1, 1859, Relief had been formed into a single concern, called the Upper Willamette Transportation Line, which also included the steamers Onward, Elk, and Surprise.[8] All four vessels had a common agent, Capt. Theo. Wygant.[8] In November 1859, when the water level in the river permitted, one of the lines boats would depart Canemah twice a week for Corvallis, and, once a week, for Eugene City.[8] This arrangement continued until July 1860.[9]

Escape from fire edit

On the night of April 23/24, 1861, Relief was nearly destroyed by fire at the dock at Linn City.[10] Relief and another steamer, James Clinton, having arrived in the afternoon, were moored in the boat basin upriver from the works of the Oregon Milling and Transportation Company,[10] The fire originated in the company’s warehouse and quickly spread.[10] There was later talk that the cause might have been arson.[11]

People tried to save the two vessels, both built entirely of wood, and they were successful in the case of the Relief, which even so was still damaged.[10] The Clinton however caught fire, burned to the water’s edge, and sank.[10] Loss to the owners of the Clinton, Capt. James D. Miller, John T. Apperson, and others, was about $6,000.[10] Damage to the Relief was estimated to be about $500.[10]

Continued service on the upper Willamette edit

On Saturday, December 29, 1861, Relief arrived at Eugene City, with Captain Cochrane in charge.[12] The last day, Sunday December 30, Relief made what was described as the “pioneer trip” to Springfield, with many of the townsfolk of Eugene on board.[12] The return from Springfield to Eugene, a distance of five miles, was completed in 26 minutes.[12] Relief loaded about 13 tons of freight at Springfield and 17 tons from Eugene City.[12]

On March 28, 1862, Relief, still running under John W. Cochran, arrived at Eugene City with 8 tons of freight, and was scheduled to depart the next day with 40 tons of cargo from the local merchants.[13]

On Saturday, February 28, 1863, Relief arrived at Eugene for the second time that winter, having taken three days on the trip from Oregon City.[14] With the water in the river falling fast, Relief loaded some freight and returned downstream the same day.[14]

Relief eventually came under the control of the People's Transportation Company, which, by the mid-1860s had a near-monopoly on transport on the Willamette River.[2]

Disposition edit

Relief was dismantled at Canemah, Oregon in 1865.[1]

Notes edit

  1. ^ a b c d e f g Affleck, Edward L. (2000). "Part One: Chapter Two: Columbia River Waterways — List of Vessels". A Century of Paddlewheelers in the Pacific Northwest, the Yukon, and Alaska. Vancouver, BC: Alexander Nicholls Press. p. 23. ISBN 0-920034-08-X.
  2. ^ a b c d e f g h Wright, E.W., ed. (1895). "Chapter 4: Puget Sound Steamboats, Golden Days of Fraser River Navigation". Lewis & Dryden's Marine History of the Pacific Northwest. Portland, OR: Lewis and Dryden Printing Co. p.75, n.57. LCCN 28001147.
  3. ^ a b "Capt. Ainsworth & Co. are building a new boat …". The Oregon Argus. Vol. 4, no. 3. Oregon City, OR: William L. Adams. May 1, 1858. p.2, col.4.
  4. ^ a b c "Messrs. Cassedy, Athey, O'Laughlin, Sturtevant & Co. are building a steamer …". The Oregon Argus. Vol. 3, no. 51. Oregon City, OR: William L. Adams. Apr 3, 1858. p.2, col.2.
  5. ^ a b c d "NEW STEAMERS.—Casedy & Co.'s new steamboat, the "Relief," built for the trade between Oregon City and Portland …". The Oregon Argus. Vol. 4, no. 19. Oregon City: William L. Adams. Aug 21, 1858. p.2, col.1.
  6. ^ a b c Cassedy, William (Nov 13, 1858). "TO MERCHANTS AND SHIPPERS! THE NEW STEAMER RELIEF …". The Oregon Argus (advertisement). Vol. 4, no. 31. Oregon City, OR: William L. Adams. p.2, col.6.
  7. ^ a b William L. Adams, ed. (Oct 8, 1859). "LARGE FREIGHT.—The steamer Relief, Capt. Cochran, returned on Tuesday from Corvallis …". The Oregon Argus. Vol. 5, no. 26. Oregon City, OR: D.W. Craig. p.2, col.1.
  8. ^ a b c Wygant, Theodore (Nov 26, 1859). William L. Adams (ed.). "UPPER WILLAMETTE TRANSPORTATION LINE!". The Oregon Argus (advertisement dated Nov. 1, 1859). Vol. 5, no. 33. Oregon City, OR: D.W. Craig. p.3, col.1.
  9. ^ Wygant, Theodore (Jul 7, 1860). William L. Adams (ed.). "UPPER WILLAMETTE TRANSPORTATION LINE!". The Oregon Argus (advertisement dated Nov. 1, 1859). Vol. 6, no. 13. Oregon City, OR: D.W. Craig. p.3, col.5.
  10. ^ a b c d e f g William L. Adams, ed. (Apr 27, 1861). "Destructive Fire!". The Oregon Argus. Vol. 7, no. 3. Oregon City, O.T.: D.W. Craig. p.2, col.5.
  11. ^ Corning, Howard McKinley (1973). "Lost Towns of Willamette Falls: Linn City, Terminal of Commerce". Willamette Landings -- Ghost Towns of the River (2nd ed.). Portland, OR: Oregon Historical Society. pp. 42–44. ISBN 0875950426.
  12. ^ a b c d "The steamer Relief, Captain J.W. Cochran, arrived here last Saturday". The State Republican. Vol. 1, no. 12. Eugene City, OR: H. Shaw & Co. Jan 1, 1862. p.3, col.1.
  13. ^ "The steamer Relief, Capt. J.W. Cochran, arrived here yesterday …". The State Republican. Vol. 1. Eugene City, OR: H. Shaw & Co. Mar 29, 1862. p.2, col.3.
  14. ^ a b "The steamer Relief arrived at Eugene last Saturday …". The State Republican. Vol. 2, no. 8. Eugene City, OR: J. Newton Gale. Mar 7, 1863. p.2, col.5.

