The Pimlico District Heating Undertaking (PDHU) is a district heating system in the Pimlico area of London, United Kingdom. The first district heating system built in the United Kingdom,[1] it is owned by Westminster City Council and operated by CityWest Homes. The system is connected to 3,256 homes, 50 business premises and three schools.[1]

The system's thermal store in Churchill Gardens.

History edit

The system began operations in 1950, and originally used waste heat from Battersea Power Station,[2] which was pumped under the River Thames through a disused Metropolitan Water Board tunnel.[1] A thermal store was built in Churchill Gardens, which could hold 2,300m³ and remains the largest thermal store in the UK.[2] The system was originally built to serve 1,600 council homes.[3] By 1958 Battersea was operating with a thermal efficiency of 25%, making it one of the world's most efficient power stations at the time.[1]

After Battersea Power Station closed in 1983, a 30MW coal-fired boiler was built to supply the system with heat. The boiler was subsequently converted to gas in 1989.[1] A refurbishment in 2006 saw two 1.55MWe CHP engines and three 8MW gas boilers installed.[2] The system generates around 51GWh of heat and 16GWh of electricity per year.

Based on the operational success of the Pimlico undertaking several schemes were proposed, and one was partly built, using waste heat from Bankside power station.[4] However, none were economically viable.

References edit

  1. ^ a b c d e CityWest Homes
  2. ^ a b c Michael Martin & Patricia Thornley (2013) The potential for thermal storage to reduce the overall carbon emissions from district heating systems Tyndall Centre for Climate Change Research
  3. ^ District heating: a hot idea whose time has come The Guardian, 18 November 2014
  4. ^ Murray, Stephen (2019). "The Politics and Economics of Technology: Bankside Power Station and the Environment, 1945–81". The London Journal. 44 (2): 113–32. doi:10.1080/03058034.2019.1583454. S2CID 159395306.

51°29′09″N 0°08′25″W / 51.485896°N 0.14028758°W / 51.485896; -0.14028758

pimlico, district, heating, undertaking, pdhu, district, heating, system, pimlico, area, london, united, kingdom, first, district, heating, system, built, united, kingdom, owned, westminster, city, council, operated, citywest, homes, system, connected, homes, . The Pimlico District Heating Undertaking PDHU is a district heating system in the Pimlico area of London United Kingdom The first district heating system built in the United Kingdom 1 it is owned by Westminster City Council and operated by CityWest Homes The system is connected to 3 256 homes 50 business premises and three schools 1 The system s thermal store in Churchill Gardens History editThe system began operations in 1950 and originally used waste heat from Battersea Power Station 2 which was pumped under the River Thames through a disused Metropolitan Water Board tunnel 1 A thermal store was built in Churchill Gardens which could hold 2 300m and remains the largest thermal store in the UK 2 The system was originally built to serve 1 600 council homes 3 By 1958 Battersea was operating with a thermal efficiency of 25 making it one of the world s most efficient power stations at the time 1 After Battersea Power Station closed in 1983 a 30MW coal fired boiler was built to supply the system with heat The boiler was subsequently converted to gas in 1989 1 A refurbishment in 2006 saw two 1 55MWe CHP engines and three 8MW gas boilers installed 2 The system generates around 51GWh of heat and 16GWh of electricity per year Based on the operational success of the Pimlico undertaking several schemes were proposed and one was partly built using waste heat from Bankside power station 4 However none were economically viable References edit nbsp Wikimedia Commons has media related to Pimlico District Heating Undertaking a b c d e PDHU CityWest Homes a b c Michael Martin amp Patricia Thornley 2013 The potential for thermal storage to reduce the overall carbon emissions from district heating systems Tyndall Centre for Climate Change Research District heating a hot idea whose time has come The Guardian 18 November 2014 Murray Stephen 2019 The Politics and Economics of Technology Bankside Power Station and the Environment 1945 81 The London Journal 44 2 113 32 doi 10 1080 03058034 2019 1583454 S2CID 159395306 nbsp England portal nbsp Energy portal 51 29 09 N 0 08 25 W 51 485896 N 0 14028758 W 51 485896 0 14028758 Retrieved from https en wikipedia org w index php title Pimlico District Heating Undertaking amp oldid 1170276005, wikipedia, wiki, book, books, library,