Northern Marmara and Değirmenköy (Silivri) Depleted Gas Reservoir (Turkish: Kuzey Marmara ve Değirmenköy Sahaları Yeraltı Doğalgaz Depolama Tesisleri) are underground natural gas storages inside depleted gas fields in Istanbul Province, northwestern Turkey. Combined, it is the country's first underground natural gas storage facility.

One of the storage facilities is situated inside a depleted gas field undersea in northern Marmara Sea and the other is in neighboring Değirmenköy, a town in Silivri district of Istanbul Province. Both sites were suitable due to their proximity to Istanbul and to the gas pipeline of BOTAŞ.[1]

Northern Marmara Gas Field edit

 
Silivri offshore platform.

Northern Marmara Gas Field was discovered in 1988 in an area 5 km (3.1 mi) west of Silivri and 2.5 km (1.6 mi) far off the coast at a depth of 1,200 m (3,900 ft). To determine the size of the natural gas reserve, which is the first undersea natural gas reserve in Turkey, three offshore boreholes in 1995 and two more were drilled in 1996. Natural gas production started in September 1997 at the five gas wells. Gas was pumped from an offshore platform by a 3 km (1.9 mi)-long undersea pipeline to the plant at the coast for processing. Between 2003 and 2004, six directional wells were drilled, which had vertical depths of 1,200–1,250 m (3,940–4,100 ft) and horizontal deviation of 2,287–2,947 m (7,503–9,669 ft).[1]

Değirmenköy Natural Gas Field edit

Değirmenköy Natural Gas Field is located 19 km (12 mi) west of Silivri. The field was discovered in 1994, and the production started in 1995 from nine wells, seven of which were directional. Gas processing facility was built by a consortium of German Lurgi AG and Turkish Fernas Construction Ltd.[1]

Depleted gas reservoirs edit

The storage facilities of Northern Marmara and Değirmenköy were projected by the Turkish Petroleum Corporation (TPAO) in 1996. The depleted gas reservoirs went into service in July 2007. The Northern Marmara Reservoir is connected to the main processing plant of BOTAŞ by a 3.5 km (2.2 mi)-long pipeline and the Değirmenköy Reservoir by a 13 km (8.1 mi)-long pipeline.[1]

The storage capacity of the Northern Marmara Reservoir is 1,600,000,000 m3 (5.7×1010 cu ft) and of the Değirmenköy Reservoir is 300,000,000 m3 (1.1×1010 cu ft). While the maximum daily gas injection capacity is 11,800,000 m3 (420,000,000 cu ft), the maximum withdrawal capacity per day is 15,000,000 m3 (530,000,000 cu ft).[1]

Currently, the Northern Marmara and Değirmenköy (Silivri) Depleted Gas Reservoir is the only underground natural gas storage facility in Turkey. It is operated by the TPAO.[2]

Capacity expansion edit

The entire natural gas storage project is planned in three phases. The second phase involves the capacity expansion for the Değirmenköy facility, and the third phase for the Northern Marmara facility.[3] The second phase expansion project, which is scheduled to be completed in 2020, provides increasing of the daily injection capacity up to 29,000,000 m3 (1.0×109 cu ft) and the maximum daily withdrawal capacity to 50,000,000 m3 (1.8×109 cu ft).[2] It is planned that the total storage capacity will be 4,290,000,000 m3 (1.51×1011 cu ft), the daily injection capacity 40,000,000 m3 (1.4×109 cu ft) and the daily withdrawal capacity 75,000,000 m3 (2.6×109 cu ft) after completion of the third phase.[2]

See also edit

References edit

  1. ^ a b c d e "Silivri doğalgaz deposu açılıyor". Hürriyet (in Turkish). 2007-07-05. Retrieved 2017-03-23.
  2. ^ a b c "Doğalgazda yatırım önceliği depolamaya". Dünya (in Turkish). 2016-04-11. Retrieved 2017-03-23.
  3. ^ "Projects – Natural Gas Storage Projects". Turkish Petroleum. Retrieved 2017-03-23.
  4. ^ . Internet Archive (in Turkish). 2017-02-10. Archived from the original on 2017-02-12. Retrieved 2017-02-22.{{cite news}}: CS1 maint: bot: original URL status unknown (link)
  5. ^ (in Turkish). Botaş. Archived from the original on 2017-03-23. Retrieved 2017-03-22.
  6. ^ . Platin Haber (in Turkish). 2016-12-23. Archived from the original on 2017-03-23. Retrieved 2017-03-22.