References edit

Printed sources edit

  • Affleck, Edward L. (2000). A Century of Paddlewheelers in the Pacific Northwest, the Yukon, and Alaska. Vancouver, BC: Alexander Nicholls Press. ISBN 0-920034-08-X.
  • Corning, Howard McKinley (1973). Willamette Landings -- Ghost Towns of the River (2nd ed.). Portland, OR: Oregon Historical Society. ISBN 0875950426.
  • Mills, Randall V. (1977). Sternwheelers up Columbia -- A Century of Steamboating in the Oregon Country. Lincoln NE: University of Nebraska (published 1947). ISBN 0-8032-5874-7. LCCN 77007161.
  • Wright, E.W., ed. (1895). Lewis & Dryden's Marine History of the Pacific Northwest. Portland, OR: Lewis and Dryden Printing Co. LCCN 28001147.

On-line newspaper collections edit

relief, sternwheeler, 1858, relief, stern, wheel, driven, steamboat, that, operated, willamette, river, from, 1858, 1865, relief, short, time, route, from, portland, oregon, city, oregon, after, being, bought, competition, relief, lined, around, willamette, fa. Relief was a stern wheel driven steamboat that operated on the Willamette River from 1858 to 1865 Relief ran for a short time on the route from Portland to Oregon City Oregon After being bought out by the competition Relief was lined around Willamette Falls to the upper Willamette where it became the first steamboat to reach Springfield This vessel should not be confused with a later vessel also named Relief which operated on the Columbia and Lewis rivers from 1906 to 1931 Advertisement for Relief and other steamers placed January 21 1860 History Operator 1 Cassedy Athey O Laughlin Sturtevant amp Co 2 John C Ainsworth 3 Upper Willamette Transportation Line 4 People s Transportation Co RouteWillamette River In service1858 Out of service1865 FateDismantled at Canemah Oregon General characteristics Class and typeriverine all purpose Tonnage97 gross tons Length110 ft 33 5 m over hull exclusive of fantail Beam24 ft 7 3 m over hull exclusive of guards Depth3 5 ft 1 07 m Installed powertwin steam engines horizontally mounted each with bore of 13 in 33 0 cm and stroke of 4 ft 1 22 m 9 6 nominal horsepower Propulsionstern wheel Contents 1 Construction 2 Design 3 Dimensions 4 Engineering 5 Operations 5 1 Opposition to the Jennie Clark 5 2 Control purchased by competitor 6 Transfer to upper Willamette River 7 Escape from fire 8 Continued service on the upper Willamette 9 Disposition 10 Notes 11 References 11 1 Printed sources 11 2 On line newspaper collectionsConstruction editRelief was built in 1858 for the firm of Cassidy or Cassedy amp Co 1 The steamer was reported to have been well built 2 Relief was built at Linn City Oregon across the Willamette River from Oregon City where another steamer the Carrie Ladd was being built at the same time 3 Construction was under way by early April 1858 4 The original owners were also referred to as O Loughlin and Company 3 and as Cassedy Athey O Laughlin Sturtevant amp Co 4 Design editRelief was designed to navigate the Clackamas Rapids on the Willamette River not far below Oregon City at any season of the year 4 Dimensions editRelief was either 102 ft 31 1 m or 110 ft 33 5 m long measured over the hull and excluding the extension of the main deck over the stern called the fantail on which the stern wheel was mounted 1 5 Relief had a beam of 24 ft 7 3 m exclusive of the guards which were heavy timbers installed along the sides of the vessel at the top edge of the hull as protective measure 1 The depth of hold was 3 5 ft 1 07 m 1 The overall size of the vessel was 97 gross tons which was a unit of volume rather than weight 1 Engineering editRelief was driven by a stern wheel turned by twin steam engines horizontally mounted each with bore of 13 in 33 0 cm and stroke of 4 ft 1 22 m generating 9 6 nominal horsepower 1 The machinery was manufactured by Rossi amp Sons at their Willamette Iron Works 5 Operations editRelief made