fbpx
Wikipedia

Neckarelz–Osterburken railway

The Neckarelz–Osterburken railway is a 30.9 km long railway line in the north of the German state of Baden-Württemberg, which connects the Neckar and the Bauland along the edge of the Odenwald. It was opened in 1866 as part of the Odenwald Railway (Baden) (Odenwaldbahn) between Heidelberg and Würzburg. It has been upgraded to form an entirely double-track and electrified main line railway. It was an east–west axis for German long-distance transport until 1945. Since 2003 passenger services on it have been operated by the Rhine-Neckar S-Bahn. The Neckarelz–Mosbach section has also been served by the Heilbronn Stadtbahn since 2014.

Mosbach-Neckarelz–Osterburken
Overview
Line number4120
LocaleBaden-Württemberg, Germany
Service
Route number665.1-2 (until 2003: 708)
Technical
Line length30.9 km (19.2 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius252 m (827 ft)
Electrification15 kV/16.7 Hz AC catenary
Operating speed95km/h (max)
Maximum incline1.7%
Route map

50.380
Mosbach-Neckarelz S 41
154 m
51.400
formerly from Hochhausen
(1939–ca. 1960)
51.800
52.456
Mosbach West
(since 2003)
53.150
Mosbach (Baden)
(until 1997)
150.8 m
former line to Mudau (until 1973)
53.159
former Mosbach–Mudau railway
(until 1973)
56.800
Neckarburken
175 m
58.989
Dallau
197 m
60.492
Dallau Tunnel (370 m)
62.375
Auerbach (b Mosbach, Baden)
236 m
66.276
Schefflenz Tunnel (543 m)
Schefflenz Valley Railway from Billigheim
(until 1965)
67.328
Oberschefflenz
294 m
69.410
Eicholzheim
304 m
70.403
Eicholzheim Tunnel (363 m)
72.170
state route 583 (412 m)
Madonnenland Railway from Miltenberg
73.915
Seckach
270 m
75.441
Seckach Tunnel (248 m)
76.474
Zimmern Tunnel (175 m)
76.700
Zimmern (b Seckach)
254 m
78.660
Adelsheim Nord
239 m
79.411
Adelsheim Tunnel (258 m)
Franconia Railway from Stuttgart
81.287
Osterburken
Terminus of S1
247 m
Franconia Railway to Würzburg
Source: German railway atlas[1]

Route

The track today starts at Mosbach-Neckarelz station, where the Neckar Valley Railway branches off. Until about 1960 there was a connecting curve from Mosbach to Hochhausen on the Neckar Valley Railway. Until 1895, the old route of the Odenwald Railway from Obrigheim connected before the line reaches the current site of the Mosbach station, which was built in 1997. The line leaves the Neckar Valley, running along the Elz and Auerbach rivers, to enter an area of karst landscape known as the Bauland. A loop of the Elz is shortened by the Dallau tunnel.

The line tunnels under the watershed between the Elz and the Jagst through Schefflenz Tunnel to reach the Schefflenz valley. It runs through Eicholzheim tunnel to the Seckach valley and in Seckach connects with the Madonnenland Railway to Miltenberg. The line runs through Adelsheim tunnel to the Kirnau valley, where it connects with the Franconia Railway in Osterburken.

The line runs parallel with federal Highway B 27 from Neckarelz to Auerbach and then the B 292 to Oberschefflenz.

History

 
Historical route of the Odenwald Railway

The Neckarelz–Osterburken railway was developed as part of the Odenwald Railway from Heidelberg to Würzburg, which was completed on 1 November 1866. Heidelberg was connected to the railway network by the Grand Duchy of Baden State Railway’s Rhine Valley Railway in 1840. In 1854 the Ludwig's Western Railway was opened from Bamberg in Bavaria to the Hessian border near Kahl am Main through Würzburg. Both Bavaria and Baden saw reasons to build a railway line between Heidelberg and Würzburg: the government of Baden sought a continuation of its main line to the north east and the Bavarian king, Maximilian II, sought a connection with the Palatinate, then a geographically separate part of Bavaria.

