fbpx
Wikipedia

Line 2 (Changchun Rail Transit)

Line 2 of the Changchun Rail Transit (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun.

Line 2
Line 2 train departing from Jiefang Ave. Station
Overview
StatusOperational
OwnerChangchun
LocaleChangchun, Jilin, China
Termini
  • Qiche Gongyuan
  • Dongfang Square
Stations21
Service
TypeRapid transit
SystemChangchun Rail Transit
Services1
Operator(s)Changchun Rail Transit Corporation
History
Opened30 August 2018; 5 years ago (2018-08-30)
Technical
Line length24.9 km (15.47 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

History edit

Phase 1 edit

Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.[2]

Western extension edit

The western extension to Qiche Gongyuan opened on 8 October 2021.[1] The extension is 4.36 km in length.[3]

Opening timeline edit

Segment Commencement Length Station(s) Name
Shuangfeng — Dongfang Square 30 August 2018 20.5 km (12.74 mi)[2] 18 Phase 1
Shuangfeng — Qiche Gongyuan 8 October 2021[1] 4.36 km (2.71 mi)[3] 3 Western extension

Service routes edit

  • Qiche Gongyuan — Dongfang Square

Stations edit

Station name Connections Distance
km
Location
English Chinese
Qiche Gongyuan 汽车公园 Luyuan
Jieda Avenue 捷达大路
West Lake 西湖
Shuangfeng 双丰 2.18 2.18
Changchun West Railway Station 长春西站  CJ ~ JH    Trams 55   CRT 1.52 3.70
Xinglongpu 兴隆堡 2.09 5.79
West Ring Road 西环城路 1.41 7.20
Heping Street 和平大街 1.14 8.34
Wanfu Street 万福街   Trams 54 0.82 9.16
Jingyang Square 景阳广场 0.86 10.02
Jiefang Overpass 解放桥  3  1.07 11.09 Luyuan / Chaoyang
Jianshe Square 建设广场 0.80 11.89 Chaoyang
Wenhua Square 文化广场 0.75 12.64
Jiefang Avenue 解放大路  1  1.36 14.00 Chaoyang / Nanguan
Pingyang Street 平阳街 0.78 14.78 Nanguan
Nanguan 南关 1.12 15.90
Jilin Avenue 吉林大路  4  1.31 17.21 Erdao
Dongsheng Street 东盛大街 0.99 18.20
East Ring Road 东环城路 1.46 19.66
Changqing 长青 1.27 20.93 Erdao / Nanguan
Dongfang Square 东方广场 1.38 22.31 Erdao

Future Development edit

Eastern extension

An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.[4] It's scheduled to open in 2025.

References edit

  1. ^ a b c 10月8日8时 长春轨道交通2号线西延线将开通运营. 新浪吉林 (in Chinese). 2021-10-07. from the original on 2021-10-07. Retrieved 2021-11-28. 2号线运营里程增长4.4公里,达到24.9公里
  2. ^ a b 长春地铁进入换乘时代 2号线8月30日通车. 新华网吉林 (in Chinese). 2018-08-30. from the original on 2019-10-07. Retrieved 2019-10-07.
  3. ^ a b 长春地铁2号线西延线预计今年年末开通. 中国新闻网 (in Chinese). 2021-04-07. from the original on 2021-08-08. Retrieved 2021-08-08. 线路全长4.36km,共设车站3座,均为地下站
  4. ^ 长春地铁2号线东延工程项目正式开工. Sohu 搜狐 (in Chinese). 2019-11-27. from the original on 2021-02-04. Retrieved 2019-11-27.

