fbpx
Wikipedia

Penarth railway station

Penarth railway station is the railway station serving the town of Penarth in the Vale of Glamorgan, South Wales. It is the terminus of Network Rail's Penarth branch running from Cogan Junction to Penarth station, 1 mile 12 chains (1.15 mi; 1.9 km) from the junction[1] and 2 miles 67 chains (2.84 mi; 4.6 km) south of Cardiff Central station. The Penarth branch ran from Cogan Junction to Biglis Junction, a rail mileage of 5 miles 65 chains (5.81 mi; 9.4 km) and was officially closed beyond Penarth after the last passenger train ran on Saturday 4 May 1968.

Penarth
General information
LocationPenarth, Vale of Glamorgan
Wales
Coordinates51°26′08″N 3°10′28″W / 51.4355°N 3.1745°W / 51.4355; -3.1745
Grid referenceST184714
Managed byTransport for Wales
Platforms1
Other information
Station codePEN
ClassificationDfT category E
History
Original companyCardiff, Penarth and Barry Junction Railway
Pre-groupingTaff Vale Railway
Post-groupingGreat Western Railway
Key dates
20 February 1878Opened
1968Down buildings and platform removed
1984Buildings replaced
Passengers
2018/19 0.655 million
2019/20 0.619 million
2020/21 69,056
2021/22 0.262 million
2022/23 0.367 million
Notes
Passenger statistics from the Office of Rail and Road

Station history edit

Heyday edit

Penarth Station (or Penarth Town as it was originally known) was built for the Cardiff, Penarth and Barry Junction Railway, and opened in 1878 as part of that company's new line to Lavernock.[2] This was a continuation of the Taff Vale Railway's Penarth Extension Railway, which had been completed in February 1878 and gave the town its first rail link to Cardiff.

The Taff Vale took over the CP&BJR in 1889 and had the line completed from Lavernock to Biglis Junction (east of Cadoxton) on the Barry Railway in 1890.[3] The extension attracted holiday and weekend traffic from Penarth to the beach at Lavernock or Barry Island Pleasure Park[4] for the day, with steam trains running every 30 minutes from 7.15 am until 11.45 pm in both directions. There was also a sizeable amount of commuter traffic from the station eastwards into Cardiff. As first constructed the station had two side platforms & tracks (plus a non-platform line for goods traffic), a signal box and a goods yard at the Lavernock end of the station.[5]

After the Beeching review edit

After The Reshaping of British Railways report, British Rail withdrew the passenger service west of Penarth on 6 May 1968.[6][7] General goods traffic over the route had previously ended on 7 October 1963 (the date the goods yard here also closed), leaving only the cement trains from the factory at Cosmeston and so the line beyond there closed to all traffic. The remaining section to Penarth followed suit in November 1969 when the Snowcem works closed, leaving the station as a dead-end terminus.[8] The line has been single track between Cogan Junction and Penarth since February 1967.[9]

Parts of the disused trackbed through Lower Penarth and towards Sully have been blocked and built on. Other parts have been turned into a rural railway walk and cycle path from north of Alberta Place (south of Penarth station) to Brockhill Rise road overbridge, approximately one half-mile north-east of the former Lavernock station.

Until 1968 Penarth station had two platforms, one on each side of the tracks for down and up traffic, with a gated foot crossing. After the branch was singled and the line on towards Sully and Biglis Junction closed, the platform buildings on the Plymouth Road side were sold and used as a garden centre until they were demolished in the 1980s and a new Government Jobcentre plus and private offices were built in their place.[citation needed] The loss of the down platform and its station building also effectively closed the station's main car parking area in the specially widened eastern end of Plymouth Road.

Closure of the coastal rail line removed the direct link between Penarth and Barry, Barry Island, Rhoose or Llantwit Major. Completion of the journey from Penarth by rail today entails first travelling north as far as Grangetown, before catching a connecting train in the reverse direction to Barry or any of the stations mentioned above, thus increasing the journey time and distance travelled.

Original buildings edit

BR had most of the original 19th-century station buildings demolished and replaced with modern ones in a major remodelling in 1984. Since 1971 the station's original ticket office building, built in 1887, has been let as a fast food outlet.

The original Railway Hotel no longer provides accommodation but is still a public house.

Facilities edit

 
Self-service ticket machine at the station

The station has a small "drop off and pick up only" car park in Station Approach. The current ticket office in the station building is open early morning to mid-afternoon six days per week. A self-service ticket machine is provided for use and for collecting pre-paid tickets. Train running information is offered via digital CIS displays and timetable poster boards. Step-free access is available from the entrance to the ticket hall and platform.[10]

All services on this line are currently operated by Transport for Wales as part of the Valley Lines system of the National Rail network.

Services edit

 
Class 769 train at Penarth

The usual service pattern is four trains per hour to Bargoed from Mondays to Saturdays during the day, of which one continues to Rhymney.[11] In the evenings, services terminate at either Ystrad Mynach or Caerphilly and the frequency pattern decreases to two trains per hour. There are several evening services to Treherbert, one combined with a Rhymney departure and a second with one to Caerphilly (both split at Cardiff Central).