The shortest route between the two cities would have run via Eberbach, Mudau and Miltenberg through Hesse, which saw this route as being opposed to its own interests. Instead, after a review of 45 alternative routes and lengthy negotiations, a decision was taken to build a line through Meckenheim, Mosbach, Osterburken and Lauda. This had the advantage for Baden that the line opened up the Baden Bauland and that it could operate entirely within Baden, as it only reached Bavaria at the end of the line. The disadvantages that had to be taken into account were an unfavourable topography and a route that was 25 km longer than the shortest route. A treaty adopting the agreed route was signed between the two countries on 27 January 1862. The Mosbach–Osterburken section was put into operation on 25 August 1866.

Baden State Railways era (1866-1920)

Four years after the start of operations on the line, the Franco-Prussian War of 1870/1871 used its capacity in full. With Baden entering the war on 16 July 1870 the line was part of the military infrastructure. From 28 July 1870 until 15 October 1871 it was a military line. There was one pair of civilian passenger trains each day; all other capacity was made available for military traffic.

 
Development of the rail network near Mosbach

After the end of the war, Baden, Hesse and Württemberg agreed to the construction of the Neckar Valley Railway from Neckargemünd via Neckarelz to Jagstfeld and on 24 May 1879 rail traffic between Heidelberg and Mosbach followed the Neckar and avoided the topographically difficult Odenwald Railway. Therefore, a relocation of Neckarelz station was necessary: the old station was built at the end of the bridge over the Neckar on the Odenwald Railway, the new station was built on the new line along the Neckar river. From the new station two curves were built to Mosbach and to the Meckenheim line. The old Odenwald Railway between the old railway station and Mosbach remained in place, but in 1895 it was considered unnecessary and was abandoned.

Duplication of the line together with the Neckar Valley Railway between Neckargemünd and Neckarelz began in 1904 and was completed on 29 April 1906.

Deutsche Reichsbahn era (1920-1949)

In the mid-1920s Deutsche Reichsbahn further upgraded the line: the bridges were reinforced to increase permissible axle loads. Furthermore, additional passing tracks were built. On 20 December 1939, the Mosbach connecting curve (Mosbacher Verbindungsbogen) was opened in Neckarelz between the Neckar Valley Railway from the south and the line to Osterburken. This relieved congestion on the Lower Jagst Railway (the section of the Franconia Railway between Bad Friedrichshall-Jagstfeld and Osterburken) created by the operation of Iko-Verkehr (a contraction of “Italy coal transport”) trains.

During the air war over Germany the line—as opposed to the Neckarelz railway junction—was not a prime target of Allied attacks. Only from September 1944 were there frequent service interruptions. On 30 November 1944 Seckach station was the objective of an air attack which injured one person and destroyed two locomotives.

After the war operations on the railway between Neckarelz and Osterburken were resumed in June 1945, as the line had great importance as a supply route for the occupation of the American zone.

Deutsche Bundesbahn era (1949–1993)

The Mosbach connecting curve was no longer needed after the Second World War and was closed in about 1960.

 
South portal of the Dallau Tunnel (Oct 2007)
 
New station in Mosbach (Oct 2007)
 
Rhine-Neckar S-Bahn train in Oberschefflenz (Aug 2007)

When, in the early 1970s, Deutsche Bundesbahn electrified the Neckar Valley Railway and the Bad Friedrichshall-Jagstfeld–Würzburg line with financial support from the state of Baden-Württemberg, it was decided to electrify the gap between Neckarelz and Osterburken as well, allowing the continuous electrical operation of freight trains on the Rhine-NeckarFranconia route. The line had lost its importance for passenger traffic as an east–west route as a result of the division of Germany at the end of the war. Starting with Dallau tunnel, work began on 1 November 1971 on lowering the floor of all tunnels by 32 to 50 centimetres. The nature of the Buntsandstein rock in Dallau Tunnel was difficult and required blasting. The Muschelkalk in the other tunnel also required special care.

Since the clearance of the bridge of the Mosbach-Mudau narrow-gauge railway was insufficient for electrification, this meant the end of the line, which was already threatened with closure. A road bridge, which also constituted an obstacle to electrification, already needed renovation, so only one bridge at Auerbach had to be rebuilt specifically for the electrification. Electric operations commenced on 1 June 1975.