line, changchun, rail, transit, line, changchun, rail, transit, chinese, 长春轨道交通2号线, pinyin, chángchūn, guǐdào, jiāotōng, hào, xiàn, rapid, transit, line, running, from, west, east, changchun, line, 2line, train, departing, from, jiefang, stationoverviewstatuso. Line 2 of the Changchun Rail Transit Chinese 长春轨道交通2号线 pinyin Changchun Guǐdao Jiaotōng Er Hao Xian is a rapid transit line running from west to east Changchun Line 2Line 2 train departing from Jiefang Ave StationOverviewStatusOperationalOwnerChangchunLocaleChangchun Jilin ChinaTerminiQiche GongyuanDongfang SquareStations21ServiceTypeRapid transitSystemChangchun Rail TransitServices1Operator s Changchun Rail Transit CorporationHistoryOpened30 August 2018 5 years ago 2018 08 30 TechnicalLine length24 9 km 15 47 mi 1 Number of tracks2CharacterUndergroundTrack gauge1 435 mm 4 ft 8 1 2 in Contents 1 History 1 1 Phase 1 1 2 Western extension 2 Opening timeline 3 Service routes 4 Stations 5 Future Development 6 ReferencesHistory editPhase 1 edit Phase 1 of Line 2 started operation on 30 August 2018 It is 20 5 km long with 18 stations 2 Western extension edit The western extension to Qiche Gongyuan opened on 8 October 2021 1 The extension is 4 36 km in length 3 Opening timeline editSegment Commencement Length Station s NameShuangfeng Dongfang Square 30 August 2018 20 5 km 12 74 mi 2 18 Phase 1Shuangfeng Qiche Gongyuan 8 October 2021 1 4 36 km 2 71 mi 3 3 Western extensionService routes editQiche Gongyuan Dongfang SquareStations editStation name Connections Distancekm LocationEnglish ChineseQiche Gongyuan 汽车公园 LuyuanJieda Avenue 捷达大路West Lake 西湖Shuangfeng 双丰 2 18 2 18Changchun West Railway Station 长春西站 CJ JH nbsp Trams 55 nbsp CRT 1 52 3 70Xinglongpu 兴隆堡 2 09 5 79West Ring Road 西环城路 1 41 7 20Heping Street 和平大街 1 14 8 34Wanfu Street 万福街 nbsp Trams 54 0 82 9 16Jingyang Square 景阳广场 0 86 10 02Jiefang Overpass 解放桥 3 1 07 11 09 Luyuan ChaoyangJianshe Square 建设广场 0 80 11 89 ChaoyangWenhua Square 文化广场 0 75 12 64Jiefang Avenue 解放大路 1 1 36 14 00 Chaoyang NanguanPingyang Street 平阳街 0 78 14 78 NanguanNanguan 南关 1 12 15 90Jilin Avenue 吉林大路 4 1 31 17 21 ErdaoDongsheng Street 东盛大街 0 99 18 20East Ring Road 东环城路 1 46 19 66Changqing 长青 1 27 20 93 Erdao NanguanDongfang Square 东方广场 1 38 22 31 ErdaoFuture Development editEastern extensionAn eastern extension to Zhaojiagang East is under construction The extension is 10 607 km in length 4 It s scheduled to open in 2025 References edit a b c 10月8日8时 长春轨道交通2号线西延线将开通运营 新浪吉林 in Chinese 2021 10 07 Archived from the original on 2021 10 07 Retrieved 2021 11 28 2号线运营里程增长4 4公里 达到24 9公里 a b 长春地铁进入换乘时代 2号线8月30日通车 新华网吉林 in Chinese 2018 08 30 Archived from the original on 2019 10 07 Retrieved 2019 10 07 a b 长春地铁2号线西延线预计今年年末开通 中国新闻网 in Chinese 2021 04 07 Archived from the original on 2021 08 08 Retrieved 2021 08 08 线路全长4 36km 共设车站3座 均为地下站 长春地铁2号线东延工程项目正式开工 Sohu 搜狐 in Chinese 2019 11 27 Archived from the original on 2021 02 04 Retrieved 2019 11 27 Retrieved from https en wikipedia org w index php title Line 2 Changchun Rail Transit amp oldid 1170588504, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.