On Sundays there is only one train every two hours, totalling seven trains all day, there is no late evening service, and trains run only as far as Cardiff Central.[12]

Preceding station   National Rail Following station
Dingle Road   Transport for Wales
Rhymney Line
  Terminus
Disused railways
Dingle Road   Great Western Railway
Taff Vale
  Alberta Place Halt

Barry connections edit

Since 1968 Penarth has had no direct rail link to Barry Island, although travel between the two towns remains popular. Rail passengers for Barry must travel in the opposite direction and change at Grangetown, before heading back to Barry. Alternatively, passengers may walk about 20 minutes from Penarth to Cogan railway station.

See also edit

References edit

  1. ^ Yonge, John; Padgett, David (August 2010) [1989]. Bridge, Mike (ed.). Railway Track Diagrams 3: Western (5th ed.). Bradford on Avon: Trackmaps. map 22. ISBN 978-0-9549866-6-7.
  2. ^ Hutton, John (2006). The Taff Vale Railway. Vol. 3. Silver Link. p. not cited. ISBN 978-1-85794-251-4.
  3. ^ Crawford, Ewan (7 August 2011). "Chronology for Cardiff Penarth and Barry Junction Railway". A History of Britain's Railways. Railscot. Retrieved 28 February 2013.
  4. ^ Page, p.82
  5. ^ Penarth Town Signal Box diagramSignalling Record Society; Retrieved 2013-09-13
  6. ^ Page, p.178
  7. ^ "Train Service Anniversary Brings Back Memories" Keitch, B - Penarth Times website news article; Retrieved 2013-09-13
  8. ^ Photo of buffer stop at the "country" end of Penarth station www.geograph.org ; Retrieved 2013-09-13
  9. ^ "The Taff Vale Railway by D.S.M Barrie" www.trackbed.com; Retrieved 2013-09-12
  10. ^ Penarth station facilities National Rail Enquiries
  11. ^ Table 130 National Rail timetable, May 2017
  12. ^ "New Sunday train service to run to and from Penarth". Penarth Times. Retrieved 6 October 2019.

Bibliography edit

  • Body, G. (1983), PSL Field Guides - Railways of the Western Region, Patrick Stephens Ltd, Wellingborough, ISBN 0-85059-546-0
  • Page, J. (1988), Forgotten Railways: Volume 8 - South Wales (2nd Ed), David & Charles Publishers, Newton Abbott, ISBN 0-946537-44-5

External links edit

  • Historical photos of the station and branch line halts
  • A photo of the station in 1960
  • YouTube video and history of the station
  • Train times and station information for Penarth railway station from National Rail

