fbpx
Wikipedia

Marq2 transit corridor

The Marq2 transit corridor is a north–south thoroughfare in Minneapolis, Minnesota, United States. It consists of the parallel streets of Marquette and Second avenues in the downtown area. Each public streetway has two contraflow bus lanes with two lanes available for general-purpose traffic in the opposite direction. Vehicular transit flows south on Marquette Avenue and north on Second Avenue. The inner curb lane allows buses to stop for riders, while the second bus-only lane allows buses to pass each other along the corridor. Bus routes that operate on the corridor stop at every other block at an assigned gate with each route assigned a northbound and southbound gate. Gates are assigned letters A, B, C, or D on Marquette Avenue and E, F, G, and H on Second Avenue. Custom bus shelters are installed at each stop with heaters and real time transit information. The corridor primarily serves express buses operated by all five public transit agencies in the Twin Cities.[2]

Marq2
Stop Group C on the Marq2 transit corridor.
Overview
OperatorMetro Transit
Maple Grove Transit
Minnesota Valley Transit Authority
Plymouth Metrolink
SouthWest Transit
StatusOpen
Began serviceDecember 14, 2009[1]
Route
Route typeBus rapid transit
LocaleMinneapolis, Minnesota
StartWashington Avenue
End12th Street
← {{{previous_line}}}  {{{system_nav}}}  {{{next_line}}} →

Transit has existed in the corridor since 1879 with the opening of steam railways which were eventually replaced by streetcars, and then buses. After both streets were converted to one-way traffic, a contraflow bus lane was installed in the 1970s. Eventually the corridor's capacity became overwhelmed with the amount of buses so that operating conditions and speeds were severely impacted. The city of Minneapolis proposed consolidating express bus traffic in the city in the corridor and secured funding to reconstruct the streets in 2007. The redesign added an additional bus lane, increased space for pedestrians, and improved waiting amenities for customers. Upon opening in 2009, capacity for buses in the corridor was tripled, which allowed most express bus service in downtown Minneapolis to be consolidated onto the two streets. Operating speeds increased in the corridor, and some trips took 10 fewer minutes to travel out of downtown. The Metro Orange Line began using the corridor in 2021 when it began operation.

History edit

Marquette and Second avenues have been important to mass transit since its introduction to Minneapolis. In May 1879 the Lyndale Railway Company opened the Motor Line along First Avenue (now Marquette), running from First Street near Minneapolis Union Depot to 13th Street, where it continued south along Nicollet Avenue. By the mid-1880s the steam trams operating the line became a nuisance downtown, and the company, now Minneapolis, Lyndale & Minnetonka Railway, responded with several forms of experimental traction along First Avenue. The company collaborated with Charles Van Depoele for trains to be towed by an electric locomotive between Washington Avenue and Sixth Street.[3] There were three tests: one in December 1885 and in January and February 1886, all of which proved to be unsatisfactory. The electric locomotive experienced intense vibrations and other mechanical problems, and current collection was unreliable. Van Depoele personally invested $25,000 (equivalent to $847,778 in 2023) to perfect the system.[3] The railway then adopted an experimental soda motor, where steam is generated by the addition of caustic soda to the boiler. These locomotives also proved to be unreliable. In 1887 Minneapolis passed an ordinance requiring the Motor Line to use cable or other source of power within city limits.[3] Van Depoele's efforts had produced reliable electric traction, but the Minneapolis, Lyndale & Minnetonka Railway was suffering financially and could not adapt to the ordinance. This prompted the line to be leased to the Minneapolis Street Railway, later Twin Cities Rapid Transit, to operate the line and make the required improvements.[3] First Avenue was electrified September 22, 1890, and the Motor Line was dissolved into First Avenue South streetcar lines.[4]

Marquette and Second avenues became one-way streets in the 1950s.[5] The first express buses to use Interstate 35W used Marquette and Second avenues while running through downtown in 1972.[6] Contraflow bus lanes debuted on the corridor on September 29, 1974.[7] Bus lanes were between 18 and 21 feet wide which is much wider than a standard 12 foot wide lane.[5]

North-south bicycle traffic in Minneapolis began changing in the late 1990s, when proposals to ban bicycles from Nicollet Mall emerged. Bus drivers were concerned about unsafe conditions with sharing Nicollet Mall between bicycles and buses. One proposal had one direction of bus traffic on Nicollet Mall removed and bus traffic in that direction diverted to Marquette Avenue. The Minneapolis City Council was leaning towards separating north-south bus traffic onto Nicollet and Marquette until Metro Transit offered to help pay for installing bike lanes on Marquette and Second avenues in exchange for banning bicycles from Nicollet Mall for at least portions of the week.[8] Ultimately bike lanes were installed on Marquette and Second avenues in September 1998, and bicycles were banned from Nicollet Mall on weekdays from 6 a.m. to 6 p.m.[9]

Capacity problems edit

The amount of bus traffic on the pair of lanes eventually overwhelmed the corridor's capacity and hampered operations. With bus stops on each block and only one bus travel lane, many buses would make two stops on each block with one at the beginning and the other at the end of the block. It regularly took buses two stoplight cycles to progress to the next block. Attempts were made to improve the corridor's performance with mixed results that often had their own drawbacks. Some bus routes were scheduled to travel in general-purpose lanes heading south on Second Avenue South, where buses heading south on the corridor would normally use Marquette Avenue. Other bus routes were moved to other streets like Nicollet Mall but travel times on Nicollet Mall were even slower than on the corridor. Faster travel times were available on nearby streets like Hennepin Avenue to the west or 3rd Avenue S to the east but both are further from downtown's central core.[10]