Since the reorganisation of the railway in 1994

In the 1990s the nature of the line changed fundamentally with the establishment of the Rhine-Neckar S-Bahn. A preliminary step was the construction of a new Mosbach station. The old station had been unsatisfactory for a long time. First, the station was some distance from the inner city, on the other hand, a level crossing at the station often caused congestion on the B 27. After disagreements between the city of Mosbach and Deutsche Bahn over the transfer of the site of the old station for the upgrading of the B 27, an agreement was reached in 1994 over the use of unused infrastructure. The new station was opened on 24 March 1997 together with the nearby horticultural show. Its two platforms can be reached via ramps. The length of the platforms allows trains with a maximum length of five cars, so only regional transport operations are possible. The platform height of 76 cm allowed for the operation of the S-Bahn's electric multiple units from the beginning. The cost of the construction of the station and relocation of the surrounding streets, amounting to 53.1 million Deutsche Marks,[2] were shared between Deutsche Bahn and the city of Mosbach. The old station was subsequently demolished.

On 23 November 1996, the last semaphore signals along the line were taken out of service. Since that time, the Neckarelz-Osterburken section has been remotely controlled from a new class SpDr interlocking in Neckarelz.

The planning for the Rhine-Neckar S-Bahn network originally envisaged only a service at 30 minutes intervals along the Neckar Valley Railway to Eberbach. An extension to Neckarelz or even Osterburken with a thinner service was put as an extension option in the tender documents. The offer to extend the S-Bahn to Neckarelz, together with an extension from Speyer to Germersheim was accepted at an initial cost of €75 million. Funding for the extension of the S-Bahn to Osterburken was partly derived from federal funds made available to the state of Baden-Württemberg as part of the regionalisation of rail transport in 1996 and from funds made available to municipalities by the state under its municipal finance law. Since 14 December 2003, line S 1 has operated every hour to Osterburken. As part of the S-Bahn extension, all stations were equipped for disabled access and provided with weather protection. 140 meters long and 76 cm high platforms allow level entry to S-Bahn trains. A new Mosbach-West station was also opened.

The S41 line of the Heilbronn Stadtbahn commenced operations at the regular 2014/2015 timetable change on 14 December 2014. This complements the S-Bahn lines S1 and S2 of the Rhine-Neckar S-Bahn on the Mosbach-Neckarelz–Mosbach (Baden) section.[3]

Notes

  1. ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2017. pp. 86–7. ISBN 978-3-89494-146-8.
  2. ^ According to a sign at Mosbach station
  3. ^ "Stadtbahn Heilbronn - Mosbach nimmt Betrieb auf" (in German). 11 December 2014. Archived from the original on 13 December 2014. Retrieved 13 February 2018.

References

  • Bleiweis, Wolfgang (1991). Eisenbahn vom Neckar nach Mainfranken (in German). Schweinfurt und Schaafheim: Heimat- und Lokalbahnverl. Bleiweis und REIJU-Fotoverl. Jungels. ISBN 3-928735-01-2.
  • Scharf, Hans-Wolfgang (2001). Eisenbahnen zwischen Neckar, Tauber und Main (in German). Vol. 1: Historische Entwicklung und Bahnbau. Freiburg (Breisgau): EK-Verlag. ISBN 3-88255-766-4.
  • Scharf, Hans-Wolfgang (2001). Eisenbahnen zwischen Neckar, Tauber und Main. Bd. 2: Ausgestaltung, Betrieb und Maschinendienst (in German). Freiburg (Breisgau): EK-Verlag. ISBN 3-88255-768-0.