its trial trip on Monday August 16 1858 5 The steamer was scheduled to make a run to Vancouver W T on August 21 1858 5 Opposition to the Jennie Clark edit Cassedy and Company placed Relief into service in August 1858 running in opposition to the steamer Jennie Clark which was owned by John C Ainsworth and Jacob Kamm 2 In November 1858 Cassedy advertised rates on the Relief running between Portland and Oregon City as 2 50 per ton for freight and 50 cents for passengers 6 Cassedy held out the following appeal Merchants farmers and travelers who have any interest in having prices kept down at the present reasonable rates would do well to patronize our boat Of what permanent advantage will it be to the community to give their custom to a MONEYED MONOPOLY which will carry free for a short time to break down competition so as to be able to put the screws on again 6 Cassedy also reminded that the steamers Jennie Clark Express and Carrie Ladd all belonged to a single company 6 Cassedy held only a minority interest in the company 2 The other principal shareholders of whom one O Loughlin a ferryman was one did not agree with Cassedy on how the boat should be operated 2 O Loughlin was suspicious of his partners and kept a close watch on the purser one Sturdevant or Sturtevant who was also a shareholder 2 Control purchased by competitor edit The competition between Relief and Jennie Clark grew so hot that Captain Ainsworth secretly bought up the majority of shares of the Relief then had the boat tied up 2 Transfer to upper Willamette River editThe next year Ainsworth sold Relief to Captain John Wilson Cochran 1823 1913 who had the steamer lined around Willamette Falls to be placed on the Upper Willamette River 2 On Tuesday October 4 1859 with Captain Cochran in command Relief returned to Oregon City from Corvallis with 85 tons of freight the largest load ever carried by the steamer up to that time 7 Freight rates at that time on the upper Willamette River were 12 per ton for freight going upriver and 7 per ton for freight going downriver from Corvallis 6 per ton for downriver cargo from Salem 7 As of November 1 1859 Relief had been formed into a single concern called the Upper Willamette Transportation Line which also included the steamers Onward Elk and Surprise 8 All four vessels had a common agent Capt Theo Wygant 8 In November 1859 when the water level in the river permitted one of the lines boats would depart Canemah twice a week for Corvallis and once a week for Eugene City 8 This arrangement continued until July 1860 9 Escape from fire editOn the night of April 23 24 1861 Relief was nearly destroyed by fire at the dock at Linn City 10 Relief and another steamer James Clinton having arrived in the afternoon were moored in the boat basin upriver from the works of the Oregon Milling and Transportation Company 10 The fire originated in the company s warehouse and quickly spread 10 There was later talk that the cause might have been arson 11 People tried to save the two vessels both built entirely of wood and they were successful in the case of the Relief which even so was still damaged 10 The Clinton however caught fire burned to the water s edge and sank 10 Loss to the owners of the Clinton Capt James D Miller John T Apperson and others was about 6 000 10 Damage to the Relief was estimated to be about 500 10 Continued service on the upper Willamette editOn Saturday December 29 1861 Relief arrived at Eugene City with Captain Cochrane in charge 12 The last day Sunday December 30 Relief made what was described as the pioneer trip to Springfield with many of the townsfolk of Eugene on board 12 The return from Springfield to Eugene a distance of five miles was completed in 26 minutes 12 Relief loaded about 13 tons of freight at Springfield and 17 tons from Eugene City 12 On March 28 1862 Relief still running under John W Cochran arrived at Eugene