Minneapolis developed a transportation plan in 2006 that proposed adding a second bus lane to speed up bus travel by allowing buses to pass each other. The 10-year transportation plan proposed concentrating all express buses serving the suburbs to use the Marquette and Second Avenue pair of streets. While many express buses used Marquette and Second avenues, some were still on Nicollet Mall.[11] At the time there were also bike lanes on each street but the plan proposed that by removing the bike lanes and adding an additional bus lane, capacity in the corridor would be tripled. Wider sidewalks would also be added for riders waiting for the bus. Bus speeds in the corridor were only around 5 miles per hour (8.0 km/h) at the time. When the transportation plan was approved by the city council in 2007, it was estimated that changes could happen in five years at the earliest and only after the two streets were reconstructed with the goal of using a federal grant to help pay for the changes.[12] Without the federal grant, changes would happen in 2012 at the earliest instead of 2009.[13]

Funding and construction edit

 
Marquette Avenue under construction in 2008

The federal government awarded the metropolitan region, as well as four other cities, funds in a program called the Urban Partnership Agreement in 2007. The $133 million grant would also fund other transit and roadway improvements like park and ride facilities and toll lanes along I-35W.[14] Almost 30 cities had competed for the grants and the state of Minnesota matched the grant with $55 million of their own funding in June 2008. A planned opening of December 2009 was given for the bus lane improvements.[15] The overall cost of the Marq2 portion of the Urban Partnership Agreement project cost was $32 million.[1]

Construction was planned to begin after the 2008 Republican National Convention in September 2008.[16] The project was constructed on an accelerated timeline that took roughly half the time it would typically take. Several techniques to ensure the accelerated construction timeline was successful were used, including early coordination of utility relocation and bonuses for construction contractors.[17] The work on Marquette and Second avenues had a required completion of December 31, 2009, while other portions of the Urban Partnership Agreement project had later deadlines.[15]

By removing express buses from Nicollet Mall, the mall was changed to allow bicycles at all times of day where previously bicycles were banned during peak periods. The change to Nicollet Mall allowed the existing bicycle lanes on the Marquette and Second Avenue pair of streets to be removed.[16] Bus traffic on Nicollet Mall was reduced by 35 percent with the move of buses to the Marq2 corridor which improved the experience for pedestrians and sidewalk cafe patrons on Nicollet Mall.[18][19] The loss of bike facilities in the corridor concerned groups like the Minneapolis Bicycle Coalition, which later became the transportation advocacy organization Our Streets Minneapolis.[20] Along with allowing bicycles on Nicollet Mall all day, bicycles are allowed in the corridor bus lanes during off peak periods.[21]

Bus travel times in the corridor were expected to improve by 5–10 minutes for each of the 1,400 weekday bus trips.[22] Adding the second bus lane increased capacity from about 60 buses per hour to 180 buses per hour.[23] The corridor consolidated around 80 percent of downtown transit service on the two streets.[24] With 14 routes shifted from Nicollet Mall, a total of 67 bus routes would utilize the corridor shortly after opening. Metro Transit as well as the six suburban transit authorities, including Southwest Transit and Minnesota Valley Transit Authority, began using the corridor when it opened on December 14, 2009.[24][1]

Operations since opening edit

While the target speed of buses in the corridor was 8 miles per hour (13 km/h), average speeds for buses in the corridor increased from 3.5 miles per hour (5.6 km/h) to 5.5 miles per hour (8.9 km/h) after the new lanes opened.[25] Ridership also increased from 23,700 to 28,000 rides per weekday.[10] The greatest improvement in speeds was on Second Avenue South in the morning rush hour where speeds increased by 74 percent. Ridership in the I-35W south corridor increased by 9 percent between 2009 and 2011 and at least 85 percent of riders rated bus reliability and travel times as good or very good. Around half of riders surveyed said the Marq2 project increased bus speeds and reliability. Buses from I-94 West, I-35W North, I-35W South, and I-394 all fed into the Marq2 lanes, which made them the busiest transit corridor in downtown Minneapolis.[26] The number of buses on the corridor increase by 52 percent in the afternoon rush hour.[25]

The addition of the heated shelters on Marq2 in combination with A Line heated shelters was identified in 2018 as a source of potential disparate impact and disproportionate burden for low-income and minority riders. This was because Marq2 riders are predominantly not low-income or minority, while other riders in the Metro Transit system—that were more likely to be low-income or minorities—did not receive the same level of benefits. These evaluations are required as part of Title VI of the Civil Rights Act of 1964.[27] To maintain compliance with Title VI, heated shelters were added on Nicollet Mall and other locations that serve more low-income and minority riders.[28]

Utility work closed a portion of Marquette Avenue to buses in 2019. When buses were shifted to the general-purpose lanes on Second Avenue, severe congestion impacted the ability of buses to exit downtown and resulted in long delays of up to an hour.[29][30] Southwest Transit officials wrote a letter to the city of Minneapolis requesting improved priority for buses, which they felt were not being given priority by traffic control agents. The city of Minneapolis insisted that buses were given priority and met with Southwest Transit, Minnesota Valley Transportation Authority, and Metro Transit officials to discuss the traffic congestion and transit.[31] Minneapolis adjusted signal light timing and parking meters to improve conditions for transit. Minnesota Valley Transportation Authority eventually temporarily detoured several bus routes off of the transit only lanes on Marquette to 4th and 3rd Avenues South in an effort to improve travel times.[32]