External links

  • "Tunnelportale der Bahnstrecke Neckarelz–Osterburken(–Würzburg)" (in German). Tunnelportale. Retrieved 3 February 2011.
  • "Timetable of 1944, p. 1" (in German). Retrieved 3 February 2011.
  • "Timetable of 1944, p. 2" (in German). Retrieved 3 February 2011.

neckarelz, osterburken, railway, long, railway, line, north, german, state, baden, württemberg, which, connects, neckar, bauland, along, edge, odenwald, opened, 1866, part, odenwald, railway, baden, odenwaldbahn, between, heidelberg, würzburg, been, upgraded, . The Neckarelz Osterburken railway is a 30 9 km long railway line in the north of the German state of Baden Wurttemberg which connects the Neckar and the Bauland along the edge of the Odenwald It was opened in 1866 as part of the Odenwald Railway Baden Odenwaldbahn between Heidelberg and Wurzburg It has been upgraded to form an entirely double track and electrified main line railway It was an east west axis for German long distance transport until 1945 Since 2003 passenger services on it have been operated by the Rhine Neckar S Bahn The Neckarelz Mosbach section has also been served by the Heilbronn Stadtbahn since 2014 Mosbach Neckarelz OsterburkenOverviewLine number4120LocaleBaden Wurttemberg GermanyServiceRoute number665 1 2 until 2003 708 TechnicalLine length30 9 km 19 2 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeMinimum radius252 m 827 ft Electrification15 kV 16 7 Hz AC catenaryOperating speed95km h max Maximum incline1 7 Route mapLegendNeckar Valley Railwayfrom Heidelberg S1 S250 380 Mosbach Neckarelz S 41 154 m51 400 formerly from Hochhausen 1939 ca 1960 51 800 Odenwald Railway from Heidelberg until 1895 52 456 Mosbach West since 2003 53 150 Mosbach Baden until 1997 150 8 mformer line to Mudau until 1973 53 159 Mosbach Baden since 1997 S2 S 41former Mosbach Mudau railway until 1973 56 800 Neckarburken 175 m58 989 Dallau 197 m60 492 Dallau Tunnel 370 m 62 375 Auerbach b Mosbach Baden 236 m66 276 Schefflenz Tunnel 543 m Schefflenz Valley Railway from Billigheim until 1965 67 328 Oberschefflenz former wedge station 294 m69 410 Eicholzheim 304 m70 403 Eicholzheim Tunnel 363 m 72 170 state route 583 412 m Madonnenland Railway from Miltenberg73 915 Seckach 270 m75 441 Seckach Tunnel 248 m 76 474 Zimmern Tunnel 175 m 76 700 Zimmern b Seckach 254 m78 660 Adelsheim Nord 239 m79 411 Adelsheim Tunnel 258 m Franconia Railway from Stuttgart81 287 Osterburken Terminus of S1 247 mFranconia Railway to WurzburgSource German railway atlas 1 Contents 1 Route 2 History 2 1 Baden State Railways era 1866 1920 2 2 Deutsche Reichsbahn era 1920 1949 2 3 Deutsche Bundesbahn era 1949 1993 2 4 Since the reorganisation of the railway in 1994 3 Notes 4 References 5 External linksRoute EditThe track today starts at Mosbach Neckarelz station where the Neckar Valley Railway branches off Until about 1960 there was a connecting curve from Mosbach to Hochhausen on the Neckar Valley Railway Until 1895 the old route of the Odenwald Railway from Obrigheim connected before the line reaches the current site of the Mosbach station which was built in 1997 The line leaves the Neckar Valley running along the Elz and Auerbach rivers to enter an area of karst landscape known as the Bauland A loop of the Elz is shortened by the Dallau tunnel The line tunnels under the watershed between the Elz and the Jagst through Schefflenz Tunnel to reach the Schefflenz valley It runs through Eicholzheim tunnel to the Seckach valley and in Seckach connects with the Madonnenland Railway to Miltenberg The line runs through Adelsheim tunnel to the Kirnau valley where it connects with the Franconia Railway in Osterburken The line runs parallel with federal Highway B 27 from Neckarelz to Auerbach and then the B 292 to Oberschefflenz History Edit Historical route of the Odenwald Railway Main article Odenwald Railway Baden The Neckarelz Osterburken railway was developed as part of the Odenwald Railway from Heidelberg to Wurzburg which was completed on 1 November 1866 Heidelberg was connected to the railway network by the Grand Duchy of Baden State Railway s Rhine Valley Railway in 1840 In 1854 the Ludwig s Western Railway was opened from Bamberg in Bavaria to the Hessian border near Kahl am Main through Wurzburg Both Bavaria and Baden saw reasons to build a railway line between Heidelberg and Wurzburg the government of Baden sought a continuation of its main line