penarth, railway, station, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books, scholar, jstor, . This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources Penarth railway station news newspapers books scholar JSTOR April 2012 Learn how and when to remove this template message Penarth railway station is the railway station serving the town of Penarth in the Vale of Glamorgan South Wales It is the terminus of Network Rail s Penarth branch running from Cogan Junction to Penarth station 1 mile 12 chains 1 15 mi 1 9 km from the junction 1 and 2 miles 67 chains 2 84 mi 4 6 km south of Cardiff Central station The Penarth branch ran from Cogan Junction to Biglis Junction a rail mileage of 5 miles 65 chains 5 81 mi 9 4 km and was officially closed beyond Penarth after the last passenger train ran on Saturday 4 May 1968 PenarthGeneral informationLocationPenarth Vale of GlamorganWalesCoordinates51 26 08 N 3 10 28 W 51 4355 N 3 1745 W 51 4355 3 1745Grid referenceST184714Managed byTransport for WalesPlatforms1Other informationStation codePENClassificationDfT category EHistoryOriginal companyCardiff Penarth and Barry Junction RailwayPre groupingTaff Vale RailwayPost groupingGreat Western RailwayKey dates20 February 1878Opened1968Down buildings and platform removed1984Buildings replacedPassengers2018 190 655 million2019 200 619 million2020 2169 0562021 220 262 million2022 230 367 millionNotesPassenger statistics from the Office of Rail and Road Contents 1 Station history 1 1 Heyday 1 2 After the Beeching review 1 3 Original buildings 2 Facilities 3 Services 4 Barry connections 5 See also 6 References 7 Bibliography 8 External linksStation history editHeyday edit Penarth Station or Penarth Town as it was originally known was built for the Cardiff Penarth and Barry Junction Railway and opened in 1878 as part of that company s new line to Lavernock 2 This was a continuation of the Taff Vale Railway s Penarth Extension Railway which had been completed in February 1878 and gave the town its first rail link to Cardiff The Taff Vale took over the CP amp BJR in 1889 and had the line completed from Lavernock to Biglis Junction east of Cadoxton on the Barry Railway in 1890 3 The extension attracted holiday and weekend traffic from Penarth to the beach at Lavernock or Barry Island Pleasure Park 4 for the day with steam trains running every 30 minutes from 7 15 am until 11 45 pm in both directions There was also a sizeable amount of commuter traffic from the station eastwards into Cardiff As first constructed the station had two side platforms amp tracks plus a non platform line for goods traffic a signal box and a goods yard at the Lavernock end of the station 5 After the Beeching review edit After The Reshaping of British Railways report British Rail withdrew the passenger service west of Penarth on 6 May 1968 6 7 General goods traffic over the route had previously ended on 7 October 1963 the date the goods yard here also closed leaving only the cement trains from the factory at Cosmeston and so the line beyond there closed to all traffic The remaining section to Penarth followed suit in November 1969 when the Snowcem works closed leaving the station as a dead end terminus 8 The line has been single track between Cogan Junction and Penarth since February 1967 9 Parts of the disused trackbed through Lower Penarth and towards Sully have been blocked and built on Other parts have been turned into a rural railway walk and cycle path from north of Alberta Place south of Penarth station to Brockhill Rise road overbridge approximately one half mile north east of the former Lavernock station Until 1968 Penarth station had two platforms one on each side of the tracks for down and up traffic with a gated foot crossing After the branch was singled and the line on towards Sully and Biglis Junction closed the platform buildings on the Plymouth Road side were sold and used as a garden centre until they were demolished in the 1980s and a new Government Jobcentre plus and private offices were built in their place citation needed The loss of the down platform and its station building also effectively closed the station s main car parking area in the specially widened eastern end of Plymouth Road Closure of the coastal rail line removed the direct link between Penarth and Barry Barry Island Rhoose or Llantwit Major Completion of the journey from Penarth by rail today entails first travelling north as far as Grangetown before catching a connecting train in the reverse direction to Barry or any of the stations mentioned above thus increasing the journey time and distance travelled Original buildings edit BR had most of the original 19th century station buildings demolished and replaced with modern ones in a major remodelling in 1984 Since 1971 the station s original ticket office building built in 1887 has been let as a fast food outlet The original Railway Hotel no longer provides accommodation but is still a public house Facilities edit nbsp Self service ticket machine at the station The station has a small drop off and pick up only car park in Station Approach The current ticket office in the station building is open early morning to mid afternoon six days per week A self service ticket machine is provided for use and for collecting pre paid tickets Train running information is offered via digital CIS displays and timetable poster boards Step free access is available from the entrance to the ticket hall and platform 10 All services on this line are currently operated by Transport for Wales as part of the Valley Lines system of the National Rail network Services edit nbsp Class 769 train at Penarth The usual service pattern is four trains per hour to Bargoed from Mondays to Saturdays during the day of which one continues to Rhymney 11 In the evenings services terminate at either Ystrad Mynach or Caerphilly and the frequency pattern decreases to two trains per hour There are several evening services to Treherbert one combined with a Rhymney departure and a second with one to Caerphilly both split at Cardiff Central On Sundays there is only one train every two hours totalling seven trains all day there is no late evening service and trains run only as far as Cardiff Central 12 Preceding station nbsp National Rail Following station Dingle Road Transport for WalesRhymney Line Terminus Disused railways Dingle Road Great Western RailwayTaff Vale Alberta Place HaltBarry connections editSince 1968 Penarth has had no direct rail link to Barry Island although travel between the two towns remains popular Rail passengers for Barry must travel in the opposite direction and change at Grangetown before heading back to Barry Alternatively passengers may walk about 20 minutes from Penarth to Cogan railway station See also editPenarth Dock railway stationReferences edit Yonge John Padgett David August 2010 1989 Bridge Mike ed Railway Track Diagrams 3 Western 5th ed Bradford on Avon Trackmaps map 22 ISBN 978 0 9549866 6 7 Hutton John 2006 The Taff Vale Railway Vol 3 Silver Link p not cited ISBN 978 1 85794 251 4 Crawford Ewan 7 August 2011 Chronology for Cardiff Penarth and Barry Junction Railway A History of Britain s Railways Railscot Retrieved 28 February 2013 Page p 82 Penarth Town Signal Box diagramSignalling Record Society Retrieved 2013 09 13 Page p 178 Train Service Anniversary Brings Back Memories Keitch B Penarth Times website news article Retrieved 2013 09 13 Photo of buffer stop at the country end of Penarth station www geograph org Retrieved 2013 09 13 The Taff Vale Railway by D S M Barrie www trackbed com Retrieved 2013 09 12 Penarth station facilities National Rail Enquiries Table 130 National Rail timetable May 2017 New Sunday train service to run to and from Penarth Penarth Times Retrieved 6 October 2019 Bibliography editBody G 1983 PSL Field Guides Railways of the Western Region Patrick Stephens Ltd Wellingborough ISBN 0 85059 546 0 Page J 1988 Forgotten Railways Volume 8 South Wales 2nd Ed David amp Charles Publishers Newton Abbott ISBN 0 946537 44 5External links edit nbsp Wikimedia Commons has media related to Penarth railway station Branch line map and photos of current greenway Historical photos of the station and branch line halts A photo of the station in 1960 YouTube video and history of the station Train times and station information for Penarth railway station from National Rail Retrieved from https en wikipedia org w index php title Penarth railway station amp oldid 1220050535, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.