While the first real-time information signs used cellular connections to receive data, upgrades on 36 signs in the corridor were replaced with signs that have fiber optic connections in 2021. The change was partially done to improve reliability of the signs as sign unreliability was a frequent customer complaint.[33] The Metro Orange Line was designed around using the corridor, and during planning stages, project staff identified several possibilities on connecting I-35W to the Marq2 lanes.[34] The final design included a transit-only ramp from I-35W to 12th Street where buses could either travel eastbound using general-purpose lanes to the 12th Street Ramp on the E-ZPass lanes or travel westbound from the ramp to a bus-only contraflow lane connecting to Marq2.[35][36] The Orange Line began using the Marq2 transit lanes on December 4, 2021, when the line began service. Most intersections along the corridor allow for transit signal priority for Orange Line buses.[37]

Design edit

 
View of contraflow lanes from above at Fifth Street where the Blue and Green Lines operate

The designed project covers 24 blocks.[38] The design was partially inspired by the Portland Transit Mall.[23][10] Each roadway contains four lanes, two in either direction. Buses travel southbound on Marquette Avenue and northbound on Second Avenue, with general traffic operating the opposite direction in the other lanes. Each stop can accommodate two buses, with there being two stops per block. The inner lane allows buses to pass stopped buses.[39]

Marquette and Second avenues are 80 feet (24 m) wide from building width to building width. The total width of the paved street is 49 feet (15 m) with 21 feet (6.4 m) dedicated to pedestrian and streetscape uses.[39] Initially the construction design called for a concrete roadway for buses and asphalt for general-purpose traffic in the other direction, but an all concrete roadway surface was close enough in cost that an all concrete roadway was built. The previous road surface was recycled and used as a base with 9 inches (23 cm) of reinforced concrete place on top. The curing process for the roadway took two to three days. The concrete roadway stands in contrast to the mostly asphalt streets within the rest of downtown.[40] The curbside bus lane is 11 feet (3.4 m) feet wide while the second passing lane is 13 feet (4.0 m) feet wide.[39]

As part of pedestrian and streetscape improvements, 200 trees were added to the corridor. The trees were held in structural cells designed to allow for tree growth and the cells were covered with 15,000 square feet (1,400 m2) of porous pavers to allow for some storm water retention.[40] Buried underground were 11,000 plastic cells that look like milk crates. The cells are filled with soil which prevents soil compaction but still allows for excess water to leave the system. Up to 21,000 cubic feet (590 m3) of storm water is diverted from the sewer system after a rainstorm. The system also helps increase the lifespan of street trees, which are otherwise frequently replaced after only five to seven years.[41] With an average of 588 cubic feet (16.7 m3) of soil dedicated for each tree, each tree pit captures water from an average surface area of 300 square feet (28 m2). The overall cost of the system was about $8,038 per tree.[42][43] After seven years many of the trees were no longer looking as healthy as when they were planted. The manufacturer of the cell system conducted a study to see why the trees were struggling and blamed trees planted at an improper depth and tree root girdling as the primary reasons for the decline.[44]

Stops and stations edit

Stops along the corridor are organized by gates, with buses stopping every other block at their designated gate. Gates on Marquette Avenue are lettered A, B, C, and D, and gates on Second Avenue are lettered E, F, G, and H.[2] Orange Line buses stop at most C and F gates, which are enhanced with pylon markers, additional security and real-time departures, and off-board fare collection.[37] Bus stops at each gate are 135 feet (41 m) long. Gates are spaced 40 feet (12 m) apart.[39]

Custom transit shelters were installed at opening, and sidewalks on the bus stop side of the street are three feet (0.91 m) wider than on the other side.[38][39] The average annual maintenance costs for each shelter was $5,038 in 2016.[45]