to the north east and the Bavarian king Maximilian II sought a connection with the Palatinate then a geographically separate part of Bavaria The shortest route between the two cities would have run via Eberbach Mudau and Miltenberg through Hesse which saw this route as being opposed to its own interests Instead after a review of 45 alternative routes and lengthy negotiations a decision was taken to build a line through Meckenheim Mosbach Osterburken and Lauda This had the advantage for Baden that the line opened up the Baden Bauland and that it could operate entirely within Baden as it only reached Bavaria at the end of the line The disadvantages that had to be taken into account were an unfavourable topography and a route that was 25 km longer than the shortest route A treaty adopting the agreed route was signed between the two countries on 27 January 1862 The Mosbach Osterburken section was put into operation on 25 August 1866 Baden State Railways era 1866 1920 Edit Four years after the start of operations on the line the Franco Prussian War of 1870 1871 used its capacity in full With Baden entering the war on 16 July 1870 the line was part of the military infrastructure From 28 July 1870 until 15 October 1871 it was a military line There was one pair of civilian passenger trains each day all other capacity was made available for military traffic Development of the rail network near Mosbach After the end of the war Baden Hesse and Wurttemberg agreed to the construction of the Neckar Valley Railway from Neckargemund via Neckarelz to Jagstfeld and on 24 May 1879 rail traffic between Heidelberg and Mosbach followed the Neckar and avoided the topographically difficult Odenwald Railway Therefore a relocation of Neckarelz station was necessary the old station was built at the end of the bridge over the Neckar on the Odenwald Railway the new station was built on the new line along the Neckar river From the new station two curves were built to Mosbach and to the Meckenheim line The old Odenwald Railway between the old railway station and Mosbach remained in place but in 1895 it was considered unnecessary and was abandoned Duplication of the line together with the Neckar Valley Railway between Neckargemund and Neckarelz began in 1904 and was completed on 29 April 1906 Deutsche Reichsbahn era 1920 1949 Edit In the mid 1920s Deutsche Reichsbahn further upgraded the line the bridges were reinforced to increase permissible axle loads Furthermore additional passing tracks were built On 20 December 1939 the Mosbach connecting curve Mosbacher Verbindungsbogen was opened in Neckarelz between the Neckar Valley Railway from the south and the line to Osterburken This relieved congestion on the Lower Jagst Railway the section of the Franconia Railway between Bad Friedrichshall Jagstfeld and Osterburken created by the operation of Iko Verkehr a contraction of Italy coal transport trains During the air war over Germany the line as opposed to the Neckarelz railway junction was not a prime target of Allied attacks Only from September 1944 were there frequent service interruptions On 30 November 1944 Seckach station was the objective of an air attack which injured one person and destroyed two locomotives After the war operations on the railway between Neckarelz and Osterburken were resumed in June 1945 as the line had great importance as a supply route for the occupation of the American zone Deutsche Bundesbahn era 1949 1993 Edit The Mosbach connecting curve was no longer needed after the Second World War and was closed in about 1960 South portal of the Dallau Tunnel Oct 2007 New station in Mosbach Oct 2007 Rhine Neckar S Bahn train in Oberschefflenz Aug 2007 When in the early 1970s Deutsche Bundesbahn electrified the Neckar Valley Railway and the Bad Friedrichshall Jagstfeld Wurzburg line with financial support from the state of Baden Wurttemberg it was decided to electrify the gap between Neckarelz and Osterburken as well allowing the continuous electrical operation of freight trains on the Rhine Neckar Franconia route The line had lost its importance for passenger traffic as an east west route as a result of the division of Germany at the end of the war Starting with Dallau tunnel work began on 1 November 1971 on lowering the floor of all tunnels by 32 to 50 centimetres The nature of the Buntsandstein rock in Dallau Tunnel was difficult and required blasting The