northern, marmara, değirmenköy, silivri, depleted, reservoir, turkish, kuzey, marmara, değirmenköy, sahaları, yeraltı, doğalgaz, depolama, tesisleri, underground, natural, storages, inside, depleted, fields, istanbul, province, northwestern, turkey, combined, . Northern Marmara and Degirmenkoy Silivri Depleted Gas Reservoir Turkish Kuzey Marmara ve Degirmenkoy Sahalari Yeralti Dogalgaz Depolama Tesisleri are underground natural gas storages inside depleted gas fields in Istanbul Province northwestern Turkey Combined it is the country s first underground natural gas storage facility One of the storage facilities is situated inside a depleted gas field undersea in northern Marmara Sea and the other is in neighboring Degirmenkoy a town in Silivri district of Istanbul Province Both sites were suitable due to their proximity to Istanbul and to the gas pipeline of BOTAS 1 Contents 1 Northern Marmara Gas Field 2 Degirmenkoy Natural Gas Field 3 Depleted gas reservoirs 4 Capacity expansion 5 See also 6 ReferencesNorthern Marmara Gas Field edit nbsp Silivri offshore platform Northern Marmara Gas Field was discovered in 1988 in an area 5 km 3 1 mi west of Silivri and 2 5 km 1 6 mi far off the coast at a depth of 1 200 m 3 900 ft To determine the size of the natural gas reserve which is the first undersea natural gas reserve in Turkey three offshore boreholes in 1995 and two more were drilled in 1996 Natural gas production started in September 1997 at the five gas wells Gas was pumped from an offshore platform by a 3 km 1 9 mi long undersea pipeline to the plant at the coast for processing Between 2003 and 2004 six directional wells were drilled which had vertical depths of 1 200 1 250 m 3 940 4 100 ft and horizontal deviation of 2 287 2 947 m 7 503 9 669 ft 1 Degirmenkoy Natural Gas Field editDegirmenkoy Natural Gas Field is located 19 km 12 mi west of Silivri The field was discovered in 1994 and the production started in 1995 from nine wells seven of which were directional Gas processing facility was built by a consortium of German Lurgi AG and Turkish Fernas Construction Ltd 1 Depleted gas reservoirs editThe storage facilities of Northern Marmara and Degirmenkoy were projected by the Turkish Petroleum Corporation TPAO in 1996 The depleted gas reservoirs went into service in July 2007 The Northern Marmara Reservoir is connected to the main processing plant of BOTAS by a 3 5 km 2 2 mi long pipeline and the Degirmenkoy Reservoir by a 13 km 8 1 mi long pipeline 1 The storage capacity of the Northern Marmara Reservoir is 1 600 000 000 m3 5 7 1010 cu ft and of the Degirmenkoy Reservoir is 300 000 000 m3 1 1 1010 cu ft While the maximum daily gas injection capacity is 11 800 000 m3 420 000 000 cu ft the maximum withdrawal capacity per day is 15 000 000 m3 530 000 000 cu ft 1 Currently the Northern Marmara and Degirmenkoy Silivri Depleted Gas Reservoir is the only underground natural gas storage facility in Turkey It is operated by the TPAO 2 Capacity expansion editThe entire natural gas storage project is planned in three phases The second phase involves the capacity expansion for the Degirmenkoy facility and the third phase for the Northern Marmara facility 3 The second phase expansion project which is scheduled to be completed in 2020 provides increasing of the daily injection capacity up to 29 000 000 m3 1 0 109 cu ft and the maximum daily withdrawal capacity to 50 000 000 m3 1 8 109 cu ft 2 It is planned that the total storage capacity will be 4 290 000 000 m3 1 51 1011 cu ft the daily injection capacity 40 000 000 m3 1 4 109 cu ft and the daily withdrawal capacity 75 000 000 m3 2 6 109 cu ft after completion of the third phase 2 See also edit nbsp Turkey portal nbsp Energy portalLake Tuz Natural Gas Storage 4 Marmara Ereglisi LNG Storage Facility 5 Egegaz Aliaga LNG Storage Facility 6 Botas Dortyol LNG Storage FacilityReferences edit a b c d e Silivri dogalgaz deposu aciliyor Hurriyet in Turkish 2007 07 05 Retrieved 2017 03 23 a b c Dogalgazda yatirim onceligi depolamaya Dunya in Turkish 2016 04 11 Retrieved 2017 03 23 Projects Natural Gas Storage Projects Turkish Petroleum Retrieved 2017 03 23 Tuz Golu deposuna ilk dogal gaz Internet Archive in Turkish 2017 02 10 Archived from the original on 2017 02 12 Retrieved 2017 02 22 a href Template Cite news html title Template Cite news cite news a CS1 maint bot original URL status unknown link Botas LNG Isletme Mudurlugu in Turkish Botas Archived from the original on 2017 03 23 Retrieved 2017 03 22 Turkiye de bir ilk Hizmete girdi Platin Haber in Turkish 2016 12 23 Archived from the original on 2017 03 23 Retrieved 2017 03 22 Retrieved from https en wikipedia org w index php title Northern Marmara and Degirmenkoy Silivri Depleted Gas Reservoir amp oldid 1168192574, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.