References edit

  1. ^ a b c Foti, Jim (December 13, 2009). "Making Time Downtown". Star Tribune. pp. B1, B7. Retrieved November 4, 2021.
  2. ^ a b "Marquette and 2nd Avenues". metrotransit.org. Metro Transit. Retrieved January 21, 2022.
  3. ^ a b c d Diers, John W.; Isaacs, Aaron (2007). Twin Cities by Trolley: The Streetcar Era in Minneapolis and St. Paul. Minneapolis: University of Minnesota Press. pp. 28–29. ISBN 978-0-8166-4358-5.
  4. ^ Russell, Olson L. (1976). The Electric Railways of Minnesota. Hopkins, Minnesota: Minnesota Transportation Museum. pp. 31, 142.
  5. ^ a b Wascoe Jr., Dan (October 1, 1974). "It's laughs and curses on first day of city's 'wrong-way' bus lanes". The Minneapolis Tribune. p. 1B, 5B. Retrieved February 2, 2022 – via Newspapers.com.
  6. ^ Wascoe Jr., Dan (December 12, 1972). "New express buses plentiful, but riders few". The Minneapolis Tribune. p. 1A, 4A. Retrieved November 1, 2021 – via Newspapers.com.
  7. ^ "Wrong-way Buses. The right idea for Marquette and 2nd Avenues". The Minneapolis Tribune. September 27, 1974. Retrieved February 2, 2022 – via Newspapers.com.
  8. ^ Brandt, Steve (August 15, 1997). "Bike-bus division of mall is latest proposal". The Star Tribune. p. B1, B8. Retrieved February 2, 2022 – via Newspapers.com.
  9. ^ Blake, Laurie (October 8, 1998). "On-street traffic directors help motorists navigate downtown bike lanes". The Star Tribune. p. B2. Retrieved February 2, 2022 – via Newspapers.com.
  10. ^ a b c Isaacs, Aaron (January 9, 2012). "A Transit Improvement: Marq2 Bus Lanes – Transit for Livable Communities – Minnesota". Transit for Livable Communities. Retrieved February 2, 2022.
  11. ^ Blake, Laurie (November 17, 2006). "Makeover proposed for downtown". Star Tribune. pp. B1, B7. Retrieved November 3, 2021.
  12. ^ Brandt, Steve (June 30, 2007). "Fewer cars, more bikes in Minneapolis' future". Star Tribune. p. B3. Retrieved November 3, 2021.
  13. ^ Brandt, Steve (July 31, 2007). "Goal of free downtown shuttle service in sight". Star Tribune. pp. B1, B3. Retrieved November 3, 2021.
  14. ^ Foti, Jim (August 15, 2007). "$133 million is coming our way to relieve congestion". Star Tribune. pp. A1, A7. Retrieved November 3, 2021.
  15. ^ a b Foti, Jim (June 13, 2008). "State gets federal aid for measures to ease traffic congestion". Star Tribune. p. B5. Retrieved November 4, 2021.
  16. ^ a b Berg, Steve (July 16, 2008). "Redo for two streets: First the mess, then maybe the magic". MinnPost. Retrieved January 22, 2022.
  17. ^ "Feats of Engineering – Marquette, Second Avenue South Transit Projects | Finance & Commerce". Finance & Commerce. American Council of Engineering Companies of. June 7, 2011. Retrieved February 21, 2022.
  18. ^ Walsh, Paul (August 5, 2008). "Minneapolis begins project to upgrade transit functions". Star Tribune. p. B4. Retrieved November 4, 2021.
  19. ^ Walsh, Paul (March 24, 2009). "As Marquette Av. gets new look, two blocks close down". Star Tribune. p. B3. Retrieved November 4, 2021.
  20. ^ Cole, Karlie (December 11, 2009). "MARQ2 Leaves Cyclists with Few Downtown Routes". Our Streets Minneapolis. Retrieved February 2, 2022.
  21. ^ "Access Minneapolis Update" (PDF). City of Minneapolis. April 5, 2016. Retrieved February 2, 2022.
  22. ^ Foti, Jim (September 27, 2009). "Transportation Transformation". Star Tribune. pp. B1, B2. Retrieved November 4, 2021.
  23. ^ a b Walker, Jarrett (November 23, 2009). "Minneapolis: Unlocking Downtown with Transit Malls". Human Transit. Retrieved January 22, 2022.
  24. ^ a b Berg, Steve (November 23, 2009). "Three big changes make downtown Minneapolis a better place". MinnPost. Retrieved January 22, 2022.
  25. ^ a b "Urban Partnership Agreement: Minnesota Evaluation Report" (PDF). U.S. Department of Transportation. January 4, 2013. Retrieved February 3, 2022.
  26. ^ "Integrating Transit with Congestion Pricing: A Review of the Miami and Minneapolis UPAs" (PDF). FHWA Webinar Series. FHWA. October 27, 2011. Retrieved February 2, 2022.
  27. ^ "2018 Service and Facilities Standards Monitoring In Compliance with FTA Circular 4702.1B" (PDF). SRF Consulting on behalf of Metro Transit. October 2018. pp. iii, v, 36. Retrieved January 1, 2023.
  28. ^ Harper, Cyndi (October 8, 2018). "Title VI Review: Service and Facility Standards Monitoring Study". Metro Transit. Retrieved February 2, 2022.
  29. ^ "Commuters Struggling With Construction In Downtown Minneapolis". WCCO-TV. June 19, 2019. Retrieved February 3, 2022.
  30. ^ Hoffland, Brett (June 20, 2019). "Traffic relief coming for buses navigating through downtown Minneapolis construction zone". KSTP-TV. Retrieved February 3, 2022.
  31. ^ Harlow, Tim (June 20, 2019). "After downtown delays, SouthWest Transit tells Minneapolis mayor buses need priority". Star Tribune. Retrieved February 3, 2022.
  32. ^ Moore, Janet (July 3, 2019). "Downtown Minnesota Valley Transit Authority bus routes, stops will change due to congestion". Star Tribune. Retrieved February 3, 2022.
  33. ^ Harlow, Tim (January 4, 2021). "New bus stop signs promise better info". Star Tribune. p. A5.
  34. ^ "METRO Orange Line Bus Rapid Transit Project Plan Update". Metro Transit. June 2014. Retrieved February 2, 2022.
  35. ^ Bitters, Janice (November 7, 2016). "Minneapolis OKs new downtown transit ramp". Finance & Commerce. Retrieved February 3, 2022.
  36. ^ "12th Street Ramp - Metro Transit". www.metrotransit.org. Retrieved February 3, 2022.
  37. ^ a b Moore, Janet (December 4, 2021). "Orange Line BRT debuts along Interstate 35W, linking Burnsville and Minneapolis". Star Tribune. Retrieved February 3, 2022.
  38. ^ a b "Twin Cities Transit System 2009 Performance Evaluation". Metropolitan Council. March 2010. p. 84. Retrieved February 2, 2022.
  39. ^ a b c d e "Marquette & 2nd Avenues, Minneapolis, MN". Urban Street Design Guide. National Association of City Transportation Officials. Retrieved February 2, 2022.
  40. ^ a b Roberts, Kris (January 2010). "Leafy-gray approach". Roads & Bridges. 48 (1): 48–50. ISSN 8750-9229.
  41. ^ Millard, Elizabeth (Spring 2014). "Long-term payoffs with permeables". Interlock Design. 21 (2): 8–11. Retrieved February 2, 2022.
  42. ^ "Tree trenches and tree boxes combined - Minnesota Stormwater Manual". stormwater.pca.state.mn.us. Minnesota Pollution Control Agency. Retrieved February 21, 2022.
  43. ^ "Marq2: Structural Cells with Trees for Stormwater" (PDF). www.asla.org. American Society of Landscape Architects. Retrieved February 22, 2022.
  44. ^ Marritz, Leda (June 12, 2017). "Revisiting the street trees of Marquette and 2nd | DeepRoot Blog". DeepRoot Green Infrastructure. Retrieved February 3, 2022.
  45. ^ Canser, Pierce (July 15, 2016). "05343 - Downtown St. Paul 5th/6th Street Customer Facility Improvements". Metropolitan Council. Retrieved February 2, 2022.

