fbpx
Wikipedia

MK Fintel Wind

MK Fintel Wind is a Serbian renewable energy company. It is a joint venture between MK Group and the Italian Fintel Energia Group.

MK Fintel Wind
Company typeJoint-stock company
IndustryElectric utility
Founded6 March 2008; 16 years ago (2008-03-06)
Headquarters,
Area served
Serbia
Key people
Tiziano Giovannetti (General director)
OwnerFintel Energia Group S.p.A. (54.00%)
MK Group (46.00%)
Footnotes / references
Business ID: 20392126
Tax ID: 105512758

History edit

MK Fintel Wind was established on 6 March 2008.

The company was the first to build and operate wind farms in Serbia.[1][2] As of September 2016, the company had two wind farms in Serbia ("Kula" and "La Piccolina"), with 16.5 MW of installed capacity.[3][4]

In February 2018, MK Fintel Wind announced that it has signed an 81.5 million euros loan to finish the first phase of the construction of Košava wind farm, located near the city of Vršac.[5][6] On September 23, 2019, "Košava 1" wind farm with capacity of 69 MW was opened; it was company's third opened wind farm in Serbia.[4]

See also edit

References edit

  1. ^ "Serbia installs first wind project". Wind Power Monthly.
  2. ^ "Serbia's first wind park launched at Kula". Balkan Green Energy News.
  3. ^ "MK Fintel Wind to complete works on 6.6 MW wind park in Serbia by end-Aug". SeeNews Renewables.
  4. ^ a b "Kompanija MK Fintel Wind pustila u rad vetropark "Košava" kod Vršca". n1info.com (in Serbian). Beta. 24 September 2019. Retrieved 28 September 2019.
  5. ^ "MK Fintel Wind agrees 81.5 mln euro loan for Kosava wind farm". renewablesnow.com. 27 February 2018. Retrieved 17 March 2018.
  6. ^ "MK Fintel Wind obezbedio 81,5 miliona evra kredita za nastavak gradnje vetroelektrane kod Vršca". seebiz.eu (in Serbian). Beta. 27 February 2018. Retrieved 17 March 2018.

fintel, wind, serbian, renewable, energy, company, joint, venture, between, group, italian, fintel, energia, group, company, typejoint, stock, companyindustryelectric, utilityfounded6, march, 2008, years, 2008, headquartersbelgrade, serbiaarea, servedserbiakey. MK Fintel Wind is a Serbian renewable energy company It is a joint venture between MK Group and the Italian Fintel Energia Group MK Fintel WindCompany typeJoint stock companyIndustryElectric utilityFounded6 March 2008 16 years ago 2008 03 06 HeadquartersBelgrade SerbiaArea servedSerbiaKey peopleTiziano Giovannetti General director OwnerFintel Energia Group S p A 54 00 MK Group 46 00 Footnotes referencesBusiness ID 20392126Tax ID 105512758History editMK Fintel Wind was established on 6 March 2008 The company was the first to build and operate wind farms in Serbia 1 2 As of September 2016 the company had two wind farms in Serbia Kula and La Piccolina with 16 5 MW of installed capacity 3 4 In February 2018 MK Fintel Wind announced that it has signed an 81 5 million euros loan to finish the first phase of the construction of Kosava wind farm located near the city of Vrsac 5 6 On September 23 2019 Kosava 1 wind farm with capacity of 69 MW was opened it was company s third opened wind farm in Serbia 4 See also editEnergy in SerbiaReferences edit Serbia installs first wind project Wind Power Monthly Serbia s first wind park launched at Kula Balkan Green Energy News MK Fintel Wind to complete works on 6 6 MW wind park in Serbia by end Aug SeeNews Renewables a b Kompanija MK Fintel Wind pustila u rad vetropark Kosava kod Vrsca n1info com in Serbian Beta 24 September 2019 Retrieved 28 September 2019 MK Fintel Wind agrees 81 5 mln euro loan for Kosava wind farm renewablesnow com 27 February 2018 Retrieved 17 March 2018 MK Fintel Wind obezbedio 81 5 miliona evra kredita za nastavak gradnje vetroelektrane kod Vrsca seebiz eu in Serbian Beta 27 February 2018 Retrieved 17 March 2018 Retrieved from https en wikipedia org w index php title MK Fintel Wind amp oldid 1056857135, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.