City with 8 tons of freight and was scheduled to depart the next day with 40 tons of cargo from the local merchants 13 On Saturday February 28 1863 Relief arrived at Eugene for the second time that winter having taken three days on the trip from Oregon City 14 With the water in the river falling fast Relief loaded some freight and returned downstream the same day 14 Relief eventually came under the control of the People s Transportation Company which by the mid 1860s had a near monopoly on transport on the Willamette River 2 Disposition editRelief was dismantled at Canemah Oregon in 1865 1 Notes edit a b c d e f g Affleck Edward L 2000 Part One Chapter Two Columbia River Waterways List of Vessels A Century of Paddlewheelers in the Pacific Northwest the Yukon and Alaska Vancouver BC Alexander Nicholls Press p 23 ISBN 0 920034 08 X a b c d e f g h Wright E W ed 1895 Chapter 4 Puget Sound Steamboats Golden Days of Fraser River Navigation Lewis amp Dryden s Marine History of the Pacific Northwest Portland OR Lewis and Dryden Printing Co p 75 n 57 LCCN 28001147 a b Capt Ainsworth amp Co are building a new boat The Oregon Argus Vol 4 no 3 Oregon City OR William L Adams May 1 1858 p 2 col 4 a b c Messrs Cassedy Athey O Laughlin Sturtevant amp Co are building a steamer The Oregon Argus Vol 3 no 51 Oregon City OR William L Adams Apr 3 1858 p 2 col 2 a b c d NEW STEAMERS Casedy amp Co s new steamboat the Relief built for the trade between Oregon City and Portland The Oregon Argus Vol 4 no 19 Oregon City William L Adams Aug 21 1858 p 2 col 1 a b c Cassedy William Nov 13 1858 TO MERCHANTS AND SHIPPERS THE NEW STEAMER RELIEF The Oregon Argus advertisement Vol 4 no 31 Oregon City OR William L Adams p 2 col 6 a b William L Adams ed Oct 8 1859 LARGE FREIGHT The steamer Relief Capt Cochran returned on Tuesday from Corvallis The Oregon Argus Vol 5 no 26 Oregon City OR D W Craig p 2 col 1 a b c Wygant Theodore Nov 26 1859 William L Adams ed UPPER WILLAMETTE TRANSPORTATION LINE The Oregon Argus advertisement dated Nov 1 1859 Vol 5 no 33 Oregon City OR D W Craig p 3 col 1 Wygant Theodore Jul 7 1860 William L Adams ed UPPER WILLAMETTE TRANSPORTATION LINE The Oregon Argus advertisement dated Nov 1 1859 Vol 6 no 13 Oregon City OR D W Craig p 3 col 5 a b c d e f g William L Adams ed Apr 27 1861 Destructive Fire The Oregon Argus Vol 7 no 3 Oregon City O T D W Craig p 2 col 5 Corning Howard McKinley 1973 Lost Towns of Willamette Falls Linn City Terminal of Commerce Willamette Landings Ghost Towns of the River 2nd ed Portland OR Oregon Historical Society pp 42 44 ISBN 0875950426 a b c d The steamer Relief Captain J W Cochran arrived here last Saturday The State Republican Vol 1 no 12 Eugene City OR H Shaw amp Co Jan 1 1862 p 3 col 1 The steamer Relief Capt J W Cochran arrived here yesterday The State Republican Vol 1 Eugene City OR H Shaw amp Co Mar 29 1862 p 2 col 3 a b The steamer Relief arrived at Eugene last Saturday The State Republican Vol 2 no 8 Eugene City OR J Newton Gale Mar 7 1863 p 2 col 5 References editPrinted sources edit Affleck Edward L 2000 A Century of Paddlewheelers in the Pacific Northwest the Yukon and Alaska Vancouver BC Alexander Nicholls Press ISBN 0 920034 08 X Corning Howard McKinley 1973 Willamette Landings Ghost Towns of the River 2nd ed Portland OR Oregon Historical Society ISBN 0875950426 Mills Randall V 1977 Sternwheelers up Columbia A Century of Steamboating in the Oregon Country Lincoln NE University of Nebraska published 1947 ISBN 0 8032 5874 7 LCCN 77007161 Wright E W ed 1895 Lewis amp Dryden s Marine History of the Pacific Northwest Portland OR Lewis and Dryden Printing Co LCCN 28001147 On line newspaper collections edit Historic Oregon Newspapers University of Oregon Retrieved from https en wikipedia org w index php title Relief sternwheeler 1858 amp oldid 1097033154, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.