External links edit

  • Metro Transit: Marquette and Second Avenues

marq2, transit, corridor, north, south, thoroughfare, minneapolis, minnesota, united, states, consists, parallel, streets, marquette, second, avenues, downtown, area, each, public, streetway, contraflow, lanes, with, lanes, available, general, purpose, traffic. The Marq2 transit corridor is a north south thoroughfare in Minneapolis Minnesota United States It consists of the parallel streets of Marquette and Second avenues in the downtown area Each public streetway has two contraflow bus lanes with two lanes available for general purpose traffic in the opposite direction Vehicular transit flows south on Marquette Avenue and north on Second Avenue The inner curb lane allows buses to stop for riders while the second bus only lane allows buses to pass each other along the corridor Bus routes that operate on the corridor stop at every other block at an assigned gate with each route assigned a northbound and southbound gate Gates are assigned letters A B C or D on Marquette Avenue and E F G and H on Second Avenue Custom bus shelters are installed at each stop with heaters and real time transit information The corridor primarily serves express buses operated by all five public transit agencies in the Twin Cities 2 Marq2Stop Group C on the Marq2 transit corridor OverviewOperatorMetro TransitMaple Grove TransitMinnesota Valley Transit AuthorityPlymouth MetrolinkSouthWest TransitStatusOpenBegan serviceDecember 14 2009 1 RouteRoute typeBus rapid transitLocaleMinneapolis MinnesotaStartWashington AvenueEnd12th StreetRoute mapLegend Second AvenueMarquette Avenue Washington Avenue A B 3rd Street C D E 4th Street A H B G 5th Street Blue LineGreen Line at Nicollet Mall C F D E 6th Street A H B G 7th Street C Line to BCTC C F D E 8th Street C Line to Park A H B G 9th Street C F D E 10th Street A H G 11th Street C F E 12th Street Marq2 busway X Stop group METRO line Orange Line station all stopsaccessible This diagram viewtalkedit previous line system nav next line Transit has existed in the corridor since 1879 with the opening of steam railways which were eventually replaced by streetcars and then buses After both streets were converted to one way traffic a contraflow bus lane was installed in the 1970s Eventually the corridor s capacity became overwhelmed with the amount of buses so that operating conditions and speeds were severely impacted The city of Minneapolis proposed consolidating express bus traffic in the city in the corridor and secured funding to reconstruct the streets in 2007 The redesign added an additional bus lane increased space for pedestrians and improved waiting amenities for customers Upon opening in 2009 capacity for buses in the corridor was tripled which allowed most express bus service in downtown Minneapolis to be consolidated onto the two streets Operating speeds increased in the corridor and some trips took 10 fewer minutes to travel out of downtown The Metro Orange Line began using the corridor in 2021 when it began operation Contents 1 History 2 Capacity problems 3 Funding and construction 4 Operations since opening 5 Design 6 Stops and stations 7 References 8 External linksHistory editMarquette and Second avenues have been important to mass transit since its introduction to Minneapolis In May 1879 the Lyndale Railway Company opened the Motor Line along First Avenue now Marquette running from First Street near Minneapolis Union Depot to 13th Street where it continued south along Nicollet Avenue By the mid 1880s the steam trams operating the line became a nuisance downtown and the company now Minneapolis Lyndale amp Minnetonka Railway responded with several forms of experimental traction along First Avenue The company collaborated with Charles Van Depoele for trains to be towed by an electric locomotive between Washington Avenue and Sixth Street 3 There were three tests one in December 1885 and in January and February 1886 all of which proved to be unsatisfactory The electric locomotive experienced intense vibrations and other mechanical problems and current collection was unreliable Van Depoele personally invested 25 000 equivalent to 847 778 in 2023 to perfect the system 3 The railway then adopted an experimental soda motor where steam is generated by the addition of caustic soda to the boiler These locomotives also proved to be unreliable In 1887 Minneapolis passed an ordinance requiring the Motor Line to use cable or other source of power within city limits 3 Van Depoele s efforts had produced reliable electric traction but the Minneapolis Lyndale amp Minnetonka Railway was suffering financially and could not adapt to the ordinance This prompted the line to be leased to the Minneapolis Street Railway later Twin Cities Rapid Transit to operate the line and make the required improvements 3 First Avenue was electrified September 22 1890 and the Motor Line was dissolved into First Avenue South streetcar lines 4 Marquette and Second avenues became one way streets in the 1950s 5 The first express buses to use Interstate 35W used Marquette and Second avenues while running through downtown in 1972 6 Contraflow bus lanes debuted on the corridor on September 29 1974 7 Bus lanes were between 18 and 21 feet wide which is much wider than a standard 12 foot wide lane 5 North south bicycle traffic in Minneapolis began changing in the late 1990s when proposals to ban bicycles from Nicollet Mall emerged Bus drivers were concerned about unsafe conditions with sharing Nicollet Mall between bicycles and buses One proposal had one direction of bus traffic on Nicollet Mall removed and bus traffic in that direction diverted to Marquette Avenue The Minneapolis City Council was leaning towards separating north south bus traffic onto Nicollet and Marquette until Metro Transit offered to help pay for installing bike lanes on Marquette and Second avenues in exchange for banning bicycles from Nicollet Mall for at least