Keppel MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line, located in Bukit Merah planning area, Singapore. This station is part of Stage 6 of the Circle line (CCL6) which will "close the circle" between the HarbourFront and Marina Bay stations. The station will be located along Keppel Road, near to the Keppel Harbour. Slated for completion by 2026, Keppel station will serve the upcoming Greater Southern Waterfront.

 CC30 
Keppel
吉宝
கெப்பல்
Future Mass Rapid Transit (MRT) station
Construction site of Keppel station in 2020
General information
Location51 Keppel Road
Singapore 099423[1]
Coordinates1°16′12″N 103°49′52″E / 1.2701°N 103.8310°E / 1.2701; 103.8310
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeUnderground
Platform levels1
ParkingNo
Bicycle facilitiesYes
AccessibleYes
History
Opening2026; 3 years' time (2026)
ElectrifiedYes
Previous namesKeppel Harbour, Keppel Port[2]
Services
Preceding station Mass Rapid Transit Following station
HarbourFront
Clockwise / outer
Circle Line
Future service
Cantonment
Anticlockwise / inner
Location
Keppel
Keppel station in Singapore

First announced in 2015, construction of the station began in 2017. The station was to be opened in 2025 along with the other CCL6 stations, but was delayed to 2026 due to the COVID-19 pandemic in Singapore.[3]

History edit

On 29 October 2015, the station was first officially announced as part of the Stage 6 of the Circle line.[4] Contract 882 for the construction of Keppel station and associated tunnels was awarded China State Construction Engineering Corporation Limited (Singapore Branch) and Nishimatsu Construction Co. Ltd. Joint Venture (JV) at a sum of S$313.8 million (US$227.24 million) in September 2017. Construction began at the end of 2017, with expected completion in 2026.[5][6][7]

On 25 July 2019, tunnelling works for the CCL6 started with the launch of the Tunnel Boring Machine at Keppel station. The TBM will tunnel from Keppel to the existing CCL HarbourFront station.[8]

Station details edit

Location edit

Situated along Keppel Road, the station will serve the Downtown Core and Keppel Distripark.[9][10]

Design edit

The station will have a unique landscape theme; an undulating green roof (with tree-like columns) in a natural setting. It was planned to have an underground bicycle park, providing cyclists direct access to the concourse.[10] The size of the two-level station will be 250 metres (820 ft) by 43 metres (141 ft) by 22 metres (72 ft).[11]

References edit

  1. ^ "Keppel (CC30) - (MRT Station) - 51 Keppel Road (S)099423". streetdirectory.com. 31 October 2020. Retrieved 31 October 2020.
  2. ^ "LTA | News Room | News Releases | Vote for Names of Circle Line 6 Stations". www.lta.gov.sg. from the original on 15 July 2020. Retrieved 15 July 2020.
  3. ^ "Speech by Minister For Transport Mr Ong Ye Kung at MOT Committee of Supply Debate 2021 on A Tale of Three Connections". www.mot.gov.sg. Retrieved 8 March 2021.
  4. ^ "News Room - News Releases - Joint Release by the Land Transport Authority (LTA) & SLA - Circle Line 6 – Becoming A Full Circle". LTA. 29 October 2015. from the original on 15 May 2020. Retrieved 30 October 2020.
  5. ^ . 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
  6. ^ . 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
  7. ^ . Archived from the original on 20 September 2019. Retrieved 20 September 2019.
  8. ^ "News Room - News Releases - Joint News Release by the Land Transport Authority (LTA) & SMRT - Upgrading the Circle Line in Preparation for Circle Line 6". LTA. 25 July 2019. from the original on 31 October 2020. Retrieved 31 October 2020.
  9. ^ "Circle Line: Closing The Loop. Opening New Opportunities". Keppel Land. 25 September 2009. from the original on 31 October 2020. Retrieved 31 October 2020.
  10. ^ a b Hetty Musfirah Abdul Khamid (29 October 2015). "With final 3 stations, Circle Line will come 'full circle' by 2025". Channel NewsAsia. from the original on 9 August 2016. Retrieved 18 June 2016.
  11. ^ C882 Keppel Station and Tunnels (Infographic at CCL6 Project Information Centre). Singapore: Land Transport Authority (LTA). 2020.