Muschelkalk in the other tunnel also required special care Since the clearance of the bridge of the Mosbach Mudau narrow gauge railway was insufficient for electrification this meant the end of the line which was already threatened with closure A road bridge which also constituted an obstacle to electrification already needed renovation so only one bridge at Auerbach had to be rebuilt specifically for the electrification Electric operations commenced on 1 June 1975 Since the reorganisation of the railway in 1994 Edit In the 1990s the nature of the line changed fundamentally with the establishment of the Rhine Neckar S Bahn A preliminary step was the construction of a new Mosbach station The old station had been unsatisfactory for a long time First the station was some distance from the inner city on the other hand a level crossing at the station often caused congestion on the B 27 After disagreements between the city of Mosbach and Deutsche Bahn over the transfer of the site of the old station for the upgrading of the B 27 an agreement was reached in 1994 over the use of unused infrastructure The new station was opened on 24 March 1997 together with the nearby horticultural show Its two platforms can be reached via ramps The length of the platforms allows trains with a maximum length of five cars so only regional transport operations are possible The platform height of 76 cm allowed for the operation of the S Bahn s electric multiple units from the beginning The cost of the construction of the station and relocation of the surrounding streets amounting to 53 1 million Deutsche Marks 2 were shared between Deutsche Bahn and the city of Mosbach The old station was subsequently demolished On 23 November 1996 the last semaphore signals along the line were taken out of service Since that time the Neckarelz Osterburken section has been remotely controlled from a new class SpDr interlocking in Neckarelz The planning for the Rhine Neckar S Bahn network originally envisaged only a service at 30 minutes intervals along the Neckar Valley Railway to Eberbach An extension to Neckarelz or even Osterburken with a thinner service was put as an extension option in the tender documents The offer to extend the S Bahn to Neckarelz together with an extension from Speyer to Germersheim was accepted at an initial cost of 75 million Funding for the extension of the S Bahn to Osterburken was partly derived from federal funds made available to the state of Baden Wurttemberg as part of the regionalisation of rail transport in 1996 and from funds made available to municipalities by the state under its municipal finance law Since 14 December 2003 line S 1 has operated every hour to Osterburken As part of the S Bahn extension all stations were equipped for disabled access and provided with weather protection 140 meters long and 76 cm high platforms allow level entry to S Bahn trains A new Mosbach West station was also opened The S41 line of the Heilbronn Stadtbahn commenced operations at the regular 2014 2015 timetable change on 14 December 2014 This complements the S Bahn lines S1 and S2 of the Rhine Neckar S Bahn on the Mosbach Neckarelz Mosbach Baden section 3 Notes Edit Eisenbahnatlas Deutschland German railway atlas Schweers Wall 2017 pp 86 7 ISBN 978 3 89494 146 8 According to a sign at Mosbach station Stadtbahn Heilbronn Mosbach nimmt Betrieb auf in German 11 December 2014 Archived from the original on 13 December 2014 Retrieved 13 February 2018 References EditBleiweis Wolfgang 1991 Eisenbahn vom Neckar nach Mainfranken in German Schweinfurt und Schaafheim Heimat und Lokalbahnverl Bleiweis und REIJU Fotoverl Jungels ISBN 3 928735 01 2 Scharf Hans Wolfgang 2001 Eisenbahnen zwischen Neckar Tauber und Main in German Vol 1 Historische Entwicklung und Bahnbau Freiburg Breisgau EK Verlag ISBN 3 88255 766 4 Scharf Hans Wolfgang 2001 Eisenbahnen zwischen Neckar Tauber und Main Bd 2 Ausgestaltung Betrieb und Maschinendienst in German Freiburg Breisgau EK Verlag ISBN 3 88255 768 0 External links Edit Tunnelportale der Bahnstrecke Neckarelz Osterburken Wurzburg in German Tunnelportale Retrieved 3 February 2011 Timetable of 1944 p 1 in German Retrieved 3 February 2011 Timetable of 1944 p 2 in German Retrieved 3 February 2011 Retrieved from https en wikipedia org w index php title Neckarelz Osterburken railway amp oldid 1130505219, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.