portions of the week 8 Ultimately bike lanes were installed on Marquette and Second avenues in September 1998 and bicycles were banned from Nicollet Mall on weekdays from 6 a m to 6 p m 9 Capacity problems editThe amount of bus traffic on the pair of lanes eventually overwhelmed the corridor s capacity and hampered operations With bus stops on each block and only one bus travel lane many buses would make two stops on each block with one at the beginning and the other at the end of the block It regularly took buses two stoplight cycles to progress to the next block Attempts were made to improve the corridor s performance with mixed results that often had their own drawbacks Some bus routes were scheduled to travel in general purpose lanes heading south on Second Avenue South where buses heading south on the corridor would normally use Marquette Avenue Other bus routes were moved to other streets like Nicollet Mall but travel times on Nicollet Mall were even slower than on the corridor Faster travel times were available on nearby streets like Hennepin Avenue to the west or 3rd Avenue S to the east but both are further from downtown s central core 10 Minneapolis developed a transportation plan in 2006 that proposed adding a second bus lane to speed up bus travel by allowing buses to pass each other The 10 year transportation plan proposed concentrating all express buses serving the suburbs to use the Marquette and Second Avenue pair of streets While many express buses used Marquette and Second avenues some were still on Nicollet Mall 11 At the time there were also bike lanes on each street but the plan proposed that by removing the bike lanes and adding an additional bus lane capacity in the corridor would be tripled Wider sidewalks would also be added for riders waiting for the bus Bus speeds in the corridor were only around 5 miles per hour 8 0 km h at the time When the transportation plan was approved by the city council in 2007 it was estimated that changes could happen in five years at the earliest and only after the two streets were reconstructed with the goal of using a federal grant to help pay for the changes 12 Without the federal grant changes would happen in 2012 at the earliest instead of 2009 13 Funding and construction edit nbsp Marquette Avenue under construction in 2008 The federal government awarded the metropolitan region as well as four other cities funds in a program called the Urban Partnership Agreement in 2007 The 133 million grant would also fund other transit and roadway improvements like park and ride facilities and toll lanes along I 35W 14 Almost 30 cities had competed for the grants and the state of Minnesota matched the grant with 55 million of their own funding in June 2008 A planned opening of December 2009 was given for the bus lane improvements 15 The overall cost of the Marq2 portion of the Urban Partnership Agreement project cost was 32 million 1 Construction was planned to begin after the 2008 Republican National Convention in September 2008 16 The project was constructed on an accelerated timeline that took roughly half the time it would typically take Several techniques to ensure the accelerated construction timeline was successful were used including early coordination of utility relocation and bonuses for construction contractors 17 The work on Marquette and Second avenues had a required completion of December 31 2009 while other portions of the Urban Partnership Agreement project had later deadlines 15 By removing express buses from Nicollet Mall the mall was changed to allow bicycles at all times of day where previously bicycles were banned during peak periods The change to Nicollet Mall allowed the existing bicycle lanes on the Marquette and Second Avenue pair of streets to be removed 16 Bus traffic on Nicollet Mall was reduced by 35 percent with the move of buses to the Marq2 corridor which improved the experience for pedestrians and sidewalk cafe patrons on Nicollet Mall 18 19 The loss of bike facilities in the corridor concerned groups like the Minneapolis Bicycle Coalition which later became the transportation advocacy organization Our Streets Minneapolis 20 Along with allowing bicycles on Nicollet Mall all day bicycles are allowed in the corridor bus lanes during off peak periods 21 Bus travel times in the corridor were expected to improve by 5 10 minutes for each of the 1 400 weekday bus trips 22 Adding the second bus lane increased capacity from about 60 buses per hour to 180 buses per hour 23 The corridor consolidated around 80 percent of downtown transit service on the two streets 24 With 14 routes shifted from Nicollet Mall a total of 67 bus routes would utilize the corridor shortly after opening Metro Transit as well as the six suburban transit authorities including Southwest Transit and Minnesota Valley Transit Authority began using the corridor when it opened on December 14 2009 24 1 Operations since opening editWhile the target speed of buses in the corridor was 8 miles per hour 13 km h average speeds for buses in the corridor increased from 3 5 miles per hour 5 6 km h to 5 5 miles per hour 8 9 km h after the new lanes opened 25 Ridership also increased from 23 700 to 28 000 rides per weekday 10 The greatest improvement in speeds was on Second Avenue South in the morning rush hour where speeds increased by 74 percent Ridership in the I 35W south corridor increased by 9 percent between 2009 and 2011 and at least 85 percent of riders rated bus reliability and travel times as good or very good Around half of riders surveyed said the Marq2 project increased bus speeds and reliability Buses from I 94 West I 35W North I 35W South and I 394 all fed into the Marq2 lanes which made them the busiest transit corridor in downtown Minneapolis 26 The number of buses on the corridor increase by 52 percent in the afternoon rush hour 25 The addition of the heated shelters on Marq2 in combination with A Line heated shelters was identified