External links edit

  •   Media related to Keppel MRT Station at Wikimedia Commons

keppel, station, future, underground, mass, rapid, transit, station, circle, line, located, bukit, merah, planning, area, singapore, this, station, part, stage, circle, line, ccl6, which, will, close, circle, between, harbourfront, marina, stations, station, w. Keppel MRT station is a future underground Mass Rapid Transit MRT station on the Circle line located in Bukit Merah planning area Singapore This station is part of Stage 6 of the Circle line CCL6 which will close the circle between the HarbourFront and Marina Bay stations The station will be located along Keppel Road near to the Keppel Harbour Slated for completion by 2026 Keppel station will serve the upcoming Greater Southern Waterfront CC30 Keppel吉宝 க ப பல Future Mass Rapid Transit MRT stationConstruction site of Keppel station in 2020General informationLocation51 Keppel RoadSingapore 099423 1 Coordinates1 16 12 N 103 49 52 E 1 2701 N 103 8310 E 1 2701 103 8310Operated bySMRT Trains Ltd SMRT Corporation Line s Circle LinePlatforms2 1 island platform Tracks2ConnectionsBus TaxiConstructionStructure typeUndergroundPlatform levels1ParkingNoBicycle facilitiesYesAccessibleYesHistoryOpening2026 3 years time 2026 ElectrifiedYesPrevious namesKeppel Harbour Keppel Port 2 ServicesPreceding station Mass Rapid Transit Following stationHarbourFrontClockwise outer Circle LineFuture service CantonmentAnticlockwise innerLocationKeppelKeppel station in SingaporeFirst announced in 2015 construction of the station began in 2017 The station was to be opened in 2025 along with the other CCL6 stations but was delayed to 2026 due to the COVID 19 pandemic in Singapore 3 Contents 1 History 2 Station details 2 1 Location 2 2 Design 3 References 4 External linksHistory editOn 29 October 2015 the station was first officially announced as part of the Stage 6 of the Circle line 4 Contract 882 for the construction of Keppel station and associated tunnels was awarded China State Construction Engineering Corporation Limited Singapore Branch and Nishimatsu Construction Co Ltd Joint Venture JV at a sum of S 313 8 million US 227 24 million in September 2017 Construction began at the end of 2017 with expected completion in 2026 5 6 7 On 25 July 2019 tunnelling works for the CCL6 started with the launch of the Tunnel Boring Machine at Keppel station The TBM will tunnel from Keppel to the existing CCL HarbourFront station 8 Station details editLocation edit Situated along Keppel Road the station will serve the Downtown Core and Keppel Distripark 9 10 Design edit The station will have a unique landscape theme an undulating green roof with tree like columns in a natural setting It was planned to have an underground bicycle park providing cyclists direct access to the concourse 10 The size of the two level station will be 250 metres 820 ft by 43 metres 141 ft by 22 metres 72 ft 11 References edit Keppel CC30 MRT Station 51 Keppel Road S 099423 streetdirectory com 31 October 2020 Retrieved 31 October 2020 LTA News Room News Releases Vote for Names of Circle Line 6 Stations www lta gov sg Archived from the original on 15 July 2020 Retrieved 15 July 2020 Speech by Minister For Transport Mr Ong Ye Kung at MOT Committee of Supply Debate 2021 on A Tale of Three Connections www mot gov sg Retrieved 8 March 2021 News Room News Releases Joint Release by the Land Transport Authority LTA amp SLA Circle Line 6 Becoming A Full Circle LTA 29 October 2015 Archived from the original on 15 May 2020 Retrieved 30 October 2020 LTA News Room News Releases LTA Awards First Three Civil Contracts for Circle Line 6 5 March 2020 Archived from the original on 5 March 2020 Retrieved 5 March 2020 First Circle Line 6 contracts worth S 1 75b awarded by LTA CNA 5 March 2020 Archived from the original on 5 March 2020 Retrieved 5 March 2020 Circle Line 6 Archived from the original on 20 September 2019 Retrieved 20 September 2019 News Room News Releases Joint News Release by the Land Transport Authority LTA amp SMRT Upgrading the Circle Line in Preparation for Circle Line 6 LTA 25 July 2019 Archived from the original on 31 October 2020 Retrieved 31 October 2020 Circle Line Closing The Loop Opening New Opportunities Keppel Land 25 September 2009 Archived from the original on 31 October 2020 Retrieved 31 October 2020 a b Hetty Musfirah Abdul Khamid 29 October 2015 With final 3 stations Circle Line will come full circle by 2025 Channel NewsAsia Archived from the original on 9 August 2016 Retrieved 18 June 2016 C882 Keppel Station and Tunnels Infographic at CCL6 Project Information Centre Singapore Land Transport Authority LTA 2020 External links edit nbsp Media related to Keppel MRT Station at Wikimedia Commons Retrieved from https en wikipedia org w index php title Keppel MRT station amp oldid 1171451652, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.