in 2018 as a source of potential disparate impact and disproportionate burden for low income and minority riders This was because Marq2 riders are predominantly not low income or minority while other riders in the Metro Transit system that were more likely to be low income or minorities did not receive the same level of benefits These evaluations are required as part of Title VI of the Civil Rights Act of 1964 27 To maintain compliance with Title VI heated shelters were added on Nicollet Mall and other locations that serve more low income and minority riders 28 Utility work closed a portion of Marquette Avenue to buses in 2019 When buses were shifted to the general purpose lanes on Second Avenue severe congestion impacted the ability of buses to exit downtown and resulted in long delays of up to an hour 29 30 Southwest Transit officials wrote a letter to the city of Minneapolis requesting improved priority for buses which they felt were not being given priority by traffic control agents The city of Minneapolis insisted that buses were given priority and met with Southwest Transit Minnesota Valley Transportation Authority and Metro Transit officials to discuss the traffic congestion and transit 31 Minneapolis adjusted signal light timing and parking meters to improve conditions for transit Minnesota Valley Transportation Authority eventually temporarily detoured several bus routes off of the transit only lanes on Marquette to 4th and 3rd Avenues South in an effort to improve travel times 32 While the first real time information signs used cellular connections to receive data upgrades on 36 signs in the corridor were replaced with signs that have fiber optic connections in 2021 The change was partially done to improve reliability of the signs as sign unreliability was a frequent customer complaint 33 The Metro Orange Line was designed around using the corridor and during planning stages project staff identified several possibilities on connecting I 35W to the Marq2 lanes 34 The final design included a transit only ramp from I 35W to 12th Street where buses could either travel eastbound using general purpose lanes to the 12th Street Ramp on the E ZPass lanes or travel westbound from the ramp to a bus only contraflow lane connecting to Marq2 35 36 The Orange Line began using the Marq2 transit lanes on December 4 2021 when the line began service Most intersections along the corridor allow for transit signal priority for Orange Line buses 37 Design edit nbsp View of contraflow lanes from above at Fifth Street where the Blue and Green Lines operate The designed project covers 24 blocks 38 The design was partially inspired by the Portland Transit Mall 23 10 Each roadway contains four lanes two in either direction Buses travel southbound on Marquette Avenue and northbound on Second Avenue with general traffic operating the opposite direction in the other lanes Each stop can accommodate two buses with there being two stops per block The inner lane allows buses to pass stopped buses 39 Marquette and Second avenues are 80 feet 24 m wide from building width to building width The total width of the paved street is 49 feet 15 m with 21 feet 6 4 m dedicated to pedestrian and streetscape uses 39 Initially the construction design called for a concrete roadway for buses and asphalt for general purpose traffic in the other direction but an all concrete roadway surface was close enough in cost that an all concrete roadway was built The previous road surface was recycled and used as a base with 9 inches 23 cm of reinforced concrete place on top The curing process for the roadway took two to three days The concrete roadway stands in contrast to the mostly asphalt streets within the rest of downtown 40 The curbside bus lane is 11 feet 3 4 m feet wide while the second passing lane is 13 feet 4 0 m feet wide 39 As part of pedestrian and streetscape improvements 200 trees were added to the corridor The trees were held in structural cells designed to allow for tree growth and the cells were covered with 15 000 square feet 1 400 m2 of porous pavers to allow for some storm water retention 40 Buried underground were 11 000 plastic cells that look like milk crates The cells are filled with soil which prevents soil compaction but still allows for excess water to leave the system Up to 21 000 cubic feet 590 m3 of storm water is diverted from the sewer system after a rainstorm The system also helps increase the lifespan of street trees which are otherwise frequently replaced after only five to seven years 41 With an average of 588 cubic feet 16 7 m3 of soil dedicated for each tree each tree pit captures water from an average surface area of 300 square feet 28 m2 The overall cost of the system was about 8 038 per tree 42 43 After seven years many of the trees were no longer looking as healthy as when they were planted The manufacturer of the cell system conducted a study to see why the trees were struggling and blamed trees planted at an improper depth and tree root girdling as the primary reasons for the decline 44 Stops and stations editStops along the corridor are organized by gates with buses stopping every other block at their designated gate Gates on Marquette Avenue are lettered A B C and D and gates on Second Avenue are lettered E F G and H 2 Orange Line buses stop at most C and F gates which are enhanced with pylon markers additional security and real time departures and off board fare collection 37 Bus stops at each gate are 135 feet 41 m long Gates are spaced 40 feet 12 m apart 39 Custom transit shelters were installed at opening and sidewalks on the bus stop side of the street are three feet 0 91 m wider than on the other side 38 39 The average annual maintenance costs for each shelter was 5 038 in 2016 45 References edit a b c Foti Jim December 13 2009 Making Time Downtown Star Tribune pp B1 B7 Retrieved November 4 2021 a b Marquette and 2nd Avenues metrotransit org Metro Transit Retrieved January 21 2022 a b c d Diers John W Isaacs Aaron 2007 Twin Cities by Trolley The Streetcar Era in Minneapolis and St Paul Minneapolis University of Minnesota Press pp 28 29 ISBN 978 0 8166 4358 5 Russell Olson L 1976 The Electric Railways of Minnesota Hopkins Minnesota Minnesota Transportation Museum pp 31 142 a b Wascoe Jr Dan October 1 1974 It s laughs and curses on first day of city s wrong way bus lanes The Minneapolis Tribune p 1B 5B Retrieved February 2 2022 via Newspapers com Wascoe Jr Dan December 12 1972 New express buses plentiful but riders few The Minneapolis Tribune p 1A 4A Retrieved November 1 2021 via Newspapers com Wrong way Buses The right idea for Marquette and 2nd Avenues The Minneapolis Tribune September 27 1974 Retrieved February 2 2022 via Newspapers com Brandt Steve August 15 1997 Bike bus division of mall is latest proposal The Star Tribune p B1 B8 Retrieved February 2 2022 via Newspapers com Blake Laurie October 8 1998 On street traffic directors help motorists navigate downtown bike lanes The Star Tribune p B2 Retrieved February 2 2022 via Newspapers com a b c Isaacs Aaron January 9 2012 A Transit Improvement Marq2 Bus Lanes Transit for Livable Communities Minnesota Transit for Livable Communities Retrieved February 2 2022 Blake Laurie November 17 2006 Makeover proposed for downtown Star Tribune pp B1 B7 Retrieved November 3 2021 Brandt Steve June 30 2007 Fewer cars more bikes in Minneapolis future Star Tribune p B3 Retrieved November 3 2021 Brandt Steve July 31 2007 Goal of free downtown shuttle service in sight Star Tribune pp B1 B3 Retrieved November 3 2021 Foti Jim August 15 2007 133 million is coming our way to relieve congestion Star Tribune pp A1 A7 Retrieved November 3 2021 a b Foti Jim June 13 2008 State gets federal aid for measures to ease traffic congestion Star Tribune p B5 Retrieved November 4 2021 a b Berg Steve July 16 2008 Redo for two streets First the mess then maybe the magic MinnPost Retrieved January 22 2022 Feats of Engineering Marquette Second Avenue South Transit Projects Finance amp Commerce Finance amp Commerce American Council of Engineering Companies of June 7 2011 Retrieved February 21 2022 Walsh Paul August 5 2008 Minneapolis begins project to upgrade transit functions Star Tribune p B4 Retrieved November 4 2021 Walsh Paul March 24 2009 As Marquette Av gets new look two blocks close down Star Tribune p B3 Retrieved November 4 2021 Cole Karlie December 11 2009 MARQ2 Leaves Cyclists with Few Downtown Routes Our Streets Minneapolis Retrieved February 2 2022 Access Minneapolis Update PDF City of Minneapolis April 5 2016 Retrieved February 2 2022 Foti Jim September 27 2009 Transportation Transformation Star Tribune pp B1 B2 Retrieved November 4 2021 a b Walker Jarrett November 23 2009 Minneapolis Unlocking Downtown with Transit Malls Human Transit Retrieved January 22 2022 a b Berg Steve November 23 2009 Three big changes make downtown Minneapolis a better place MinnPost Retrieved January 22 2022 a b Urban Partnership Agreement Minnesota Evaluation Report PDF U S Department of Transportation January 4 2013 Retrieved February 3 2022 Integrating Transit with Congestion Pricing A Review of the Miami and Minneapolis UPAs PDF FHWA Webinar Series FHWA October 27 2011 Retrieved February 2 2022 2018 Service and Facilities Standards Monitoring In Compliance with FTA Circular 4702 1B PDF SRF Consulting on behalf of Metro Transit October 2018 pp iii v 36 Retrieved January 1 2023 Harper Cyndi October 8 2018 Title VI Review Service and Facility Standards Monitoring Study Metro Transit Retrieved February 2 2022 Commuters Struggling With Construction In Downtown Minneapolis WCCO TV June 19 2019 Retrieved February 3 2022 Hoffland Brett June 20 2019 Traffic relief coming for buses navigating through downtown Minneapolis construction zone KSTP TV Retrieved February 3 2022 Harlow Tim June 20 2019 After downtown delays SouthWest Transit tells Minneapolis mayor buses need priority Star Tribune Retrieved February 3 2022 Moore Janet July 3 2019 Downtown Minnesota Valley Transit Authority bus routes stops will change due to congestion Star Tribune Retrieved February 3 2022 Harlow Tim January 4 2021 New bus stop signs promise better info Star Tribune p A5 METRO Orange Line Bus Rapid Transit Project Plan Update Metro Transit June 2014 Retrieved February 2 2022 Bitters Janice November 7 2016 Minneapolis OKs new downtown transit ramp Finance amp Commerce Retrieved February 3 2022 12th Street Ramp Metro Transit www metrotransit org Retrieved February 3 2022 a b Moore Janet December 4 2021 Orange Line BRT debuts along Interstate 35W linking Burnsville and Minneapolis Star Tribune Retrieved February 3 2022 a b Twin Cities Transit System 2009 Performance Evaluation Metropolitan Council March 2010 p 84 Retrieved February 2 2022 a b c d e Marquette amp 2nd Avenues Minneapolis MN Urban Street Design Guide National Association of City Transportation Officials Retrieved February 2 2022 a b Roberts Kris January 2010 Leafy gray approach Roads amp Bridges 48 1 48 50 ISSN 8750 9229 Millard Elizabeth Spring 2014 Long term payoffs with permeables Interlock Design 21 2 8 11 Retrieved February 2 2022 Tree trenches and tree boxes combined Minnesota Stormwater Manual stormwater pca state mn us Minnesota Pollution Control Agency Retrieved February 21 2022 Marq2 Structural Cells with Trees for Stormwater PDF www asla org American Society of Landscape Architects Retrieved February 22 2022 Marritz Leda June 12 2017 Revisiting the street trees of Marquette and 2nd DeepRoot Blog DeepRoot Green Infrastructure Retrieved February 3 2022 Canser Pierce July 15 2016 05343 Downtown St Paul 5th 6th Street Customer Facility Improvements Metropolitan Council Retrieved February 2 2022 External links editMetro Transit Marquette and Second Avenues Retrieved from https en wikipedia org w index php title Marq2 transit corridor amp oldid 1170362279, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.